Allscott Meads Primary School

OVERVIEW

Officially opened in September 2023, Allscott Meads Primary School is primed to become a community hub for the residents of the Telford area.


Built on the former Sugar Beet factory site, the new school has capacity for 150 students aged 3-11 and comprises 6 classrooms, a sports hall, kitchen, staff room, storage rooms, offices for 1-1 teaching support and interviews. The grounds of the school also contain an impressive 1.1 acre sports field and hard-surfaced sports court, as well as 40 bike spaces and car parking for staff and visitors.


Tegula and Tegula Duo Block Paving were used to create a warm, inviting feel to the external landscaping on this project.  


The Challenge


Aesthetically pleasing paving options were required to establish a welcoming entrance to the Telford community hub.


Following the deterioration of the Sugar Beet Factory that once stood on the site, the vision for Allscott Meads was to create a modern school in a beautiful setting, that would become a hub at the heart of the community. To reach a wide demographic, creating an inviting space was imperative and the use of warm tones were requested for the paving. A retaining wall solution for a small area to one side of the building was necessary to optimise space for parking in a manner that would elevate aesthetic appeal.


The Solution


Hydropave Tegula Cedar and Bracken were used to compliment the modern building. To create a space where students could flourish and thrive, it was important for the area to feel modern but welcoming. Hydropave Tegula 240 and Hydropave Tegula Duo Block Paving in the homely colours of Cedar and Bracken were ideal products to realise a traditional, warm feel.


To reduce flooding and remove harmful pollutants, a sustainable drainage system was implemented through use of Tobermore’s Hydropave products. All walkways and car parking areas were paved, with delineation added so that specific areas were clearly visible. Secura Grand facilitated a seamless, tiered retaining wall solution that enabled additional parking to be added to the grounds, simultaneously increasing aesthetic appeal.


Products featured in this case study

View all products (61)
Hydropave Tegula 240 | Permeable Block Paving

Hydropave Tegula 240 | Permeable Block Paving

Hydropave Tegula Duo | Permeable Block Paving

Hydropave Tegula Duo | Permeable Block Paving

Secura Grand | Concrete Segmental Retaining Wall

Secura Grand | Concrete Segmental Retaining Wall

More inspiration from Tobermore

View inspiration
Copthorne Place - Persimmon Homes

Copthorne Place - Persimmon Homes

Grey Towers Village Country-Chic Meets Modern Living

Grey Towers Village Country-Chic Meets Modern Living

Telford College of Arts & Technology - Pinnegar Hayward Design

Telford College of Arts & Technology - Pinnegar Hayward Design

Queen Elizabeth University Hospital - NHS Greater Glasgow and Clyde

Queen Elizabeth University Hospital - NHS Greater Glasgow and Clyde

More inspiration from Concrete paving blocks

View inspiration
Hudson Quarter, North Yorkshire

Hudson Quarter, North Yorkshire

Crimple Hall, Harrogate

Crimple Hall, Harrogate

The Green Quarter, Southall London

The Green Quarter, Southall London

Royal Highland Centre

Royal Highland Centre

More inspiration from Concrete interlocking blocks

View inspiration
Latches Close

Latches Close

John O’Gaunt Golf Club

John O’Gaunt Golf Club