OVERVIEW
Helmsman won the Berwick Leisure Centre cubicles package and worked across two floors. We manufactured, delivered, and installed fully framed leisure cubicles alongside the integrated plumbing system panels.
We altered our orginal fully framed leisure cubicle design to create a bespoke product for Berwick Leisure Centre, creating a floating look from the front. Most cubicles were changing cubicles located on the ground floor and some toilet cubicles on the first floor.
Fully Framed Cubicles
Isenhurst Health Club
Reach Printing Services
Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes
Eos Interiors Ltd Office Lockers Project
Aberavon Aqua Splash
Newhaven Holiday Park
Heathrow Primary School
Norwich High School for Girls