NBS Source
I'm a manufacturer

APL Case Study - Aluminium Sinusoidal Firewall - Nathan Way, Woolwich

OVERVIEW

Client: Royal Borough of Greenwich Council

Architect: Frankham Consultancy Group

 

Assembly & Performance:

·        All constructions including APL Tritherm™ structural framing system and all as non-combustible assemblies

·        Roof – 10,000 m² of APL Energi Twin-Skin: Profile 31/1000RR in stucco-embossed mill-finish aluminium on walk-on roof liner plus all associated flashings, gutters, fixings and sealants, U-value = 0.18 W/m².K

·        Walls - 10,000 m² of APL Energi Twin-Skin: Profile AP45HR in RAL 9006 PVF2 aluminium on wall liner plus all associated flashings, fixings & sealants, U-value = 0.16 W/m².K

 

Special Features:

·        Client required a 40-year maintenance free material for the roof in the marine location

·        Multiple consultants employed by the end client to ensure the construction exceed current building regulation due to the proximity to Grenfell

·        APL clamp-end lap detail for the roof to allow for thermal expansion

·        APL Firewall™ with 60 minute integrity and 60 minute insulation ™ construction due to boundary walls

 

Building Location:

·        London Borough of Greenwich

Products featured in this case study

View all products (20)
Sinusoidal / Half-Round (40mm Deep) Profile Wall System - AP45HR - Sinusoidal Profile Cladding System

Sinusoidal / Half-Round (40mm Deep) Profile Wall System - AP45HR - Sinusoidal Profile Cladding System

Trapezoidal Profile (30mm Deep) Roof System - AP31/1000-R  - Trapezoidal Roof Profile System

Trapezoidal Profile (30mm Deep) Roof System - AP31/1000-R - Trapezoidal Roof Profile System

Sinusoidal / Half-Round (40mm Deep) Profile Roof System - 45HR-R - Sinusoidal Roof Profile System

Sinusoidal / Half-Round (40mm Deep) Profile Roof System - 45HR-R - Sinusoidal Roof Profile System

More case studies from Architectural Profiles Ltd

View all case studies (21)
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study -  StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

More case studies from Metal profiled sheet self-supporting cladding systems

View all case studies (20)
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study -  StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

More case studies from Metal profiled sheet self-supporting roof covering systems

View all case studies (8)
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre

APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre

APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical

APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical