GRP Rail Station Platform - Hybrid Install | Case Study
Robroyston station features two brand new platforms constructed using the Dura Composites recommended hybrid GRP and steel solution which is designed to meet the requirements of Network Rail standard NR/L3/CIV/030 and combines the strength of a steel foundation with a Glass Reinforced Polymer (GRP) Dura Platform surface. The platform surface has incredible durability and anti-slip properties which is shown to reduce by only 5% after a million footfalls (tested to BS 7976-2:2002+A1:2013).
AmcoGiffen were responsible for delivering the design and build works for the development, with funding for the station coming from Glasgow City Council, Network Rail and the Strathclyde Partnership for Transport.
In choosing the GRP/Steel system from Dura Composites, the platform installation for the project (using GRP Dura Platform and steel trestles) has been able to take place largely while the line is open, minimising the impact on customers using the line.
Dura Platform 40 - GRP Rail Station Platform Panels
West Ham Stadium, London
The Lock, Greenford Quay, West London
Offshore Technician Training Facility, Grimsby
Composite Decking Garden Transformation, Essex
West Ham Stadium, London
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside