BATTERSEA POWER STATION

OVERVIEW

Standing derelict on the south bank of the River Thames, Battersea Power Station renowned for its four chimneys and art deco design is undergoing a massive phased transformation in a multi-billion redevelopment programme.


A ComFlor® composite floor system throughout was chosen for a number of reasons including its ability to provide a solution that is strong and robust and one that was capable of achieving the load and long span requirements. It has a low floor self-weight, obtains good load optimisation and offers fast build times.


Prodeck Fixing installed over 135,000m2 of our ComFlor® floor decks on this project which will support the flooring system for the whole project using a mix of ComFlor® profiles

Products featured in this case study

View all products (17)
ComFlor® - Floor and deck structure systems

ComFlor® - Floor and deck structure systems

More case studies from Tata Steel

View all case studies (28)
Foodmate Industrial buildings

Foodmate Industrial buildings

The Goldsmith Avenue

The Goldsmith Avenue

NEW ORKNEY HOSPITAL

NEW ORKNEY HOSPITAL

MAPLEFIELDS SCHOOL

MAPLEFIELDS SCHOOL

More case studies from Composite concrete deck systems

View all case studies (1)
Burj Khalifa

Burj Khalifa