OVERVIEW
Contacted by Tefken Construction, we designed, fabricated and supplied modular flat packs of both steel and GRP gratings, heavy duty barrier rails, gates, ladders, treads and handrails to the 'Chirag Oil Field'.
Our designers ensured that all material and placements could withstand the given environment. Using both steel and GRP allowed for cost efficiencies for the client, while maintaining a great strength for their platforms and rails.
Our modular flat packs allow the client to install their flooring and other items easily.
Chirag is an offshore production, drilling and quarters (PDQ) platform located 120km east of Baku in the Caspian Sea, at a water depth of 120 meters.
First oil from the platform was achieved on 28 January 2014.
Total Chirag production was on average 53,000 barrels per day.
Handrail Tubular Stanchions
Utility Grating
GRP Handrail
GRP Flowgrate
Steel Stair Treads - 35mm Ball Proof - Open Steel Grating
Steel Stair Treads - 20mm Ball Proof - Open Steel Grating
GRP FlowDeck
GRP FlowGrate Micromesh
GDF Suez Cygnus Bravo
Shah Deniz
Solan Topside
Clair Ridge Oil Field
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings
ASF 5006 Handrailing at Bradford Library Steps
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall
White City, London. Illuminated handrailing
Hilton Garden Inn, Terminal 2, Heathrow Airport
West Ham Stadium, London
GDF Suez Cygnus Bravo
Solan Topside
Clair Ridge Oil Field
GDF Suez Cygnus Bravo
Solan Topside
Clair Ridge Oil Field
West London Platform Extensions
New Air BP Jet Fuel Station - plank gratings
Clair Ridge Oil Field
North Pole Depot
Old Trafford
Solan Topside
West London Platform Extensions
Ormonde Wind
Beatrice Offshore Wind Farm
Clair Ridge Oil Field
West London Platform Extensions
Clair Ridge Oil Field