OVERVIEW
Dura Grating Riser Installation | Case Study
Shard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter.
Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.
Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.
d² Dura Grating Standard Mesh - GRP heavy-duty floor grating
Post-Fix Dura Riser System - Steel-supported GRP riser flooring
West Ham Stadium, London
The Lock, Greenford Quay, West London
Offshore Technician Training Facility, Grimsby
Composite Decking Garden Transformation, Essex
Chirag Oil Field
GDF Suez Cygnus Bravo
Solan Topside
Clair Ridge Oil Field