NBS Source
I'm a manufacturer

"water"

6,786 results found

Sort by:

Showing 649-684 of 711

Sponsored
National Physical Laboratory

National Physical Laboratory

KWC DVS Limited

The National Physical Labratory, the UK’s National Metrology Institue, was due a washroom upgrade and Dart Valley Systems provided products for the project. Developing and maintaining national primary measurement standards, the NPL has been responsible for building eliable and successful measurment foundations that help towards evolving antibiotics to tackle resistence, more effective cancer treatments, superfast 5G and unhackable quantum communications. The range of products provided are as follows: • 40 x AT03-011 Aquarius DM A45 tap spout only in s/steel with pex hose • 40 x WC02-013 Concealed plastic cistern kit – vertical – 1 ½“ • 40 x WC03-013 Low voltage WC flushvalve with programmable sensor (1 ½“ base c/w mains PSU) • 17 x WC02-001 Concealed plastic cistern – cistern only – 1 ½“ • 17 x UC00-002 Auto-Syphon for cisterns – 8 ¼“ x 1 ½“ BSP • 12 x AT00-007 Two station mains kit low pressure 0.5-1 BAR • 3 x AT00-003 Two station mains kit standard pressure 1-10 BAR • 1 x AT00-002 Single station mains kit standard pressure 1-10 BAR • 1 x AT00-004 Three station mains kit standard pressure 1-10 BAR • 2 x AT00-006 Single station mains kit low pressure 0.5-1 BAR • 2 x AT00-008 Three station mains kit low pressure 0.5-1 BAR • 7 X UC01-024 Flushmatic downlighter kit for suspended ceilings in White - Mains • 24 x AC17-047 Thermostatic mixing valve 4in1 15/22mm Our DVS no-touch WC flushing system is an electroincally operated drop valve which replaces the traditional syphon and delivers a measured volume of water from the cistern to the lavatory bowl. A simple wave of a hand past the fitted sensor will acitivate the electronic Flushvalve.The system typically saves 30% on water costs, is vandal proof and easy to install a maintain. For over a hundred years, the NPL has worked with it’s customers to convert scientific proficiency into economic success, proficent employment and the enhanced quality of life. As an insitute that has aided in saving lives and protecting our enviroment National Physical Labratory has played a huge role in helping the British public feel safe and secure. 
Sponsored
Little Corkhill Farm - F. Ball enables quick getaway

Little Corkhill Farm - F. Ball enables quick getaway

Ball, F and Co Ltd

F. Ball and Co. Ltd.’s newest high-performance water-mix smoothing underlayment, Stopgap 1500 AquaPro, and Styccobond F48 PLUS temperature tolerant fibre-reinforced adhesive have enabled a fast-track LVT installation as part of barn conversions to create three holiday cottages in rural Nottinghamshire.Flooring contractors installed floorcoverings in bedrooms, open-plan living and dining areas and corridors of three previously disused farm buildings of varying size, a total area of over 200m2.Work began by sanding down the new concrete bases, which had been installed as part of the renovation of the properties, by mechanically preparing them, removing any laitance, contamination, dust and debris, to leave a solid, sound, micro textured surface to receive floor preparation products.A moisture test was undertaken by one of F. Ball’s technical representatives to ensure that the building’s subfloors were dry enough to receive floorcoverings. Surfaces were then primed using Stopgap P131 general-purpose primer to promote the application characteristics of subsequently applied subfloor preparation products.Stopgap 1500 AquaPro was applied to create a perfectly smooth base for floorcoverings. Fast-setting and fast-drying, it is walk-on hard in as little as 60 minutes after application and ready to receive floorcoverings from just four hours. The product uses the latest technology to offer a water-mix smoothing underlayment that can be applied over old adhesive residues, including bitumen, carpet tile tackifiers and ceramic tile adhesives. As it is moisture resistant, it can be applied to damp subfloors prior to the application of a waterproof surface membrane.Flooring contractors then used Styccobond F48 PLUS to adhere 7-inch wood-effect vinyl planks in each of the three cottages. The temperature tolerant adhesive holds floorcoverings in place when subject to high temperatures, which may be an issue as a result of solar gain caused by large patio doors. This can cause tenting and gapping at the edges of vinyl floorcoverings as a result of repeated expansion and contraction over time. Fibres in the adhesive also provide high initial grab, a benefit when installing LVTs.Commenting on the project, Anthony Holmewood, fitter at Forester Flooring, said: “Using Stopgap 1500 AquaPro meant that we could complete the work in less than a week. We opted for Styccobond F48 PLUS to install LVTs mainly because we like the adhesive, but also for the reason that floorcoverings are exposed to direct sunlight in some areas.”
Sponsored
National Physical Laboratory

National Physical Laboratory

Dart Valley Systems Ltd

The National Physical Laboratory, the UK’s National Metrology Institute, was due a washroom upgrade and Dart Valley Systems provided products for the project. Developing and maintaining national primary measurement standards, the NPL has been responsible for building reliable and successful measurement foundations that help evolve antibiotics to tackle resistance, more effective cancer treatments, superfast 5G and unhackable quantum communications. The range of products provided are as follows: ·       40 x AT03-011 Aquarius DM A45 tap spout only in s/steel with pex hoses ·       40 x WC02-013 Concealed plastic cistern kit – vertical – 1 ½“·       40 x WC03-013 Low voltage WC flush valve with programmable sensor (1 ½“ base c/w mains PSU)·       17 x WC02-001 Concealed plastic cistern – cistern only – 1 ½“ ·       17 x UC00-002 Auto-Syphon for cisterns – 8 ¼“ x 1 ½“ BSP ·       12 x AT00-007 Two station mains kit low pressure 0.5-1 BAR·       3 x AT00-003 Two station mains kit standard pressure 1-10 BAR ·       1 x AT00-002 Single station mains kit standard pressure 1-10 BAR ·       1 x AT00-004 Three station mains kit standard pressure 1-10 BAR·       2 x AT00-006 Single station mains kit low pressure 0.5-1 BAR  ·       2 x AT00-008 Three station mains kit low pressure 0.5-1 BAR·       7 X UC01-024 Flushmatic downlighter kit for suspended ceilings in White - Mains ·       24 x AC17-047 Thermostatic mixing valve 4in1 15/22mm  Our DVS no-touch WC flushing system is an electronically operated drop valve that replaces the traditional syphon and delivers a measured volume of water to the lavatory bowl from the cistern. A simple wave of a hand past the fitted sensor will activate the electronic Flush valve. The system typically saves 30% on water costs, is vandal-proof, and is easy to install and maintain. For over a hundred years, the NPL has worked with its customers to convert scientific proficiency into economic success, proficient employment, and an enhanced quality of life. As an institute that has aided in saving lives and protecting our environment, National Physical Laboratory has played an enormous role in helping the British public feel safe and secure. 
Sponsored
Hotel MK

Hotel MK

Ecoprod Technique

About Doubletree by Hilton Hotel Milton KeynesHotel MK is a Hilton-branded hotel built into Stadium MK, home of MK Dons FC and 2015 Rugby World Cup venue. It has 304 bedrooms as well as multiple event spaces. Its conference space regularly accommodates up to 700 people for banquets, 1,000 for conferences and up to 2,500 on match day. Consequently the urinals in the conference area can experience very high usage. The hotel operates under the Hilton brand and so must comply with Hilton’s brand standards. It also takes part in Hilton’s Lightstay programme, designed to reduce energy and water usage throughout the Hilton portfolio.In 2016 Sue Dawson, the hotel’s Operations Director, was tasked with arranging the refurbishment of the two blocks of toilets in the hotel’s conference area. Waterless urinals were already in use in the Stadium and the hotel was keen to reduce its water usage further by installing them in the conference areas.Why did Hotel MK choose waterless urinals?Waterless urinals offered several benefits to the hotel. The conference area is not used every day so moving to waterless urinals means no water is used on the days that the conference area is not used. The hotel also needed to ensure that the installation fitted with Hilton’s brand standards for design. Waterless urinals offer an aesthetic advantage as the waste from them simply runs directly into the drains, eliminating the need for ugly pipes on show or any need to box pipes in. Draining into a wide pipe, rather than a narrow pipe as is the case with traditional urinals, also means that waterless urinals are highly unlikely ever to block.Why did Hotel MK choose URIMAT urinals?"I searched online for waterless urinals but none of the ones I looked at were particularly nice looking and it was very important to us to get something that fitted with the overall look of the facility and with Hilton’s own brand standards. When I came across Ecoprod I felt that their products were much more attractive and fitted with the clean look we wanted to achieve. They ticked all the boxes for us.The key selling points were the fact that the urinals were eco-friendly and the aesthetics of their design – that’s what sold me."Sue Dawson, Operations DirectorSmooth and quick installationThe installation was done by the hotel’s in-house team of builders and joiners in conjunction with external plumbing contractors and took only a few days to complete."I liaised with Edward at Ecoprod and together we agreed a plan and a delivery date. Everything went very smoothly. The products were all delivered on time. We arranged a split delivery so that one set of urinals could be installed while a second set remained in use."Sue Dawson, Operations DirectorPositive feedback from staff and customers"There have been no operational issues at all since launch. Edward came down to demonstrate the cleaning regime and everything is really hunky-dory. Ecoprod has been very helpful and on the case the whole time, very diligent and attentive, making sure we had everything we needed on time and knew what we were doing the whole time."Sue Dawson, Operations Director"Conference people notice the new urinals, and we do a lot of show arounds. They look so much better – much more hygienic than standard urinals.The cleaners have also noticed a difference. These urinals are mounted onto a wood board rather than tiles, so there’s no grout or other areas where dirt and residue can accumulate. The wood is much easier to wipe around. The hotel design is all driven by making things easier to clean so this is a really important consideration for us."Mark Watson, Operations Manager."It’s a very modern-looking facility – we’re very happy with the results – it feels fresh and modern."Sue Dawson, Operations Director
Sponsored
NATIONAL STATIONS IMPROVEMENT PROGRAMME BENEFITS FROM CLARK-DRAIN LINEAR DRAINAGE AND STEEL ACCESS COVERS

NATIONAL STATIONS IMPROVEMENT PROGRAMME BENEFITS FROM CLARK-DRAIN LINEAR DRAINAGE AND STEEL ACCESS COVERS

Clark-Drain Ltd

The refurbishment of platforms is part of Network Rail’s government funded National Stations Improvement Programme (NSIP ). The five year programme aims to deliver £179 million worth of station improvements to a minimum of 150 medium sized stations in England and Wales.An overarching objective of the programme is to achieve a noticeable improvement to the passenger perception of stations whilst providing value for money in station investments. Part of this remit involves aspects of customer comfort and safety, including ensuring that the control of surface water runoff is efficiently and effectively managed. For this project Murphy Group were commissioned by Network Rail as the main contractor.Clark-Drain has provided a total of 740m length CD 434 linear drainage channel for installation in three of the station‘s platforms to drain the surface water at a maximum rate of 4.6 l/s into silt box traps before discharge into the mains.The silt boxes work by retaining runoff to allow deposited silt to settle to the bottom of the basket before the water is discharged via the outlet pipe connection. The basket is located so that it is easily removed for periodic cleaning. Both the channels and silt boxes are lightweight and designed for easy handling, installation and maintenance. The bodies of the channel are constructed from recycled hard wearing polypropylene to protect them from damage and ensure long lasting durability. A BS EN 1433 Class B125 quick-fit grating with ‘CatchLock’ retention system provides all the strength required for the 12.5 tonne loading it was designed and tested to withstand and perfectly suits high trafficked station platforms.The narrow-slot ‘heel-guard’ design reduces the potential for tripping and slipping and provides a useful safety feature for passengers and rail staff.The weight of each one meter length, at 5kg, made it very easy to install enabling Murphy Group Engineers to lay several lengths in one go for faster levelling and taking 25% less building time  than heavier polymer concrete options. As part of the aesthetic appeal of the platform refurbishment, the CD 434 was specified because of its flexibility to follow the curve of the platform edge, giving uniformity and enhancing the visual appearance when laid to the same contour.In addition, the linear drainage channel was supplied with 450 x 450mm, 600 x 600mm and 750 x 600mm steel recessed covers and frames. These enabled 60 of the stations lighting cable access chambers to be securely covered and in-fi lled with the marble effect paving specified for the station floor as part of an attractive and functional design for the public to enjoy.WHY THE CD 434 WAS CHOSENLightweight – The one meter length channel and grate is lighter, weighing 5kg, compared to traditional concrete products weighing 20kg or more without being detrimental to its strength for EN1433 B125 loading.Reduced manual handling – Lightweight design and simpler, easier and safer installation provides greater emphasis on health and safety, reducing work related injuries.Easy and quick to install – Installing up to four lengths in one go enables faster levelling, taking 25% less time than traditional polymer concrete.Dual Locking – The Catchlock system simplifies locking of the grating yet enables safe and speedy access for maintenance. The optional anti-tamper bolt locking system provides added security against theft, reducing time and cost spent on replacing lost gratings.Anti-slip and narrow slot finish – Reduces the potential for tripping and slipping, helping to improve public safety.100% recycled – ‘Green’ credentials help toward reducing the carbon foot-print and act as a theft deterrent due to having no intrinsic scrap value.Enhanced durability – Carefully designed load transfer structure improves product life span and lowers maintenance and replacement costs.Heat resistant – The polypropylene/nylon properties make the CD 434 channel ideal for hot tarmac installation.
Sponsored
Museum of London - Visionary Roof

Museum of London - Visionary Roof

Bauder Ltd

Museum of London - Visionary RoofSynopsisThe Museum of London opened in 1976 on the historic London Wall and is a few minutes’ walk from St Paul’s Cathedral. A visionary approach to roofing had been adopted on a building that, will not only green as much of the exposed roofs as possible, but also provide a strong research aspect for future green roof projects. As with many buildings, the original roofs needed to be upgraded or replaced, at the same time as being brought up to date using environmental and sustainable solutions.Through the recommendation of waterproofing and green roof manufacturer Bauder Ltd, the Museum invited Dusty Gedge, one of the UK’s leading independent green roof consultants, to work directly with them to design 3500m² of varying habitats that encompassed the museum’s sustainable vision. and help in the provision of environments that would attract a range of wildlife, as well as being able to help the city adapt to climate change.Bauder Building BoardProject:Visionary roof, Muesum of LondonLocation:LondonProject type:RefurbishmentRoof size:9512m²Specifier:Museum of LondonRoofing contractor:Russell Trew LtdThe specificationAn independent consultant had previously carried out an energy model on the Museum of London buildings. When the museum inputted the green roof specification, it showed a potential energy saving of 10% per year, as well as a reduction on the future replacement costs of the heating and cooling plant. Some of the green roofs were funded through Drain London, a partnership project led by the Greater London Authority and funded by Defra. The project aims to better understand surface water flood risk across London, with a view to promote interventions (such as green roofs) to reduce surface water flooding. The museum has used the Bauder green roof system and worked closely with Dan Costen of Bauder and the roofing contractor Russell Trew Ltd, to deliver the various green roof spaces.These include:The refurbishment of the lower garden in the central courtyard with hard landscapingThe installation of Bauder’s new wildflower blanket to the upper garden in the central courtyard (funded through Drain London)Plug planting the roofs of the recently completed garden and terrace rooms that provide high quality corporate hire (matching the colour scheme chosen for the rotunda garden refurbishment and integrated with the new rainwater harvesting system funded by Renaissance London)An integrated sustainable urban drainage system (SuDS)Plug planting in other individual small roof areas including outside the boardroom and committee roomsTwo different planting schemes on an area of the main museum roof where the Drain London Project aims to carry out water attenuation researchThe resultRetrofitting green roofs will help to realise the Mayor of London’s ambition, to increase green cover in central London by 5% by 2030. The Museum of London is one of the largest retrofit green roof projects in the City and is certainly to be commended for allowing its roofs to be used for research purposes. Not only will it provide a benchmark for best practice, but it also demonstrates that retrofitting green roofs onto existing buildings is both environmentally and economically viable and is the way forward in helping London adapt to climate change.System installedBauderflex Green 1 BauderPLANT E 42A torch applied SBS elastomeric bitumen capping sheet. This product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green.AdvocacyGavin McCourt MRICS, Project Manager for The Museum of London said:“In producing the business case for installing green roofs, reference was made to the extensive published documents on the benefits of green roofs. In this case as the museum building had already been energy modelled by outside consultants, it was decided to input the green roof specification into the model. The results showed a potential energy saving of 10% per year, as well as a reduction in future replacement costs for heating and cooling plant. These factors, combined with the longer life cycle replacement of green roofs compared with normal felt roofing systems, enabled me to produce a robust business case for green roofs. With increasing energy prices the economic benefits of installing green roofs can only become more viable”Dusty Gedge added:“One of the major issues that London faces is flash floods during the summer, when sudden rainfall levels overwhelm the current drainage network. With the support of Drain London we will be researching the rainwater run-off for different green roofs. This will help us validate the kind of roofs and depth of substrates that will negate the costly effects that the sudden rainfall has on the infrastructure of the City.”
Sponsored
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Access Floors Distribution

Capella Development, Handyside, Kings Cross LondonDeveloper: ArgentMain contractor: Laing O’Rourke Architects: Chapman TaylorSub Contractor: InstaGroup120 newly built residential apartments received InstaCoustic's 'dry' cradle & batten system combining under floor heating & topped with Knauf GifaFloor FHB25.Original plans were to install a T&G chipboard to finish the acoustic floor system, however it was determined that there were deflection risks around the proposed large format tile finish.As a result, the chipboard was replaced by the high density, gypsum fibreboard Knauf GifaFloor FHB25. This resulted in:Quicker install & less use water than a wet screed systemImproved acoustic performanceImproved fire performanceImproved thermal efficiency resulting in reduced energy costs for the end userHigher loading performance, creating a solid substrate for the finish to be applied directly toReduction in overall embodied carbon & installation of a product that offers a high recycled contentLifetime guarantee of the buildingClick the link below to read the full case studyhttps://www.instacoustic.co.uk/case-study/kings-cross-london-n1c/
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
EWI for two high-rise residential towers

EWI for two high-rise residential towers

Sto Ltd

Located in Tower Hamlets, Gayton House and Sleaford House are managed by housing association Poplar HARCA. Following amendments to Building Regulations, which banned the use of combustible materials in external walls of high-rise buildings above 18m, StoTherm Mineral K was specified to replace the existing EWI system.BBA-certified, StoTherm Mineral K comprises mineral fibre insulation boards and the system is classified with an A2-s1, d0 reaction to fire in accordance with BS EN 13501-1.Working on behalf of Westminster Building Company, Square 1 Architectural Solutions was responsible for removing the existing EWI and installing the StoTherm Mineral K system onto four elevations on each 23-storey block. The non-combustible mineral fibre insulation boards were secured to the existing concrete substrate using adhesive and mechanical fixings, and without the need for additional expansion joints.A StoLevell Duo Plus reinforcing coat embedded with Sto-Glass Fibre Mesh was then applied to the face of the insulation boards. This was followed by the application of 1.5mm stippled StoSilco, a silicone resin render that provides high levels of water repellence to protect the walls from weathering.
Sponsored
Cannon Park Student Accommodation

Cannon Park Student Accommodation

Biotecture Limited

Cannon Park Shopping Centre in Coventry has undergone a significant transformation. Led by MPR, the redevelopment project includes refurbishment of the existing shopping centre, construction of a new 780-bed student residence, and the addition of a new 400-space multi-storey car park. Biotecture was brought on board to incorporate living walls into the development.In 2021, Biotecture installed a 690 square metre green wall on the multi-storey car park as part of the project’s first phase. We then continued to collaborate with the project’s architects, Urban Innovations, and landscape architects, Parkhood, on phase 2; 9 living walls on the student accommodation phase. The vertical greening was an important part of the scheme, helping to help soften the development, improve air quality, contribute to biodiversity net gain.The living walls are integrated into the building fabric. We worked closely with the design team to ensure that the living walls not only aligned with the desired aesthetics but also met the technical requirements.We used our BioPanel system which uses Grodan® as the growing medium. Grodan is dimensionally stable, chemically inert, and water retentive resulting in healthier and longer-lasting plants.
Sponsored
The Works

The Works

Forterra Building Products

Built on a largely derelict gap site, The Works is a development of 34 two-bedroomed apartments in the popular Yorkhill / Finnieston area of Glasgow, offering panoramic views over the city and the River Clyde. To accommodate the site’s slope, the development comprises a four-storey north side and a six-story south side.The development had to overcome a number of issues, including planning issues around daylighting and massing, and the challenge of building immediately adjacent to the Yorkhill railway tunnel.PROJECT INFOThe Works provides residents with off-street parking and use of a large communal garden, with ground floor properties having private rear gardens. Design emphasis is on open-plan layouts and generous room sizes. To take advantage of the views, the apartments feature south-facing and Juliet-style balconies.Ecostock Belgravia Gault Blend was selected to meet the requirements of both the client and planning for a high quality, light buff brick with grey tones that would match the surrounding buff sandstone tenements. The sustainability credentials and technical performance of Ecostock, with its low water absorption suiting the wet weather typical of the west of Scotland’s, also contributed to the selection decision.
Sponsored
MEGAgrip Safety Railing Installation On The River Thames

MEGAgrip Safety Railing Installation On The River Thames

Pure Vista Ltd

A safety railing on the River Thames. London’s longest pier, Royal Wharf includes a 162m² viewing platform for unparalleled views along the River Thames, now surrounded by a glass balustrade safety railing. Like many river-side locations, the view is spectacular and is preserved for the enjoyment of those walking by. The glass balustrade keeps the views in tact while also providing a safety barrier and windbreak along the length of the pier. The Royal Wharf Pier opened in 2019, after a refurbishment, and now provides quick transport to and from central London by water taxi. The use of MEGAgrip keeps the view of the River Thames while providing the necessary safety feature on the pier. MEGAgrip is Pure Vista’s answer to a heavy-duty and fully adjustable balustrade system. The internal glass clamps allow for easy alignment of the glass within the channel, making this one of the most easily adjustable systems available. MEGAgrip is ideal to be used as a public space barrier in busy locations such as transport hubs or venues. A benefit to this product is that it can be upgraded, with the use of a converter kit, to become bomb-resistant. For this project, MEGAgrip provides the most suitable safety railing on the River Thames.
Sponsored
BAA Case Study

BAA Case Study

Dart Valley Systems Ltd

Dart Valley Systems (DVS) were thrilled to be chosen for the refurbishment project at Heathrow Terminal 5. DVS worked with Heathrow Airport (formerly known as Heathrow Airport) for over 15 years, providing brassware and water controls and have become established as a trusted partner. The Terminal 5 design team at Heathrow Airport worked with DVS to expand the range to include flush valves, urinal controls, automatic taps amongst others to fulfil their requirements. This specification was then carried forward to future Terminal projects.After a thorough review of washroom products from leading suppliers, the Heathrow Airport design team nominated DVS as the preferred supplier. There was a high level of confidence in the reliability of the products and support provided from previous successful collaborations. The results, achieved through close collaboration, have provided both parties with significant benefits, Heathrow Airport obtained the exact specifications they required and DVS was able to produce some of their next generation products. With an anticipated 35 million passengers a year passing through the terminal, the products needed to be robust and able to withstand a high footfall, along with offering cost and operational savings. 
Sponsored
Palm Paper Factory Uetze

Palm Paper Factory Uetze

Trespa UK Ltd

Top-of-the-range lab solution for a major new production siteNext to the company’s headquarters in Aalen, 70km east of Stuttgart in Southern Germany, Papierfabrik Palm – one of the leading European manufacturers of papers for the printing industry, corrugated base papers and corrugated packaging – has built a brand-new paper mill. Its scale alone sets it in a category of its own: Palm invested half a billion Euros into the project, and to supply the production process with the required amount of steam, the site relies of the two largest water boilers in the world.This new paper mill, though, is just one of many milestones. Founded in 1872, Papierfabrik Palm operates in the meantime 33 production sites. In 2020, the company generated 1.5 billion Euros in global revenues. In terms of size and success, Palm epitomises the ‘hidden champions’ of the German economy ­– family-owned businesses that have combined highly professional management with ambitious international growth strategies to expand far beyond the usual bounda­ries of the category. In addition – and today more than ever – Papierfabrik Palm is ideally positioned to reap the benefits of sustainability: since its inception, the company has been using exclusively recycled raw materials.
Sponsored
Ocean Wharf, London

Ocean Wharf, London

MyDek Ltd

High-rise riverside apartment building refurbishmentLocated on the banks of the River Thames, Ocean Wharf is a high-rise apartment building that can be subject to salt-water spray during high tide and windy days. Timber decking had previously been fitted on the balconies and had started to deteriorate, as well as being identified as a fire risk by the Fire Risk Assessor.A high-quality decking system was required to replace the existing balcony decking. The chosen solution needed to have a premium look and feel in line with the luxury standard of the development. Luxura, being A1 fire-rated and resistant to salt which could have affected other types of decking, was the ideal choice for this project.As the installer hadn’t installed non-combustible decking before, they required some on-site support from our team who were able to provide a toolbox talk and check ongoing progress. This resulted in a fantastic end result with the installation completed to a very high standard.“The material was completely new to us, so we were a bit hesitant at first. However, now that we have experienced it, we wouldn’t want to use anything else.” - Installer, Ocean Wharf
Sponsored
Basingstoke Hospital, Basingstoke

Basingstoke Hospital, Basingstoke

Rapid Ramp Limited

PROJECT BACKGROUND: A mobile trailer was adapted into a Covid PCR Testing Laboratory.The staff test 6-7 thousand saliva pots every three weeks.REQUIREMENT: Temporary modular steps to replace the existing ones to the trailer. The current steps were too steep and narrow, with no handrails and platform.END RESULT: We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team. Removal is a service included in our rental package. The steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
Caernarfon Station

Caernarfon Station

Excelsior Panelling Systems Ltd

The ProjectFfestiniog and Welsh Highland Railway’s new Caernarfon Station forms part of a £15m Waterfront regeneration project led by Gwynedd County Council.Designed by Architects Purcell to include catering and retail facilities, the project hopes to bring an extra 5,000 visitors to the area as well as boosting the local economy. The Welsh Highland Railway is the UK's longest heritage railway, having been extended to a 25-mile line starting from beneath the castle walls in historic Caernarfon, the railway climbs to the foot of Snowdon before dropping again to sea level at the harbour in Porthmadog. The ChallengeProvide a washroom package befitting the iconic new station building.The station will need to cope with up to two hundred people at departure / arrival times with facilities to tell the story of both the waterfront and railways.Produce first class facilities capable of withstanding the rigors of high traffic footfall. The Solution Excelsior Mariner range offers extremely high levels of durability. Free standing, 12mm solid core panels are extremely robust and vandal resistant.Solid grade laminate used for the vanity units ensure water resistance and a solid, hard-wearing surface, guaranteed to withstand the test of time.
Sponsored
Exchange Square

Exchange Square

In Opera (UK) Limited

Exchange Square, designed by DSDHA, is a refurbishment of a major 1.5-acre public park above the tracks of Liverpool Street Station in London. Our terrazzo was supplied throughout, including water features, amphitheatre steps, paving and planter edges with complex 3D pieces. The challenge for In Opera was to provide over 3000 pieces, 90% of which were unique and many having to fit into each other perfectly. The 1.5-acre park will see a four-fold increase in the amount of planting and dramatically enhance biodiversity, with 25% of the area featuring green space that is accessible to all.Quadrupling the amount of green space at Broadgate, the aim is to boost the emotional and physical well-being of those that work at Broadgate and the local community while supporting British Land’s commitment to sustainability and biodiversity.We are proud to have been involved in such a major development, which aims to draw people together and help the communities thrive in a better environment. What was once a dark uninviting space has been transformed into a light and welcoming place where people can truly live, where communities and businesses can thrive, and that helps the planet to flourish. It is a more attractive, less corporate environment for Broadgate, which creates places to dwell, not just pass through.
Sponsored
Colchester County High School

Colchester County High School

Langley Waterproofing Systems Ltd

The purpose: Water penetration into classrooms alerted theOfsted “outstanding” rated Colchester County HighSchool for Girls in Essex to a problem with its roofs.Its premises advisors, Archer Building Consultancy,turned to Langley to offer technical support for themost efficient best-value rectification, with fundingprovided by the school’s governing body, The AlphaTrust.Our solution: We carried out an in-depth roof condition report which highlightedthat the four flat asphalt and 10° pitched copper standing seamroofs urgently need repair.We advised the most efficient solution and use of resources wasto strip the copper roof back to the plywood deck and form a newwaterproof layer from our TA-30 Flat Roofing System and theasphalt roofs overlaid with TA-30 and our Liquid Roofing System.By leaving the original roof, we were able to minimise disruption.In the process, we assessed the roofs for their suitability forphotovoltaic (PV) installation, then helped address energy costs:one over a three-storey building was deemed appropriate. Finally,in partnership with Archers, we supported the detail required toapply for Salix funding to cover the supply and installation of thePV array.
Sponsored
SPIG-LITEadvanced Domestic Garden Patio Installation

SPIG-LITEadvanced Domestic Garden Patio Installation

Pure Vista Ltd

A raised garden patio has been secured by a glass railing, supported by SPIG-LITEadvanced. The first few images of installations have been arriving and we love this one by Veon Glass Ltd. A raised patio must have it’s edges protected, but not everybody likes the look of wood or metal railing options. Glass provides a sleek and modern aspect to the garden. The SPIG-LITEadvanced raises the glass above the ground, allowing water to flow beneath, making it the ideal balustrade solution for poolside or wet areas. The product is lightweight and compact, enabling easy and quick installation. As with all Pure Vista products, the glass angle can be adjusted to ensure the glass is perfectly aligned. The best windbreak solution, when you have a view, is glass balustrade. As can be seen from the photos, the glass provides protection from the wind and allows a clear line of sight onto the lawn. A great solution for this family home and everybody can enjoy watching a game of football from the patio. To find out about what building regulations require of your glass balustrade project, refer to our building regulations web page.Installation and photos by Veon Glass Ltd.
Sponsored
Hotel Café Royal

Hotel Café Royal

CDM Stravitec

Hotel Café Royal has just undergone a complete refurbishment and internal re-build. Part of the new complex is a state-of-the-art Spa and Gym which is located in the basement. Directly next to the hotel is Regent Street, below which runs the Bakerloo underground train line.Structure-borne noise levels from the trains were far too high to create the relaxing environment required for a top class Spa. The acoustic consultants therefore specified that all of the noise sensitive spaces must be isolated on a Stravifloor Deck concrete floating floor system.Café Royal’s 1,200 sqm Wellbeing Centre provides a personal and intimate holistic experience. It has a large lap pool and four different areas, corresponding to the four natural elements: spa/water, gym/fire, yoga/air and organic bar/earth.The spa offers a variety of Watsu hydro-experiences, a private and communal Hammam and signature Akasha treatments. Moods are enhanced by restorative music, aromas and gentle lighting. The gym has the most advanced fitness equipment, including Kinesis machines. There is a spacious aerobics studio and a private training room. Yoga, Tai-Chi and Pilates are offered in the calming area, with bespoke classes.
Sponsored
Lincoln bowl

Lincoln bowl

Dart Valley Systems Ltd

Lincoln bowl has recently undergone a major washroom refurbishment to give their bowling alley a much-needed makeover. The renovation consisted of a whole washroom revamp from flooring to washbasins, taps, urinals and even the less-abled washroom facilities. The main aim of the project was to make their washrooms stand out as much as the bowling alley itself. Franke Water Systems provided over 20 washroom products for the revamp, including a range of Dart Valley branded taps, WCs, flush valves, hand dryers and a range of Miranit composite wash troughs for the male and female toilets.The full range of products provided were:2 x WC03-002 - WC flush valve kits 1 x WC03-002 - WC flush valve kit 2 x WC02-011 - Concealed plastic cistern kits 1 x WC02-011 - Concealed Plastic Cistern Kit 3 x UC07-010 - Urinal control systems 3 x UC00-001 - Backflow Preventers 3 x AT03-011 - Aquarius deck mounted A45 taps 1 x AT00-004 - Three station mains Kit 1 x ANMW411 - Single Quadro Miranit wash basin 1 x ANMW421 - Double Quadro Miranit wash basin 1 x DRYX500N - Hands in hand dryer 1 x F1390 - Airblast Hand Dryer
Sponsored
GEC Anderson Stainless Steel Is Salt Of The Earth

GEC Anderson Stainless Steel Is Salt Of The Earth

Anderson, GEC Ltd

The Old Saltings has been created on the middle floor of a nineteenth century saltings, situated right on the beach at Porthmeor in St Ives, Cornwall. What was once a place where pilchards would have been packed and salted, has now been dramatically transformed into a stunning contemporary apartment sleeping up to 8 guests.The spacious kitchen has been designed to make the most of the sea views as well as top of the range appliances and fittings. The brushed-satin stainless steel sinktop from GEC Anderson further enhances the light and contemporary living space. Practical, twin sink bowls are seamlessly integrated within the continuous stainless steel worktop-run that also includes an integrated hob. The back upstand provides water safe and hygienic detailing that is typically demanded by discerning and knowledgeable specifiers.Architect Cany Ash of Ash Sakula said, “The GEC Anderson stainless steel worktop provided edge detailing and a finish which was better than the usual alternatives normally associated with catering applications. We especially like the jointless, continuous nature of the surface area. The other benefit of stainless steel is that it is hard wearing, which is very important in a holiday apartment where it will get significant use.
Sponsored
Malmaison Hotel Composite Decking

Malmaison Hotel Composite Decking

EnviroBuild Materials Ltd

Slate Hyperion Frontier Composite Decking was selected for Malmasion Hotel's renovations. The client had old and weathered hardwood decking in the hotel terrace areas and all of the room balconies, on a seafront hotel which required replacing as part of a complete hotel refurbishment.To replace the current decking the client required a commercial grade, anti-slip board that could withstand the harsh salt water environment for over 25 years.The SolutionFrontier range in the Slate colour was specified for the project as the highly durable outer board layer provided the perfect protection against the elements and the high customer usage. With the additional warranty against stains and fading the client was assured at the lasting quality and aesthetics of the board with little maintenance ever being required.EnviroBuild’s expert team also provided full project support including bespoke short notice delivery direct to site, which helped the client complete the job on schedule.Customer FeedbackAfter the successful installation and service received from the EnvrioBuild team, the client has specified Hyperion decking on a number of other Malmaison hotels across the UK.Project DetailsSize: 450 m²Product: Substructure: Treated timberBuild time: 4 weeksLocation: Brighton
Sponsored
Cranbrook Primary School

Cranbrook Primary School

Bauder Ltd

Cranbrook Primary SchoolBauder Total Roof System (BTRS) with Tapered insulation schemeSynopsisCranbrook Primary School in Ilford, London, was experiencing some major water ingress due to the advanced deterioration of the existing roof system. A roof survey was conducted by Stuart Parratt, Bauder area technical manager, where core test samples were taken to identify the existing roof construction to deck level and to provide an indication of the roof condition. The survey revealed that the existing waterproofing was in extremely poor condition, with extensive evidence of water ingress.  Bauder Building BoardProject:Cranbrook Primary School Location:LondonProject Type:RefurbishmentRoof Area:440m² Client:London Borough of Redbridge Council Approved Contractor:Thameside Roofing Ltd The specificationThe original waterproofing had been poorly overlaid with EPDM which had subsequently debonded. Before the installers could begin laying the new system, they had to strip the substrate back to the original asphalt. The client required a robust system that would deliver durability, value and longevity. 390m² of bitumen waterproofing, Bauder Total Roof System (BTRS), was specified for the main roof areas and 50m² of our cold applied liquid waterproofing, LiquiTEC, for an area that had limited upstands due to clerestory windows that could not be repositioned. Products appliedBauderPIR tapered insulation  A lightweight and cost effective alternative method of providing falls to a roof, whilst also providing thermal insulation. The client opted for this scheme at Cranbrook to minimise standing water on the roof. Bauder Total Roof SystemA two-layer bituminous waterproofing system robust enough to withstand foot traffic and most permanently sited plant. For use within warm and cold roof scenarios, as well as overlaying existing roofing materials. BTRS meets current UK Building Regulations Part B for external fire protection and features torch-free and safe to torch installation on combustible details. LiquiTEC Cold Applied liquid waterproofing Utilising Bauder’s PMMA cold applied liquid waterproofing on one of the roof areas ensured a fully watertight solution around rooflights and below upstands that could not be raised.  Project challengesAlthough the deck appeared to be in a reasonable condition for reuse as part of the refurbishment, there were large deflections to some areas and the existing waterproofing that overlaid the original system had been poorly installed and had pulled away from the asphalt below and so needed stripping prior to works commencing. The existing insulation was inadequate and left the building falling short of the current requirements. A thermal upgrade was incorporated into the works using a tapered insulation scheme which helped to solve the deflection issues by creating falls on the roof. To meet the minimum upstand requirements, the existing extractor vents needed to be removed to allow for the increase in the kerb height. Large continuous structural rooflights providing natural light to the building below were deemed thermally inefficient. The rooflights were upgraded during the refurbishment to meet current standards.  The resultBauder systems are only installed by Bauder approved contractors to ensure quality. The installation on this project was expertly carried out by Thameside Roofing Ltd, overseen by Dave Gregory and John White. After sign-off from Bauder site technician, Paul Osbourne, this system was awarded a comprehensive guarantee.  Systems installedBauder Total Roof System (BTRS) with Tapered insulation1 Bauder K5KHeavy duty, torch-applied SBS elastomeric bitumen capping sheet featuring a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUO Technically advanced self-adhesive SBS elastomeric bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. 3 BauderPIR FA G16Tapered PIR Insulation board manufactured in accordance with BS EN 13165 with no facings. It is lightweight with a high compressive strength and has zero Ozone depletion potential. The product provided effective drainage as well as efficient thermal insulation.4 BauderTEC KSD FBSA technically advanced, self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish on the upper surface to allow easy bonding of insulation using the specified Bauder Insulation Adhesive.
Sponsored
Central M40, Banbury

Central M40, Banbury

Knauf Insulation Ltd

Central M40, a 70 acre industrial estate situated off J11 of the M40 in Banbury, comprises six warehouses totalling over 1 million sq ft of accommodation – equivalent to roughly 17 football pitches. The estate was developed speculatively by db Symmetry*, who specified CA Group’s robust Twin-Therm® Built-up Roof and Wall systems.A key component of the Twin-Therm® building envelope system is Therma-Quilt, a bespoke high-performance Glass Mineral Wool insulation. It is manufactured by Knauf Insulation specifically for CA Group and is the result of a long standing partnership between the two companies.Therma-Quilt is ideally suited for non-residential cladding applications. It offers outstanding performance and functionality available in different thicknesses to support the Twin-Therm® system, delivering enhanced thermal U-values as low as 0.09W/m2K. It is non-combustible with a Euroclass A1 Reaction to Fire Classification, meaning it will not contribute to the development or the spread of a fire.Therma-Quilt is also a high-performing acoustic insulation. In Twin-Therm® roof applications, it helps reduce the drumming effect of rainwater, while in Twin-Therm® wall applications, it aids with sound reduction and can minimise the reverberation of internal sound when used in conjunction with perforated metal liner sheets. Therma-Quilt has been developed with water resistance in mind and uses materials that help prevent water ingress.The Twin-Therm® system has been designed with sustainability in mind and Therma-Quilt is no exception. Knauf Insulation’s Glass Mineral Wool products contain up to 80% recycled materials. This saves on virgin raw materials and energy demands, cuts carbon emissions, and reduces waste going to landfill.It is manufactured with ECOSE® Technology, Knauf Insulation's unique bio-based binder that contains no added formaldehyde or phenol. It is made from natural raw materials that are rapidly renewable and is 70% less energy-intensive to manufacture than traditional binder, so it is more environmentally-friendly.Products made with ECOSE® Technology are soft to touch and easy to handle. They generate low levels of dust and VOCs and have been awarded the Eurofins Gold Certificate for Indoor Air Comfort.In total, more than 70 tonnes of Therma-Quilt insulation were used on the six megasheds on the Central M40 development. While the industrial estate was built speculatively, its strategic location has previously attracted premium occupiers including Hellofresh, Prodrive Motorsport, TVS Supply Chain Solutions and Rinkit.Thanks to the Twin-Therm® system with its Therma-Quilt insulation, the warehouses have achieved BREEAM ‘Very Good’ ratings, while the businesses using them will enjoy more comfortable, warmer and safer working environments – and lower energy costs. *db Symmetry has rebranded as Tritax Symmetry
Sponsored
NIBE Ground Source Heat Pump Installation for a livestock auctioneering house

NIBE Ground Source Heat Pump Installation for a livestock auctioneering house

NIBE Energy Systems Ltd

Hexham and Northern Mart is an auction house in Hexham (25 miles west of Newcastle), specialising in the sale of livestock and cattle to farmers across the North East of England. The business decided it was time to replace its old gas-fired heating system with a more sustainable alternative – one that would not only reduce energy consumption and running costs, but also earn additional income through the Renewable Heat Incentive (RHI). Minimising impact on day-to-day operations during the transition was another key consideration. Managing director Robert Addison tasked renewable energy specialist and NIBE Pro Installer Calibrate Energy Engineering with finding the right solution to meet the heating and hot water demands of the 112,050sq ft building.The SolutionThe team at Calibrate specified, designed and installed a 300 kW renewable heating system made up of five 60 kW NIBE F1345 ground source heat pump (GSHP) units. They paired this with a 50 kW solar PV array, fitted to the roof of the main pen area, which partially powers the NIBE GSHP system. The in-ground heat collectors required for the GSHP were laid in the fields around the buildings, with the controls units sited in a prefabricated plant room to the rear of the premises. The installation took just three months from start to finish, and during this time it was business as usual for Hexham and Northern Marts.ResultsDocked together in a cascade for greater output capacity, the five NIBE F1345 GSHP units now meet 95% of Hexham and Northern Marts’ 394,000 kW/h annual heating and hot water demand. Meanwhile, the 50 kW solar PV array generates enough free electricity to offset a significant 50% of the power needed to run the GSHP system. Hexham & Northern Marts is set to make a 236% return on investment – reaping an estimated £862,000 in energy savings and commercial RHI payments over the next two decades.Customer Testimonial“We couldn’t be happier with our new renewable heat and power sources. As well as delivering instant reductions in energy usage and subsequent savings on heating bills, the NIBE GSHP solution is providing us with a steady stream of income for the next two decades, thanks to the RHI. The power produced by the solar PV panels is an added bonus, and makes running the heat pump system even more cost-effective.“As a result, we’re expecting to see returns of more than double our original investment over the next 20 years – which is absolutely invaluable from a business point of view. Not only this, but we’ve got an efficient, reliable renewables setup that’s fit for the future, and will continue to deliver ongoing savings for years to come.”Robert Addison, managing director, Hexham & Northern Marts
Sponsored
Using Polytrol to revive a dull and faded garage door

Using Polytrol to revive a dull and faded garage door

Owatrol UK Ltd

We’re always so pleased when we hear from customers who have opted to use our products for their projects.When we received an email and some impressive before and after photos, from one such customer who had used Polytrol colour restorer to revive his garage door, we’re not exaggerating when we say that there was an audible buzz of appreciation in the Owatrol office as we took in the transformation.It was then that we knew that we had to share how Brian (our happy customer) had achieved this result, so that our other customers could benefit, too.First, clean your garage doorIf you want to replicate Brian’s success, it’s important to ensure that your garage door is prepped before application. Your door must be clean and free of any dirt, grease, mildew or grime.A bit of elbow grease and a bowl of soapy water is usually all you’ll need to do the job. However, if there’s any mildew on your garage door, scrub on a 50:50 bleach and water solution, leave it for 10 minutes, then rinse it off.If you have any polishes or waxes on your garage door, you will need to remove these too.Before moving on to the next step, ensure that your garage door is completely dry.Now it’s time to apply PolytrolA deep penetrating oil, Polytrol works by penetrating the surface of your door and re-wetting the pigments. This restores the colour that has been lost over the years, through exposure to pollution, rain and sunlight.Using a brush or a cloth and only working in sections that you can complete in 10-20 minutes, apply a liberal layer of Polytrol.As you work, if you notice any particularly matt and shiny patches, it means that the surface is absorbing Polytrol unevenly. If this happens, just move any surplus oil over to the matt areas.Allow the product to work for 10-20 minutes, then wipe off any excess with a clean, lint-free cloth. If you want a shinier finish, you can also buff the surface with a lint-free cloth.It really is as simple as that…Now, you just need to leave Polytrol to dry.One of the great things about Polytrol, is that it has been designed to dry to a tough and long-lasting flexible finish but with no film, so you won’t need to worry about it peeling or flaking.Plus, Polytrol is now also available in a spray can, to make application super simple.“Couldn’t have wished for a better result”Brian informed us that he:“just chanced upon your advert while browsing the net looking for a product that would improve the look of my door, and I am so very glad that I did…”In his email, Brian also said he “couldn’t have wished for a better result”. We have to agree – his garage door has been totally transformed.
Sponsored
Chelmsley Wood Shopping Centre

Chelmsley Wood Shopping Centre

Bauder Ltd

Chelmsley Wood Shopping CentreBauderflex bituminous waterproofing systemSynopsisChelmsley Wood Shopping Centre, located in East Birmingham, was experiencing leaks with their current flat roof waterproofing system and so they needed a quick, high quality solution to remedy the situation. Although competitors had suggested the only option was to strip the roof, Bauder found a more cost-effective answer by using our in house Troxler Moisture Gauge to identify any areas of wet roof construction, removing the saturated areas and then overlaying the whole roof area.Bauder Building BoardProject:Chelmsley Wood Shopping Centre Location:BirminghamProject Type:RefurbishmentRoof Area:4500m²Specifier:Black Cat ConsultancyApproved Contractor:BBR Roofing LtdProject challengesThe works were to be undertaken in the middle of winter on the existing single ply covering which kept freezing when the operatives were drying the surface. Fixing down of the insulation boards (to the existing waterproof covering) was a noisy operation which also exposed the retail tenant below to risk of water ingress. Work had to be undertaken on a roof where ridges and valleys had to be navigated whilst managing the waterflow.The specification allowed for the removal and replacement of the saturated areas as identified by our moisture mapping survey. This operation had to be planned to ensure that the retail stores were not put at risk in terms of water ingress, but still managed to keep the works progressing to schedule. This was particularly difficult due to the exposed site and the inclement weather encountered. The resultAs a result, Large sections of cable bespoke design had to be developed with Bauder to overcome these challenging site details without the need to decant the retail tenants below. trays and handrails had to be lifted in situ so the roof works could be completed without compromising electrical or mechanical install.By working closely with the centre, a method of work was developed which fulfilled these criteria in terms of waterproofing, health and safety and business protection of the shopping centre. System installedBauderflex bituminous waterproofing system1 BauderFLEX K4EA torch applied SBS elastomeric bitumen capping sheet, featuring spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture.2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTHERM DS 1 DUOA self-adhesive SBS elastomeric bitumen air and vapour control layer (AVCL) with patented “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures.
Sponsored
Engineering the future with Vandersanden bricks

Engineering the future with Vandersanden bricks

Vandersanden Brick

Unrivalled in scale in the UK as a hub of engineering and material science expertise, the new Manchester Engineering Campus Development (MECD) embraces the refurbished, Grade II listed Oddfellows Hall, the MEC Hall and buildings on Upper Brook Street and York Street. Brick played a crucial role in creating the campus and, to find the perfect products to fulfil their aesthetic vision, the architects turned to Vandersanden.The new campus is one of the largest construction projects undertaken by any higher education institution in the UK. It will allow 1,300 staff and 7,000 students to work and study in spaces that enable connection, collaboration and concentration across the faculty.Working with Mecanoo, Penoyre & Prasad and Balfour Beatty Construction, BDP provided detailed design consultation services for the entire MECD project. The collaborative team completed the sensitive renovation and extension of Oddfellows Hall to accommodate a suite of conference rooms, academic workspaces and a restaurant.Originally built in 1857 and rebuilt in 1916, Oddfellows Hall anchors the new MECD to its formative past. Set back on the north side from the listed building, the modern extension presents a neat facade where Vandersanden’s Berit water-struck facing brick, which is white with a light texture, is coupled with areas of glazing and tile. “The approach to the scheme has been to add a twenty-first-century building of its time but in continuity with the existing language, using materials such as brick and glass,” explains Paul Owen, architect associate at BDP.Configured horizontally, the elements wrap around the façade of the extension to create a strong connection to both the north and south facades of the older building. The aesthetic is enhanced further by a combination of narrow brick piers and vertically proportioned windows. A defined brick plinth at ground floor level achieves additional visual interconnection between the old and the new.On the roof, the plant enclosure uses the same Vandersanden Berit brick as the façade, but the structure is set back from the parapet line. A hit and miss pattern allows for ventilation of the mechanical and electrical equipment inside as an elegant alternative to standard ventilation grilles.On Upper Brook Street and York Street, the new buildings are of solid brick that includes feature brick vertical and horizontal elements to articulate the façade and frame the window openings. Again, the brick is from Vandersanden; in this case, the company's Herning water struck brick with a dark brown-purple-blue multi-coloured appearance.“The technical advice the team at Vandersanden gave was incredibly helpful while the bricks offer great visual appeal. In the long term, they will age gracefully in combination with the existing material of Oddfellows Hall, ensuring the new extension sits well in its context,” says Paul Owen.For more information on the development go to https://www.mub.eps.manchester.ac.uk/science-engineering. For details on BDP visit, www.bdp.com and to find out more on Berit, Herning and the wide range of high-quality bricks available from Vandersanden, visit Together we build greatness | Vandersanden
Sponsored
REEMA Properties, Swindon

REEMA Properties, Swindon

K Systems Insulated Facades

BackgroundK Systems’ retrofit of the REEMA non-traditional construction Properties in Swindon, South-West England, is a stellar example of the company’s ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Swindon Borough Council had a development of 50+ properties in Upper Stratton all with aged facades and poor thermal qualities, some with U-values as inadequate as1.59W/m ² K.K Systems supported Swindon Borough Council, led by Projects Surveyor John Black, to completely refurbish this residential development and deliver on five primary objectives:- Improve the thermal performance rating of each home (SAP rating)- Deliver greater thermal comfort for residents- Choose a solution with acoustic benefits and non-combustable benefits- Reduce tenants’ energy consumption- Deliver an attractive aesthetic that would uplift the areaHaving a good reputation for matching systems with finishes to deliver its clients’ visions, K Systems partnered with approved installer, Rateavon Ltd, to scope out theproject and specification in fine detail, with particular focus on insulating properties and aesthetic.Our ServiceK System worked in collaboration with Swindon Borough Council and Rateavon Ltd to upgrade these poorly insulated houses and deliver a total revamp of the properties, resulting in thermally efficient homes.One of the primary requirements was to improve the performance rating of each home, with a target U-value of 0.30W/m²K. In fact, K Systems exceeded that in the project delivery by achieving a U-value of 0.29W/m²K.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Digital technology was deployed from the very beginning to produce models and CGIs (Computer Generated Imagery) to not only assure Swindon Council the finished project would meet its specific requirements, but to also guide the design process and ensure compliance with all health and safety regulations.Regular inspections and site audits were carried out alongside Swindon Council to ensure the same level of care and attention to detail that applied when specifying theproject was being applied during its implementation and delivery.Technical Project DetailsOn initial inspection, K Systems found a problematic substrate. The REEMA hollow panel non-traditional construction properties are constructed of a concrete frame with thin concrete panels to the exterior façade. This type of thin panel construction created a significant challenge for the team to find a suitable EWI fixing, but with the help from Rawlplug, one of our EWI fixings suppliers a robust and safe fixing solution was found, without compromising the existing REEMA construction.Harnessing years of EWI system design knowledge and unrivalled expertise in this field, K Systems worked closely with Rawlplug and a structural engineer to identify a suitable fixing detail and pattern which would not only be robust but also suitable for this type of substrate.With a structurally strong solution agreed, focus then turned to the appropriate insulation solution.After a comprehensive scoping process taking into consideration client requirements, project objectives, budgets and timeframes, K Systems specified the industry proven K Systems M, Mineral Wool EWI system to not only significantly boost thermal performance of the buildings but also reduce noise pollution for the tenants.K Systems 100mm Mineral Wool insulation has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the refurbishment as it would combat the increased heating costs faced by residents whilst retaining the solid foundations of the existing building and reducing the risk of condensation or mould damage.Other technical benefits which made the K Systems Mineral Wool system the ideal specification for this refurbishment include:- non-combustibility, A2-s1,d0 fire rated- its excellent acoustic properties, reducing noise pollution- its environmentally friendly composition as the insulation is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)- its workability and easy to cut format, reducing labour time across the board for the team.Having identified solutions that improved structure and thermal performance, K Systems then offered the best quality finish for the properties – an aesthetically pleasing, cost effective combination of VBriQ+ clay brick slips and Silkolitt+ silicone render that both Swindon Council and the residents would be proud of.VBriQ+ is a lightweight, highly durable, clay brick slip system and a more cost-effective finish option in comparison to tradition brick systems without compromising on quality, weather resistance, workability and durability. This made it perfect for a project of this scale – a project which required maximum and long-lasting impact without incurring maximum costs.The Silkolitt+ silicone render finish rejuvenated the properties’ exteriors and massively enhanced the area’s overall aesthetic, making it a much more appealing place to set up home.Yet again going the extra mile for clients to ensure unrivalled workmanship and longevity, K Systems finished all 52 properties with K Pro - a water-based protective treatment used to provide long term enhanced water repellent properties to external render and other masonry surfaces, helping combat the problems associated with water intrusion including efflorescence, frost, water-soluble pollutants and algae growth meaning the substrate will stay clean and dry for longer.K Systems and approved installer Rateavon Ltd delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Swindon Council, and the residents of the newly improved homes.John Black, Projects Surveyor at Swindon Borough Council, said:“Throughout the project K Systems have supported Swindon Borough Council agreeing all detailing to ensure current day Building Control Regulations were met. They supported resolutions throughout the project lifecycle and were really reactive, visiting site and supporting when required. They carried out weekly detailed spot check reports with photographic evidence and also checked batch numbers of materials. They delivered a great service. A really successful project.”
Sponsored
Devonshire Mansions, Eastbourne

Devonshire Mansions, Eastbourne

K Systems Insulated Facades

BackgroundFor the perfect example of architectural excellence which not only delivered an impressive aesthetic, significant environmental benefits, and a more robust structural foundation, but also improved thermal performance, look no further than the eight-storey, three-building Building Safety Fund (BSF) project Devonshire Mansions.Situated in beautiful Eastbourne on the south-east coast of England, Devonshire Mansions were an extremely attractive choice for those wanting stunning sea views and some peace and privacy. However, due to their location in a high exposure area, the buildings were aged and weather-beaten, and required a full overhaul and refurbishment to modernise, align with current safety regulations for high rise buildings, and strengthen the buildings at their core whilst rejuvenating the exterior.Understanding and appreciating K System’s renowned ability for outstanding refurbishment projects, Pavehall contracted K Systems to completely refurbish this residential development and deliver on the following four primary objectives:- Remediate unsafe cladding- Improve the thermal performance rating of each home- Update and seamlessly replicate existing façade features- Deliver a solution with acoustic benefitsOur ServiceIn collaboration with Archiflair Design, Pavehall, and Fullers Plastering, K Systems delivered an industry-leading, insulated façade solution that fulfilled the desired criteria, achieved a U-value of 0.26 W/m²K and resulted in an outstanding architectural structure.The commitment of K Systems team, their continuous communication, in-depth level of reporting, and consistent presence on site not only ensured a perfect refurbishment, but also instilled 100% confidence in the supply chain throughout, showing exemplary levels of customer service.This project is a great example of how K Systems overcame various construction challenges to deliver within the agreed time constraints.The make-up of the façade had multiple protrusions in forms of balconies meaning that every sheathing and insulation board had to be cut to fit. Replicating this without compromising on the strict site deadlines was a challenge but under the great install team and K Systems’ expertise and onsite presence, this was achieved.Additionally, Devonshire Mansions had a problematic substrate and challenging aesthetic deliverables. Working closely with all partners, and utilising digital technology, K Systems mapped out the refurbishment and specified the ideal solution to Pavehall for implementation.Technical Project DetailsAfter a comprehensive scoping process, K Systems discovered that the existing system had a drained cavity build up and when removed, the sheathing boards were compromised by water. With the buildings being high rise, steel frame and multi-occupancy, the industry-proven K Systems Exicco Cavity Drainage EWI System was specified.In the Exicco system, the drained cavity behind the insulation ensures that any interstitial moisture escapes without detriment to the performance of the system. Due to their seafront location, Devonshire Mansions were prone to fierce rain and water exposure, so this system was the ideal choice to ensure any future moisture or condensation build up was allowed out to avoid compromising the substrate or newly installed façade.Once the strip out of the existing façade had occurred, further challenges were discovered – the substrate was far from line and level. This meant that every rail within the newly installed EWI system had to be packed out using steel shims to create a level vertical façade, subsequently adjusting the specified fixing lengths to suit.Some elements of the substrate were high strength concrete incorporating a flint aggregate which proved problematic for standard mechanical fixings. Via K Systems’ on site support, a suitable, more bespoke fixing was specified which ensured proper anchoring of rails and intumescent fire barriers. A swift solution was achieved with no detriment to the construction programme.The newly installed Exicco system was combined with the K Systems M (Mineral Wool) system. This high performing system provides optimal levels of fire resistance and noncombustibility and its installation at Devonshire Mansions meant that the fire classification of the buildings was upgraded to A2-s1,d0 meaning that the development is now compliant with the latest building regulations for all high-rise dwellings in England, further ensuring the safety of residents.Devonshire Mansions is visually impressive with its feature balconies, architectural cornices, ashlar panelling and quoin detailing. It was a specific requirement of the client to remediate the unsafe cladding without losing these exterior design features.K Systems created two specifications; one for the elevations and one for the balconies and provided bespoke detailing to allow them to seamlessly harmonise as one façade. Ashlar panelling and quoin detailing was replicated cost-effectively using varying thicknesses of non-combustible mineral wool insulation which was over-rendered skilfully by the contractor using K Systems Silicone Thincoat render.The more intricate cornice features were all bespoke manufactured using compliant non-combustible materials and integrated into the design with K Systems providing robust detailing to create a water-tight barrier and eliminating cold bridging. Decorative columns were installed at ground level to complete the façade.The eye-catching, waterfront dwellings were finished with Silkolitt+ - a versatile, easy to apply, water repellent, durable, and low maintenance thin coat render, perfectly paired and formulated for use with our Exicco systemOverall, K Systems specified a fit-for purpose, non-combustible façade with a high level of complex architectural detailing using cost effective solutions. The installation process was overseen by our unrivalled site support team who were frequently on hand to solve any issues as they arose.“Working alongside K Systems on a project of the size and nature of Devonshire Mansions was a true pleasure. From initial scope and specification to intricate detailing and innovative finishes, the K Systems team lead by example and made the process and delivery a slick and seamless operation. The refurbishment was a complex case but working together in partnership, we all delivered on excellence, and the beautiful Devonshire development is something we can all proudly put our names to.”James Fuller, Fullers Plastering
Sponsored
329 Edinburgh High Street, Edinburgh, Scotland

329 Edinburgh High Street, Edinburgh, Scotland

Vebro Polymers

Client: Cheval ResidencesLocation: Edinburgh, ScotlandSector: Hotel, Leisure & HospitalityYear: 2021Project Size: 150 m²System: vebroscreed Renovatevebroscreed Renovate, from Vebro Polymers, bonded to marine ply and concrete, has been installed across the ground floor reception and concourse leading to the bar area and restaurant.vebroscreed Renovate is a single part, fibre reinforced, cementitious smoothing underlayment screed, incorporating a blend of graded fillers, fine cements, and polymers, with excellent flow properties. The material is mixed with a cold-water addition to deliver a fine flow slurry that can be both pump and pour applied. The material has been used to level the existing concrete surface prior to the installation of terrazzo and ceramic tiles, which have been chosen in keeping with the listed building’s new interior scheme. Incorporating a specially formulated fibre technology, vebroscreed Renovate aids application and strength resulting in a strong, sound and even base that is ready to commence the tiling process after only 8 hours.All screeding on site has now been completed and the site turned over to the tilers, who are on track to complete ahead of building’s opening in a matter of weeks and to coincide with Scotland’s relaxation of international travel restrictions. 
Sponsored
Creamery production facility uses FasTop

Creamery production facility uses FasTop

Sherwin-Williams

Wensleydale Cheese has been made in Wensleydale, Yorkshire since 1150 when monks settles and lived at monestary at Forsnear Hawes. Today cheese is till handcrafted with the original recipe at the two Wensleydale Creamery sites using milk from local cows.Wensleydale Creamery required floor finishes throughout production floors which would be hygienic and very durable to provide a long term solution. Excellent chemical resistance was required against regular spillages from dairy produce such as whey.Dairy production procedures mean that floors are subjected to heavy duty use and impact from fork lift trucks and storage equipment.SystemThe system chose was FasTop TG69 polyurethane floor screed which has been applied throughout the two creamery sites. The system provides a completely seamless finish which is ant-slip even in wet conditions and which can be cleaned to the exacting conditions required in a modern food factory.Coved skirting has been formed around perimeters of all production and storage areas to create a 'tanked' finish which can be cleaned with hot water processes such as steam cleaning. The product has been tested and certified by Campden BRI as a non-taint product and is certified by HACCP as a food grade material.
Sponsored
Royal Arsenal River

Royal Arsenal River

SELO

Royal Arsenal Riverside sits at the heart of Woolwich and occupies a prime location along the River Thames.The development is delivering 562 apartments and ground-floor commercial space on a 1.1ha site that forms part of the wider Royal Arsenal Waterfront. The scheme comprises three buildings of varying heights over a common single-storey basement.The ambitious waterfront scheme transforms an underused parcel of land into a new, thriving neighbourhood that enhances its surroundings. It is located at the end of the new linear park which aspires to establish a unique relationship between town and water; linking the town centre in the south to the river frontage in the north.Our high-performance metal riser doorset, Quadra was used throughout the development. Perfect for concealing fire-rated riser doors, access panels, and internal doors in corridors, landings, and other access areas; Quadra+ is supplied as an integral, four-sided frame and door system, pre-constructed to form a single robust unit. Ideal for hidden commercial access solutions, Quadra+ is designed and manufactured to the highest standards.A design innovation – Quadra+ is the original riser doorset from Selo, now featuring an Adjustable Frame to enhance installation speed and fire compliance. The screw-operated adjuster bolts allow for simple and secure Quadra+ frame installation.
Sponsored
Yattendon C Of E Primary School, Yattendon

Yattendon C Of E Primary School, Yattendon

Rapid Ramp Limited

REQUIREMENT: Compliant ramped access to the recently built outdoor classroom. END RESULT:The ground in the front of the entrance is split between tarmac and a barked area. The tarmac is slightly higher and solid, whereas the barked area is a soft surface. Due to this, weed membrane was rolled over the barked area, and the ramp feet on that side were fixed to concrete slabs.All legs were adjusted accordingly to achieve a level walkway with a compliant gradient of 1:15.The ramp fully complies with Document K and M of the Building Regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard colour: Black - Ramps are powder coated black to create a durable finish that is tougher than conventional paint.

Showing 649-684 of 711

Feedback