OVERVIEW
The new Everton Stadium at Bramley-Moore Dock is creating an architectural landmark in the heart of Liverpool. The design, by the internationally renowned firm BDP Pattern, captures the industrial history of the docklands and reinterprets it in a contemporary way with a clear formal language and expressive materials. The stadium combines technology, tradition, and atmosphere – with a capacity of 52,888 seats, an impressive brick facade, and a steep stand geometry that creates a palpable sense of proximity and emotion. BEMO was privileged to participate in the project and realized the wide-span, dynamically shaped standing seam roof – technically sophisticated, visually powerful, and an integral part of the overall architecture
BEMO Standing Seam - GFK Structural Deck System
Leicester Royal Infirmary
ICR Sutton
Clamart, France
National College for High Speed Rail, Birmingham
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre
APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical