NBS Source
I'm a manufacturer

"stages platforms"

749 results found

Sort by:

Showing 37-72 of 289

Sponsored
Platform Lift for a Shopping Centre

Platform Lift for a Shopping Centre

CIBES Lift UK

The lift was installed in the heart of the shopping centre, alongside the staircase to provide access to the floors for all visitors. The glazed shaft and panoramic doors preserve the light and airiness of the space, making this an ideal solution for public accessibility.
Sponsored
Stage is set for Selectaglaze acoustic secondary glazing to soundproof historic theatre

Stage is set for Selectaglaze acoustic secondary glazing to soundproof historic theatre

Selectaglaze Ltd

The Grade II Listed Victorian Tamworth Assembly Rooms had secondary glazing installed by Selectaglaze as part of a multi-million-pound project to refurbish and restore the much respected theatre. A solution was required to insulate the single glazed original arched casement windows in the auditorium to provide suitable acoustic and thermal insulation. Selectaglaze’s Series 41 side hung casement secondary glazing was specified with 6.4mm glass to each of the windows, matching the sightlines and providing full access to the originals for cleaning and maintenance.
Sponsored
Cibes Outdoor A5000 Platform Lift

Cibes Outdoor A5000 Platform Lift

CIBES Lift UK

This eye catching outdoor A5000 was installed with access the care homes patio area, ensuring safe and secure accessibility for residents and staff. The patio has outdoor seating where residents are regularly served afternoon tea, and meals when the weather is fine. The glazed shaft panels allow for great views of the landscaped grounds when travelling in the lift. The staff and residents enjoy many activities outdoors, including their annual summer fair and barbeques, so a lift was essential for ensuring that everyone has easy access to the patio and gardens.
Sponsored
Double Goods Lifts Project in Cambridge

Double Goods Lifts Project in Cambridge

Gartec Platform Lifts

Creating a new logistical and warehousing space in Cambridge, project managers at a new premises at Farboud Innovation Park got in touch with our Goods Lift Manager, Nick Gibbons. They were looking to include 2 high capacity goods lifts on the project to improve efficiency at the premises. They decided our box goods lift was ideal for the project. The quick turnaround and additional hard-wearing features to prevent damage when loading made it suitable for goods logistics. The team chose a shutter gate on the upper floor, but swing doors on the lowest floor for alternative loading efficiency.
Sponsored
St Mary’s Garden Village, Ross-on-Wye

St Mary’s Garden Village, Ross-on-Wye

Broxap Ltd

Ross-on-Wye’s skyline has formed the inspiration for new community facilities at a residential development.The iconic St Mary’s Church spire is reflected in the play area and recreation space created by Hand Made Places for families of St Mary’s Garden Village.The secure play area is surrounded by timber picket fencing and accessed via a bespoke arch double leaf gateway.The planed and sanded softwood arch is engraved to read St Mary’s Garden Village.Four further bespoke archways make up a fun walkway leading to a custom-built version of our Milton Play Unit.The play tower features a slide, rockhold ramp, ladder wall and stepped platform with a church-style spire to one end.A Hawkley Adventure Trail, Swing Steps and Bird’s Nest climbing frame are available for older children.And no play area is complete without the swings, with a Double Cradle Swing installed for little ones as well as a Nest Swing.A Star Stage brings role play to life for little ones, with timber Modular Radius Seating, including a bench engraved with the location, also available. Our cute little Hedgehog Animal Face is watching over everyone. Our installers laid a Bound Rubber Mulch safety surface in neutral green and brown colours.In addition to the play area installation, our parent company Broxap Street Furniture manufactured and supplied six Harrogate Senior Cycle Stands for community use. Four cast iron Blackburn Seats, finished with hardwood slats and a black frame, were provided along with a Derby Standard litter bin.
Sponsored
Cibes A5000 Platform Lift for London Restaurant

Cibes A5000 Platform Lift for London Restaurant

CIBES Lift UK

Chokhi Dhani is a premium fine-dining restaurant and lounge in London offering the authentic taste of India. It aims to represent Indian culture in it’s truest form through it’s exquisite decor and stunning dishes. The Cibes A5000 made for the perfect accessibility solution for this luxurious setting.
Sponsored
Cibes Outdoor A5000 Home Platform Lift

Cibes Outdoor A5000 Home Platform Lift

CIBES Lift UK

This outdoor home lift was installed at this stunning stone built house out in the Welsh countryside and is home to a couple that were looking for an accessibility solution after a double knee replacement. The adaptability of the A5000 makes it an ideal choice for an outdoor lift, saving the internal square footage of the home.
Sponsored
Cibes Outdoor A5000 Home Platform Lift

Cibes Outdoor A5000 Home Platform Lift

CIBES Lift UK

This outdoor home lift was installed at this stunning stone built house out in the Welsh countryside and is home to a couple that were looking for an accessibility solution after a double knee replacement. The adaptability of the A5000 makes it an ideal choice for an outdoor lift, saving the internal square footage of the home.
Sponsored
A8000 Platform Lift Installed in a Beauty Salon

A8000 Platform Lift Installed in a Beauty Salon

CIBES Lift UK

The elegant Cibes A8000 is the perfect lift for a beauty salon, like this salon in Madrid, Spain. The lift has a capacity of 1000 kg and provides safe transportation of customers, staff and merchandise.
Sponsored
London Mews Futureproof with Smart Residential Lift

London Mews Futureproof with Smart Residential Lift

Gartec Platform Lifts

With renovations finishing up at a 3 storey residential property in a quiet London mews, the owners of this beautiful property were looking at futureproofing options. From the upper outdoor atrium area to the stunning railway sleeper stairway, the home spans over 3 floors and has been designed as a ‘forever home’. They wanted a modern lift to match the renovation work. Our smart HomeLift with connected app gave them the control and technology they wanted. Using black for the shaft and frames, their home lift contrasts beautifully on each floor with the bright white walls and darker accents.
Sponsored
Matalan Reduce Manual Handling with Gartec Lift

Matalan Reduce Manual Handling with Gartec Lift

Gartec Platform Lifts

A busy Matalan retail store in Rugby was having issues with manual handling. They required quick installation, a quiet system, and a lift able to carry goods and attendant without a time consuming training or commissioning process. Our 7000 Flexi provided the speed and simplicity they required with extra features like a curb for trolley protection. Daneka, Team Leader at the store said: “The curb has stopped any damage to the lift shaft – it’s bulletproof!”
Sponsored
Gym Group Lift Boosts Brand Identity

Gym Group Lift Boosts Brand Identity

Gartec Platform Lifts

The Gym Group required external street-level access for the Monument location in London, and the Aritco 7000XT from our commercial range was ideal. External installation also saved valuable space internally for the group, vital in a city or restricted location where space is at a premium. Additional weatherproof finishes, canopies and heating/ventilation systems keep the lift in great condition in any weather. Providing the lift with restricted access using a key locking system also allowed them to lock the lift out of hours to prevent any misuse or unattended access.
Sponsored
working platform and walkway system - Manchester Airport

working platform and walkway system - Manchester Airport

Safety Fabrications Limited

The Ascent Aluminium Roof Access Walkway was specified to meet the clients requirement to create a level anti-slip route across the roof for maintenance personnel. The Ascent Aluminium walkway is tested for use on the aluminium standing seam roof and is secured back to the roof sheet using a proprietary support clamp. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardaril, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.
Sponsored
working platform and walkway system - Asda, Burnley

working platform and walkway system - Asda, Burnley

Safety Fabrications Limited

The Ascent Aluminium Roof Access Walkway was specified to meet the clients requirement to create a level anti-slip route across the roof for maintenance personnel. The Ascent Aluminium walkway is tested for use on the metal profiled roof sheet and is secured back to the roof sheet using a proprietary fixing. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.
Sponsored
Coleg y Cymoedd

Coleg y Cymoedd

Gerflor Flooring UK Limited

When the Coleg y Cymoedd (translated meaning is the College of the valleys) in Wales needed to totally refurbish the flooring element of their campus in Ystrad Mynach (near the town of Caerphilly), they turned to international flooring specialist Gerflor to supply over 1000m2 of flooring for numerous areas and spaces throughout the campus. It was a project that provided Gerflor with the perfect platform to showcase a raft of high-quality flooring solutions ideal for the concerned demanding education environment.Tony Thorne, Gerflor Sales and Specification Manager - South Wales commented, “This project started at the specification stage with the Architects Austin-Smith: Lord. Over several meetings, we looked at a number of products to be used in various areas of the building scheme. The installation at the Ystrad Mynach campus is an outstanding example of how a mix of Gerflor innovations can achieve world class results. Mixing gym tiles with sheet vinyl, safety flooring and LVT, yielded incredible results for this college refurbishment project.”Kate Thomas, Director Austin-Smith: Lord commented, “The refurbishment project, part-funded by the Welsh Government’s 21st Century Schools and Colleges Programme, formed part of the college’s plans to continually invest in new facilities and equipment that will allow learners across its catchment area to have access to the latest training opportunities and career paths.”Mark Bond, Estimator and H&S Manager at Floor Furnishings commented, “The client is extremely impressed with the end results. We regularly work with Gerflor products and recommend Gerflor where suitable, in line with our client’s requirements and expectations. Gerflor’s staff are particularly skilled in being able to work in collaboration and alongside both the end user clients, as well as contractors in achieving an excellent final result that is pleasing to the client and meets the complicated design brief.”
Sponsored
Case Study - Gerrards Cross & Headstone Lane

Case Study - Gerrards Cross & Headstone Lane

Twinfix Limited

Twinfix is a family run business. For more than 30 years they have supplied modular polycarbonate panels for use as rooflights in many railway stations and depots. Replacing the old canopy glazing used at rail stations with products from Twinfix’s range of polycarbonate glazing options floods the area with daylight while eliminating the common issues that occur with historic railway roof glazing. Last year, Twinfix assisted with the refurbishment of two of the UK’s historic stations, Gerrards Cross and Headstone Lane.Gerrards Cross StationGerrards Cross Station is a fantastic example of one of the nation’s historic stations. Built in 1906 as part of the Great Western and Great Central Joint Railway it has recently undergone a series of upgrades to improve the station for passengers.As part of a £2.4m Railway Upgrade Plan investment by Network Rail, the following areas were refurbished:Full replacement of the platform’s canopy – ensuring passengers are protected from the weatherInstalling lighting throughout – making the station safer and more secureRe-roofing of the main station’s roofWindows repairs where necessaryApplying fresh coats of paint to steelworkRefurbishment of the canopy roofHeadstone Lane StationTravel eleven miles east of Gerrards Cross and you arrive at Headstone Lane station. Another of the UK’s historic stations, this station opened in February 1913 and consists of a small single storey brick-built station building adjacent to the Headstone Lane road bridge, with two platforms.This station was also part of the Railway Upgrade Plan, with investment in the refurbishment of both platform canopies.An innovative roof glazing systemA team comprising of Network Rail, Principal Contractor J. Murphy & Sons Limited, and specialist Design Consultant Arcadis Consulting (UK) Ltd were assigned to the job to ensure that the correct roof glazing was specified and installed over the platforms.The product chosen for both stations was the innovative Twinfix modular non-fragile Multi-Link-Panel NF (Non-Fragile) system, glazed with 6mm clear solid polycarbonate. Approximately 225 square metres of these panels were required to re-glaze the five canopies across both stations, with panels delivered to site ready for quick installation.Each panel of the innovative Multi-Link-Panel NF system comprises of a powder-coated aluminium frame and fitted with polycarbonate glazing. The panels are built completely off-site in a quality-controlled factory environment, reducing the risk, and cost, of site mistakes, and are delivered on-site fully glazed and ready for rapid installation. The system has a unique linking design feature that results in incredibly quick installation times, making the system very much suited to rail work due to its restricted possession times.The Multi-Link-Panel NF system is an innovative roof glazing product that has been well utilised for many years on station canopy roofs, and it has been thoroughly tried and tested in that time.It was the chosen system for this project for a number of reasons:sustainability – these panels are virtually unbreakable in manufacture, transit and in situ, meaning that, unlike glass, maintenance costs will be eliminated.safety – Twinfix Multi-Link-Panel NF (Non-Fragile) conforms to the HSE recommended test method ACR[M]001:2019 (as outlined in document HSG33) and achieves a ‘B’ Classification.off-site construction – The panels are pre-assembled in Twinfix’s factory ensuring strict quality guidelines are adhered to, which is not always guaranteed when roofing products are assembled on site.ease of access – The Multi-Link-Panel NF system can be fitted with In-Line Access Hatches, to allow cleaning of gutters and roof. These hatches are hardly visible and allow safe access through the glazing without needing to get on the roof.weight – The Multi-Link-Panel NF is light in weight and due to its modular format, it is very quick to install which allows for short rail possession works.appearance – the clear polycarbonate panels have the appearance of glass and provide just the right level of light transmission onto the platforms below.This project demanded a collaborative approach, requiring Twinfix to liaise closely with Principal Contractor J. Murphy & Sons Limited, installation company Orchard Roofing & Building, and design consultancy Arcadis, where early engagement with the team ensured that all aspects of the project ran smoothly from the onset.Richard Nash, Contracts Manager at J. Murphy & Sons Limited commented: ‘Throughout the design and implementation stages of our refurbishment works at Gerrards Cross and Headstone Lane Railway Stations, Twinfix have been a pleasure to work with. Working alongside both our designers and approved installers, they have provided a professional end to end service resulting in a quality finished product.’Piotr Stencel, Senior Project Manager at Arcadis Consulting (UK) Ltd commented: “All the Twinfix team we have been in contact with have been very helpful to provide information, contact and help resolve issues. We were also invited to their offices in Warrington back in 2019 where we could see/touch Twinfix products and discuss design/constructability aspects which is always better than just seeing on the product data sheet.”The Twinfix team are proud to be part of this journey that will see the UK rail network revolutionised and sees exciting times ahead for the company.
Sponsored
Cibes A5000 Office Platform Lift for Dyno Plumbing

Cibes A5000 Office Platform Lift for Dyno Plumbing

CIBES Lift UK

Cibes installed their A5000 lift in Dyno Plumbing’s colourful and modern office in Trimdon. This one stop lift provides the ideal accessibility solution to this industrial inspired office. Homage is paid to the towns mining history with artefacts proudly displayed on the walls. The white steel panels and glass door sit perfectly in the bright and colourful surroundings. The plumbing and drainage experts have 50 years of experience, offer free call-outs 24/7 and fixed prices. They cover just about any commercial and private work, from the largest projects right down to unclogging your kitchen sink!
Sponsored
H&M Boost Mezzanine Access with Gartec Lift

H&M Boost Mezzanine Access with Gartec Lift

Gartec Platform Lifts

Busy retail store, H&M, needed to provide customer access to the upper mezzanine floor. With floor level fixing points and 2 day out-of-hours installation, a Gartec 9000 cabin lift was installed. The cabin lift looks and feels exactly like a conventional lift, but with half the cost, no building works and simple retrofitting it fitted the bill perfectly for the retail environment. Emily, the store administrator, commented "this lift does the job perfectly and provides a familiar environment for our customers".
Sponsored
Motorline Renault Plan Showroom Access with Gartec Lifts

Motorline Renault Plan Showroom Access with Gartec Lifts

Gartec Platform Lifts

Motorline Renault car showroom in Maidstone had an access issue during building, with customer showrooms and a meeting room spread between 2 floors. To open the showroom to everyone, a lift was required in the customer lounge. Gartec suggested an Aritco 7000 as a simple, low cost option which ticked all the boxes. Our team worked around their building schedule and the lift blends perfectly with the high end showroom. “Whilst we don’t use it very often, the lift is a perfect addition to make our entire showroom accessible to everyone” (Lin, Showroom Administrator)
Sponsored
Godalming Home Gets Smart with Gartec Home Lift

Godalming Home Gets Smart with Gartec Home Lift

Gartec Platform Lifts

Already in their dream home, a couple in Godalming needed a home lift installed to help with restricted mobility. After visiting our showrooms, the couple went for our HomeLift, a design driven smart lift with linked phone app. A huge range of colours and flooring helped blend the lift with the interior decor, and gives them freedom. Our team helped the couple pick a better spot for the lift and design artwork for the back wall. Kevin, one of the homeowners, commented "the Gartec team helped us the whole way through the process - we love it".
Sponsored
working platform and walkway system - Ely Cathedral, Cambridgeshire

working platform and walkway system - Ely Cathedral, Cambridgeshire

Safety Fabrications Limited

The Ascent Aluminium Roof Access Walkway was specified to meet the clients requirement to create a level anti-slip route across the roof for both visitors and maintenance personnel. The Ascent Aluminium walkway is laid to the lead roof covering using non-penetrative support feet. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.
Sponsored
Paddington Station

Paddington Station

AATi (Antislip Antiwear Treads International)

Paddington has 13 terminal platforms, numbered 1 to 14 with platforms 1 to 8 below the original three spans of Brunel's train shed, platforms 9 to 12 beneath the later fourth span.
Sponsored
Robroyston Station, Glasgow

Robroyston Station, Glasgow

Dura Composites Ltd

GRP Rail Station Platform - Hybrid Install | Case StudyRobroyston station features two brand new platforms constructed using the Dura Composites recommended hybrid GRP and steel solution which is designed to meet the requirements of Network Rail standard NR/L3/CIV/030 and combines the strength of a steel foundation with a Glass Reinforced Polymer (GRP) Dura Platform surface. The platform surface has incredible durability and anti-slip properties which is shown to reduce by only 5% after a million footfalls (tested to BS 7976-2:2002+A1:2013).AmcoGiffen were responsible for delivering the design and build works for the development, with funding for the station coming from Glasgow City Council, Network Rail and the Strathclyde Partnership for Transport.In choosing the GRP/Steel system from Dura Composites, the platform installation for the project (using GRP Dura Platform and steel trestles) has been able to take place largely while the line is open, minimising the impact on customers using the line.
Sponsored
NBS Chorus for Architecture

NBS Chorus for Architecture

NBS

Based in London, Mulroy Architects is an award-winning, RIBA-Chartered Practice. They are a small team of nine staff that works mostly on residential projects and projects such as Radley College's rowing centre and a hostel for backpackers in Tower Bridge.When the COVID-19 pandemic hit, Mulroy Architects acted early and started working from home within 24 hours. With respect to writing project specifications, Director Andrew Mulroy said that the transition was ‘“seamless’” thanks to NBS Chorus. 12 months on, the team is still working from home, and all specification writing now takes place collaboratively using Chorus.  MOVING TO CHORUSThe practice had been using NBS Scheduler since 2009, but with the move to home-working and most of their other software becoming cloud-based, it made sense to move to NBS Chorus. ‘We had a demonstration of Chorus when the pandemic hit, and we were impressed with its feature set and how intuitive it was compared to NBS Scheduler. We also knew that Scheduler would be retiring later in 2021, so we wanted to make sure we were well prepared. With the help of our account manager and the NBS support and training, we were able to switch over Chorus quickly’, Andrew said. 'We realised that by moving to Chorus, we could reduce our hardware costs and switch to writing specifications on Apple Macs rather than on PC – this was not possible with the older NBS software. With the software being cloud-based, we can now work anywhere with it – another key benefit.'One of the other advantages of using a cloud-based specification platform is that it allows greater collaboration. Chorus enables internal and external collaboration by allowing specifiers to invite other team members into the project environment. This is one of the main features that Mulroy Architects has been utilizing. ‘Even though we’re a small practice, the way we run the office is by having teams of four working on a project; that way, everybody works on everything’, Andrew said. 'We’ve recently started on a project where we’re all collaborating on the same specification as a team. It’s great to be able to see changes that the team are making in real-time and be able to leave notes directly on the spec – it speeds up decision making and how long it takes to complete a project.'  A RANGE OF BENEFITS Greater collaboration also means a greater level of risk management – something that Andrew says the practice has ‘without a doubt’ benefitted from with NBS Chorus due to the latest industry standards always being up-to-date and available at the user’s fingertips. As well as the overall impact on the business, Chorus has also helped to build the business’ level of specification knowledge and skills internally. ‘The guidance and notes on Chorus are brilliant for updates’, he said. 'Standards are automatically updated within Chorus, and reading what's changed helps to improve your knowledge. The product information from NBS Source, that’s available in Chorus, is also useful - knowing which products have third party certification is essential to us when creating a specification, so having that information available saves everybody a lot of time at the design stage.'Andrew also believes that Chorus is helping the practice to specify sustainably.'If you’re working on a project which is BREEAM rated, some of the clauses start to address that. Throughout the guidance notes and product literature, the sustainability information is embedded, which is good.'‘The industry’s shift to digital is a mammoth task and what NBS is doing is great. Cloud-based systems are the way forward’.
Sponsored
Canada Water Station

Canada Water Station

AATi (Antislip Antiwear Treads International)

Canada Water is located in Rotherhithe and is the busiest two-platform National Rail station, with 23.7 million entries and exits to the NR platforms in 2015/16. The AATi cast metal anti-slip stair nosings are still in service performing remarkably 16 years later.
Sponsored
Network Rail Station Seating - Derby

Network Rail Station Seating - Derby

Townscape Products Ltd

Network RailStation Refit SeatingStreet furniture | Railway seatingPlatform seatingWhen Network Rail extended the platforms at Derby station, the contractors Galliford Try worked with Townscape to design and fit the extended platform with Townscape Voltan seating.This versatile scheme shows a range of seating elements include PRM seating, 3 and 4 person seating, perch seating and Stainless steel bump rails.Product featured: Voltan Multi-Single 4 Seater Mild Steel Seat – Zinc Plated Polyester Powder Coated Finish in a Standard Range Colour with a Pedestal Leg (On or Below Ground Fix) Fitted as Standard.
Sponsored
Royal & Derngate Theatre

Royal & Derngate Theatre

Harlequin Floors (British Harlequin plc)

The Royal & Derngate Theatre is a mult-purpose space which can be configured for a variety of performances. Harlequin’s stage refurbishment project was the first restoration undertaken since 2005 when the theatre was first re-developed.A comprehensive multi-layered Harlequin Stage System. Harlequin fitted new battens to strengthen the stage over which a further double-layer of wood ply was installed. The stage surface was finished with a black Harlequin Standfast vinyl performance floor. The complete refurbishment project covered the entire stage area incorporating wings, lifts, orchestra pit and retractable removable seating.
Sponsored
Antrim Bus & Rail Station

Antrim Bus & Rail Station

Tobermore

The hard-wearing vibrant finish of Tobermore’s Pedesta block paving provided a functional and visually attractive finish for the refurbished trafficked area and train platforms at Antrim Bus and Rail Station in Northern Ireland. Tactile Flags were also implemented as an essential sensory health and safety measure on the train platforms and on crossing zones at the station.
Sponsored
Mid Calder Fish Pass

Mid Calder Fish Pass

Architectural Street Furnishings part of WB White Foundry

ASF worked with AECOM and Barhale Construction for the new fish pass and viewing platform at Mid Calder, Livingstone. A standard base plate version of the ASF Buckden 2 Rail post was used, manufactured in 100% recycled cast iron, for the fish pass itself offering a safety barrier for Scottish Water and fish pass technicians when accessing the riverside area. A bespoke version of the posts were manufactured for the viewing platform that were supplied as a panel post with vertical infill bars so that the public can view the fish pass. A matching lockable gate with vertical infill was also manufactured to link the viewing platform and the fish pass itself.
Sponsored
Kings Cross Station, London

Kings Cross Station, London

Dura Composites Ltd

GRP End of Platform Steps | Case StudyContractor AmcoGiffen selected Dura Composites to design and fabricate 6 sets of GRP End of Platform Steps for Kings Cross Station in London, which were installed by Amco in a very short time frame to meet the needs of the tight project timescales. Weighing up to 80% less than steel and 30% less than aluminium, Dura Composites End of Platform Steps offer equivalent performance for considerably less weight. This results in major savings including lower installation costs due to more economical transportation, handling and on-site positioning.The client was delighted with the quality of the design and workmanship and with Dura’s ability to turn the fabrications around in such a short space of time, describing the structures as having “gone in like a dream”. As well as fully fabricated non-corrosive and non-conductive single unit GRP end of platform steps Dura Composites can also supply in component or flat pack kit form ready for quick assembly on-site.
Sponsored
New Air BP Jet Fuel Station - plank gratings

New Air BP Jet Fuel Station - plank gratings

Elefant Gratings T/A PcP Gratings Ltd

This project involves the partners Fremek AB, Totech AB and PCP A/S.Fremek is a workshop company in Dals-Långed that is certified according to EN-1090, EXC1, EXC2 and EXC3. Fremek specializes in welding, cutting, painting and assembly of large projects throughout Sweden.PcP’s solution includes CUBE® gratings and treads for a modern design and ladder systems for worker safety. Fremek and Totech chose PcP’s solution to install a new fuel station for Air BP, one of the world’s largest aviation suppliers.Project criteria - Slip-resistant steel platformFor this project, Air BP required an anti-slip platform due to the use of oil during maintenance.Although the platform is new construction, it was erected on an existing outdoor structure with nothing but a roof and fuel tanks. Thus, there were specific dimensions required.Therefore, PcP provided a more efficient fuel station platform and a safe working environment for personnel carrying out aircraft maintenance.The project had a strict timeline of 10 weeks as the construction had to be finalised before winter.Fremek was responsible for designing the air-plane fuel station and for sourcing the correct materials. Fremek contracted Totech for the works. Totech has more than 25 years of experience managing complex projects for a range of industries and, therefore, extensive knowledge of industrial construction and of which materials to use.PcP has delivered gratings to Fremek in several previous projects. Totech, therefore, approached PcP to showcase gratings with high slip-resistance for the platform. Totech seeked to use standard sizes to meet customer requirements of lead time and budget. At this point, Totech discovered that PCP also could provide handrail and ladder systems.Project solution - CUBE gratingsThe PcP CUBE® gratings, treads and toe-plate were provided for the platform in standard sizes. For easy access to the platform, PcP provided fire escape ladders and safety handrails. PcP CUBE® gratings and treads benefit from outstanding high PTV slip-resistance reducing trip and fall risk, lightweight but strong and fitted perfectly into the existing construction from the ground to roof.Fremek installed the platform, and the workers on-site made cut-outs to suit various plant equipment. Additionally, PcP provided escape ladders to mount on fuel tanks. In case of fire incidents/emergencies, enabling workers to escape rapidly.
Sponsored
Chirag Oil Field

Chirag Oil Field

Lionweld Kennedy Group

Contacted by Tefken Construction, we designed, fabricated and supplied modular flat packs of both steel and GRP gratings, heavy duty barrier rails, gates, ladders, treads and handrails to the 'Chirag Oil Field'.Our designers ensured that all material and placements could withstand the given environment. Using both steel and GRP allowed for cost efficiencies for the client, while maintaining a great strength for their platforms and rails.Our modular flat packs allow the client to install their flooring and other items easily.Chirag is an offshore production, drilling and quarters (PDQ) platform located 120km east of Baku in the Caspian Sea, at a water depth of 120 meters.First oil from the platform was achieved on 28 January 2014.Total Chirag production was on average 53,000 barrels per day.
Sponsored
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were planned for installation in the hospital parking lot.It was determined that a ramp with a wide platform was necessary to accommodate the diverse range of daily users of the system, including those operating patient-moving equipment, carts, and pedestrians accessing the cabins.END RESULT:A fully compliant ramp featuring an extra-wide metal walkway was designed and successfully installed. This product boasts a secure loading capacity of over one ton!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Sponsored
Liphook Station

Liphook Station

AATi (Antislip Antiwear Treads International)

ATi Supplied anti-slip stair nosings for another AFA ‘Access for All’ footbridge at Liphook station in Hampshire. This is part of a Network Rail replacement project worth £5.3million, the bridge is set to provide better journeys for passengers and improve station access. The structure features a lift on each platform to provide the step-free access for disabled users. The footbridge with runs over two platforms, upgrading CCTV and lighting simultaneously.
Sponsored
Stamford Station Refurbishment Project

Stamford Station Refurbishment Project

Twinfix Limited

As part of the Railway Upgrade Plan, Platform 1 at Stamford Station in Lincolnshire was recently refurbished. Careful consideration resulted in the use of Twinfix Multi-Link-Panels Non-Fragile to replace the old curved corrugated roofing of the canopy and the end result is more in keeping with the original age and design of this elegant Grade II listed building. Passengers and staff are now all benefiting from the high levels of natural light that floods the platform.
Sponsored
Lift enables wheelchair users to access Osnabrück registry office

Lift enables wheelchair users to access Osnabrück registry office

Guldmann Limited

The city of Osnabrück has made the entrance to the Weigh House on the market square accessible. The heavy wooden doors now open automatically, and with the help of a platform lift, wheelchair users are now also able to access the room used for wedding ceremonies in the historic building with ease.Remodelling the historic building cost 90,000 euro and took three months to complete. The building (constructed in 1532), which is used by the registry office, is now completely accessible – just in time for wedding season. Over 600 wedding ceremonies are held in the Weigh House each year.“A project close to the heart”A platform lift has been installed, which is not only easy to operate, but also looks elegant. The platform lift can be completely lowered into the floor. A touch of a button is all that’s required to access the foyer via the stairs. The Lord Mayor Wolfgang Griesert describes it as “elegant and discreet”.

Showing 37-72 of 289

Feedback