NBS Source
I'm a manufacturer

"soil and waste systems"

2,095 results found

Sort by:

Showing 145-180 of 1387

Sponsored
Impressive Basement Extension, Berkshire

Impressive Basement Extension, Berkshire

Newton Waterproofing Systems

An impressive basement extension, housing a swimming pool and sauna, required a robust waterproofing solution at this large country home.Newton Specialist Contractor Stonehouse were brought onto this large residential project to waterproof an underground extension including a swimming pool and sauna. Set in a small village in Berkshire, the impressive countryside home was designed by architects Spratley and Partners.For the new below-ground structure, Stonehouse were required to install a failsafe and maintainable waterproofing system that would completely protect the luxurious basement from unwanted water ingress.Ensuring that the project was fully compliant with BS 8102:2009, Stonehouse recommended a combined waterproofing solution using a Type B reinforced and water-resistant concrete structure designed to BS EN 1992, combined with a full Type C internal cavity drain membrane system.As the most reliable and completely maintainable Type C waterproofing solution, the Newton CDM System was the ideal choice for this structure. Firstly, Newton 508 membrane was securely fixed to the internal walls of the basement using Newton's specialist MultiPlug fixings.Any water that is captured by the membrane is then drained away with Newton Basedrain channels, and pumped out of the property using a Titan-Pro sump chamber fitted with two NP400 pumps and supported by a failsafe battery back-up system.As an extremely experienced waterproofing contractor, Stonehouse were able to confidently recommend, design and install a comprehensive and truly failsafe waterproofing system that will protect the property from unwanted water ingress for many years to come. Stonehouse also provided complete peace of mind by offering a 10-year guarantee on the installation.
Sponsored
JD Gyms

JD Gyms

Wedi Systems (UK) Ltd

JD Gyms are a reputable company within the leisure industry. When they started to experience serious leakage problems across their estate (especially on mezzanine floors), they quickly realised that their existing shower construction does not live up to the standard of their service – and would need a reliable, guaranteed system solution.In order to allow for a straightforward and safe replacement of existing showers without the need to change the existing pipework, a grid platform constructed of 80mm XPS building boards was proposed . The showers then were fitted with XPS linear shower trays featuring dry-fit drain technology, 12.5mm XPS building boards on the walls and surrounding floor areas were sealed by proprietary sealing and decoupling membrane, all ready to tile after 24 hours. Up till now, 18 different sites have been completed and the shower system solution comes with one manufacturer’s guarantee on the whole installation. 
Sponsored
Ormskirk Hospital

Ormskirk Hospital

Forbo Flooring Systems

After nearly 30 years without refurbishment, the Paediatrics department at Ormskirk District General Hospital required a new lease of life to be injected into the building. With hospitals in operation around the clock by patients, visitors and staff, it was vital that the new flooring solution offered a combination of optimal performance benefits, whilst being quick and easy to install to minimise both disruption and downtime. Looking for a time and cost saving solution, Southport and Ormskirk NHS Hospital Trust chose Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for the refurbishment. Easy and quick to install during out of hours, the ‘fast fit’ floor covering delivers outstanding dimensional stability and indentation resistance.
Sponsored
Roman House

Roman House

Forbo Flooring Systems

Forbo Flooring Systems’ impressive digital printing capabilities gave Gilltown the scope to have some real fun with the interior design of new student accommodation in Newcastle, resulting in a scheme like no other – all while providing the performance properties required for a heavily used building.“The flooring played a key role within this project and we were determined to opt for floor coverings that have rarely been seen in this kind of environment before. After working with Forbo on earlier projects, we knew it’s wide range of high-end and quality products, along with its impressive bespoke design capabilities would help us to achieve this.” - James Gillespie, Project manager.
Sponsored
Jubilee Wood School

Jubilee Wood School

Excelsior Panelling Systems Ltd

The Project  A new Primary School built as part of the school’s framework agreement with Milton Keynes.  Two storey portal frame build.Jestico & Whiles Architects The Challenge Produce a system suitable for use in an open space.Open plan arrangement of Cubicles and Solid Surface Vanities located directly off the corridor.Ensure safety of the user and create an anti-bulling, completely visible space. The Solution Excelsior Skyline Cubicle Range, a full height system with overhead panel. This extremely popular range is an ideal choice for school environments meeting the demands of modern education and providing complete privacy and comfort to the user.Full height cubicle systems have increased in popularity over the past few years. Skyline Range enables Schools, Colleges and the like to ensure both safety and anti-bulling objectives are met and Excelsior’s rise and fall hinge paired with the bespoke door design enables lift off access in the event of an emergency.Skyline range is an extremely durable system and comes as standard with a ‘P’ section headrail, ‘U’ channel base rail and over-panel providing maximum stability. Optional bolt through fixings are available and recommended.The successful open plan arrangement of cubicles and solid surface vanities in Orange and Pomme Verte is in keeping with the modern vibrant atmosphere of the school.
Sponsored
Broadway Apartments, Morecambe

Broadway Apartments, Morecambe

K Systems Insulated Facades

BackgroundLocated in a prominent location on the Morecambe seafront, the Broadway Apartments project was large new build steel frame apartment block.A challenging project to be involved with, as M H Stainton Homes wanted to create an iconic building on a corner location. The steel frame was key, combined with curved glazing on the corner elevation of the building. Then a lightweight cladding solution was required for the rest of the façades.K Systems approved installer M & M Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.Our ServiceWe worked in close partnership with M & M Façades throughout the duration of the project. The K Systems Technical team offered on-site technical and installation support throughout the build process and supported the M & M Façades team at all stages of the project.As the building is over 18 metres, a bespoke specification was produced to ensure compliance with the current building safety regulations.A direct fix system suitable for steel frame structures and all building heights was specified, ensuring the safety of both the building and future residents.Technical Project DetailsAfter numerous design meetings the K Systems Direct Fix M (Mineral Wool) EWI system with a Silicone Render (TC 15) finish was chosen, meeting the requirements of M H Stainton Homes.This system provides high levels of fire resistance and non-combustibility bringing the apartments in line with mandatory Government requirements for buildings over 18 metres tall.We specified the use of multiple thicknesses of insulation boards (50mm, 100mm and 170mm) to allow for the line and level of the steel frame. A U-value of 0.28 W/m²K was achieved, meaning the residents will enjoy thermally efficient homes.For the finish Silicone TC 15, our high-performance thin coat render, was used. With the coastal location, this durable, weather resistant finish offers an eye catching, clean design, creating a modern and crisp aesthetic. Its hydrophobic properties provide a low-maintenance finish.We delivered a safe, thermally efficient, eye-catching design with a long-lasting finish that residents will appreciate for years to come.
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.
Sponsored
Basement Extension

Basement Extension

Delta Membrane Systems Ltd

The project was split into 2 phases. Phase 1, waterproofing the exiting basement and Phase 2, retrofit extension to the existing basement to create a luxurious multiuse living area. Due to the partially retaining nature of the structure, the project required a combination of Type B and C waterproofing systems to ensure a Grade 3 habitable environment.
Sponsored
Park Plaza - Victoria Hotel

Park Plaza - Victoria Hotel

Licata Building Systems Ltd

Park Plaza Victoria Hotel is located in the heart of central London providing premium stays in close proximity to famous attractions such as Buckingham Palace, Big Ben, and the Houses of Parliament. Guests of the Park Plaza Victoria Hotel can enjoy the exclusive facilities available such as the sauna, swimming pools and on-site restaurant. Licata Building Systems are proud to have been a part of this project by providing full Licata waterproofing systems, flooring systems, and interior paints.
Sponsored
The Newt Hotel & Spa, Somerset

The Newt Hotel & Spa, Somerset

Schlüter-Systems Ltd

Schlüter-Systems undertile heating and waterproofing products were used in a complete renovation and restoration of a Hotel and Spa in Somerset.
Sponsored
EuroPipe at Manchester Airport - Case Study

EuroPipe at Manchester Airport - Case Study

BLÜCHER UK Ltd

BLÜCHER recently supplied our BLÜCHER EuroPipe system to the new Terminal 2 car park at Manchester Airport. The new multi-story car park has space for 3,800 vehicles and is part of the £1 billion transformation programme at the airport. The installation was overseen by G Beverley & Son on behalf of the M&E Contractor, Crown House. Our stainless steel drainage systems are the ideal choice due to our lightweight push-fit pipes and fittings are easy to handle and install, and provide rapid discharge of rainwater and waste water.
Sponsored
Nuway Tuftiguard Black Anodised

Nuway Tuftiguard Black Anodised

Forbo Flooring Systems

As a leading entrance matting installer, Andrew Scollan Matting Systems are a trusted partner for Nuway installations across Ireland.Here you can see several examples of Nuway Tuftiguard Black Anodised, which has been expertly installed by Andrew Scollan Matting Systems in offices and entrances throughout Ireland.In line with recent design trends, Nuway Tuftiguard Black Anodised is becoming increasingly popular for customers who wish to combine quality with design, when it comes to their primary barrier matting solution.
Sponsored
Evoo Barzzeria

Evoo Barzzeria

Forbo Flooring Systems

The natural aesthetics, durable performance and extensive colour palette of Forbo Flooring Systems' Allura Wood luxury vinyl tiles (LVT) collection have all played a significant role in creating a contemporary, stand- out environment for Evoo, a new 'barzeria' in Barnsley, Yorkshire. 'Evoo- The Barzzeria' is a pizzeria and bar, which combines authentic Italian cuisine with Britian's popular cocktail cultur, forming the worlds first 'barzzeria'. Set in a once prominent building that was left derelict for years, Julie Poulter Interior Design (JPID) was tasked by restaurant owner, Jaz Boparai, to design 'the best looking bar' in Barnsley. Subsequently, the project was awarded 'commended' in the Fly Forbo competition 2018/2019.
Sponsored
Chailey School, Brighton

Chailey School, Brighton

Senior Architectural Systems Ltd

With a proven track record of successful work in the education sector, Senior Architectural Systems was more than qualified to deliver the fenestration package for this new secondary school in Brighton.The new Chailey School in South Lewes has been designed by leading architects Jestico + Whiles and features a full range of aluminium fenestration solutions including Senior’s thermally-efficient, slimline SF52 aluminium curtain wall system and robust SPW501 aluminium commercial doors. The new school has also reunited Senior with main contractor Bowmer & Kirkland, with whom Senior has an established supplier framework agreement. The two companies have collaborated together on numerous projects, with Bowmer & Kirkland being the first contractor to specify Senior’s patented low U-value PURe® aluminium window system when it was launched back in 2015. The main contractor has gone on to work with Senior and specify its aluminium windows, doors and curtain wall systems on many other education projects across the UK.Chailey School is itself part of Department of Education construction framework agreement to modernise educational facilities and improve the environmental efficiency of this sector. Senior worked closely with specialist contactor RKN Aluminium to design, fabricate and install the fenestration package for the new school building which comprises some 85 windows, 14 section of curtain wall and 12 door sets!
Sponsored
Apex Hotel London

Apex Hotel London

Wedi Systems (UK) Ltd

wedi Primo completes luxury in central London Hotel.The Apex Temple Court Hotel is a luxury 4 star hotel, just off Fleet Street central London. Full architectural and interior design was by Ian Springford Architects, Edinburgh.A key factor in the selection of the wedi shower units for each of the 184 bedrooms was the requirement to achieve a high performance quality waterproof bespoke solution capable of adapting to the on site conditions. Ian Springford Architects has specified wedi shower units since 2004 and Apex Temple Court is the fourth Apex hotel where they have been successfully installed. Bespoke pre-fabricated shower units - Fast installation. The key benefits of using wedi were that the Fundo shower design provided simple, fast adaption to the individual shower configurations on site, as well as the detail of enabling the units to extend under the shower door to promote drainage back into the shower area from water falling off the door when in use.Complete prefabricated shower units allow fast dry and accurate construction in ONE integrated product system rather than a combination of different individual manufacturer’s products creating the risk of potential failures between the different systems during assembly and installation. The finished result was a fast track installation of a factory prepared shower system capable of on-site adjustment, delivering a completely waterproof system backed by warranty.
Sponsored
Park Plaza - Hercules House

Park Plaza - Hercules House

Licata Building Systems Ltd

The Park Plaza Hotel, Hercules House is positioned just south of Westminster Bridge overlooking the River Thames with spectacular views across London. The hotel provides high-end dining and premium facilities such as the spa, sauna and swimming pool. Within walking distance of London’s most famous attractions inclduing the London Eye, Big Ben, Westminster Abbey, the Houses of Parliament and the London Aquarium, Hercules House is the ideal place to stay in the Capital. Licata Building Systems was involved with the development of this project, providing several Licata systems, such as waterproofing and flooring systems. Licata waterproofing systems were used throughout the modern bathrooms and swimming pool facility. Licata resin flooring created a sleek and finish throughout public area of the hotel. 
Sponsored
NHS COVID-19 Projects

NHS COVID-19 Projects

Concept Cubicle Systems

Concept Cubicle Systems worked around the clock during the height if the Coronavirus outbreak for several Nightingale hospitals across the country.
Sponsored
Walsall - Metal Roof Coating

Walsall - Metal Roof Coating

Liquasil Ltd

This 6,500m² metal roof at Axcess 10 Business Park, Walsall was soiled, delaminating and affected by spot corrosion in numerous areas, which would have eventually spread and perforated the sheets if a treatment was not applied.Bosworth Cladding Services Ltd ensured that the roof was cleaned and the peeling factory finish was removed with a 4000 psi pressure washer. The laps were ground back and primed as necessary.The whole roof area was then coated with Liquasil's single-coat BBA Certified Metalseal 20 system to provide a 20 year product guarantee upon completion.The completed installation left a metal roof on its way to failure looking brand new, with a protective silicone coating that will last 20 years.For more information, or to make an enquiry, contact Liquasil on 0121 709 5352.
Sponsored
Walkways Community Centre, Belfast

Walkways Community Centre, Belfast

K Systems Insulated Facades

BackgroundBelfast City Council designed Walkways Community Centre with the local community in mind, providing them with places to both work and play. In this £1.37m project, the original portable modular building was demolished and replaced with a new 575 square metre build. The two storeys include a creche and soft play area, a 250sqm sports hall and a series of multipurpose rooms for meetings and courses aimed at the local people. Main contractor, McKelvey Construction led the project and worked alongside Michael Whitley Architects to design and deliver the most appropriate solution for Belfast City Council and the local community. K Systems provided on-site technical support and installation guidance throughout the build which resulted in delivery of a modern, aesthetically pleasing facility that achieved the target U-value of 0.18W/m ² K. Our ServiceHaving originally specified rainscreen cladding, K Systems technical team worked with the architect to design a bespoke engineered system with the drained cavity to suit the metsec frame. Regular site visits from our team ensured support was available throughout the build. The Centre is located on a busy street with limited surrounding space, so we had to manage a very congested, condensed site with deliveries planned and arranged by appointment only. We worked closely with McKelvey Construction to manage such challenges and ensure that local access for residents was uninterrupted, as well as ensuring the overall safety of the site area. From design advice through to installation, we offered a partnership approach which ensured a smooth installation process with minimal disruption, and the delivery of a fantastic community centre for the local area to enjoy. Technical Project Details Originally rainscreen cladding was specified for the Walkways project. However during the construction process, due to spiralling material costs and budget restraints, this was deemed too expensive so alternative solutions had to be sourced. It was decided an external insulation system would be used and a ventilated cavity system was required, as this provides a secondary defence in commercial buildings like Walkways. The K Systems Exicco E drained cavity façade system was specified as it ticked all the boxes. Exicco provides excellent protection and can offer an excellent fire rating of up to A2-s1,d0, providing high levels of fire resistance and non-combustibility. The drained cavity behind the insulation in the Exicco system will ensure that any interstitial moisture will escape without detriment to the performance of the system. As EWI was not originally specified for the project, no metsec frame had been designed. This is a crucial element for the Exicco system, which meant a bespoke metsec frame had to be designed specifically to suit our system. The Exicco E system for Walkways used Expanded Polystyrene (EPS) insulation boards that were mechanically fixed and attached to 12mm BBA Approved sheathing boards to create a 25mm drained cavity. EPS boards are extremely light-weight and the system offers a great fire rating of B-s1,d0. It is a high performing, economical system that generates high levels of thermal performance and ensured the target U-value of 0.18W/m ² K. was achieved. For the finish, Silkolitt+ silicone renders ensured a clean, crisp contemporary finish that offers protection to the exterior of the community centre. The flexibility of this finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish for Walkways. 
Sponsored
River Gardens, London

River Gardens, London

K Systems Insulated Facades

Bellway had a prime location, just four miles from Canary Wharf and eight miles from central London, with 300 metres of river frontage and panoramic city views, in which to build an attractive new housing complex.Due to its prestigious postcode, the new homes needed to be of the highest quality in terms of construction and elegant in appearance to appeal to the target clientele.Following extensive planning, K Systems brought Bellway’s vision to life and created a beautiful collection of new one, two, and three-bedroom waterside homes on the banks of the River Thames.Each home in the River Gardens development boasts outstanding thermal performance incorporating a façade with an A2 fire resistance rating and a high-quality finish with superb durability and resistance to the elements.Our ServiceThe River Gardens project took place during a global pandemic when the construction industry was significantly impacted in terms of workforce and availability and costs of materials. Despite all these external factors we delivered a stunning, successful project, within budget, without delay or compromise on quality, that not only met but exceeded the requirements and expectations of the client, Bellway Homes.We worked in close partnership with Jessella Ltd (the installer) throughout the duration of the project. As part of our service commitment, our technical team were available to provide hands-on-guidance, offer support, technical guidance and ensure high levels of quality.Jessella Ltd Project Manager, Pavel Mihaylov explains:“River Gardens was one of the most challenging but rewarding projects I have worked on. It was a very complex project with a strict scaffold strike programme and being dependent on weather and many other trades. That made it very difficult to achieve completed areas on time. Thanks to working closely with Jason and Patrick from K Systems and their regular site visits and guidance over the phone, we managed to achieve the required completion dates, safely and with an excellent quality finish.”Technical Project DetailsAfter extensive planning and a comprehensive scoping process with the client and all involved third parties, we specified the K Systems Exicco M, drained cavity façade system with mineral wool insulation. This high performing system is suitable for steel and timber framed buildings and is highly compatible with high rise projects like River Gardens.Fire safety with high rise buildings is of utmost importance and the K Systems Exicco M system generates exceptional performance and provides high levels of fire resistance and noncombustibility (A2 rating).K Systems specified River Gardens with a façade system with an A2-s1,d0 fire rating. The system specified was made up of a combination of A1 fire classification substrate (sheathing board), a Tenmat 120-minute cavity barrier, an A1 non-combustible, dual-density stone mineral wool insulation slab, and a galvanised steel rail. The latest building regulations were complied with ensuring the safety of the future residents.Mineral wool has superb acoustic qualities, another reason it was specified for this project. Its inclusion in the build meant that noise from the wind and traffic travelling up and down the River Thames would be significantly reduced, ensuring a quieter residential option for target clientele who wish to avoid an audible disruption yet still live within the hustle and bustle of city life.For the finish, high-performance 1.5mm thin coat silicone render (Silicone TC) was specified. Our Silicone TC render is renowned for its ease of use on application, variety of texture and colour, and its high-performance properties. Each waterside home in River Gardens was finished in a variety of shades complimentary to the development’s surroundings.Aesthetically the development had a clean, crisp attractive finish with an impressive thermal performance and a protective exterior. The hydrophobic qualities of Silicone TC ensure a low maintenance finish, ensuring it will remain aesthetically pleasing for years to come.
Sponsored
Victoria Residence - Windsor

Victoria Residence - Windsor

Licata Building Systems Ltd

Victoria Residences is a bespoke collection 11 luxurious apartments and penthouses with elements of traditional British heritage blended with a contemporary and timeless design. Replicating powerful Georgian features with modern thermal efficient technology was a primary driver for the architect selecting Licata Building Systems as the facade provider. Specifying Licata Therm Eco, the installing partner used ashlar plus other decorative profiles to ensure the properties regal vision was achieved. The system was finished with a 1.5mm self-cleaning Silicone render to ensure the building retained that “just-applied” look for the longest possible period.
Sponsored
The Hilton Garden Inn, Sunderland

The Hilton Garden Inn, Sunderland

Stone Cladding Systems

Architect: Redbox Design GroupMain Contractor: Tolent Construction Installer: Metcalfe Roofing & Building Services LtdStone: Cebecca LimestoneThe Sunderland Hilton Garden Inn, on the banks of the River Wear, is a 141 room hotel featuring MX curtain walling as well as Aztec 20mm Cebecca limestone Ventilated Rainscreen. Designed By Redbox the architects wanted a light and spacious building without the need for a heavy support system. The glass and limestone mix imparts this vision perfectly. Completed in 2016 The Aztec system was installed by Metcalf Roofing & Building.
Sponsored
Leightons Opticians

Leightons Opticians

Forbo Flooring Systems

The refurbishment of independent opticians and hearing specialists, Leightons, has used Forbo Flooring Systems’ Allura luxury vinyl tile planks alongside a host of other products to create a spacious looking interior that helps to minimise the spread of unwanted noise to the consultation rooms. Subsequently, the design won a Commended award in the Fly Forbo 2016/2017 competition.Leightons called on SKK Design for the design of their Reading store when it relocated from Oxford Road to the town centre, tasking them to give the branch a new lease of life and adapt the space into something that customers and staff would appreciate. The complete refurbishment saw new ceilings, lights, furniture and flooring throughout the main shop floor, staff areas and consultation rooms.
Sponsored
The Curve, Manchester

The Curve, Manchester

K Systems Insulated Facades

BackgroundOccupying a prominent position on the Kingsway, The Curve development is a portfolio of 27 apartments. The key requirement for Cube Homes was to offer residents high quality, low carbon, affordable and sustainable apartments.After extensive planning, K Systems specified a direct fix system with mineral wool insulation and a silicone render finish. Our Direct Fix system for steel frame structures is KIWA BDA certified and provided the ideal solution for these newly constructed mid-rise apartments.Our team designed a façade solution that delivered modern, thermally efficient and aesthetically pleasing homes, meeting the client’s requirements.Our ServiceDue to the number of fixings and the curvature of the property, this was a technical project which required bespoke detailing.In collaboration with Bowker Sadler Architects and our approved installer Profac, we designed a comprehensive specification and were on-site when required, offering Profac technical and installation support throughout the build.The Direct Fix system specified is a cost-efficient solution for steel frame structures, with fewer components for a simpler and faster install. Direct Fix generates exceptional insulation and with a silicone render finish provides high levels of fire rating (A2,s1-d0), allowing Cube Homes to deliver safe and thermally efficient homes.Technical Project DetailsThe EWI needed to be line and level with the ground floor brickwork. To achieve this specific requirement, 300mm mineral wool (which is deeper than available mineral wool) was specified for the project. This meant 110mm and 190mm boards were combined to achieve the required 300mm.This thicker mineral wool meant that the curved elevation on the building was difficult to achieve. The insulation was facetted around the curve and carefully installed by Profac to create a seamless façade. The 300mm mineral wool resulted in a low U-value of circa 0.10 W/m²K, meaning heating costs for the apartments will be minimal and carbon usage will be reduced to a minimum standard.For the finish, silicone render (TC 15) was specified to create a striking curved elevation. Silicone TC incorporates the benefits of silicone technology to provide a water repellent finish with a fresh and modern appearance. The silicone allows water vapour to pass freely through the render whilst allowing the finish to remain weather resistant, making it the ideal solution for a low maintenance, long-term finish.
Sponsored
Westfield, Stratford

Westfield, Stratford

Berry Systems

Vehicle and pedestrian safety barriers for edge protection on perimeters, ramps and other areas in three multi-storey car parking at a new shopping mall adjacent to the London Olympic Park.Berry Systems installed one of our largest ever car park safety barriers projects at Westfield Stratford City with over 7 kilometres of Berry Beam barrier, all mounted on our impact absorbing spring steel buffers.The £1.5bn Westfield Stratford City complex covers an area of 1.9 square miles and houses 300 retail outlets, 70 food outlets, 3 hotels, multiplex cinema, bowling alley and casino. It also has 5, 000 parking spaces across 1 adjacent and 2 integral multi-storey car parks. The safety barriers were very carefully specified by architects: Buchan Group International. The car park structures are metal framed with concrete decks with an exterior expanded metal mesh surround and cladding. All floors have our Berry safety beams mounted on RB1X and GH spring steel buffers to provide full perimeter protection meeting BS EN 1991-1-1 and BS 6180 standards.All the ramps in the two overground car parks have curved Berry Beam barriers to match the varying radius of the ramps. On tighter bends and at ramp exits, chevron signs have been mounted directly to the barriers. All ramp returns and split level areas are protected by our barriers, again mounted on RB1X buffers with handrail extensions and anti-climb mesh.
Sponsored
INNOVATIVE HIGH SECURITY PRIVACY LOUVRE SYSTEM

INNOVATIVE HIGH SECURITY PRIVACY LOUVRE SYSTEM

Zaun Limited

When a significant UK security site needed a complete upgrade to its perimeter fencing, Zaun stepped in with a cost-effective and highly secure solution.The task aheadDue to the compassionate nature of the site, guarding against the physical threat and providing a visual screen was important. Therefore, the perimeter had to meet the high standards of the Centre for Protection of National Infrastructure [CPNI] and be capable of housing Perimeter Intrusion Detection Systems [PIDS] – a sensor mounted on the fence.As there was no current security fencing system that includes a visual block approved by CPNI, it was thought that two fences were required. One of these fences would provide high-security protection and the other a screen from prying eyes.Installing an additional conventional louvre screen would have been expensive and taken up too much room, so Zaun’s development team came up with a solution to address both of these issues.The Patent Pending system uses horizontal louvres that cleverly link into the mesh; this keeps cost and size down as the mesh itself becomes part of the louvre system. The furthermore, them grabs the wires as it is installed to ensure a tight fit, thus preventing rattles that might interfere with the acoustic PIDS system. This clever design saves costs and space. In addition, the product can be configured to provide varying degrees of screening.What Was SuppliedCPNI approved HiSec Super 6 high-security fencing system is designed for sensitive, high-profile sites. The vertical wires are 6mm in diameter with 76.2mm x 12.7mm spacings, enhancing a standard 358 system.Louvre privacy screens are easily attached to the robust fencing eliminating the need for two sets of fencing. Manufactured from 2mm thick steel sheets, which are folded to form the louvre. The galvanised sheets cleverly grab onto the mesh as they are installed, improving privacy and making the 358 mesh more rigid.This whole private and secure fencing system can also have PIDS easily attached. These mounted detection systems give early warning to any attempts of intrusion, whether penetration or climbing. It offers discreet monitoring and early warning and can be fitted on existing fencing units.
Sponsored
SIGnature Torch On System - Layfield School

SIGnature Torch On System - Layfield School

AccuRoof

Not long after completion, the Foundation Stage and Children’s Centre building at Layfield Primary School in Yarm started leaking. Water ran down internal walls and damp patches spread across ceilings. Fortunately, the problem has now been solved with the help of SIG Design & Technology, which specified its SIGnature Torch on System to remediate the leaking roofs once and for all.
Sponsored
Mills & Reeve Office

Mills & Reeve Office

Forbo Flooring Systems

The prestigious law firm Mills & Reeve has refurbished its Norwich brand to create a smart office environment that incorporates a homely feel, using three shades of Allura Wood LVT from Forbo Flooring Systems. Mills & Reeve's new office was designed by architects Feilden + Mawson and has subsequently won the Highly commended prize in Fly Forbo 2017/2018.
Sponsored
Park Parade, Stroud

Park Parade, Stroud

K Systems Insulated Facades

BackgroundLocated in Stroud, the Park Parade, Park Road refurb project was part of a large refurbishment planned by Stroud District Council. The shopping area and sheltered accommodation scheme were given a complete revamp with internal and external work being completed.MD Group from Bristol were awarded the contract by Stroud District Council and were appointed as the main contractor. A new external wall insulation system was installed, along with an extensive refurbishment to the communal areas, external balconies and roofing. Our approved installer Elite Rendering Systems were contracted by MD Group to complete the exterior wall insulation.Alongside Elite, we transformed the premises aesthetically creating modern homes and commercial premises. The buildings were given a new lease of life, and together with Elite we delivered safe, stylish and energy efficient buildings that will help to reduce fuel bills for residents and help decarbonise the Council’s housing stock.Our ServiceOur Technical team were available to provide hands-on-guidance throughout the duration of the project. As part of our service commitment, our K Systems Site Technician regularly visited the project to inspect progress, offer support and ensure high levels of construction quality.As the ground floor of Park Parade is used for commercial premises, one challenging aspect of the project was the detailing and installing around complex interfaces such as air conditioning/refrigeration units. We transformed the outside of the properties with a durable, low maintenance solution that is fully compliant with fire regulations and fulfilled the Council’s criteria.The combination of finishes used not only delivered the desired contemporary aesthetic but provided an additional benefit of cost savings for the client. Residents of Park Parade, Park Road will enjoy reduced energy bills and better living conditions thanks to the U-value improvement.Technical Project DetailsFollowing design and site meetings with the K Systems Technical team, K Systems M (Mineral Wool) was specified by Bailey Partnership Architects and Stroud District Council. This system incorporates eco-friendly mineral wool insulation boards. As an A2-s1, d0 firerated solution, it is widely specified to provide thermal and aesthetic improvements to buildings, reducing energy usage and therefore energy costs.K Systems M, utilising non-combustible insulation, ensured the latest building safety regulations were met. Thanks to its exceptional properties, the thermal performance of the walls after installation has been significantly enhanced. A U-value of 0.27 W/m²K was achieved, which will help to reduce the residents fuel bills and reduce the level of condensation forming on the inside walls – two key objectives for the client.For the finish, high-performance Silkolitt+ silicone renders were supplied along with our lightweight synthetic brick slips (VBriQ). This combination improved the aesthetics of the buildings for its residents.Silkolitt+ silicone thin coat renders are available in a wide range of colours offering a contemporary finish. The excellent vapour permeability allows the building to breathe and prevents interstitial condensation. The flexibility of the finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish to the properties. It is very user friendly, and its hydrophobic properties reduce maintenance requirements.Accredited by the BBA, the K Systems VBriQ brick slips provide top tier Cateogory 1 impact performance and are ideal for use on this project. This lightweight system is quick and simple to install and has high UV resistance while also allowing the original brick colour to be maintained. An extremely durable finish that will withstand the day-to-day demands placed Park Parade, Park Road.
Sponsored
Jump Nation

Jump Nation

Excelsior Panelling Systems Ltd

The Project Warehouse refurbishment to house trampoline centre.Jump Nation intend to open centres across all major towns and cities in the UK as popularity soars.The Challenge Propose a robust system suitable for heavy use environment. Changing Cubicles and matching WC Cubicles finished in the company’s vibrant colour scheme. Powder coat ironmongery to match companies branding.     The SolutionExcelsior T-Line range fitted the project brief perfectly for Jump Nation, offering a robust system with a modern and minimalist feel incorporating a powder coated extruded satin anodised aluminium pilaster and headrail presenting a sleek & slimline façade.Offering consistency, excellent service, quality products and strong working relations Excelsior look forward to supporting the team at Jump Nation with their planned progression to open trampoline parks across all major towns and cities in the UK.SpecificationProduct Range: T-Line 12mm Solid Grade LaminateDoors: P112 PrunePilaster: SAA RAL 5012Partition: P112 PruneIronmongery: SAA RAL 5012
Sponsored
Small Steps

Small Steps

Forbo Flooring Systems

When charity, Small Steps, secured its new home at the heart of Richmond, it required a warm and welcoming interior environment that would support children living with physical disabilities and their families. Providing the perfect natural canvas, Forbo Flooring Systems' linoleum brand, Marmoleum, was installed throughout the purpose built facility. Spread over three floors of a former office building on Worple Way, the 517 m² site that Small Steps now calls home, was funded through a generous donation. The entire design team – which included JTP Architects, Robert Bird & Partners, MTT Consultants, ISG Ltd, PIP Building Services and P2 Design – worked together, many on a pro bono or reduced fee basis to complete the refurbishment for the charity.
Sponsored
Warwick Court Redevelopment, London

Warwick Court Redevelopment, London

Newton Waterproofing Systems

Warwick Court, the former Goldman Sach's headquarters on Paternoster Square in London, is being redeveloped by Mace Group after they won the £60m project in 2020. Newton Specialist Contractor ASF Waterproofing specified a waterproof and hard-wearing coating system for the floor of the plant rooms. As a result, ASF Waterproofing designed and installed a watertight system utilising Newton 110 WATstop and Newton 701-HB. ASF Waterproofing provided a completely watertight solution following the guidelines set out in BS 9102:2009. The works were carried out to a high standard and delivered on time, despite the tight schedule.
Sponsored
Buckshaw Primary School

Buckshaw Primary School

CLD Physical Security Systems

Challenging brief The CLD team worked closely from the initial design stage to ensure they met budgets and a challenging brief: to create a fencing design that was attractive and fun whilst providing optimal safety for the school and its 200 pupils. CLD supplied the Dulok Wavetop system for discreet but robust security, the Dulok Rebound system for high performance sports fencing and locking gates with a Slidemaster main gate. A unique multi-coloured ‘pencil’ fence was also added marking out the play area with large pencil-shaped posts with wooden tops that can be re-painted by the children in any colour.
Sponsored
Commercial | London Stansted Airport

Commercial | London Stansted Airport

Venesta Washroom Systems Ltd

The sheer volume of passengers visiting Stansted Airport on a daily basis puts an enormous strain on the airport facilities, including the washrooms. System M was specified for the refurbishment due to its strength and durability. System M’s patented emergency access system is made possible by an innovative pivoting pilaster. The pilaster is ‘squeezed’ allowing normally opening inward doors to be pulled outwards in the event of an emergency at the airport. The finish was completed with Clipclad precision wall panelling; bright and sleek with a fresh colour palette of greens and natural wood effects.Read the full case study for more information.
Sponsored
Protecting a primary school and providing an early flood warning system to keep kids safe

Protecting a primary school and providing an early flood warning system to keep kids safe

Andel Ltd

In 2020 the River Wye broke its banks and flooded nearby Monmouth Prep School in Wales causing severe damage to the entire ground floor of the Prep School, playground and surrounding fields. According to the latest reports on the impacts of climate change, flooding caused by severe and frequent rainstorms is the UK’s most pressing climate-change risk and could affect millions of people causing extensive damage, disruption and loss. So, once the school was back on its feet, we were delighted to work with their insurance broker, Hettle Andrews, to make sure the property was protected against future flooding. Monmouth Prep School, MonmouthMonmouth Prep School is a fully co-educational Prep School in Wales for children aged three to 11-years-old. The independent school is one of Wales’ leading prep schools and offers boarding and day attendance to pupils in modern and contemporary teaching spaces which encapsulate the very best of traditional, independent education.  We worked with the school’s insurance broker and project facilitator, Hettle Andrews, who work primarily with schools, universities, colleges and charities. The challengeThe school had previously had minor issues with flooding as the River Wye is situated at the bottom of its garden. However, the flood of 2020 was the most devastating. The river broke its banks and flowed into and through the school to the dual carriageway situated on the other side. The flood damaged the entire ground floor of the school, the playground and surrounding fields and the whole school had to be urgently evacuated. No warning: the school is surrounded by a flood bank and had flood gates installed in 2002 however there was no early warning system in place to get the flood gates closed in time.Extensive damage: the 200-year-old school building sustained catastrophic damage and needed large-scale structural repairs to be restored.Sanitation issues: the waste from the surrounding farmlands was washed into the school along with the floodwater, mud and debris causing not only damage but also sanitation issues. Inconvenience: the clear-up process included using five 40 foot skips which were filled with damaged items such as furniture, clothing, educational equipment and floating debris.Disruption: the school had to close for nearly seven months to clear the debris, remove all the damaged school equipment, clean the entire premises, sanitise and eventually re-build.The solution;Andel’s FloodAlert – one of our innovative, industry-unique flood defence solutions which provides an early flood warning for properties not covered by the Environment Agency flood warning service. FloodAlert provides real-time information on rising water levels and automatically sends out early warnings. The robust and reliable system is easy to install and set up and once in, tracks surface water levels for up to 15km from a gateway. This means the school now has:A cost-effective, real-time local flood alert system with three alert levels A sensor which sends SMS and email alerts to give them time to take action to protect their pupils and the school Optional live monitoring on a cloud-based portal, via any device with internet connectivityA system that can communicate with an unlimited number of designated usersCommunication via a low-power LoRaWAN network. The resultEarly warning: the school now has an effective early warning system for rising surface water. Safety first: the school now has safety measures in place to protect its pupils aged three to 11-years-old. Confidence: the early warning system gives the school staff around six hours from the first notification of rising waters to close the flood gates allowing plenty of time to evacuate the children as well as any equipment. Peace of mind: the staff at the school feel relieved knowing the water levels are constantly being monitored at the property especially because they are so close to the banks of the River Wye. Community: we are always quick to try and accommodate schools that require our services as we know they are the centre of the community and provide safe havens to many. We are proud to have been involved in this project alongside Hettle Andrews and to have been able to install our FloodAlert product on a site with such a rich history and provide the school with an effective early warning system plus peace of mind.What the customer said;The 2020 floods were devastating and left us with the fear that it could happen again. Having such little children on site, it was very stressful knowing there was no early warning system in place. Now we have a good five or six hours from the first notification of rising waters to close the flood gates, evacuate the children safely, and make the necessary arrangements to protect the building. With all these flood defence measures in place, we hope to never have a repeat of the destruction and school closure of 2020.Rob Alexander, Caretaker, Monmouth Prep School
Sponsored
Claridge's Case Study

Claridge's Case Study

Dart Valley Systems Ltd

Dart Valley Systems Ltd have been working closely with Claridges to help reduce water consumption within their washrooms facilities at their London Mayfair Hotel.

Showing 145-180 of 1387

Feedback