NORclad were specified as the timber cladding supplier to this project, working with the Main Contractor on site we were able to work to a length schedule and optimise the lengths supplied with the aim to minimize wastage from offcuts on site. Profiles: Over 9000/LM of 45 x 95mm PAR boards were supplied for this project, pre-treated before it arrives to site, the MicroShades ‘Brunnea’ treatment offers a 30 year warranty against Rot & Fungal decay.
Contact NORclad Limited by clicking the button below to find out which products were used in this case study.
Project: Carbon Zero - Bristol
Solersense - Zero Carbon Hub
Siberian Larch Timber Cladding Case Study - NORclad - UWE Bower Ashton
Welsh Larch Timber Cladding Case Study - NORclad - Steiner Academy