NBS Source
I'm a manufacturer

Hadrian’s Tower

OVERVIEW

The project comprised the construction of Newcastle’s tallest building, Hadrian’s Tower on behalf of The High Street Group. Following a 30-month build programme, the 26-storey luxury high-rise mixed-use development in the heart of Newcastle was handed over, with more than 60% of the apartments already sold or let at the point of handover.


The development included 160 units which comprised a mix of studio, one and two-bedroom apartments and three spacious three-bedroom penthouse suites. Hadrian’s Tower offers 134,000 sq ft of modern living space a 4,300 sq ft rooftop sky bar and coffee house on the 27th floor.


The scheme has redeveloped and in turn transformed the dilapidated city centre brownfield site into a high-quality pedestrian route into the city centre.


Shield Membranes supplied numerous products and systems in order to waterproof, insulate and finish all external areas.

No featured products in this case study

Contact Shield Membranes Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Shield Membranes Ltd

View all case studies (7)
Papworth Hospital

Papworth Hospital

Deptford Anthology

Deptford Anthology

Friars Walk Shopping Centre

Friars Walk Shopping Centre

University of Kent – Sibson Building

University of Kent – Sibson Building