NBS Source
I'm a manufacturer

"water pipe cleaning maintenance"

6,786 results found

Sort by:

Showing 1-36 of 1448

Sponsored
Energy Efficiency Case Study - Hot Water Generation and Distribution Systems

Energy Efficiency Case Study - Hot Water Generation and Distribution Systems

nVent Thermal Management

There are two options to compensate for the heat loss in hot water distribution pipes: using a temperature maintenance cable or a re-circulation pipe. Which option is more sensible from an energy point of view, when using a condensing boiler for hot water generation? A study by the Technical University in Dresden addresses the question of which option is more energy-efficient.The results presented show that a single pipe hot water system that compensates for heat losses with a self-regulating temperature maintenance cable is a better solution.
Sponsored
Metal pipe boxing protects sprinkler pipework

Metal pipe boxing protects sprinkler pipework

Pendock

Metal pipe boxing from the Pendock Profiles range is being used at a London tower block to conceal and protect fire sprinkler pipework, cabling and other services as part of a fire safety upgrade and refurbishment programme.Bespoke manufactured to the exact dimensions and project requirements, the metal boxing is non-combustible, which makes it suitable for use in public areas, such as lift lobbies, landings and corridors, where no sprinkler heads are present.Finished in white PPC, the metal pipe boxing not only improves the overall aesthetics, but also provides durable protection for pipework and services, while the integrated hinged inspection panels allow easy access for routine checks and maintenance.
Sponsored
DOFF Cleaning at Aviva Building.

DOFF Cleaning at Aviva Building.

Stonehealth Ltd

Recently, Purple Rhino were approached to clean the iconic Aviva building in York. The Aviva building has a long and rich history, built to house increasing staff numbers of what was then the Yorkshire Insurance company several decades ago. It is now a well known and beloved landmark in the city of York.They chose to tackle the project using the Stonehealth DOFF Integra system due to its unrivalled ability to gently remove a variety of unwanted matter, without causing any damage to this iconic and historic building.Stonehealth Rosette Approved, Purple Rhino recognise the DOFF Integra as the very best in steam cleaning equipment and note it’s proficiency in phased, sensitive cleaning. Providing a high 150-degree superheated water vapour at a very low-pressure, the DOFF was a natural fit for the project.
Sponsored
Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Warm tones and clean lines for bathroom with Altro Walls ShowerKit

Altro

IssueA 15-year-old bathroom in a housing development was looking tired and dated and the owner wanted to refresh the area with minimal disruption in a quick timescale. The bathroom had three walls of ceramic tiles, and a sink splashback, which were in good condition but were unfashionable and required high levels of maintenance to remove limescale and mould.The property, a first floor flat, had easy access but no lift, so equipment, materials and any waste needed to be carried up and down the stairs.Approach“We wanted to replace the ceramic tiles, without having to re-plaster the bathroom walls which would mean a complete renovation and redecoration project,” said Helen Green, the owner. “We live in an area with hard water and limescale is a real problem so a wall that is easy to keep clean would be ideal.”SolutionAfter liaising with Altro customer services, the new Altro Walls ShowerKit was recommended as being the ideal solution as the wall panels can be installed over existing ceramic tiles and provides ease of maintenance for residents. There is also no requirement for construction materials or heavy equipment as Altro Walls ShowerKit is lighter to transport than ceramic tiles.
Sponsored
West End Gate

West End Gate

VIEGA LTD

A high-quality installation of pipework for heating and drinking water, absolutely free of contaminants, quick to install and guaranteed to perform over the long term. These were the priorities for the developer of the prestigious West End Gate development in London, leading to the specification of the Profipress system from Viega throughout.The development is a collection of apartments, stunning penthouses, commercial units, and leisure facilities situated in the prestigious neighbourhood of Marylebone and Little Venice. Berkeley St Edwards were taking no risks with water hygiene, looking for a piping system which would guarantee clean water to the different heights of the towers. Given the prestige of the development, the system had to be faultless, future proof and guaranteed to last. Specifying a high-quality solutionKevin Guiry, Senior MEP Manager for Berkeley St Edwards, explained the rationale for specifying the Profipress solution. “Quality was our top priority, both in terms of the water system and the products used. With all the heating and chilled distribution pipework running in a closed system, we needed a solution to guarantee clean and safe water without contamination. The copper Profipress system delivers this alongside real on-site benefits.” Berkeley St Edwards has made a considered effort to move to press connections over soldering methods for pipework. Particularly in domestic projects, the benefit of cold press means contaminants from soldering are reduced and so systems produce a quicker turnaround for test results from flushing. On top of the speed advantages of cold press, the additional benefit of risk reduction through removal of hot works helps increase safety for those installing on site.“Viega was specified in the first phase block, and it was fantastic. As such, we approved the spec for the next phase as per the previous block. The contractor who received the contract used their same core operatives which resulted in a consistent, clean installation.” Kevin summarised.Working with Viega qualityCraig Yardy, Fit-Out Manager at Vital Energi, oversaw the installation of the system and mirrored the sentiment from Kevin. “Three to four years ago we mainly used soldering, but we’ve shifted to press connections systems. With soldering, you get flux and contaminants in the pipe, so you must flush the system. With press, it’s a far cleaner system.”On working with the Viega Profipress system Craig commented: “we had used the copper system on previous projects which were good installations, and it has been the same on-site here. Generally, the high-level fitting has been easy, the challenge has been where pipework in the walls runs into mixers. This means tight spaces for the installer to work the pipes and makes it difficult to press the joints. Viega press tools come with an angled jaw giving us the flexibility to get into those hard-to-reach places.”Providing ongoing support and training One of the benefits of choosing the Viega specification is the on-site training offered for the installation teams. This will ensure that the systems are installed correctly and effectively, using the recommended tools and techniques. Not only does this process maximise speed of installation, it also allows Viega to issue its full warranty.“The support from Viega started with demonstration days at the very beginning of the project. Throughout the first block installation they visited multiple times to check on the installation, offering support and guidance” Kevin noted. “We plan to continue using Viega for the remaining phases of the development. The Viega quality and future guarantees are what made the initial investment worth it in the long run. I’m a big believer in quality and with this system we’re getting the best quality fittings for this premium development. We didn’t want to risk any further maintenance or damage and the Viega Profipress system achieves this.”Due to be completed in 2025, the first four tower blocks have been completed. Ranging from 10 to 30 storeys in height, the development offers unparalleled views of the surrounding area, commanding high-quality finishes to the apartments inside and out.
Sponsored
How to Simplify Maintenance with an Electric Lifting Winch

How to Simplify Maintenance with an Electric Lifting Winch

Penny Hydraulics Ltd

Precautions required to prevent falls from height can be costly and disruptive to operations. Where a ladder is not appropriate, scaffold towers, scissor lifts, and warehouse cherry pickers, are commonly used to safely perform cleaning and maintenance at height. Lighting for instance, is essential to every business and is one of the most frequently accessed suspended assets, using powered access equipment.
Sponsored
Tomorrow's perception of clean

Tomorrow's perception of clean

Geberit Sales Ltd

Geberit partners with Hotel Designs for its latest virtual round table event: Tomorrows perception of clean
Sponsored
Walls can purify the air with ESCREO Clean Air

Walls can purify the air with ESCREO Clean Air

ESCREO

For almost a decade, ESCREO whiteboard paints have been helping companies transform their workplaces, making them more creative, organised and open to collaboration. Creativity and innovation are embedded in the DNA of the company and its team from the very beginning. Thanks to this, they manage to find a solution to a problem that negatively affects our productivity and well-being, namely poor air quality. This is how ESCREO Clean Air was born - the latest addition to ESCREO's carbon neutral portfolio of functional paints. ESCREO Clean Air is an interior air purifying paint, which reduces air pollution by more than 90.1%. One of the magic components is an enhanced mineral which attracts and neutralises harmful pollutants, incl. VOCs, odours, air chemicals and CO2. The non-toxic environmentally friendly water-based formula is a great collaboration between modern technology and a clever "problem-solving" approach, through which ESCREO can help commercial building owners use hitherto passive areas such as walls to further purify the air indoors, making the premises more attractive to current and future users.
Sponsored
Metal pipe boxing in the round

Metal pipe boxing in the round

Pendock

Metal pipe boxing from the Pendock Profiles range is concealing heating pipework, electrical cabling and ventilation ducting at Phoenix Point in Thamesmead as part of a refurbishment and upgrade programme of homes at the striking, cylindrical high rise building.Originally built in 2008 on the site of a boiler house used for a community heating scheme, the 8 storey, circular building provides a mix of one and 2 bedroom flats. The Pendock aluminium boxing is used extensively in the refurbishment and is located below the walkway on each tier, following the form of the structure to conceal building services, as well as acting as a mounting point for lighting.
Sponsored
CLEAN AND HYGIENIC PAINT SOLUTIONS FROM CROWN TRADE

CLEAN AND HYGIENIC PAINT SOLUTIONS FROM CROWN TRADE

Crown Trade, product of Crown Paints Ltd

Crown Trade has extended its Clean Extreme range to offer specifiers a trio of high performance products to help combat the common problems of dirt, mould and bacteria. The water-based range offers three quick drying and low odour solutions to creating clean and hygienic surfaces- Clean Extreme Anti-Bacterial Scrubbable Matt, Clean Extreme Stain Resistant Scrubbable Matt and Clean Extreme Mould Inhibiting Scrubbable Matt. The full Clean Extreme range is also available in a high performance, stain-resistant, durable and washable Acrylic Eggshell mid sheen finish.
Sponsored
CROWN’S CLEAN EXTREME HAS OPACITY COVERED

CROWN’S CLEAN EXTREME HAS OPACITY COVERED

Crown Trade, product of Crown Paints Ltd

Crown Trade has introduced an upgraded Ultimate Opacity formulation to its popular range of Clean Extreme Stain Resistant Scrubbable Matt emulsions which offers excellent coverage, increased scrubbability and a flawless finish. The new high opacity formulation is available on Crown Trade’s Clean Extreme Stain Resistant Scrubbable Matt, as well as the matt versions of its Clean Extreme Anti-Bacterial and Mould Inhibiting paints. Developed to exceed the performance characteristics of the popular Clean Extreme range, the new water-based Ultimate Opacity option offers increased scrubbability and excellent flow as well as being quick-drying and low-odour.
Sponsored
Easy does it with Crown’s Clean Extreme product performance guide

Easy does it with Crown’s Clean Extreme product performance guide

Crown Trade, product of Crown Paints Ltd

Crown Trade has launched a comprehensive new product performance guide to support its market-leading and recently expanded Clean Extreme range of high performance water-based paints. The new Clean Extreme product performance guide is packed full of information along with advice and tips to ensure specifiers select the most appropriate paint for each job and decorators get the very best finish every time. The Clean Extreme range features a trio of high performance paints - Clean Extreme Stain Resistant Scrubbable Matt, Clean Extreme Mould Inhibiting Scrubbable Matt and Clean Extreme Anti-Bacterial Scrubbable Matt.
Sponsored
Clean up with Crown Trade Clean Extreme’s 100% More Stain Resistant Finish

Clean up with Crown Trade Clean Extreme’s 100% More Stain Resistant Finish

Crown Trade, product of Crown Paints Ltd

The power of Crown Trade Clean Extreme has seen the product gain a new style billing, focused on its stain removing powers. Crown Paints has repackaged its polished performer – one of the most popular products in the Crown Trade range among specifiers – to highlight its class-leading capabilities. New designs for the Crown Trade Clean Extreme suite of products highlight that the product is 100 per cent more stain resistant than standard matt vinyl emulsion paint - and can be scrubbed up to 10,000 times.
Sponsored
Case study - heavy duty pipe supports

Case study - heavy duty pipe supports

Walraven Ltd

We were approached to help design the support system for two new district heating pipelines running under a newly constructed bridge spanning the River Avon.There were several complexities on this project including the heavy pipework, pipe expansion, corrosive environment and vibrations.
Sponsored
South Kesteven chooses Pendock metal pipe boxing in Grantham

South Kesteven chooses Pendock metal pipe boxing in Grantham

Pendock

Riverside age exclusive housing in Grantham is using aluminium boxing from the Pendock Profiles range to conceal pipework installed as part of South Kesteven District Council’s programme of heating system upgrades.Originally built in 1980, Riverside provides 50 one & two bedroomed flats, and the metal boxing covers both horizontal and vertical pipe runs across the front and sides of the buildings as well as the point where they enter each flat. The Pendock metal pipe boxing is bespoke manufactured from 2mm thick aluminium and incorporates Incorporating a PPC RAL 9005 black finish.
Sponsored
Metal Pipe Boxing for communal heating project

Metal Pipe Boxing for communal heating project

Pendock

A project to install a communal heating system at low rise flats and maisonettes at Bretton House and Sanders Way, in the London Borough of Islington, is using bespoke metal pipe boxings to conceal external pipework.The more efficient heating system was installed as part of Islington Council’s ongoing cyclical repair programme, which assesses all properties on a 7 to 10 year cycle to establish where improvements need to be planned & implemented.The Pendock casings are manufactured from 2mm thick corrosion resistant aluminium and incorporate a brown PPC finish to integrate with the brickwork and provide a consistent finish to the project. The use of aluminium not only improves weather resistance, but also adds tough protection to the external pipework.
Sponsored
Metal pipe boxing adds the finishing touch in Camden

Metal pipe boxing adds the finishing touch in Camden

Pendock

Extensive upgrades to the distributed heating system at two low-rise housing blocks by Camden London Borough Council, have chosen Pendock bespoke metal pipe boxing to conceal and protect exterior pipework.The 3 storey Ludham block and 6 storey Waxham building provide more than 200 dwellings, which are occupied by both tenants and leaseholders. Following the installation of the heating system pipework to the exterior of the buildings, the Pendock aluminium and PPC coated boxing was installed to provide a uniform and more aesthetic finish to the project while also providing weather protection.
Sponsored
Southern Water Otterbourne

Southern Water Otterbourne

Polyroof Products Ltd

Working with Williams Roofing Contractors Ltd of Eastleigh, Hampshire, the winning project involved the refurbishment of a large water treatment plant that imposed stringent environmental and performance requirements.The outstanding workmanship and attention to detail by the Polyroof approved contractor during this large scale installation allowed this project to really stand out from the crowd. The below is a case study for this LRWA award-winning project, highlighting the many challenges and how they were overcome through innovation, workmanship and product choice.The SolutionFollowing a survey of the roof area conducted by Williams Roofing and Polyroof Technical Services, a detailed report was carried out after which a bespoke specification was produced and handed to the client. This document detailed a comprehensive set of recommendations for solving the issues that had arisen due to the aged condition of the roof coverings.The client, satisfied that the solution proposed would provide the lasting peace of mind they were looking for, awarded the contract to Williams Roofing Contractors Ltd to install the Polyroof Protec System.There were many challenges on this project as this was a live ‘Clean Water’ environment site, so all Williams Roofing Contractor staff on the project had to have the EUSR National Water Hygiene Cards and be fully inducted by Southern Water’s high standards. Working within these type of environments brings additional Health & Safety implications as the National Water Hygiene scheme is in place to ensure the protection of public health and promote safe drinking water practices. Further risks had to be considered and covered including the risk of working over open water areas with additional buoyancy aids on site to reduce the risks as described under CDM regulations.Williams Roofing Contractors Ltd had to be especially vigilant providing additional protection to ensure that no potential contamination or spills caused any contaminants to the clean water processes/water courses and environment with additional spill kits on hand. Due to the varying conditions of the roof construction(s)/substrates the preparation had to be thought through thoroughly. Certain roof areas needed to be scarified which would have caused reverberations through the roof/concrete deck. This would have possibly created contaminants by spooling of concrete/debris/dust to within the MF Compound Water Lanes/Tanks.
Sponsored
Pain free maintenance for district general hospital

Pain free maintenance for district general hospital

Howe Green

Howe Green’s Visedge Series Flexible Floor Access covers have removed the hassle involved in maintaining building services located under the flooring at a hospital in East Anglia. Howe Green supplied seven Visedge Series covers to provide safe and easy access to underfloor building services in corridors throughout the busy hospital. Maintenance of essential building services had become problematic as the original floor access covers, fitted over four decades ago, had broken. The covers could no longer be removed, making access for planned and emergency maintenance virtually impossible
Sponsored
Uridan water-free urinals provide solution to water leakage at winchmore school - London

Uridan water-free urinals provide solution to water leakage at winchmore school - London

KWC DVS Limited

Winchmore School has completed a washroom refit specifying Franke’s Uridan waterless urinal pods. The Uridan system is available exclusively through Franke Sissons in the UK and Ireland and is manufactured from glass reinforced plastic which is far more resilient than ceramic and provides reassuring security against vandalism. Adrian Bailey, Facilities Manager at Winchmore School explained, “We wanted a waterless solution to reduce water use and maintenance costs. There are other water-free products available for this type of installation but we wanted assurance it would stand the wear and tear of secondary school pupils and be completely odour free.”
Sponsored
Low maintenance cassette systems for school refurbishment

Low maintenance cassette systems for school refurbishment

Yewdale Corporation Ltd

St Benet Biscop Catholic Academy, in Bedlington, Northumberland, was undertaking a full building refurbishment and required low maintenance blinds that wouldn’t get sucked out of the windows. They installed the YewdaleDefiant® C40T sidewinder blind. This cassette system retains the fabric with studs integrated into the fabric. This holds the fabric into the side channels meaning there is no chance of the blind blowing in the wind. The barrel is enclosed within a headbox which protects the fabric and helps with keeping the blind low maintenance and looking good. Read more about this project.
Sponsored
Pendock metal pipe boxing for age exclusive housing in Grantham

Pendock metal pipe boxing for age exclusive housing in Grantham

Pendock

A heating system upgrade programme at an age exclusive housing development at Rectory Close in Grantham, Lincs, is using aluminium boxing from the Pendock Profiles range to conceal pipework runs that feed into each flat. Originally built in 1968, Rectory Close provides 16, one-bedroom flats, operated by social landlords South Kesteven District Council.The Pendock metal pipe boxing is bespoke manufactured from 2mm thick aluminium to ensure it fully conceals the vertical and horizontal pipework used as part of the heating upgrade. Incorporating a PPC RAL 9005 black finish, the boxing not only conceals the pipework, but also protects it from damage.
Sponsored
Paramount choose Zip for their office water solutions Case study

Paramount choose Zip for their office water solutions Case study

Zip Water

With the vision being to create one of the city’s most ‘instagrammable’ offices, fit out contractor Paramount needed every product specified for the refurbishment of Dock House to be aesthetically pleasing as well as highly practical. Zip’s HydroTap and InLine ranges met the brief for all of their water needs."We pride ourselves on making places where people want to be and that’s certainly the case with our new Bristol office. We wanted every detail to reflect our vision of creating a destination workplace and this included the water provision. Zip Water could provide world class products combined with the best service so we had no hesitation in specifying their products."Kevin Marshford, Sales Director | Paramount OfficeThe briefDock House, a three storey building in Bristol’s Welsh Back, was ripe for redevelopment. Paramount wanted to create a striking office space that was flexible enough for working, events and meetings. And, taking the ground floor as their new Bristol head office, Paramount had a vested interest in designing a modern and desirable workplace which was in-keeping with its historic location. In terms of water products, Paramount wanted energy efficient water heaters for washrooms which could reliably deliver hot water whenever required. With the building being used frequently but with a low intensity interspersed with short stints of high occupancy, it was important that the systems were as efficient as possible. In addition to washroom water heaters, Paramount wanted to offer staff and visitors a sociable tea point in the communal bar area. With aesthetics and sustainability so high on the priority list, a stylish drinking water product was needed that could provide filtered boiling, chilled and sparkling water without the need for single-use plastic water bottles.The solutionThanks to an existing relationship with Paramount, Zip Water was specified to provide a number of products for this project. Washroom hot water was solved thanks to Zip’s InLine range, which discreetly provides instantaneous hot water whenever needed. Its innovative design heats water as it flows through, meaning there is no standing heat loss, just energy efficient hot water. For the bar area, Zip provided its HydroTap Classic Plus in smart matt black. This clever tap which was installed on the bar with the help of a font, provides instant filtered boiling, chilled and sparkling water. This transforms the way staff and visitors can make hot and cold drinks - and helps to encourage a refill culture within the workplace. Another benefit of the HydroTap is the enhanced hygiene thanks to SteriTouch which is embedded in the touchpad, as well as in key components of the water path, reducing the growth of bacteria by 99.99%.The results"We pride ourselves on making places where people want to be and that’s certainly the case with our new Bristol office. We wanted every detail to reflect our vision of creating a destination workplace and this included the water provision. Zip Water could provide world class products combined with the best service so we had no hesitation in specifying their products."Kevin Marshford , Sales DirectorParamount Office Interiors
Sponsored
Break the mould with Crown Trade’s Clean Extreme

Break the mould with Crown Trade’s Clean Extreme

Crown Trade, product of Crown Paints Ltd

The mild, wet autumnal weather can provide the ideal conditions for mould and mildew to thrive but Crown Trade’s range of Clean Extreme Mould Inhibiting paints offers the solution. Ideal for damp-prone areas including bathrooms and kitchens, as well as for use in void properties, Crown Trade’s Clean Extreme Mould Inhibiting paint range offers long lasting protection from unsightly and unhygienic mould. Available in a choice of matt and acrylic eggshell, the range benefits from built in fungicide that prevents mould growth on the paint film. Highly resistant to stains, it can be repeatedly cleaned.
Sponsored
The Rolex Building, London

The Rolex Building, London

nVent Thermal Management

nVent was brought in to employ a variety of heating solutions at the London Rolex Building. Rolex was looking to convert its heating to a simpler, lower cost single pipe system requiring less maintenance. nVent provided hot water services using the RAYCHEM HWAT single pipe hot water temperature maintenance system. More than 400 meters of cable were installed to provide hot water all the way to the point of use, 600 metres of pipe freezeprotection to safeguard the chilled water supply lines from freezing. In addition, the entrance foyer welcomes visitors with the warmth of RAYCHEM QuickNet floor heating systems.
Sponsored
Improving water water in Manchester

Improving water water in Manchester

Marshalls Civils & Drainage

The modernisation programme of the multimillion pound project involves significant remediation of previously abandoned land, followed by construction of six circular primary settlement tanks (PST) and a large activated sludge plant (ASP) with 10 circular final settlement tanks (FST). This work will lead to significant environmental benefits for the site, improving the outflow, and subsequently the quality, of water entering the Manchester Ship Canal.
Sponsored
Camden’s high rise cover up with Pendock - Metal Pipe Boxing

Camden’s high rise cover up with Pendock - Metal Pipe Boxing

Pendock

The London borough of Camden’s extensive heating system renewal and refurbishment programme at the St Silas Estate is using bespoke manufactured metal pipe boxing boxing from Pendock to conceal external pipework on several high rise blocks where the community heating system is being upgraded.The metal boxing from the Pendock Profiles range is bespoke manufactured from 2mm thick aluminium to ensure it fully conceals the vertical and horizontal pipework used on the new heating system. Incorporating two PPC finishes in brown and dark yellow to integrate with the brickwork, the boxing not only conceals the pipework, but also protects it from damage.
Sponsored
Kempsford Primary School - Sand & Reseal Maintenance

Kempsford Primary School - Sand & Reseal Maintenance

DYNAMIK Sports Flooring

Sometimes even a floor needs a little TLC and this is an area that DYNAMIK Sport excels. The Maintenance Team completed a sand and reseal at Kempsford C of E School followed by line marking for one Badminton and a reduced Netball court. See photos on our website of before and after which show how effective this process can be. DYNAMIK supply and install sports flooring and walling solutions in the UK.
Sponsored
3 Stannah goods lifts support growing CLEAN Yeovil laundry

3 Stannah goods lifts support growing CLEAN Yeovil laundry

Stannah Lifts

A trio of Stannah Goodsmaster CD goods-only lifts has been installed in the Yeovil branch of CLEAN Linen and Workwear. Installed over three years, each lift reflects and supports the depot’s ongoing development by lightening the growing workload.
Sponsored
Water in the Desert

Water in the Desert

FlexEJ

FlexEJ partners with its sister-company Safetech to design and fabricate specialist large diameter rubber expansion joints.Typically, particularly in the Gulf States, these are used in water treatment, distribution and desalination plants – and it’s these processes that took contingents from our sales and management teams to the UAE recently to see our product installed and operating.Desalination and water distribution in the UAE and surrounding countries are vital, integral components helping to supporting these oil-rich economies, thriving as they do in a desert region.The teams flew into Dubai to meet with our local representatives Parvez Mohiuddin and Mansoor Pullat and find out a little more about how the potable water supply operates in this thirsty city. Plants all over this region are in a continual process of refurbishment; the team were able to see how rubber expansion joints of various sizes had been replaced with high quality Safetech joints during a recent plant upgrade.We have an ongoing and growing commitment to the Gulf region and various projects underway there. Building relationships and developing understanding in the field are very much how we like to do business in both Safetech and FlexEJ so this was an ideal opportunity to share information and make plans.If you are interested in finding out more about FlexEJ’s large and custom-engineered rubber expansion joints, please contact our Technical Sales Team on +44 (0) 1384 881188 or send an email to sales@flexej.co.uk.
Sponsored
Ashtons Legal

Ashtons Legal

Zip Water

The HydroTap with a tailored HydroCare plan is the perfect drinking water solution for law firm. When undertaking an office refurbishment is always a good opportunity to review your company’s drinking water supply. It’s often the case that with growth, the kettle is no longer up to the job of providing your workforce with the hot drinks they need, day after day.
Sponsored
RNIB

RNIB

Zip Water

After 20 years in its Judd Street office in London’s Kings Cross, the Royal National Institute of Blind People recently moved to a new head office that better suited the charity’s evolving needs. The Grimaldi Building, a characterful self-contained office, serves as the charity's new London hub. Months of detailed planning and a thoughtful fit-out was required to ensure the new office facilities met the needs of all the RNIB employees and visitors. Understandably, accessible drinking water was a top priority."Zip HydroTaps have been used on a number of our projects and I have always found the team at Zip very willing to engage and explore a variety of user needs, which is really helpful – accessibility, clarity and ease of use is always a primary consideration for all our projects" Jean Hewitt, Inclusive Designer | Buro HappoldThe briefAn essential amenity in the workplace, the RNIB needed to provide staff, visitors and volunteers with easy access to both boiling and chilled drinking water, for hot and cold beverages. Integrated consulting engineers and advisers Buro Happold had their inclusive design expert Jean Hewitt on hand to support the RNIB with the Grimaldi building refurbishment, advising on accessibility. Her primary focus was ensuring that the building design considered those with sight loss and with this in mind, began her search for a drinking water system that was as inclusive as possible.The solutionOur HydroTap Accessibility range is designed specifically to support visually impaired, wheelchair and limited dexterity users. Jean chose to specify two HydroTap Accessibility models that provide instant filtered boiling and chilled drinking water. “I was attracted by the accessibility features, such as very clear colour coding and easy grip extended ‘ears’ for people who may have reduced dexterity and grip. The inclusion of tactile and Braille markings makes the use of the tap more intuitive for everyone,” explains Jean.The results"Zip HydroTaps have been used on a number of our projects and I have always found the team at Zip very willing to engage and explore a variety of user needs, which is really helpful – accessibility, clarity and ease of use is always a primary consideration for all our projects"Jean Hewitt , Inclusive DesignerBuro Happold
Sponsored
The Royal United Hospital

The Royal United Hospital

Zip Water

The Medical Assessment Unit (MAU Ward) was having continuous issues with its old countertop water boiler. Due to excessive scale damage it was repeatedly out-of-use and the taste of the water it dispensed was increasingly unpleasant. Kevin Ferguson, Assistant Practitioner on the ward, was on the look-out for an alternative drinking water solution.
Sponsored
NATIONAL STATIONS IMPROVEMENT PROGRAMME BENEFITS FROM CLARK-DRAIN LINEAR DRAINAGE AND STEEL ACCESS COVERS

NATIONAL STATIONS IMPROVEMENT PROGRAMME BENEFITS FROM CLARK-DRAIN LINEAR DRAINAGE AND STEEL ACCESS COVERS

Clark-Drain Ltd

The refurbishment of platforms is part of Network Rail’s government funded National Stations Improvement Programme (NSIP ). The five year programme aims to deliver £179 million worth of station improvements to a minimum of 150 medium sized stations in England and Wales.An overarching objective of the programme is to achieve a noticeable improvement to the passenger perception of stations whilst providing value for money in station investments. Part of this remit involves aspects of customer comfort and safety, including ensuring that the control of surface water runoff is efficiently and effectively managed. For this project Murphy Group were commissioned by Network Rail as the main contractor.Clark-Drain has provided a total of 740m length CD 434 linear drainage channel for installation in three of the station‘s platforms to drain the surface water at a maximum rate of 4.6 l/s into silt box traps before discharge into the mains.The silt boxes work by retaining runoff to allow deposited silt to settle to the bottom of the basket before the water is discharged via the outlet pipe connection. The basket is located so that it is easily removed for periodic cleaning. Both the channels and silt boxes are lightweight and designed for easy handling, installation and maintenance. The bodies of the channel are constructed from recycled hard wearing polypropylene to protect them from damage and ensure long lasting durability. A BS EN 1433 Class B125 quick-fit grating with ‘CatchLock’ retention system provides all the strength required for the 12.5 tonne loading it was designed and tested to withstand and perfectly suits high trafficked station platforms.The narrow-slot ‘heel-guard’ design reduces the potential for tripping and slipping and provides a useful safety feature for passengers and rail staff.The weight of each one meter length, at 5kg, made it very easy to install enabling Murphy Group Engineers to lay several lengths in one go for faster levelling and taking 25% less building time  than heavier polymer concrete options. As part of the aesthetic appeal of the platform refurbishment, the CD 434 was specified because of its flexibility to follow the curve of the platform edge, giving uniformity and enhancing the visual appearance when laid to the same contour.In addition, the linear drainage channel was supplied with 450 x 450mm, 600 x 600mm and 750 x 600mm steel recessed covers and frames. These enabled 60 of the stations lighting cable access chambers to be securely covered and in-fi lled with the marble effect paving specified for the station floor as part of an attractive and functional design for the public to enjoy.WHY THE CD 434 WAS CHOSENLightweight – The one meter length channel and grate is lighter, weighing 5kg, compared to traditional concrete products weighing 20kg or more without being detrimental to its strength for EN1433 B125 loading.Reduced manual handling – Lightweight design and simpler, easier and safer installation provides greater emphasis on health and safety, reducing work related injuries.Easy and quick to install – Installing up to four lengths in one go enables faster levelling, taking 25% less time than traditional polymer concrete.Dual Locking – The Catchlock system simplifies locking of the grating yet enables safe and speedy access for maintenance. The optional anti-tamper bolt locking system provides added security against theft, reducing time and cost spent on replacing lost gratings.Anti-slip and narrow slot finish – Reduces the potential for tripping and slipping, helping to improve public safety.100% recycled – ‘Green’ credentials help toward reducing the carbon foot-print and act as a theft deterrent due to having no intrinsic scrap value.Enhanced durability – Carefully designed load transfer structure improves product life span and lowers maintenance and replacement costs.Heat resistant – The polypropylene/nylon properties make the CD 434 channel ideal for hot tarmac installation.
Sponsored
Pendock cleans up with washroom range

Pendock cleans up with washroom range

Pendock

Cubicle and washroom systems from Telford based casing and enclosure specialist, Pendock, provide a comprehensive range of solutions to meet most specifications and requirements for single or multi-cubicle installations, as well as IP panels systems.Originally launched in 2005, the range was later extended with the addition of lockers and changing room products, which together with regular colour and finishes updates, has led to their use in a range of sectors, including education, retail, health, leisure and public buildings.Five systems are available under the Pendock Washroom brand, which include the Classic; Classic Plus; Robust; Ultimate and Education – as well as modular IPS panels and bespoke solutions.The Classic range is manufactured from 18mm thick MFC (melamine faced chipboard) and is designed for use where economy and simplicity are key factors, while the Classic Plus uses the same core, but is faced with high pressure laminate. Both models are edged with 2mm PVC.Designed for high traffic and wet areas, including high humidity zones, Robust cubicles are produced from 12mm compact laminate (CL), which provides high durability, excellent value and design flexibility to meet the demands of most washroom projects.Pendock’s Ultimate cubicles are also manufactured from 12mm CL with a radiused edge. The range provides an exceptionally wide choice of options and can be specified with any finish or colour combination to meet exact interior design or project requirements.The dedicated Education range covers washrooms from nursery through to further education and are available in 18mm MFC or HPL, as well as 12mm CL in a range of colours and finishes including special options for early years and schools through all key stages.For complete design versatility, every aspect the IP panel system and bespoke washroom range can be specified, including the core material, finish colours, graphics, panels and door sizes, as well as pilasters and ironmongery.Vanity units, back panels and accessories are also available across the range, alongside DDA and Approved Document M compliant options, allowing specifiers to maintain design consistency and integrity, whilst providing high levels of versatility and cost-effectiveness.
Sponsored
SECURITY WORK FLOWS FROM THAMES WATER

SECURITY WORK FLOWS FROM THAMES WATER

Zaun Limited

The UK’s largest water and waste company is aiming for savings of £500,000 over the next three years in the supply and installation of security fencing and gates across its estate that supplies water to over 14 million people.However, given the risk of accidental pollution, theft and mindless vandalism, safety and security must not be compromised in making the savings across its 600 sites that supply 2,600 million litres of tap water and treat more than 4 billion litres of sewage per day.The SolutionThames Water Utilities chose Zaun as one of four appointed contractors for their three-year framework agreement for the supply and installation of security fencing and gates, with an option to renew for a further two years, worth around £2 million, and one of three for their ongoing maintenance.Thames is looking for savings and the benefits of dedicated account management, certified and experienced perimeter protection designers, engineers and technicians, access to new and innovative products and robust management reporting linked to an exacting service level agreement. Zaun proved its reputation with Thames Water during its multi-billion pound London Tideway improvements to create a cleaner healthier River Thames, on which Zaun addressed some complex planning issues and security needs. Zaun designed, manufactured and installed its ArmaWeave, the highest-rated single panel fencing solution for defending against forcible attack. This solution meets Thames’ security requirements and enables certain installation concerns to be mitigated.Zaun has also put in Axiom, turnstiles, vehicle barriers and pedestrian access control across the Thames’ estate.

Showing 1-36 of 1448

Feedback