Aberdeen Railway Station, Scotland

Aberdeen Railway Station, Scotland

Sika Limited

Aberdeen Railway Station is the UK’s busiest station north of Edinburgh and Glasgow and is listed is listed as ‘Category A’ by Historic Environment Scotland. The station building has a glazed canopy roof, which needed a full upgrade. This included replacement of the glazed roof area and waterproofing of the gutters around the perimeter of the canopy and of the plinth that connects the gutters to the glazed roof, forming the base for all maintenance walkways.The project had to be carried out without interruption to rail services or disruption to passengers, while adhering to strict health and safety requirements.Components:Sika Liquid Plastics Sikalastic®-825 -625.Metal Primer.S-Vap 5000 SA.Sika® Primer 600.
Sponsored
CEEQUAL WINNING PROJECT USES VOLTEX

CEEQUAL WINNING PROJECT USES VOLTEX

CETCO

Kings Cross Package 4. The tanking material had to succeed where the specified competiton fell short : all weather installation; self-healing/sealing capabilities; one product application ; mechanical not chemical bond to concrete. It also had to meet the specified requirements of BS8102 1990 Grade 4. The solution was 8000m2 of Voltex, containing zero VOC, installed in almost any weather conditions to green concrete, and proven effective on both new and remedial waterproofing projects worldwide. Aided by CETCO holding both ISO 14001 & 9001, and the properties of Voltex, the project achieved its CEEQUAL award, scoring above 75%, and rating Excellent.
Sponsored
Vibration Isolation of Residential Building over Tube Lines

Vibration Isolation of Residential Building over Tube Lines

Total Vibration Solutions Limited t/a TVS Group

TVS Group was tasked with the isolation of a residential property in St. John’s Wood as part of a redevelopment and basement extension. With the property in close proximity to the Jubilee line and the Metropolitan line passing only 5m away from the new basement extension, radiated noise and vibration was a serious concern for the client.An isolation layer utilising varying stiffnesses of Sylomer materials spanned the underside of the basement slab, continued up between the contiguous piled wall and the lining wall, and then across the top of the capping beam and to the side of the ground floor slab.Close work with the design team throughout the planning and specification process, provided a solution that integrated seamlessly with the structure and waterproofing detail.
Sponsored
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi access. Services: Bespoke access ramp solution. Roof build-up: Warm roof design / TPO/PVC membrane. Pump House recently supplied an external rooftop access ramp solution for a proposed route out of a building down onto the flat roof. The solution was fully adjustable against typical flat roof falls, and did not penetrate the waterproofing below. Steelwork was hot dip galvanised whilst landings were a non-slip 8mm thick GRP sheet to provide great slip resistance. Supplied with full handrail and kick plates to all exposed sides, to ensure safe passage of pedestrians and cargo.
Sponsored
Woodland Trust Curved Roof

Woodland Trust Curved Roof

Polyroof Products Ltd

As described by the Woodland Trust, Glen Finglas is a great expanse of ancient woodland, lochs and open heathland, sitting at the heart of Loch Lomond and The Trossachs National Park and home to one of the best examples of upland wood pasture in Scotland.The newly constructed Gateway Building was designed to blend in with the surrounding woodlands and featured a circular timber-clad exterior with a spiralling, curved roof. The Woodland Trust approached RTA Building Limited, a Polyroof Approved Contractor, to provide a guaranteed waterproofing solution that would complement the aesthetics of the building.After comprehensive discussions and careful evaluation, we recommended the Polyroof 185 Warm Roof System for this unique project. This system stood out due to its exceptional BBA 30-year durability rating, impressive life-cycle costing performance, and an insurance-backed guarantee that offered the client peace of mind.The implementation process involved the meticulous installation of the Polyroof membrane, which flawlessly covered the flat roof areas while seamlessly following the curved perimeters and intricate spiral design. To ensure a fully waterproof edge detail that complemented the building’s contours, we installed a bespoke GRP capping. This robust combination provided Woodland Trust with a reliable and long-lasting roofing solution.Through our collaboration with Woodland Trust, we successfully implemented the Polyroof 185 Warm Roof System, delivering a durable, and cost-effective roofing solution. Our system’s exceptional durability rating, long-term life-cycle costing performance, and insurance-backed guarantee provided Woodland Trust with the confidence that they had chosen a roofing solution that would stand the test of time. With Polyroof, Woodland Trust achieved a seamless, reliable, and environmentally conscious roofing solution for their unique project.
Sponsored
Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Alumasc Water Management Solutions

Alumasc Rooflights provided an ideal solution to allowing natural daylight into the building from above. The unique kerb design incorporates both security and waterproofing to create a reliable, safe and secure rooflight, allowing horizontal termination of the waterproof membrane. This makes water penetration virtually impossible. The domed glazing is moulded from Marlon FSX Longlife, premium quality solid polycarbonate, which has an impact resistance up to 200 times that of glass.Technically sophisticated, Harmer AV high-performance aluminium roof outlets are chosen for this project as they guarantee a trouble-free performance and are especially suited to flat roofing applications featuring continuous membranes.Harmer AV roof outlets combine innovative product design with full industry compliance to meet the needs of rainwater drainage in any construction project, with the ability to drain up to 40% more roof area than conventional gravity outlets. Further to this, their lightweight, durable, non-corrodible design means that they will do so for up to 40 years.GX Pressed Aluminium Gutters are robust box section gutters designed for traditional wet jointing on site. They’re especially suited to applications where maximum capacity gutters are required. For the very large drainage area of the campus roof, they were perfect.Designed to fully accommodate thermal movement at every joint, they are lightweight, durable and noncorrodible, and, upholding the environmental prerequisites of this project, they are 100% recyclable.Finally, Heritage Circular Pipes are available in 4 pipe diameters and 3 pipe lengths, together with a complete range of fittings. Can be factory finished to replicate cast iron or with BBA certificated powder coatings in a range of colours.
Sponsored
177 Bothwell Street, Glasgow

177 Bothwell Street, Glasgow

Alumasc Roofing

Scotland’s Largest Single Office Building with Rooftop Running Track and 360 Panorama.A Sustainable and Futureproof Roof, Harnessing the Power of the OutdoorsBothwell Street in Glasgow is now home to an exceptionally progressive office space – making way fora new chapter in the rich history of the area. If there are any doubts about what Grade A office spacereally means, then think touchless entry, bike storerooms, lux changing facilities, an 8,000 sq. ft roofterrace, a 150-metre rooftop running track, 4 activity zones/terrace spaces and panoramic views.The project complements the sustainable regeneration programme along the Clyde Waterfront also,home to the new financial Northern European hub, firmly cementing the business district at the heart ofmodern Glasgow.GOALSThe architects at Sheppard Robson have made sure sustainability and lifecycle credentials remaincentral to the design specification. Occupants’ wellbeing has been carefully considered with a stunningpanoramic rooftop and 150m running track and general outdoor employee wellness facilities.A roofing solution was required to support the lifecycle of the building along with an excellentproduct reputation for this distinguished office space. Given the quality, longevity and environmentalconsiderations required from the roofing design, the insulation properties and warranty performancewere extremely important from the outset.CHALLENGESOur Technical department assisted the architectural and construction teams to resolve numerouscomplex design elements across the varied roof zones including running track, ballast walkways, greenzones, and pedestal zones, to determine the best roofing solution.Installation of the Davit Arm System for a building of this scale was especially important so personnel canbe safely suspended whilst working at height. This presented us with a unique challenge in providing aworkable solution that aligned with the sequence of works, whilst facilitating future routine inspection ofits base plates, and maintaining waterproof integrity without compression.Careful planning and detailing were required around roof penetrations to minimise aesthetical impact,and roof equipment was safely installed above the roof assembly.SOLUTIONThe construction comprises a composite concrete slab receiving our Hot Melt Hydrotech Waterproofing System. Offering a true lifecycle – Hydrotech high performance waterproofing, through its’ unique characteristics and installation process, now forms part of the building fabric. The result offers complete watertightness for the lifetime of the building.The building is also insulated to a high u-value target offering exceptional thermal performance and achieving a high kPa rating. This was essential to receive loadings from all components including overlying finishes, roof equipment and the end use for the building occupants.Key fire performance standards were achieved throughout including the lift overrun and lower roof terrace areas where the preferred solution was switched to our Derbigum sustainable warm roof system to maintain project performance targets.LIFECYCLE MANAGEMENTDesigned with BREEAM credentials and an EPC rating coming in at below 10 the careful focus on lifecycleconsiderations and the choice of materials throughout the building envelope is exemplary.Hydrotech hot melt is a high-performance solution containing 30% recycled content and zero productfailures in over 50 years, offering lifetime peace of mind, designed for the service life of the roof.PROJECT DATACompletion: Autumn 2022Building Type: Commercial OfficeProduct Application: Hydrotech & Derbigum waterproofing systemsCertification: BBA Approved, European Technical Approval & FM Global Class 1Architect: Sheppard RobsonMain Contractor: HFD Group
Sponsored
Fforestfach Transport Depot, Asbestos Overcladding

Fforestfach Transport Depot, Asbestos Overcladding

Garland UK

The Fforestfach site is a busy passenger transport depot for the Local Authority, managed by the Place Directorate, serving a variety of users. Severely weathered and corroded, the original 1,800 sqm roof on the depot comprised of old asbestos corrugated sheets that had degraded over the years, to the point that heavy rain resulted in overflowing gutters and severe internal leaks to the building. Garland UK Technical Manager, Dale Thomas, was asked by the Swansea Councils Property Maintenance team to carry out a full detailed roof survey and specify a waterproofing solution that would overcome the existing asbestos challenges of the depot roof and upgrade the external site offices, whilst minimising any disruption to the daily operations of the active depot.
Sponsored
Heathside & Lethbridge

Heathside & Lethbridge

Shield Membranes Ltd

Heathside and Lethbridge is one of London’s biggest estate regeneration programmes, and is planned to be carried out over six phases. The regeneration works being undertaken by Family Mosaic and the London Borough of Lewisham are transforming the estates into an attractive mixed tenure development, with over 1200 high-quality private and affordable homes.Phase three saw 218 homes built including 102 homes for social rent, the rest being for sale and shared ownership. Phase 4a and 4b saw 236 new homes built.Shield Membranes supplied the waterproofing, insulation & external finishes to all external areas with great efficiency, making sure everything was on site as and when it was required in order to keep each phase on track.
Sponsored
Tesco Express Store - Shaw, (near Rochdale).

Tesco Express Store - Shaw, (near Rochdale).

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Access – Bespoke access platforms. Services: Existing condensers. Roof build-up: Existing warm roof design (bituminous felt) – Overlaid with a liquid applied plastic waterproofing layer. An operational Tesco Express store, in the heart of the Shaw community, that had existing high level rooftop condensers requiring annual maintenance. Pump House supplied a safe access solution around two existing high level condensers. Pump House carried out a site survey and provided full working AutoCAD drawings for approval. The access solution was manufactured in smaller modules which facilitated easier lifting and fitting. Pump House attended site on the day of installation.
Sponsored
The Little Chapel

The Little Chapel

Polyroof Products Ltd

The Little Chapel in Guernsey was built in 1914 and, at only 16 feet by 9 feet, is said to be “one of the smallest functioning chapels in Europe, if not the world”. The chapel and its unique appeal gained national fame after an article accompanied with a colour photograph was published in the Daily Mirror, and it has since been considered one of, if not the most famous tourist attraction in Guernsey.In 2015, work began to weatherproof the intricate building, with the Protec System specified as the best solution for the job.The ChallengeHaving never been finished by its original builder, Brother Déodat, the chapel has been undergoing a long-term restoration project to create a structurally sound building that retains the beauty of the original vision. Firstly, the foundations were underpinned and properly secured for the first time since they were created over 100 years ago. The next priority was to fix the roof, as described by Pat Johnson, chairman of the Little Chapel Foundation:“The asphalt on the roof was hollow and had to be taken off. The concrete underneath was hollow. We ended up with a substrate of soil and clink, so to repair it we had to go inside and grout all the cracks in the ceiling. [The new roof] comprises three layers of concrete, 340 stainless-steel plugs, a stainless-steel mesh and a final coating of concrete”.The task of making the new concrete surface waterproof fell to local Polyroof approved contractor Sarnian Roofing Ltd. Andy Gavey (Company Director) said about the project:“As a boy I would regularly visit The Little Chapel and I’ve always been blown away by its beauty and character. To get the chance to help restore the building to its full potential is a dream come true for me – this has to be my favourite roofing project yet. Polyroof’s contribution towards the roofing works has meant that we were able to provide a top-quality roofing solution that has done justice to the amazing exterior of the building.”The SolutionWith its ability to be applied directly to the concrete to form a lightweight, seamless and durable waterproofing membrane, Polyroof’s Protec System was a clear choice for waterproofing the chapel roof.The first stage was to make the entire roof area fully watertight. Following a coating of primer to seal the porous concrete surface, the first coat of Protec was applied which incorporated fibreglass reinforcement. After 30 minutes the coating had cured and the second coat was applied to the whole roof area. To areas where new mortar was laid to re-embed the pebbles and seashells, which had been painstakingly removed from the old roof, a coating of Polyfinish was applied to provide extra protection.The architect chose a sanded decorative finish to complement the exterior of the building, which is covered in a mosaic made from seashells, pebbles and broken china. To create this finish, a third coat of Protec was applied and, whilst still wet, Quartz Sand was broadcast into the resin. After brushing off the excess sand, the whole roof surface was sealed with an application of Polyfinish Clear.
Sponsored
375 Kensington High Street

375 Kensington High Street

WM | Wetroom Materials

Located in the Royal Borough of Kensington and Chelsea; one of London’s most prestigious locations is now home to an exclusive collection of luxury apartments and penthouses. 375 Kensington High Street is now one of the most sought after addresses in London, setting itself above all others and serves as the epitome of London living. Wetroom Materials worked hand in hand with the architects and contractors to overcome the varying challenges the project presented. 300+ low profile wetroom solutions were able to be supplied to the development.The Unidrain linear drain system 1004 model finished with the highline custom tiled panel was the chosen drain. This was supplied as part of the Unislope 1K kit, which couples the drain up with a preformed slope and waterproofing solution.
Sponsored
Trinity Buoy Wharf

Trinity Buoy Wharf

Polyroof Products Ltd

Container City is an outstanding example of upcycling architecture in the London Docklands. The buildings are constructed from old shipping containers that have been refurbished and then fixed and welded together, creating an innovative modular building solution that houses offices.The roofs had been waterproofed with an EPDM membrane as part of an inverted roof design, however due to failings within the roof coverings leaks were occurring.It was also felt that the inverted roof insulation was unable to provide satisfactory thermal performance, leading to excessive fuel bills during winter. The architect responsible for finding a solution used Polyroof’s Solution Finder Tool to quickly find a recommendation for improving the thermal properties whilst providing long-term waterproof protection. Equipped with the key information needed, the architect specified the Protec Warm Roof System for the roof refurbishment works.Polyroof Technical Services carried out a full technical survey of the existing roof to identify all existing issues and provide a full set of recommendations. One of the key drivers for the refurbishment was the ability to easily access the roof membrane to carry out regular cleaning and maintenance works, so the specification included for converting the roofs from an inverted roof to a warm roof design.Polyroof Approved Contractor A R Roofing Ltd began by stripping away the old inverted roof components and the failed EPDM membrane to expose the metal roofs of the containers below. A self-adhesive vapour barrier was then laid onto the metal decks and Polyroof RES Insulation (T&G) was bonded on top using PU adhesive. Lastly, the Protec system was laid direct to the insulation boads to create a seamless, smooth and long-lasting finish that came with a 20 year insurance backed guarantee. This striking piece of upcycled architecture now has a roofing solution to match the innovation behind its creation.
Sponsored
Library of Birmingham

Library of Birmingham

Radmat Building Products Ltd

Also the largest public cultural space in Europe, the new 35,000m² Library of Birmingham replaces the old Central Library and is seen by Birmingham City Council as a flagship project for the redevelopment of the city.Designed by architects Mecanoo, working with multi-discipline engineers Buro Happold and main contractor Carillion, the multi-tiered roof of the library features two garden terraces which have both contributed to the BREEAM Excellent rating.Radmat Approved Contractor Prater delivered a roofing solution that is BBA Certified to last ‘the life of the building’. Consisting of Radmat PermaQuik PQ6100 Hot Melt Monolithic waterproofing membrane, root resistant Cap Sheet and ProTherm inverted roof insulation, the entire roof was electronically tested for integrity prior to the installation of aluminum powder coated cappings to the perimeter roof upstands.Once the installation of the 7,500m. of PermaQuik PQ6100 roofing system on the roof and ground level podium deck was signed off by a Radmat Technical Adviser, Prater brought in specialist green roof contractor Frost Landscapes. They then carried out the installation of the complex intensive green roofs, at levels 3 and 7, which were created to attract local wildlife and to offer visitors a pleasant environment to enjoy all year round.Combining durability and flexibility with independent verification of life expectancy and a market leading guarantee the PermaQuik PQ6100 Hot Melt Monolithic waterproofing system is set to deliver exceptional performance befitting of the uniquely designed structure which has set a remarkably high standard for library design.With Radmat’s high performance roofing solution providing weathertight protection for years to come, the Library of Birmingham looks set to not only form the catalyst for further regeneration within the city but also how future libraries are designed and perceived by the user.
Sponsored
Balance self-levelling pedestals for luxury rooftop living

Balance self-levelling pedestals for luxury rooftop living

Wallbarn Ltd

Balance pedestals form Wallbarn provide ultimate in precision and performance for roof terrace construction.This large roof terrace in a luxury residential redevelopment of a commercial block next to the Royal Courts of Justice demanded a high end finish. The roof deck had been waterproofed and insulated and 50mm limestone slabs needed to be raised and supported to achieve optimum drainage and ventilation to the structure.The client wanted a flat upper surface with no ridges or interruptions between individual slabs and the Balance self-levelling pedestals were able to create a smooth upper surface with reduced trip hazard and more attractive aesthetics across the terrace.The self-levelling nature of the headpiece meant any blemishes on the surface beneath such as laps between the waterproofing layers and drains, services etc. were accommodated easily without any noticeable effect on the upper surface.Because the self-levelling headpiece has an optic type mechanism it moves in all directions and achieves a perfectly flat upper level by itself, there is no need for installers to wind up and down separate segments of the head. it creates a better finish in much less time. The installer on this project simply loves Balance and will not use any other brand for self-levelling solutions. The limestone slabs were installed in a staggered layout and the Balance pedestals coped with this easily as the positioning lugs could be snapped off at T junction and other detail areas to create clean finishes. Weight tolerance was a major issue as heavy planters, a large barbecue, seating and other furniture were to be placed onto the slabs. Balance pedestals have a normal weight tolerance of 683kg each and a break point of over 1 tonne, so could cope with the additional weight easily. The end result was stunning. The client was delighted with the result and used this terrace on the show flat for the whole development.
Sponsored
Basildon & Thurrock University Hospital

Basildon & Thurrock University Hospital

Bauder Ltd

Basildon & Thurrock University HospitalBauder Total Roof System (BTRS) and LiquiTEC cold applied waterproofing systemSynopsisBasildon and Thurrock University Hospital’s existing roof was failing in multiple areas, and 80 rooflights needed replacing. The client wanted the refurbishment to make as little impact as possible on the departments directly below which included drug refrigeration, x-ray and ultrasound clinics, patient wards and operating theatres.Bauder Building BoardProject:Basildon & Thurrock University HospitalLocation:EssexProject Type:RefurbishmentRoof Area:900m²Specifier:NHSApproved Contractor:Breyer ConstructionProject challengesThe plant on the rooftop could not be turned off or raised and many of the AC units and boilers had to be left running due to the nature of the rooms below. Certain areas had to be repaired before others and detailing under and around the plant that could not be raised was almost an impossible task. When working around the plant, COSHH regulations had to be considered and adhered to.The result Coordinating with both the client and approved contractors was key in this project, and by using cold liquid applied waterproofing the contractors could ensure a watertight seal with quick application, allowing them to complete the remainder of the roof using reinforced bitumen membrane, and meet the tight project deadline of 12 weeks.System installedBauder Total Roof System (BTRS)Suitable for a variety of applications on both new build and refurbishment projects and can be used in warm, cold and inverted roof scenarios.1 Bauder K5KA top quality, heavy duty, torch-applied SBS elastomeric bitumen capping sheet. The product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUO 35A 3mm thick technically advanced self-adhesive elastomeric bitumen underlayer with DUO lap technology and glass lattice reinforcement.3 BauderPIR FA G16 Tapered (laid to falls)Tapered insulation is a lightweight, convenient, easy to install and cost-effective alternative method of providing falls to a roof instead of incorporating them into the structure.4 BauderTEC KSD FBSA technically advanced, self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder insulation adhesive.LiquiTEC Roof SystemThe Bauder LiquiTEC roof systems combine ease of application, fast cure and durability to provide a cold applied liquid waterproofing product second to none.1 LiquiDEK with reinforcement layerA cold applied liquid fast curing waterproofing resin, for use on the main roof area of the LiquiTEC Roof System. It is applied in 2 coats ‘wet-on-wet’, with a layer of Bauder 110g reinforcement fleece between them. The product is a PMMA based resin and requires the addition of catalyst to trigger curing. It is solvent, isocyanate and halogen free, minimizing its environmental impact.2 BauderTEC KSD DUOCarrier membrane & Vapour Barrier is a technically advanced self-adhesive elastomeric bitumen vapour barrier with patented “DUO” lap technology. The product features an aluminium foil facing for vapour impermeability.AdvocacyBreyer Roofing’s Contracts Manager for the project, Kerry Cutts:“The main challenge was working around the hospital’s requirements. For example, we provided a weekly plan for the areas we were working in and the rooflights / plant affected. Where possible, we worked out of hours while doing rooflight replacements to minimise any issues. We also worked closely with Bauder to vary the specification when we had to work around live plant. The communication between Bauder and Breyer Roofing was exemplary throughout and I was pleased this completed project was nominated for a national award."
Sponsored
The Cheng Yu Tung Building, Jesus College

The Cheng Yu Tung Building, Jesus College

Axter Ltd

Projects of complexity that demand innovative solutions to technically challenging interface design often deliver exceptional buildings. As a shining example, Axter recently completed the roofing systems for The Cheng Yu Tung Building, a landmark project for Jesus College in the heart of Oxford City.Systems in useStarcoat® PMMAForce Dalle®Excel®Cityflor®OverviewThis project required Axter’s extensive range of materials and methods combined to complete the multifaceted interfaces and deliver the demanding architectural design, whilst achieving the project’s ambitious goals.Founded in 1571, and with original buildings from this date, Jesus College is based in the centre of this diverse and historic city. With the development of the Cheng Yu Tung Building the college has undertaken its most significant transformation since the early 18th century.Combining new graduate accommodation, indoor and outdoor communal spaces, state-of-the-art teaching and meeting facilities with the latest digital technologies, this £36m innovative development is intended to have significant impact on the college faculty and students’ learning experience.Axter worked with architects MICA from early in the process, helping to specify solutions that would realise the design vision of lead architect Mandy Franz.“We’d worked with MICA before on a number of projects - including Keble College, University of Oxford - so they knew us and trusted us to add value through being involved with the design,“ comments Axter's Regional Sales Director, Matthew Saunders. “However, this project was a significant step up in complexity, with approximately 18 separate roof areas in total to complete. Looking at the main quad alone there is a raised area, numerous external stairways and walkways to waterproof as well as further raised terraces and inaccessible roof sections. Fortunately, we had significant experience to bring to this challenge.”Sustainability was the client’s major focus from the start, with the college already utilising ground source heat pumps, photovoltaic panels, and a heat recovery and cooling system to ensure zero carbon building operations, as well as reviewing all construction waste to ensure minimum diversion to landfill. We supported this aim working with main contractor BAM Construct UK to carefully plan and schedule the waterproofing systems to be installed, identifying the material composite of each roof to maximise efficacies in installation and logistics.The College’s key priority was to achieve a sustainability-focused design to reduce their carbon footprint. Naturally, this contributed to the challenges of the scheme, such as the additional fire safety requirements in response to the timber-framed construction. To help deliver the College’s ambitions, Axter supported the client’s design team by providing expert knowledge, understanding and application of the current regulations.Tapered roof insulation was used to support energy efficiency and drainage requirements, with bituminous waterproofing throughout. In keeping with the college’s sustainability mission, the main quad features a blue roof system to attenuate rainwater drainage. Other roof areas are finished with wildflower meadows. A combination of exposed and buried waterproofing membranes were consequently required, with additional complexity created by the range of different materials and surfaces involved.“Normally, if our membrane is marrying up to a vertical wall, we would see it come up as a visible detail,” continues Matthew, “but the beautiful Clipsham stonework used for the building façade wasn’t compatible with the typical detailing. We were also challenged by the desired architectural intent to defend the historic aesthetic of the stone, so we created a bespoke solution that has the required guaranteed watertightness whilst also delivering the architectural vision.”Additional challengesThe project started in 2020, just as the UK was trying to navigate the guidelines for operating during the COVID-19 pandemic. Matthew explains: “there were still restrictions in place, such as a general 2-metre distancing requirement, which was challenging in the tighter spaces, for example corridors where you literally couldn’t pass another person. We had an unusually hot summer also, which wasn’t helpful when you have workers in full PPE using 1,400-degree butane torches where use of naked flame was permitted in accordance with NFRC Safe2Torch guidance.”The overall scope of the project, which encompassed multiple terraces at different levels and a mixture of concrete, CLT and steel frame structural composites, was a defining characteristic. “This was a large-scale development to begin with,” adds Matthew. “Furthermore, the university emphasised from the start the centrality of the significant sustainability objectives, and MICA had ambitious solutions in mind in terms of the materials used. Our job was to accommodate these various requests while keeping in mind all of the regulatory and compliance requirements. Achieving those without exception, for a large number of surfaces, does become more challenging where each part of the project has several ambitious aspirations intersecting with one another. Fortunately, we are known for always rising to a challenge.”SolutionsThe pandemic accelerated the shift to a range of technological solutions replacing traditional or face-to-face approaches. Systems were evolved for everything from distancing to digital rather than traditionally signed delivery acceptance.“As a manufacturer, we don’t have to be on site every day,” notes Matthew, “but traditionally we would attend fairly frequently, as well as meeting regularly with partners to agree and then oversee various aspects of the project plan. Fortunately, Axter was already moving towards solutions such as virtual meetings, so we simply shifted much more quickly to those approaches, using them wherever possible.“I think one advantage we have is the breadth of the product range we design. We can offer clients such as Jesus College a full system approach involving multiple solutions, to ensure we use the right system for the right application on each occasion. Our accredited installers are carefully vetted and trained by us, and have worked with us for long enough to know our products inside out.”The range of products we are able to offer, all developed in-house, does testify to the culture of Axter. Comments Matthew: “We are very much a technically-oriented company and that runs through every aspect of our work and our staff. Our sales team are all very aware of the products on that level, they aren’t selling products they don’t fully understand the technical details of. Our long-term partners know that what we offer them is reassurance that, from early-stage design meetings through to completion, whatever challenges they put to us, our response will be considered and robust in terms of quality and compliance.”Systems and products usedExternal stair cores used Axter Starcoat PMMA liquid waterproofing membranes.For the main quad and some lower areas, our innovative Force Dalle warm roof solution was used.Our Excel reinforced waterproofing membranes were used as an exposed membrane finish, with a tapered insulation to ensure the falls and consequent drainage characteristics required by BS 6229.Axter’s Cityflor warm living roof membranes were used as buried applications in several roof terraces, again with tapered insulation.Self-adhesive membranes were used where necessary to ensure compliance with NFRC Safe2Torch Guidelines, especially required due to the timber elements.Acknowledgments"To deliver the increasing demand on a building’s performance specification, combined with the seamless aesthetics of contemporary architectural design, an advanced understanding of technical detailing is required in the design and construction process. The design criteria have also resulted in an extensive range of engineered systems on the market to provide certified, technical solutions for multifaceted interfaces.Working directly with the designers and product manufacturers, we prioritise a full system approach to the weather-tightness of the building, focusing on durability, termination and compliance with current regulations. I have worked with the team at MICA Architects and Axter’s Matthew Saunders on a number of challenging projects, including The Cheng Yu Tung Building, Jesus College, and the HB Allen Centre, Keble College. Matthew Saunders has always been a key consultant for the technical specification of above ground waterproofing systems and the buildings’ thermal performance. He’s an expert in technical detailing and advisor on the materials required to deliver the optimum waterproofing system for the building."Eric O’Hare, Design Manager, BAM Construction www.bam.co.ukWith special thanks to: Tomasz Zozak, who provided the photographs, and BAM Construction Ltd.
Sponsored
Alderley Park, Science and Innovation hub

Alderley Park, Science and Innovation hub

Garland UK

Formerly the home of AstraZeneca, Alderley Park is a world-leading life science and innovation campus situated across 93,000 sqm on the outskirts of Manchester city centre. With a mix of new-build waterproofing requirements and existing roof refurbishments, the client appointed Garland UK as a roofing partner across the multi-building site. Alongside the refurbishment and new-build site works, Garland UK was also briefed to provide a tailored design specification for the Glasshouse Project, which would become the largest triple pitched standing seam roof in the UK.Garland UK's 3 system portfolio of high-quality bituminous membranes, cold applied liquid coatings and profiled metal ensured that each roof would get the right system for its unique challenge.
Sponsored
Green Roof - The Liner Apartments Falmouth

Green Roof - The Liner Apartments Falmouth

Sika Limited

Luxury coastal apartments able to withstand the elements with Sika roofing system. Owing to its beautiful coastal location, The Liner, a nautical-inspired £35 m residential new-build in Falmouth, presented a compelling roofing challenge. Exeter-based roofing contractor, Progressive Systems, assisted by Sika, took on the task, installing a roof to withstand the harsh seaside conditions with an immaculate finish.Green roof composed of:Sika® Sarnafil® G410 18EL PVC Single Ply Waterproofing Membrane.Sarnavap® 5000E SA Vapour Control Layer.Sarnafil® Primer 610.Sarnatherm® ‘G’ insulation.Sikalastic® 625.Sarnafil® G445-13 PVC Protection Sheet.Sika® Green Roof System.
Sponsored
Luxury Hotel Bathrooms - Hyatt Blackfriars

Luxury Hotel Bathrooms - Hyatt Blackfriars

Wedi Systems (UK) Ltd

Grade II listed hotel in the heart of the City of LondonHyatt Regency London Blackfriars is located in the historic Square Mile, directly outside Blackfriars station, and is a short stroll from St. Paul’s Cathedral, the Tate Modern and Shakespeare’s Globe Theatre. The Grade II-listed five-star hotel is steeped in regal history, residing on the former grounds of King Henry VIII's Bridewell Palace.195 rooms had wedi XPS shower tray formers (the wedi Fundo Riolito neo) featuring a linear drainage channel with continuous slope right to the channel and more flexible adjustment for tiling. Providing a complete abP-approved, CE marked and BBA accredited waterproof system, removing the need for labour intensive tanking because no further sealing is required.
Sponsored
Deptford Anthology

Deptford Anthology

Shield Membranes Ltd

Made up of eight buildings and one tower, Deptford Foundry houses 276 private homes in total. A selection of one, two and three-bedroom homes are on offer, all boasting balconies or terraces.Deptford Foundry also has 32,000 sq ft of studio spaces provided by Second Floor Studio & Arts spaces for over 450 artists, crafters, designers and makers, plus its residents have access to a beautiful, communal landscape garden.Set in a thriving local community, the rest of the city is also within easy reach via the nearby stations at New Cross and Deptford.Shield Membranes supplied all external waterproofing, insulation and finishing products. Including our own ShieldINTENSIVE living roof product to provide an aesthetically pleasing finish to external areas.
Sponsored
Paxman Avenue Secondary School

Paxman Avenue Secondary School

Bauder Ltd

Paxman Avenue Secondary SchoolBauderflex bituminous waterproofing system with Euroglaze rooflightsSynopsisPaxman Avenue Secondary School is a new build project situated in Colchester, Essex. The school opened its doors for the first time in September 2019 welcoming 180 year 7 students. It is expected that the school will eventually hold 900 pupils by 2023.Bauder Building BoardProject: Paxman Avenue Secondary SchoolLocation: Colchester, EssexProject type: New buildRoof size: 2500m²Architect: Concertus Design & Property ConsultantsMain contractor: Barnes ConstructionApproved contractor: G.R.M Roofing Company LtdThe specificationThe main contractor, Barnes Construction, was looking for a durable, cost effective roof with longevity, and wanted a waterproofing system which included a comprehensive guarantee with great service and full support from the supplier, and so Bauder’s bituminous system, Bauderflex, was specified. Rooflights were also specified to increase natural light into the building.Bauder’s Rainwater Calculation Software was also used to perform calculations in accordance with BS EN 12056-3:2000 based upon provided data relating to the building’s dimensions, geographical location and the flow rate performance of the selected Bauder rainwater outlet product. This helped to determine the total number of outlets needed for the roof.Products appliedBauderflexA reinforced bituminous membrane system with a choice of self-adhesive and torch-applied membranes that are resistant to high levels of structural and thermal movement. Bauder Euroglaze rooflightsThese rooflights are made to order and the size can therefore be tailor made to fit any roof aperture, with many ventilation and glazing options are available to meet the demands of any type of project.The resultThe client was supported by the Bauder Area Technical Manager, Andy Leggett, from start to finish with help being provided on the design element of the project, and the Bauder approved contractors, G.R.M Roofing Company Ltd, were supported by Bauder site technicians throughout the installation.
Sponsored
JACKOBOARD® is the “ideal” companion for underfloor heating

JACKOBOARD® is the “ideal” companion for underfloor heating

BEWI UK Construction

The JACKOBOARD range from BEWI is “ideal” for use as a tile backerboard on projects where increasingly popular underfloor heating systems are being installed, the company says.Made from extruded polystyrene foam (XPS), the construction boards are said to be inherently waterproof because the structure of the board does not allow water to penetrate. They are designed to be easy to work with and cut, as well as truly lightweight.They are finished on both sides with a special coating and reinforced fibreglass mesh, ready to be tiled, rendered or plastered. The boards are said to possess excellent thermal insulation properties, which give them enormous advantages over plasterboard or cement board. They are especially suitable for interior construction, the company says, especially in rooms subject to high moisture levels.According to BEWI, JACKOBOARD goes “beyond bathrooms” and can be used in any room of the house and as a backerboard for virtually any tiling project.The boards are suitable for quickly and effectively levelling uneven walls and floors, for partition walls, compensating for cracks in substrates and for creating substrates for laying tiles on non-adhesive surfaces.JACKOBOARD is also said to provide the best waterproof, insulated, tiling substrate for underfloor heating projects. Whether electric mats or hot water systems are being installed, BEWI says, JACKOBOARD – laid underneath the heating elements or pipework – will help to decrease warm-up times of the system by pushing the heat directly up to the tile layer. In this way, the heat generated by the system is used in the most efficient way, not just during the initial heat-up stage, but in general usage with the continued thermostat-controlled use of the heating system.As builders are forced to reduce the carbon footprint of their projects, the materials they choose to build with can provide a key to unlocking the thermal performance of a building. The XPS foam used on JACKOBOARD products reportedly achieves excellent insulation properties. It’s designed to help maximise the energy efficiency of walls and floors, improving the overall thermal performance of any property.www.bewi.com
Sponsored
Rhondda Heritage Park

Rhondda Heritage Park

Polyroof Products Ltd

The Rhondda Heritage Park is a renowned tourist destination in South Wales, offering a glimpse into the coal mining community that thrived in the area for over 130 years until the early 1980s. Every year, thousands of visitors take a guided tour led by former colliery workers to experience the life of coal miners.The Heritage Park takes great pride in its appearance and the local heritage it represents. However, the aging asphalt roof terraces that covered the old mine shafts had been leaking constantly, damaging the visual appeal of the visitor site.The ChallengeThe Polyroof technical team was called in to help with the waterproofing and refurbishment of the two roof terraces, measuring over 1100m², that protected the underground mining attraction. After conducting a thorough survey of the roof terrace areas, a customized specification was prepared. This specification included a comprehensive set of recommendations for addressing the issues that had caused the aged and worn condition of the terrace areas over the years. To support the proposal, additional information was provided to the client to demonstrate how a liquid system could seamlessly encase and waterproof the terraces while maintaining an aesthetically pleasing solution that was true to the authenticity of the site.Satisfied that the solution proposed would provide the long-term peace of mind they were looking for, the Heritage Park awarded the contract to RM Polymers Ltd.Before starting the work, any areas affected by fungal growth or moss were treated with Polykill Anti-Fungal Wash to eliminate all spores. Any holes in the asphalt were smoothed out or removed, and levelled using Polyroof Structural Repair Mortar. All large cracks and voids were cleaned and repaired using the same mortar.PVC protrusions were removed and surfaces were cleaned with acetone. Any damaged, loose, or unsound concrete or brickwork was removed and repaired using Polyroof Structural Repair Mortar. All repairs were allowed to cure and dry before priming.The SolutionOne of the main features of the tourist attraction is the mining carts that were used to transport coal around the mine tunnels during its operation. Similar to train tracks, the mining cart tracks are fixed into the ground using metal bolts and fixings which over time had become a weak point for water ingress. Concrete and sandstone had been used as a “quick fix” to prevent rainwater entering the mine shaft below but a long-term solution was now needed. The cement and sandstone was carefully chiselled from the rails, exposing the original metal tracks which were then lifted and abraded back to their original condition. Whilst lifted, the underlying surface was made good before the application of the Protec System. Railway sleepers were then laid on a sacrificial layer on top of the waterproof membrane, upon which the tracks and mining carts were re-instated.As the terraces are constantly trafficked by the general public, the client was clear that an anti-slip finish would be required on any walkway areas.Following the application of the Protec System, Polyfinish and Quartz Sand Anti-Slip was applied to all walkway areas, to provide slip resistance and surface protection. A 50mm margin around the perimeters of the terrace was masked off to provide a neat termination of the anti-slip finish. Ensure masking tape was removed whilst resin was still wet. Then a third coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and whilst wet, clean dried quartz sand (0.7 – 12mm) was broadcast at an approximate coverage rate of 4.0kg/m². Once cured, the loose sand was removed.WorkmanshipThe engine houses along the tour experience featured vast amounts of intricate details and unique items and structures, such as “Bertie and Trefor” – the names given by the mine owner to the mine head stock wheels. This presented an exceptional challenge, particularly in regards to the difficulty of working on the intricate details of the degraded mastic asphalt upstands and decking.As a result of many years of weathering and gravity, the vertical sections of asphalt on the raised terraced roof had slumped and rippled, leading to stress cracks and ultimately water ingress. To overcome this ugly problem, the asphalt was stripped from these vertical sections back to the concrete and removed from site in accordance with the Health and Safety policies in place. The contractor then installed new 18mm OSB3 to these areas to create a flat substrate for the Protec System. The incorporation of Polyroof pre-formed GRP Drip trims at the bottom of the OSB3 ensured the timber would not be exposed to any rain water in the future as well as provide a neat, edge detail.To keep the overall aesthetic feel of the site, the application of the liquid waterproofing system at wall abutments was critical. This, combined with the undulating nature of the stone and brickwork meant that the contractor would not be able to install a cover flashing or termination bar. Instead, the contractor carefully dressed the system onto the wall to the standard minimum 150mm upstand height and into a chase.The edging was then finished with a mortar to provide a neat and clean weatherproof finish, in-keeping with the traditional methods of the site at the time of its construction.The roof terraces that cover the old mining areas also act as the main walkways to the Heritage Centre’s tour routes. Therefore, one of the main challenges of the project was the complex planning of the works to ensure that the site continued to operate so not to financially impact the heritage park. It was imperative that works were complete within an 8-week period with 17,500 visitors booked in for their annual Santa’s Grotto Experience Tour beginning in early December.The application speed of the catalyst cured Protec System, combined with communication between the contractor and the site to ensure unobtrusive installation, meant the centre stayed open and the tours running with minimum disruption.The benefits of using a fast-curing liquid waterproofing solution were also vital due to the ever-changing micro-climate in the Welsh valleys. On any single day, the weather would serve up anything from bright sunshine to windy, rainy conditions. Therefore, the fast-curing Protec System, combined with the flexibility of the installation team, who gave up weekends when required, ensured the project was finished on schedule. The works were completed to an extremely high standard with full encapsulation of the roof terrace areas and without a single detail being left exposed to the elements.ConclusionThe unique aspects of this project certainly kept the team on their toes. But they were determined to complete the project on time.The team worked tirelessly, even giving up their weekends to ensure that the project was completed on schedule. Despite the harsh Welsh weather, they pushed on and were determined to make sure that Santa could visit the children of the Welsh Valleys. It was a challenging project but the team’s hard work and dedication paid off.Finally, the project was completed and the results were astounding. The roof terraces are now fully waterproofed and refurbished, and the visual appearance of the visitor site was greatly improved. It was a project that was both memorable and rewarding to all those involved.
Sponsored
Museum of the Home, London. Koster TPO Single Ply Membrane.

Museum of the Home, London. Koster TPO Single Ply Membrane.

Koster Aquatecnic Ltd

A new extension and internal fit out was designed by Wright and Wright Architects of London. It gave a modern and fresh look to the original 18th century listed building. New Gallery space, a cafe, and leaning spaces have all been incorporated into the new building.Koster Aquatecnic Ltd were involved in this project at an early stage. We gave advice on the below ground areas as well as the waterproofing for the green roof.The Koster TPO Single Ply Membrane was selected as the material of choice to cover the flat roof section primarily due to its the environmental characteristics. The Koster TPO membrane is recyclable, contains no PVC, and is the most robust and longest lasting membrane on the market. The Slate Grey color (RAL 7015) was selected as it would blend in with the overall look the clients were trying to achieve. This project was fully Electronically tested prior to the green roof sedum blanket being installed. 
Sponsored
Kingsway Gardens, Residential Balcony Upgrades

Kingsway Gardens, Residential Balcony Upgrades

Garland UK

Kingsway Gardens, located in a leafy suburb of Hampshire, is made up of 5 residential blocks of flats that had been experiencing a large number of leaks across their balconies on multiple levels.The existing asphalt was showing signs of wear and tear with age degradation, where the lack of a full cavity tray, had meant the perimeter upstand had not been sufficiently protected for many years. With many attempts being made to patch the repairs, eventually, the insulation beneath the asphalt had become saturated, severely reducing its effectiveness as an insulator and having a detrimental effect on the U-Value of the buildings.Garland Technical Manager, Paul Boole and Technical Assistant, James Hiscock was instructed by property and construction consultants, The Welling Partnership, to provide their technical expertise and support to survey Kingsway Gardens and propose a tailored waterproofing specification for the residents.
Sponsored
Mono M311 Glass Balustrades for Park Brow Primary School

Mono M311 Glass Balustrades for Park Brow Primary School

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixThrough the early design stages of this impressive project, Delta Balustrades worked closely with the Liverpool based architects to develop the specification, design and technical details of the balustrade system.As one of the main features of the building, the Mono balustrade system to stairs, atriums, and external terraces with its minimalistic and subtle appearance, transformed the architect’s vision into reality.To meet requirements for buildings designed for children a lower handrail at 600mm above pitch line was required to the stair balustrades and the glass infill panels were required to extend to 1500mm above FFL and stair pitch line.On site close cooperation with the main contractor was necessary to conceal the baluster fixings below the finished floor level in line with the architect’s specification. Externally, this required an early fix of the balustrades without the glass infills, to enable the contractor to complete the waterproofing in view of subsequent trades progressing.
Sponsored
Kingston Gas Works, Berkeley Group

Kingston Gas Works, Berkeley Group

Wedi Systems (UK) Ltd

A recent project of the Berkeley Group, the Kingston Gas Works with 240 apartments called for a special solution due to the maximum construction height available for the shower being only 100mm including tray and drainage. All showers were constructed with XPS integrated shower elements (wedi Fundo Integro), which are only 90mm thick including the integrated DN50 drainage. Despite the low construction height, the specified solution offers no compromise on the flow rate of the drainage. Complete waterproof bathrooms - walk-in shower with a niche, building boards on walls & floors with sound insulation. Products:wedi Fundo Integro shower element with integrated drainage (1800x900x90mm) wedi building boards 10mm & 12.5mm - for walls and floorswedi prefabricated niche wall element wedi Non-step sound insulation composite panel (reduction by 16db)
Sponsored
Vibration Isolation of Property near Railway Line

Vibration Isolation of Property near Railway Line

Total Vibration Solutions Limited t/a TVS Group

TVS was Group was tasked with the isolation of a new luxury residential property in Mayfair from ground-borne noise and vibration from the nearby Jubilee line. A target re-radiated noise criterion of 30dB LAmax,(slow) within the lower ground floor (the worst affected area) meant that a fully floated raft foundation was required with a target natural frequency of 10Hz.A combination of Sylodyn products in 50mm thickness across the base of the raft, and Sylomer materials in 37.5mm thickness up the basement walls, provided this high-performance solution, whilst bespoke treatments around service penetrations and at connections to adjacent buildings ensured that this was not compromised throughout the rest of the construction.Close work with the design team throughout the planning and specification process provided a solution that integrated seamlessly with the structure and waterproofing detail, whilst detailed layout plans, on-site training and supervision resulted in an easily installed system.
Sponsored
School Heating Renovation

School Heating Renovation

Kompozit'All UK

application area: commercial gas heatinguse type: condensing gas boilersproject scope: line commercial freestanding chimney for condensing operationadded value: corrosion-resistant, air-tight and waterproof finishBackgroundThe combustion gases from the school's boiler room are exhausted through a freestanding 28-metre brick chimney. The structure was not suitable for the wet operation of condensing boilers. FuranFlex-25 Black was the chosen lining material.The new boiler plant required a 500mm diameter flue liner but the chimney could not accommodate a rigid liner this size. A FuranFlex25 Black liner was therefore specified as it expands into the rectangular flue shape when inflated with steam.Statement of workFuranFlex25 comes as a folded and soft tube. Inflating with steam irreversably hardens the liner fixing it in place. Within a few hours of steaming the liner was ready for connecting to the boilers. The appropriate adaptors/terminals were fitted making the chimney ready for operation.
Sponsored
Southampton General Hospital, New Oncology Ward

Southampton General Hospital, New Oncology Ward

Garland UK

A brand new, state of the art Oncology Unit had been proposed for Southampton General Hospital, to become a flagship facility for the area. Designed to house 27 dedicated beds, cutting edge treatment rooms and medical equipment, the new Oncology Unit would provide life-saving treatment for cancer patients and essential support services to the locality.With works originally scheduled to commence during the COVID-19 pandemic, the NHS Trust Estates Team worked closely with Garland UK and all contractors to speed up the construction as safely as possible, to ensure the vital facilities were available at the earliest convenience.From the outset, Southampton General clearly outlined their future intentions to increase the capacity of the Oncology Unit, and fully utilise the inverted roof design by adding extra stories of ward space.As an essential part of Garland’s brief, the unique design intentions for the building had to be factored in and the rooftop waterproofing system required careful planning.
Sponsored
Olympic Village, Stratford

Olympic Village, Stratford

Radmat Building Products Ltd

As part of the regeneration programme within the bid for the 2012 Summer Olympics, the Olympic Village (now known as the multiple award-winning East Village) was designed to house the athletes based on reusing the buildings after the games as a new residential district for Stratford.The 67 acres site, provided for 11 residential plots, each made up of 5 to 7 blocks, built around communal squares and courtyards, with water features accentuating the proximity of the River Lea.Radmat Building Products provided the waterproofing system and the MedO Extensive living green roofs on much of the apartments, to provide a low maintenance and self-sustaining plant community. Working with expert horticulturalists, Radmat Building Products have developed the MedO range of living green roofing systems. All systems are suitable for both new and refurbishment projects and are constructed using the appropriate drainage board, filter fleece and growing medium for the planting required.
Sponsored
Fire safety and cleanability design for Battersea Dogs and Cats Home, London

Fire safety and cleanability design for Battersea Dogs and Cats Home, London

Dortek Ltd

Battersea Dogs & Cats Home was established in 1860 by Mary Tealby as the Temporary Home for Lost and Starving Dogs. Since it opened, the charity has cared for more than 3.1 million dogs and cats. To increase capacity at their old Windsor site BDCH are adding a new wing.The animal charity required specialist doors for a new intake building which includes 27 kennels and 4 maternity kennels.Dortek supplied hygienic hinged doors with Stainless Steel frames throughout the new building. Some doors also had automations and access control locks for ease of access and increased security. Fire doors with 30 minutes certification were also supplied for the protection of animals and staff throughout the facility.The GRP construction of Dortek doors makes them easy to clean, waterproof and extremely robust. They are ideally suited to animal care facilities requiring a low maintenance design.
Sponsored
Hadrian’s Tower

Hadrian’s Tower

Shield Membranes Ltd

The project comprised the construction of Newcastle’s tallest building, Hadrian’s Tower on behalf of The High Street Group. Following a 30-month build programme, the 26-storey luxury high-rise mixed-use development in the heart of Newcastle was handed over, with more than 60% of the apartments already sold or let at the point of handover.The development included 160 units which comprised a mix of studio, one and two-bedroom apartments and three spacious three-bedroom penthouse suites. Hadrian’s Tower offers 134,000 sq ft of modern living space a 4,300 sq ft rooftop sky bar and coffee house on the 27th floor.The scheme has redeveloped and in turn transformed the dilapidated city centre brownfield site into a high-quality pedestrian route into the city centre.Shield Membranes supplied numerous products and systems in order to waterproof, insulate and finish all external areas.
Sponsored
Roof-top Screen at Pioneer Foodstore, Carlisle

Roof-top Screen at Pioneer Foodstore, Carlisle

Lang+Fulton

The new flagship outlet of Pioneer Foodstore in Carlisle was built to a high specification with the aim of significantly extending their client base. The planning application had to meet the requirement for a screen to conceal the roof-top services and air-conditioning plant.Italia-80V was proposed, which could be bent to a radius, to fulfill the vision for a semi-circular end to one side of the compound. The 2950mm high steel louvre panels were welded onto appropriately shaped RSA support rails at top and bottom, which were supplied with multiple holes for fixing to the posts to ensure perfect continuity of spacing. A double-leaf gate was also seamlessly incorporated by using a front fixing design.Lang+Fulton worked closely with the architect at an early stage to advise on the fixing points for the posts which would carry the screen. This ensured that the thermal barrier and waterproof membrane could be wrapped up the footings for a neat and effective installation.
Sponsored
Woolwich Works - Del Carmen Ultra

Woolwich Works - Del Carmen Ultra

Spanish Slate Quarries UK Ltd

Woolwich Works (previously known as Woolwich Creative District) is a £31 million project by the Royal Borough of Greenwich to restore five heritage Grade II listed buildings on the Royal Arsenal, creating a new landmark cultural hub for London. With large-scale, flexible performance and event spaces, rehearsal studios, bars and a café, the site will be home to a number of local, national and internationally-renowned resident artistic companies including Punchdrunk, the hugely successful immersive theatre.The major investment brought a series of landmark historic buildings back into use to form the creative district. Bennetts Associates have been appointed to carry out the plan to transform five buildings, including The Carriageworks, previously known as Building 19. The work to the building included sensitively restored roof and windows to ensure adequate soundproofing. The Mace Group, and Arc Waterproofing were delivering Woolwich Creative District, transforming a historic military complex into a major cultural destination.