NBS Source
I'm a manufacturer

Steeldor: Asda Supermarket

OVERVIEW

For any retail application, there is usually a balance to be made between the functionality of easy access with the absolute need for security. In the case of this new build store for ASDA, the minimum requirement was for high performance steel doors that had to be delivered on time, to specification and within budget.


Strongdor worked with the architects and contractor to ensure the supply of the doors that more than met the criteria.

Products featured in this case study

View all products (21)
Steel Door - Panic

Steel Door - Panic

Steel Door - Personnel

Steel Door - Personnel

Steel Door - Thermal Panic Exit

Steel Door - Thermal Panic Exit

Fire Rated Thermal Steel Door Panic

Fire Rated Thermal Steel Door Panic

Steel Door - Personnel with Louvre

Steel Door - Personnel with Louvre

Steel Door - Panic with Vision

Steel Door - Panic with Vision

Steel Door - Panic Exit with Louvre

Steel Door - Panic Exit with Louvre

Steel Door - Thermal Personnel

Steel Door - Thermal Personnel

More case studies from Strongdor Limited

View all case studies (23)
Steeldor: Enterprise Court, Blackpool

Steeldor: Enterprise Court, Blackpool

Steeldor: Wirral Metropolitan College

Steeldor: Wirral Metropolitan College

Steeldor: AFC Fylde Mill Farm

Steeldor: AFC Fylde Mill Farm

Steeldor: Cambridge Cycle Point

Steeldor: Cambridge Cycle Point

More case studies from Carbon steel doorsets

View all case studies (80)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Glasgow Royal Infirmary University Tower for NHS

Glasgow Royal Infirmary University Tower for NHS