OVERVIEW
Aviva Studios, Manchester - The New Home of Factory International:
Fire resistant, acoustic joint sealing of the complex facades, has been completed with Emshield-WFR and Emshield QuietJoint from NCC Movement joints Limited.
NCC Movement joints have supplied Emshield-WFR-2 and Emseal QuietJoint to seal the wide, high movement capability, expansion joints in the complex facades of the new Aviva Studios in Manchester. Aviva Studios are new arts and cultural venues, which are now the new home of Factory International, and located in the centre of St John’s. This is the 13-acre regeneration project around the old Granada TV studios in Manchester. On this prestige project, the architect was Ellen van Loon, a partner at OMA (Office of Modern Architecture), who designed the buildings to create an eclectic environment for the arts, including striking and complex architectural facades. This included her trademark industrial styled finishes, cladding the facades with corrugated metal panels, and incorporating large exposed concrete surfaces. Structural engineering for the project was provided by Burro Happold.
The structural movement joints in the external façade and walls, as well as in some of the floor slabs, had to be designed to accommodate not only significant movement (+/-50% or more), whilst maintaining watertightness, but also to be CE certified fire resistant for at least 2 hours, and it was also essential to maintain the high acoustic soundproofing and thermal insulation of the building across the façades.
Emshield-DFR/WFR-2 for internal joint sealing, from NCC Movement Joints Limited was the ideal solution, quickly installed as a complete system to meet all the specified requirements in a single solution, with no mechanical fixings, and without disrupting other trades. The Emshield system was installed by TECL (Thermal Engineering Contracts Ltd) as the acoustic and firestopping specialists on the project, as well as by the specialist façade manufacturers, Lindner Prater.
The 13,350 m2 building has been designed to provide open spaces that are flexible, adaptable, and capable of being reconfigured for a wide variety of shows at different scales. The key facilities are The Hall, an auditorium that seats 1,600 but can accommodate 2,000 standing; and The Warehouse, an open performance space 21 metres high, with capacity for 5,000 people, all designed and built with advanced acoustic-insulation. They can function separately or together, with a stage that can stretch back to a depth of 45 meters.
Factory International are named after the Factory Records record-label, which was founded by the late Tony Wilson ran Manchester’s Haçienda nightclub in the 1980’s and launched bands such as the Happy Mondays and Joy Division. Their new home at Aviva Studio complex is the first public project by OMA in the United Kingdom, and already regarded as the most ambitious cultural development for the future in Manchester.
Acoustic Movement Joint - Emseal QuietJoint® - Acoustic Joint Filler
Fire Resistant Floor & Wall Movement Joints - Emshield DFR / WFR CE
Emseal Colorseal seals joints between precast façade panels at the Broadway Redevelopment In London
Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester
Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at Staines in Middlesex
Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester
Emseal SJS System Seals the structural deck movement joints on the new White-Link Ferry and Ro-Ro Terminal in Portsmouth
Emseal SJS System installed to seal wide seismic movement joints for the main Stadium at Basra Sports City, Basra, Iraq
Emseal BEJS used to seal Parapet & wing wall joints on the new Dodmoor Bridge A45, Daventry Link Road in Northamptonshire
Emseal BEJS used to repair and reseal the deck joints on Whitton Park Road Bridge
Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London
Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide, High Movement, Structural Movement Joints