OVERVIEW
Our Midlands and East contracting team supplied Pure 100 EclipseTec top-hung sliding doors. This top-hung sliding door system was integrated seamlessly into the double-glazed partition system, fitting snugly into the cavity space while maintaining both sound insulation and visual appeal. The EclipseTec system provided a clean, modern aesthetic, allowing the Student Learning Centre’s teaching labs and communal areas to remain open and adaptable, while also offering high performance in terms of noise control and ease of access. Elsewehere, thicker glazing was integrated into Pure 100 where screens were guarding a change in floor level from 1st to Ground.
PURE100 Double Glazed Panel Partition System
Ampersand, London
Network Rail HQ, Milton Keynes
Moneypenny, Wrexham
Wellington Hospital, London
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca