NBS Source
I'm a manufacturer

Blackwall Reach

OVERVIEW

Phase 1b is a partnership between the London Borough of Tower Hamlets and Swan Housing Association. Station Square (Phase 1b) delivered 242 new homes built in three blocks – two at 10 storeys and one of 24 storeys, together with commercial space at ground floor level. The development created a link between the Station and the wider Blackwall Reach masterplan to the North. This phase also includes significant public realm improvements with the creation of a new square around Blackwall DLR station.

Products featured in this case study

View all products (7)
Stofix Brick Slip Cladding Panels - English Bond

Stofix Brick Slip Cladding Panels - English Bond

Stofix Brick Slip Cladding Panels - Vertical Stretcher

Stofix Brick Slip Cladding Panels - Vertical Stretcher

Stofix Brick Slip Cladding Panels - Stack Soldier Course

Stofix Brick Slip Cladding Panels - Stack Soldier Course

Stofix Brick Slip Cladding Panels - Soldier Course

Stofix Brick Slip Cladding Panels - Soldier Course

Stofix Brick Slip Cladding Panels - Stretcher Bond - Brick facade Panel

Stofix Brick Slip Cladding Panels - Stretcher Bond - Brick facade Panel

Stofix Brick Slip Cladding Panels - Stack Bond

Stofix Brick Slip Cladding Panels - Stack Bond

Stofix Brick Slip Cladding Panels - Flemish Bond

Stofix Brick Slip Cladding Panels - Flemish Bond

More case studies from Stofix UK ltd

View all case studies (10)
Vita Ruskin Square

Vita Ruskin Square

Urbanest, Vauxhall

Urbanest, Vauxhall

Thames Park School

Thames Park School

Box Makers Yard

Box Makers Yard

More case studies from Drained and back-ventilated rainscreen cladding systems

View all case studies (89)
Vita Ruskin Square

Vita Ruskin Square

Urbanest, Vauxhall

Urbanest, Vauxhall

Thames Park School

Thames Park School

Forth Bank, Newcastle UK

Forth Bank, Newcastle UK