NBS Source

EuroPipe at Manchester Airport - Case Study

by BLÜCHER UK Ltd

BLÜCHER recently supplied our BLÜCHER EuroPipe system to the new Terminal 2 car park at Manchester Airport. The new multi-story car park has space for 3,800 vehicles and is part of the £1 billion transformation programme at the airport. The installation was overseen by G Beverley & Son on behalf of the M&E Contractor, Crown House. Our stainless steel drainage systems are the ideal choice due to our lightweight push-fit pipes and fittings are easy to handle and install, and provide rapid discharge of rainwater and waste water.

No featured products in this case study

Contact BLÜCHER UK Ltd by clicking the button below to find out which products were used in this case study.

More case studies from BLÜCHER UK Ltd

View all case studies(2)
Flexible, sustainable and safe drainage solutions for Leeds Arena

Flexible, sustainable and safe drainage solutions for Leeds Arena