OVERVIEW
A recent project of the Berkeley Group, the Kingston Gas Works with 240 apartments called for a special solution due to the maximum construction height available for the shower being only 100mm including tray and drainage.
All showers were constructed with XPS integrated shower elements (wedi Fundo Integro), which are only 90mm thick including the integrated DN50 drainage. Despite the low construction height, the specified solution offers no compromise on the flow rate of the drainage.
Complete waterproof bathrooms -
walk-in shower with a niche, building boards on walls & floors with sound insulation.
Products:
wedi Fundo Integro shower element with integrated drainage (1800x900x90mm)
wedi building boards 10mm & 12.5mm - for walls and floors
wedi prefabricated niche wall element
wedi Non-step sound insulation composite panel (reduction by 16db)
wedi 610 Adhesive Sealant - Single Component Joint Sealant
wedi Tools - Waterproof Sealing Tape - fleece tape used to seal joints
wedi Fundo Drains - shower waste drains with integral trap
wedi 520 Cement Based Waterproof Membrane - Two-Part Composite Sealant/ Adhesive
wedi brings wellness to Hilton Heathrow T5
Schwimmbad Berlin
Apex Hotel London
Wood Wharf London
Alpin Panorama Hotel - Valdaora, Italy
Savoy Hotel Restoration Project
Piccadilly Circus Underground Station - London
Scottish Parliament
Luxury Hotel Bathrooms - Hyatt Blackfriars