You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
Invisible-fix system used for decking and cladding in London residential upgrade.
55 m2 of Grad Thermo Ash 120mm deck boards have been used to great effect by the architects in the modernisation of this semi-detached property for decking, horizontal and vertical cladding, and fencing.
At the back of the building, the living space has been extended by the addition of a garden room, joined together by a deck which runs the length of the garden between the two buildings. Both the main house and the garden room feature a wrap-around canopy and deck.
At the front of the property, the extension and entrance porch have been clad in the same material.
All of these elements have been seamlessly finished using the invisible-fix system, Grad, in Thermo Ash using the same width board throughout.
Hidden-fix Decking System - Grad - Decking System
Hidden-fix Cladding System - Grad - Hidden-fix Cladding System
Kew Bridge, London
Battersea Power Station, London
White City Place, London
One Tower Bridge, London
A three-in-one adjustable pedestal for paving and decking
Ceramic tile rail substructure system
Brewhouse Balcony Remediation
The Terrace | Lee Valley
Canadian Western Red Cedar Timber Cladding Private House Case Study
VTX Pigmented Redwood Timber Fins - Sadlers Mead Car Park Case Study
Manhattan Loft Gardens, London - Western Red Cedar Cladding
Newmarket Racecourse