NBS Source
I'm a manufacturer

Securidor: Duckham Court

OVERVIEW

Situated in Sherbourne, Coventry the success of the Duckham Court housing project largely depended on the combination of the protection, durability and finish that the Securidor range offers.


It was essential that these high traffic doors worked seamlessly with the access control systems. Integrating these elements can often be a source of snags and delay on site. Working with our partners within the industry and construction trade, Strongdor identified and resolved potential issues before the doors where delivered.

Products featured in this case study

View all products (21)
Steel Door - Panic PAS 24

Steel Door - Panic PAS 24

Steel Door - Panic SR2

Steel Door - Panic SR2

Steel Door - Personnel PAS 24

Steel Door - Personnel PAS 24

Steel Door - Personnel SR2 LPS 1175 (B3)

Steel Door - Personnel SR2 LPS 1175 (B3)

More case studies from Strongdor Limited

View all case studies (23)
Steeldor: Asda Supermarket

Steeldor: Asda Supermarket

Steeldor: Enterprise Court, Blackpool

Steeldor: Enterprise Court, Blackpool

Steeldor: Wirral Metropolitan College

Steeldor: Wirral Metropolitan College

Steeldor: AFC Fylde Mill Farm

Steeldor: AFC Fylde Mill Farm

More case studies from Carbon steel doorsets

View all case studies (77)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS