Degafloor FB System, Commercial Kitchen - Resin Flooring

OVERVIEW

The National Flooring Company, a Degafloor Ltd approved installer, have received another complimentary review following a kitchen refurbishment on the 23rd floor at a popular 4-star hotel in Manchester. Making the most of the quieter, New Year period, the hotel decided to upgrade their kitchen floor. Having worked at other locations for the popular hotel chain, The National Flooring Company were contacted to provide advice and following a successful proposal, were asked to complete the refurbishment.


The kitchen, which is situated on the 23rd floor, required meticulous planning to ensure that works could be completed with minimal disruption to the hotel’s guests.


The existing vinyl floor within the kitchen had become worn and brittle and sections were beginning to lift, causing a potential trip hazard. The vinyl floor was removed to expose the tiled finish underneath. Any loose tiles that had debonded from the floor were also removed and infilled with Degafloor Deep Fill, quick curing repair mortar.


The National Flooring Company laid a scrape coat, embedded with a promesh reinforcing membrane, prior to the installation of the Degafloor Full Broadcast System (FB). The Degafloor FB system is broadcast with rounded aggregate to provide an anti-slip finish and retains this feature even in wet conditions to ensure employee safety is always maintained. As with all Degafloor systems, they are seamless and impervious, ensuring the floor will not lift, as previously experienced with the existing vinyl floor finish.


Degafloor MMA resin flooring systems are fully cured within 2 hours of installation, allowing the hotel to resume normal kitchen operating procedures shortly after completion. MMA resins have a distinctive odour, but with the correct management, installations can progress with very little disruption. The National Flooring Company used the kitchen extraction system and sealed all doorways to contain and manage the odour.


The project was completed to the satisfaction of the Chief Engineer, Hilton MCR, who commented on how good the floor looked. “The restaurant being on the 23rd floor presented a logistical challenge.  However, after careful planning and consideration of our hotel operations, The National Flooring Company completed the installation efficiently and to a high standard.  We were impressed with the service from start to finish.”

Products featured in this case study

View all products (16)
Degafloor QTA System  - Resin Flooring

Degafloor QTA System - Resin Flooring

Degafloor Full Broadcast Heavy Duty System  - Resin Flooring

Degafloor Full Broadcast Heavy Duty System - Resin Flooring

Degafloor Full Broadcast System - Resin Flooring

Degafloor Full Broadcast System - Resin Flooring

More case studies from Degafloor Ltd

View all case studies (17)
Degafill Pot Hole Repair - HAPAS - Resin

Degafill Pot Hole Repair - HAPAS - Resin

Degafloor Full Broadcast - School, Glastonbury Resin Flooring

Degafloor Full Broadcast - School, Glastonbury Resin Flooring

Car Park Resin Flooring System - Capital Quarter Multi-Storey Resin Flooring

Car Park Resin Flooring System - Capital Quarter Multi-Storey Resin Flooring

Degaflex Fire Rated Roofing System - Case Study - Resin

Degaflex Fire Rated Roofing System - Case Study - Resin

More case studies from Resin flooring systems

View all case studies (24)
ROUNDHOUSE TRUST, CAMDEN, LONDON

ROUNDHOUSE TRUST, CAMDEN, LONDON

WAGWORKS, FULHAM, LONDON

WAGWORKS, FULHAM, LONDON

CEDARWOOD HOUSE, BATH

CEDARWOOD HOUSE, BATH

GREAT ORMOND STREET HOSPITAL – Zayed Centre for Research into Rare Disease in Children - London

GREAT ORMOND STREET HOSPITAL – Zayed Centre for Research into Rare Disease in Children - London