NBS Source

Buckingham Green - London

by EFFISUS

Developed as three separate buildings, the existing tower is being refurbished as high quality apartments with offices and retail, whilst the podium is being replaced with new offices and roof garden. With a fully glazed lobby, a reduced and rationalized core cased in luscious marble and innovative dark bronze-cased windows which sit in the steel frame. The building will be 80% more energy efficient when complete. Effisus Ecofacade Pre-fab Profiles were used to seal façade connections – not only to protect the building from water damage, but also to improve building airtightness and energy efficiency.

Products featured in this case study

View all products (9)
Effisus Ecofacade Pre-Fab System

Effisus Ecofacade Pre-Fab System

More case studies from EFFISUS

View all case studies(46)
SSE Hydro Arena

SSE Hydro Arena

Southbank Place

Southbank Place

Redmond Building (University of Liverpool)

Redmond Building (University of Liverpool)

Birmingham New Street Station

Birmingham New Street Station