NBS Source
I'm a manufacturer

Wellington Hospital, London

OVERVIEW

Balfour Beatty approached Planet Partitioning with a high-performance refurbishment specification for the UK's largest private hospital. For all the patient and treatment rooms, Planet Partitioning used p20 demountable glass partitioning with Eclipse sliding doors. FireStop partitioning ensured that lift lobby partitioning has a fire integrity and insulation rating of EI120/120. Doors for the lift lobby are fire rated for EI 60/60 and steel framed.

Products featured in this case study

View all products (54)
EclipseClear Sliding Glass Door

EclipseClear Sliding Glass Door

PURE20 Single Glazed Partition System

PURE20 Single Glazed Partition System

More case studies from Planet

View all case studies (57)
Ampersand, London

Ampersand, London

Santander UK HQ in London

Santander UK HQ in London

Network Rail HQ, Milton Keynes

Network Rail HQ, Milton Keynes

Equinox Gyms, London

Equinox Gyms, London

More case studies from Sliding door and partition sets

View all case studies (51)
First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

Rundum Original garage doors provide unique feature in prestigious Cornish development

Rundum Original garage doors provide unique feature in prestigious Cornish development

Stylefold Hinged sliding folding acoustic moveable wall - Crown Commercial Services (CCS) offices, Norwich

Stylefold Hinged sliding folding acoustic moveable wall - Crown Commercial Services (CCS) offices, Norwich

Stylefold Hinged sliding folding Glass moveable wall - Brighton Day Nursery School

Stylefold Hinged sliding folding Glass moveable wall - Brighton Day Nursery School

More case studies from Partition panels

View all case studies (50)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca