NBS Source
I'm a manufacturer

"substructure"

324 results found

Sort by:

Showing 37-44 of 44

Sponsored
Thrayle House Balcony Paving

Thrayle House Balcony Paving

EnviroBuild Materials Ltd

The redevelopment of Thrayle House involves a collection of new builds with heights of up to 20 storeys. Changes to fire legislation placed a ban on using combustible materials on the external walls and specified attachments of new high-rise buildings. Materials used in the construction of relevant residential buildings have therefore been limited to those with a fire-rating of Class A1 or A2 under EN13501-1 standards.Project BreakdownOrientated around quality and high specifications, Thryale House was after a balcony flooring system to support its 170 new homes, accommodating for a variety of resident needs, from the elderly to families and couples.Designed to comply with all current legislation, EnviroBuild’s Luxury Porcelain Tiles were selected to furnish all balconies across the Thrayle House collection.The SolutionThese complete non-combustible balcony systems offer solutions to meet the requirements of any project without compromising on quality or sustainability. Iron, from the Ergo collection, was selected to beautifully accompany the existing shades of the build, supporting the charismatic aesthetic developed through its local connections.Along with its reliable non-combustibility, a variety of impressive benefits include anti-fade technology, scratch resistance and low maintenance requirements for resident security and ease.Project DetailsSize: 460 m²Product: Iron Outdoor Porcelain PavingSubstructure: MESA Paving SupportsClient: Henry Construction & Network HomesArchitect: PRPLocation: London
Sponsored
Residential Apartment Decking- Ebury Place

Residential Apartment Decking- Ebury Place

EnviroBuild Materials Ltd

EnviroBuild worked closely with Bouygues development to provide over 160sqm of Hyperion Pioneer Oak composite decking for the residential balconies. For the Ebury centre project. This exciting mixed educational and residential development in the heart of London’s SW1 was designed by award-winning architects Sheppard Robson. The project– commissioned by developers Linkcity, combines the creation of an 11-storey residential tower with a 56,000 sq ft University Technical College (UTC).The UTC, named after the London’s former mayor for Planning and Policy, Sir Simon Milton, includes workshops, as well as a gym, sports facilities and a large outdoor terrace.The residential element of the scheme, which has been purchased by Taylor Wimpey Central London, is set to complete in 2018. The 11-storey tower will offer 47 high-quality one, two and three-bedroom apartments with adjoining balconies.The decking was installed on a durable sub-frame of Manticore plastic Lumber and MESA Support adjustable decking pedestals. This subframe allowed quick, easy and adjustable installation and the non-rot composite Hyperion Decking meant our clients were safe in the knowledge the balconies would look great for years to come.Project DetailsSize: 400m²Colour: OakProduct: Pioneer Range – Hyperion DeckingSubstructure: Manticore Plastic Lumber & Mesa Support Adjustable PedestalsLocation: LondonClient: LinkcityArchitect: Sheppard Robson ArchitectsContractor: BouyguesAll images courtesy of Sheppard Robson Architects and Taylor Wimpey
Sponsored
The Old War Office - Refurbishment

The Old War Office - Refurbishment

RYNO

The Old War Office is a magnificent refurbishment of Winston Churchill's headquarters during the World War II. The sensitive restoration of this Grade 2 historic building includes a 125-room world class Raffles Hotel and 85 luxury residences, along with restaurants, exclusive bars, a Spa and Wellness centre. Referred to as London’s anticipated destination, this architectural landmark opens its doors to the public in Summer 2023.RYNO’s involvement in the scheme included providing the paving and substructure to the Centre triangle Courtyard and the Penthouse Roof Terraces. The triangle Courtyard was finished with a RYNO Quadro porcelain range and supported on our TerraSmart Rail system. The system uses a double lattice structure to provide superior support to the pavers even around the complex curves of the planters on the courtyard and penthouse terraces. The design and detailing of the build-ups from concept to completion has been brilliant, fully complementing the building’s magnificent heritage and unique character.RYNO worked very closely with The Gardenists to ensure the rail layout and build-ups were designed to absolute perfection. Seeing is believing and as Calvin Dalrymple, Specification Manager at RYNO, testifies “to come to the site and see the results…, they really just speak for themselves. Knowing and understanding the coordination that's gone into this whole project and now to see it looking so fantastic has really been a huge reward.” Home to Winston Churchill and David Lloyd George, the Old War Office was designed in a trapezium shape to maximise the use of the land in Whitehall. Of the 25 million bricks that make up the building, the first was laid in 1901: the building was completed in 1906. For all Bond-fans out there, the building has featured in the background of many films: its first Bond-appearance was in 1983.
Sponsored
Colindale Residential Apartment Decking

Colindale Residential Apartment Decking

EnviroBuild Materials Ltd

Colindale Gardens is a unique mixed-use development in the heart of north west London. Commissioned by Redrow, the full development will bring over 2,900 new homes along with cafes, restaurants and retail facilities to the local community.Project BreakdownDesigned in a collaboration between Broadway Malyan, Fielden Clegg Bradley Studios and Fourpoint Architects, the extensive 19.17 hectare project will encompass a range of residential spaces, from studios to 4 bedroom homes. Each new development will overlook over 9 acres of landscape gardens.Close to Fryent Country Park with 250 acres of rolling fields and woods, the development has been designed with an emphasis on creating a community for relaxation, sports and play. To further enjoy indoor/outdoor living, all new release apartments and duplexes offer a tranquil private balcony and/or outdoor terrace space. The full development is due to be complete 2021.The SolutionEnviroBuild provided just under 400 m² of Hyperion Pioneer Walnut and Oak decking for the residential terraces. The minimal water absorption rate of Hyperion decking made it the perfect material to frame large outdoor planters in the centre of the residential hub.Working closely with sub-contractor Horohoe, the terrace decking was installed on a sub-frame of Manticore plastic Lumber and MESA Support adjustable decking pedestals.Project DetailsSize: 400 m²Product: Oak Hyperion Decking, Walnut Hyperion DeckingSubstructure: Manticore Plastic Lumber & MESA Support Adjustable PedestalsClient: RedrowArchitect: Broadway Malyan, Feilden Clegg Bradley Studio & Fourpoint ArchitectsContractor: RedrowSub-Contractor HorohoeLocation: London
Sponsored
Net Zero Carbon design featuring EQUITONE facade material

Net Zero Carbon design featuring EQUITONE facade material

EQUITONE

HLM Architects were asked by Wokingham Borough Council to create a community centred and modern building to replace the old and dated Activity Centre. HLM’s design is inspired by the centre’s beautiful and natural setting and supported the Council’s commitment to be carbon neutral by 2030.Celebrating the natural lakeside surroundings, the modern £2.4million scheme provides educational and leisure facilities for the local community in Dinton Pastures County Park for adventures on water and land. The new centre includes an activity hall, adults and children’s changing areas, dual-use teaching and conference spaces, and a coffee shop opening on to a spectator terrace overlooking the lake and park to cater for all the needs of the users and visitors.HLM worked with Reds10 to complete the structure offsite, with the facade applied later on-site. The designed is noted as it doesn’t look like the often maligned rectangular ‘shipping’ container shape which comes to mind when off-site production is mentioned. The size and presence of the two-storey building is specifically designed to be in harmony with the surrounding landscape and sits like a hidden oasis nestled between the treeline and shoreline. 75 per cent of the building was completed offsite; 16 modular frames were built and then transported to Dinton Pastures Country Park and then lifted into place. The facades were then added to the substructure on site. The modular approach significantly reduces the carbon emissions in the construction process.EQUITONE was used on the ground-level of the building. The high-density characteristic of EQUITONE worked well for the high footfall areas that will be getting a lot of contact, and where durability is crucial.The colour was considered a sympathetic complement to the FSC-certified Siberian larch chosen for the upper building, which is designed to weather overtime and blend in further with setting. Another important consideration was that EQUITONE is naturally resistant to many living organisms (fungi, bacteria, insects, vermin, etc.) and requires no harsh chemicals to clean.
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
IKEA Hammersmith

IKEA Hammersmith

RYNO

The Ikea Hammersmith roof terrace project was an exciting one to be involved with as it is a perfect example of when to use a rail-based support system over pedestals.Ikea is a global brand known for its simple design solutions that can be used by everyone.The system – TerraSmart Rail IGNOThere was 6600m2 of the TerraSmart Rail system installed across the terrace to support concrete pavers and porcelain pavers. The lattice make-up of the paving system meant that the insulation layer placed upon the original roof was held down. This framework offered a robust and reliable substructure to the walking surface that will experience a lot of foot traffic.As it is part of our IGNO range, the system is fully non-combustible.The ChallengesThe roof had existing features in the structural slab, which meant that pedestals alone wouldn’t have been able to successfully support the surface, and therefore, a rail system was employed. The rail system allowed easy adjustment to the height creating level plains across the terrace. This system also became an advantage when forming the ramp featured in the design because the TerraSmart Rail can provide non-combustible multidirectional support to the pavers maximising stability and reliability, creating a robust and safe incline a the desired angle.Two different pavers were used as part of the project, a 50mm concrete tile and a 20mm porcelain tile. The transition between the two pavers took place at the same level. The seamless transition between the two finishes was achieved by ‘zoning’ the areas and changing the paving support heights.As it was part of a larger building, the terrace had to account for the expansion and contraction felt over time by differences in the residual temperature. The paving supports had to account for this so that any heat-induced changes would have minimal impact on the safety of the surface. An expansion profile was manufactured to slot between the tiles found over the expansion seam in the insulation to overcome this issue. The expansion profile rises above the gap between pavers and creates an L-shaped cover, hiding any expected movement.Why the project succeededThe success of this project was down to the collaborative effort between everyone involved in the project. The unique features of the project were worked on by the project, innovation and specification teams at Ryno and were complemented by the installation carried out by Greenside Landscapes.
Sponsored
The Terrace | Lee Valley

The Terrace | Lee Valley

RYNO

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!

Showing 37-44 of 44

Feedback