NBS Source
I'm a manufacturer

"uninterruptible power supplies"

742 results found

Sort by:

Showing 361-380 of 380

Sponsored
Old Trafford

Old Trafford

Lionweld Kennedy Group

Lionweld Kennedy designed, fabricated and supplied the vomitory stairs and handrails for Old Trafford, the home of Manchester United, East Stand Development.Due to an expansion in 1999, Manchester Unites ground undergone works to add a second tier to the East stand of Old Trafford, this increased the capacity to 61,000.We supplied and designed the stairs to ensure all fans were comfortable, while ensuring all health and safety standards were met.
Sponsored
Awel-y-Mor Primary School

Awel-y-Mor Primary School

Bauder Ltd

Awel-y-Mor Primary SchoolBauder Thermofol PVC single ply waterproofing systemSynopsis The Awel-y-Mor Primary School site, situated at the heart of the town of Port Talbot in Wales, needed to undergo major redevelopment in preparation for its brand new fit for purpose school to replace the two pre-existing primary schools, which had experienced serious build repair and surplus capacity issues.Bauder Building BoardProject:Awel-y-Mor Primary SchoolLocation:Port TalbotProject type:New buildPV roof area:300m²Investor:Neath Port Talbot County Borough CouncilMain contractor:Dawnus Construction LtdRoofing contractor:Span Roofing Contractors LtdThe specifcationThe Neath Port Talbot County Borough Council wanted the new school to be fitting for the 21st century and bring them to the forefront of modern-day roofing technology. These requirements were met by BauderSOLAR’s innovative photovoltaic system, which delivers significant cost and environmental benefits, as well as providing an eye-catching visual reminder of the importance of sustainability.Roof areas totalling 300m² were fitted with 92 PV modules, which were secured to Bauder’s Thermofol Single Ply waterproofing, enabling the new Awel-y-Mor school to generate at least 25.9 Megawatt Hours of solar power each year. The incredible simplicity of the installation also meant that the entire PV array could be installed in just three days ensuring that there was no disruption to the commencing school term.Products appliedBauder Thermofol PVCSingle Ply System offering a lightweight and cost effective waterproofing solution that is resilient to the natural elements.BauderSOLAR SOLfixxPhotovoltaic system is an innovative renewable energy source that is secured to the roof without any penetration of the waterproofing or roof deck. 92 PV modules were installed with an expected energy generation of 25.9 MWh and with a kWp of 27.14.The resultRoof areas totalling 300m² were fitted with 92 PV modules, which were secured to Bauder’s Thermofol Single Ply waterproofing, enabling the new Awel-y-Mor school to generate at least 25.9 Megawatt Hours of solar power each year. The incredible simplicity of the installation also meant that the entire PV array could be installed in just three days ensuring that there was no disruption to the commencing school term.System installedBauder Thermofol PVC single ply waterproofing system1 Bauder Thermofol U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 BauderTEC KSDA self-adhesive elastomeric bitumen air and vapour control layer with an aluminium foil facing for vapour impermeability AdvocacyJonathan Morris, lead architect for the project, stated:“Our local Bauder representative offered the highest degree of service throughout the project, ensuring our site operation ran smoothly. With the complete roof finish covered by the all-encompassing Bauder guarantee we have peace of mind moving forward with regards to potential future defects.”
Sponsored
Greenwich Substation

Greenwich Substation

Cordek Ltd

Cordek were asked to supply Sheet Pile Infills to facilitate the construction of the basement.
Sponsored
Social Housing – Derby

Social Housing – Derby

Russell Roof Tiles

Russell Roof Tiles supplied tiles to 3 social housing sites in Derby.
Sponsored
Paddington Station

Paddington Station

A J Wells & Sons

A.J Wells manufactured and supplied vitreous enamel white printed cladding panels for the new Bakerloo Line Link Project at Paddington Station, London. The panels were supplied in flat, convexed and concaved profiles that were printed with individual patterns in one of two subtle grey colours to meet the client’s specific project requirements.KEY FEATURES: • Cladding • Vitreous enamelA.J WELLS SERVICES: • Design development • Manufacture • Screen print
Sponsored
Wardian Towers, London

Wardian Towers, London

TaperedPlus

TaperedPlus in conjunction with Unilin Insulation supplied tapered TR/MG for the full PIR scheme. The East Tower L55 and Machine roofs were 798m2 in total, so we supplied the roof in two call-offs to make deliveries more manageable on site.The vision for the Wardian “is to take inspiration from [Nathaniel Bagshaw Ward’s] curiosity, his spirit of adventure and his sense of precision, and to create the most exciting new development in the British capital”.
Sponsored
Edge Hill University Campus, Ormskirk (2013)

Edge Hill University Campus, Ormskirk (2013)

Artform Urban Furniture Limited

The Edge Hill University redevelopment of the Eastern Campus landscape had a master plan that included a range of seating to complement other factors on this ambitious scheme. Artform were asked to supply architectural seating in the forms of The Salgueiro and Couso seats from the Gravin range. The seating had to be robust and durable with a simple and minimalist design to suit the project. Artform were able to supply these products on a short lead time which suited the needs of the client and the project.
Sponsored
Secure DeltaWing louvred compound for eurobins and storage at Care Facility

Secure DeltaWing louvred compound for eurobins and storage at Care Facility

Lang+Fulton

Lang+Fulton have supplied a bespoke 6.6 x 5.7m compound for euorbins and general storage. The compound was sub-divided into two separate areas, each with 1.4m wide double doors for access, secured with Locinox euro-cylinder locks and dropbolts.The panels were made from DeltaWing-100 to provide total visual screening and were supplied hot-dip galvanized with an additional polyester powder coating colour RAL 7040.
Sponsored
Kingston University

Kingston University

Harlequin Floors (British Harlequin plc)

In the three dance studios Harlequin supplied and installed a fully-floating Harlequin Activity sprung floor with Harlequin Cascade and Harlequin Standfast performance surfaces totalling over 330 square metres. Harlequin Ballet Barres and Harlequin Mirrors completed the dance studio facilities. In the Performance Teaching Space a Harlequin WoodSpring basket weave sprung floor system with a Harlequin Standfast top surface was supplied and installed to an area of over 180 square metres.
Sponsored
Albert Dock Bollards - ASF 104

Albert Dock Bollards - ASF 104

Architectural Street Furnishings part of WB White Foundry

ASF have for many years supplied these bollards for the Albert Dock area of Liverpool. Supplied in 2 different sizes - some to the standard pattern dimensions and some to a larger bespoke dimension the bollards are set up both as stand alone and with chain and chain eyes to form chain barrier systems.Manufactured in 100% recycled cast iron, and 100% recyclable and with an expected lifespan in excess of 100 years, these bollards are ideal for such a valuable and historic site
Sponsored
Emerald Gardens, Wembley

Emerald Gardens, Wembley

Fusion Facades

Project Overview:Emerald Gardens, a contemporary residential development. The Aluminium package was designed and supplied by Fusion Facades Limited and stands as an urban oasis comprising 472 units with secluded gardens adjacent to England's national football stadium at Wembley. The project encompasses 288 studio, 1, 2, and 3-bedroom apartments arranged around an acre of green space. Key features of Emerald Gardens include a concierge, residents' gym and clubroom, and a private screening room. This case study spotlights Fusion Facades' contribution to the development by supplying aluminum entrance portal flashings, window liners, spandrel panels, rainscreen cladding, and SnapLok cappings.Project Details:Client's Requirements:Emerald Gardens aimed to set a new standard for contemporary urban living with a focus on design, functionality, and aesthetic appeal. Fusion Facades was tasked with supplying elements that aligned with the development's modern and luxurious vision. The client's key project requirements included:Seamless Integration: The aluminum package was expected to seamlessly integrate into the overall design of Emerald Gardens, enhancing its modern aesthetic.Quality Materials: High-quality materials were crucial to ensure the longevity and durability of the supplied components, given the urban environment and the development's scale.Collaborative Design: Fusion Facades needed to collaborate effectively with the project team to ensure the supplied elements not only met but exceeded the development's design and functionality standards.Fusion Facades' Approach:Fusion Facades Limited approached the Emerald Gardens project with a commitment to cutting-edge design and precision:Custom Design Solutions: Fusion Facades collaborated closely with the project's design team to supply aluminum entrance portal flashings that seamlessly blended with the modern architectural design.SnapLok Cappings Expertise: The use of SnapLok cappings showcased Fusion Facades' expertise in providing high-quality, visually appealing solutions for large-scale residential developments.Material Durability: Fusion Facades ensured that the supplied components were made from top-tier materials, emphasising durability and resistance to the demands of an urban environment.Results:Fusion Facades Limited's contribution to Emerald Gardens resulted in a highly successful project:Seamless Integration: The aluminum package seamlessly integrated into the modern design of Emerald Gardens, contributing to its aesthetic appeal.SnapLok Cappings Excellence: The use of SnapLok cappings demonstrated Fusion Facades' expertise in delivering high-quality, visually striking solutions for large-scale residential developments.Durability and Longevity: The emphasis on top-tier materials ensured that the supplied components offered durability and longevity, meeting the demands of an urban environment and the scale of Emerald Gardens.Conclusion:The design and supply by Fusion Facades Limited played a crucial role in the success of the Emerald Gardens project. This case study showcases the importance of expert collaboration and precision in delivering design-forward solutions for contemporary residential developments. Fusion Facades' commitment to quality, durability, and seamless integration demonstrates its role as a key contributor to the modern and luxurious living experience at Emerald Gardens, adjacent to Wembley Stadium.
Sponsored
Raj Green Sandstone Paving and Pool Copings with a contrast Brazilian Black Slate Roman End

Raj Green Sandstone Paving and Pool Copings with a contrast Brazilian Black Slate Roman End

Stoneworld Oxfordshire Ltd

Stoneworld have supplied Brazilian Slate and Raj Green Sandstone paving and pool copings
Sponsored
Amazon Logistics Centre, Leeds

Amazon Logistics Centre, Leeds

Brandsafe

Brandsafe supplied and installed a wide range of impact protection products at this site. Armco safety barriers, bollards, flexible delineators, speed bumps, wheel stops, lamp post protectors, pedestrian guardrail and handrail were all specified. Secure cages with digital locks were also supplied by Brandsafe to protect key equipment within the building. Click the link to read more about how Brandsafe provided full external and internal protection for this industrial workplace.
Sponsored
Brunnea treated Redwood Timber Cladding - NORclad - Tesco Car Park

Brunnea treated Redwood Timber Cladding - NORclad - Tesco Car Park

NORclad Limited

NORclad were specified as the timber cladding supplier to this project, working with the Main Contractor on site we were able to work to a length schedule and optimise the lengths supplied with the aim to minimize wastage from offcuts on site. Profiles: Over 9000/LM of 45 x 95mm PAR boards were supplied for this project, pre-treated before it arrives to site, the MicroShades ‘Brunnea’ treatment offers a 30 year warranty against Rot & Fungal decay.
Sponsored
Surrey Police Headquarters

Surrey Police Headquarters

Anderson, GEC Ltd

A range of specialist fittings were supplied by GEC Anderson, for use the police forensic laboratory.These included a large height adjustable examination table; cabinets shelving and work surfaces with integrated bowls, upstands and special drainers. Perforated, height adjustable stepless shelving (GEC Anderson V90 System) was also supplied.Single-piece L-shaped stainless steel worktop with integral bowls, integral upstands and perforated draining rack. Shelving and cabinets with 'D' handles.
Sponsored
Accoya for the Hampton Court Flower Show

Accoya for the Hampton Court Flower Show

International Timber

International Timber was recently approached by Cultivar to supply Accoya timber for the Hampton Court Flower Show.
Sponsored
Leicester Royal Infirmary

Leicester Royal Infirmary

BEMO Project Engineering UK Ltd

BEMO supplied the N50 profile in bronze anodised aluminium, with smooth curved radii as tight as 1000mm.
Sponsored
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

Sika Limited

Sika ComfortFloor® supplied the superior surface solution as part of a major overhaul of the ‘home of rugby’.
Sponsored
Social Housing – Oxfordshire

Social Housing – Oxfordshire

Russell Roof Tiles

Russell Roof Tiles worked closely with the roofing contractor to supply tiles for a rural exemption scheme.
Sponsored
Private Housing – Waterlooville

Private Housing – Waterlooville

Russell Roof Tiles

Russell Roof Tiles supplied Bute tiles in Burnt Orange for a residential housing project in Hampshire.

Showing 361-380 of 380

Feedback