OVERVIEW

REQUIREMENT: Whilst major works were being carried out, temporary wheelchair access to an alternative entrance was necessary.


The systems had to overcome the concrete steps and fully comply with Part K and M of the Building Regulations.


END RESULT:

The fitters worked different shifts over three days and two nights to ensure the project was completed by the deadline.


The platforms include a 1:15 gradient and fully comply with Documents M & K of the Building Regulations. 


A step system was also fitted for able-bodied access, and mid-handrail in yellow at 600mm high was installed on both sides of all the ramps and platforms. 


Once the rental period is complete, the systems will be dismantled and reused in other hire projects.


FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and steps and distinguish any level changes.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Rest Platform – a rest platform at 5 metres is required to allow the user to pause.
  • 1100mm High Rail – these handrails attach to any level sections.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.


EXTRA FEATURES INCLUDED:

  • Yellow Mid-Handrail - a lower handrail system designed to be used by young children and wheelchair users. Yellow is one of the easiest colours to see because of its ability to reflect light.
  • Fully Compliant Step Unit – complies with Document M and K of the Building Regulations.
  • GRP - a slip-resistant and non-corrosive surface. The ideal option for areas with high footfall, such as schools and public application.

Products featured in this case study

View all products (7)
Modular Walkway Platform

Modular Walkway Platform

Fully Compliant DDA Modular Ramp

Fully Compliant DDA Modular Ramp

GRP Modular Ramp

GRP Modular Ramp

More case studies from Rapid Ramp Limited

View all case studies (20)
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Front Door Ramp, Woking

Front Door Ramp, Woking

More case studies from Working platform and walkway systems

View all case studies (7)
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Retail Store, Sheffield.

Retail Store, Sheffield.

New Facebook Data Centre. Ireland

New Facebook Data Centre. Ireland

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe

More case studies from Heavy steel stair systems

View all case studies (2)
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe