OVERVIEW
The Handball Arena in the Olympic Park in the centre of London is an iconic landmark - designed and built to host the handball events at the London Olympics in 2012, it is now a completely flexible arena which hosts a range of different sports and training events.
Main contactor Buckingham Group enlisted IRC Carocelle to carry out the roof works, and IRC Carocelle turned to Fixfast to supply the complete fixing package for this - our tube washer and fastener combinations enabled the use of panels which achieved the specified insulation levels.
Fixfast also had the needed solution for the external façade - thousands of shingle cleats were used to hang the 3000sqm of specially manufactured copper panels.
"Fixfast maintained a high level of quality throughout the build, minimising site wastage and ensuring continuity of work for the site team"
Steve Holder - Owner of IRC Carocelle
SureFast SF-TB-50 barbed flat roofing membrane tube washer
SureFast SF-TLP Flat Roofing Tube Washer
SureFast SF-RS-SSA4-6.1 flat roofing concrete screw
SureFast SF-RS-SSA4-4.8 Flat Roofing Fastener
SureFast® Flat Roof Termination / Peel Stop Bar
SureFast SF-T-50 Flat Roof Membrane Tube Washer
SureFast SF-T-75 Flat Roof Insulation Tube Washer
Ocado Distribution Centre
Morrisons - Sheppey
Exeter College Cohen Quad
Curious Brewery
Ocado Distribution Centre
Morrisons - Sheppey
Curious Brewery
Wembley London Designer Outlet
Friars Walk Shopping Centre
Butlins Wave Hotel
Royal Garden Hotel
St Luke's Cancer Care