OVERVIEW

The Challenge

Failing retaining wall needed to be stabilised and strengthened.


The failing masonry wall, to the rear of Latches Close Social Housing, was braced with timber struts and remained like this for 10 years. The ‘temporary’ buttress was effective for a short time but then the wall began to move. The brick retaining wall had fractured at the corner which was a sign it was slowly inching forward. For fear of the wall’s collapse, the surrounding area was cordoned off with heras fencing. For health and safety reasons, the rear of the social housing was completely ‘out of bounds’.


The wall couldn’t be taken down and replaced because there was a car sales elevated above. The car sales proprietor did not want his land to be affected. Clarion Housing Group contacted Engie to survey the failing wall and propose a solution.

 

The Solution

Secura Grand was installed under the expert advice of Tobermore’s Civil Engineering Consultants.

Engie had previously worked with Tobermore on other schemes and had experience using their Secura Grand Retaining Wall system. Following consultations with Tobermore’s Civil Engineering Consultants, Engie proposed Secura Grand as a solution to strengthen and stabilise the existing wall.


Rather than replacing the entire wall, the existing wall and its timber buttress was incorporated into the retaining wall designs. This retaining wall project has restored land for the residents and property managers.

Products featured in this case study

View all products (60)
Secura Grand | Concrete Segmental Retaining Wall

Secura Grand | Concrete Segmental Retaining Wall

More case studies from Tobermore

View all case studies (106)
Copthorne Place - Persimmon Homes

Copthorne Place - Persimmon Homes

Grey Towers Village Country-Chic Meets Modern Living

Grey Towers Village Country-Chic Meets Modern Living

Telford College of Arts & Technology - Pinnegar Hayward Design

Telford College of Arts & Technology - Pinnegar Hayward Design

Queen Elizabeth University Hospital - NHS Greater Glasgow and Clyde

Queen Elizabeth University Hospital - NHS Greater Glasgow and Clyde

More case studies from Concrete interlocking blocks

View all case studies (2)
Allscott Meads Primary School

Allscott Meads Primary School