High early strength concrete for hydro electric power station

by Tarmac

Dawnus Civil Engineering were commissioned by Cardiff CC to construct a hydro electric power station at Radyr Weir. The £2.6m scheme comprised of damming the section of works from the River Taff and constructing the structure to house the Archimedes turbine screws. They required a concrete that could take the weight of the screws 3 days after pouring and asked for a 3 day strength of 50N.


Tarmac suggested TOPROC ED which is a high performance readymixed concrete suitable for use in industrial, commercial and infrastructure construction where high early strength is required.

Products featured in this case study

View all products (26)
Toproc

Toproc

More case studies from Tarmac

View all case studies(38)
Tarmac Ultifastpave car park surface

Tarmac Ultifastpave car park surface

Tarmac Ulticolour - coloured asphalt for tourist venue

Tarmac Ulticolour - coloured asphalt for tourist venue

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour asphalt Modern Housing Develeopment, Salford

Ulticolour coloured asphalt, busy tourist develeopment

Ulticolour coloured asphalt, busy tourist develeopment