NBS Source
I'm a manufacturer

"soil and waste systems"

2,092 results found

Sort by:

Showing 1-36 of 1401

Sponsored
Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Alumasc Water Management Solutions

Two renowned Alumasc brands, Harmer and Wade, were recently specified and installed for a new striking residential development in London.Newfoundland Tower, also known as “The Diamond Tower”, due to its unique diamond shape and diagonal structure, is a build-to-rent development in Canary Wharf, London. Harmer SML Cast Iron above ground, and Wade gulliesand linear drainagewere installed to provide an effective water management solution.The Harmer SML lightweight cast iron pipework system is dry-jointed, BBA & Kitemark certified, and has a proven track record in above-ground drainage. With its comprehensive range of fittings and accessories, Harmer SML is the ideal soil and waste system for above and below-ground drainage, including rainwater installations, and is fully compatible with other Harmer and Wade drainage products.“Harmer was chosen primarily for its longevity,” said Gary Zumeris - Area Sales Manager – Harmer SML, South. “It’s also easy to install and has excellent acoustic qualities. It’s a very quiet system, which is especially good in apartments or other high-density housing as you can’t hear fluids flowing down the pipes.“The Harmer system was also chosen for its fire-resistant properties, which is an important aspect, due to current legislation. Cast iron is highly specified in London currently, where most buildings incorporate cast iron for increased fire safety.”Harmer SML has the highest product reaction to fire classification possible, which is A1 for BS EN 13501-1, as well as a system fire classification of A2 for BS EN 13823 Single Burning Item A2, s1-d0.
Sponsored
Birmingham Asbestos Roof Coating

Birmingham Asbestos Roof Coating

Liquasil Ltd

This asbestos cement roof in Birmingham was soiled and in need of remediation.Nadco Roofing Services ensured that the roof was cleaned with all waste water being filtered to 2 microns prior to the application of Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating system.The full system involved priming the metal fixings with our SWT Primer, before sealing the fixings and any cracks in the roof using our Non-Sag Sealer.Once dry, the roof can then be seamlessly coated using Asbestoseal which comes with a 20-year product guarantee and leaves an old asbestos cement roof looking revitalised and brand new.
Sponsored
London Waste and Recycling Board

London Waste and Recycling Board

Tarkett

When the London Waste and Recycling Board (LWARB) moved into their new HQ they set out to design a space that would embody their core values of creating a circular economy. This meant designing an innovative and inviting space, while keeping sustainability at front of mind. Interior specialists, Action Workspace, were brought in to manage the design, specification and installation for the fit-out. With the project brief focusing heavily on the use of recycled or recyclable material, they worked closely with LWARB to ensure total transparency when it came to making sustainable material choices.
Sponsored
Islington Waste Recycling Centre

Islington Waste Recycling Centre

VIEGA LTD

The Islington Waste Recycling Centre is looking to decarbonise. At present, the centre accounts for 9% of Islington Council’s corporate estate gas use and the aim is to reduce that to zero. To achieve this, air source heat pumps and condenser units will be installed which posed an immediate challenge – how to install new copper pipework without disrupting the recycling centre. Contractor Vital Energi’s solution focused on the use of Viega Profipress.
Sponsored
Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis

In 2015, Quinn London Ltd started the refurbishment of The Market Building, in Brentford which involved the conversion of Offices to residential dwellings as a ‘Material Change of Use’ project. Soundis provided acoustic solution options for this project, in order to ensure a cost effective Value Engineering Exercise, on behalf of the Main Contractor.As the 1st floor required a deep void system due to new soil pipes and waste pipes having to be installed along the corridor within the building for kitchens and bathrooms, it was agreed to utilise Soundis Cradle & Batten System. This provided a service void for the pipes of 300mm whilst the other areas of the floor were treated with the system at 80mm FFH. The Soundis cradle & batten acoustic floor was then overlaid with a Soundis a high quality, interlocking dry screed system gypsum fibreboard.The Soundis cradle & batten floor system has been installed on the existing concrete and existing timber structural floors to provide a level floor over the un-even sub-deck. The service void provided by Soundis cradle & batten system can be used for other flooring applications, such as underfloor heating.Our Cradle and Risers are manufactured from 100% recycled materials assisting to the sustainability targets of projects.
Sponsored
Dublin Waste Facility - Dublin

Dublin Waste Facility - Dublin

FSi Limited

Penetration sealing though walls using the following FSi Stopseal® Batts, Pyrocoustic® Sealant, Pyropro® HPE Sealant and PipeBloc® PCP Pipe Collar
Sponsored
Basement Pumping System, Kent

Basement Pumping System, Kent

Newton Waterproofing Systems

Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
Sponsored
Basement waterproofing at Ardley Energy from Waste Plant

Basement waterproofing at Ardley Energy from Waste Plant

Fosroc International Limited

The new Ardley EfW Plant, including a 12m basement built over an Artesian Well, presented a host of construction challenges. Due to the extreme water pressure created by the Artesian Well, as well as ammonium salts in the ground, Fosroc worked closely with Tata Projects specifying a solution using Proofex Engage to provide a watertight, chemically resistant barrier, with Supercast SW20 in the construction joints to reinforce the floor to wall joint. Fosroc provided a ‘total solution’ package to ensure Tata Projects could feel confident with the proposed specification, from basement waterproofing, to grouting crane bases, flooring and sealants.
Sponsored
All Cellweb Cellular Confinament System Case Studies - Brochures - Data Sheets - General Info & Technical Advice

All Cellweb Cellular Confinament System Case Studies - Brochures - Data Sheets - General Info & Technical Advice

Geosynthetics Limited

Cellweb®TRP is a cellular confinement system specifically designed for tree root protection. The system creates a stable, load bearing surface for traffic or footfall whilst eliminating damage to roots through compaction and desiccation. The distinctive cell size, cell depth and cell wall perforations combine to create the tree root protection system.The Cellweb®TRP system comprises of the three specific elements, Cellweb®TRP, Treetex™ pollution control geotextile and an infill of clean angular stone.Features and benefits:Guaranteed cellular confinement system.Independently tested.No dig solution - loads placed upon it are laterally dissipated rather than transferred to the soil and roots below. Prevents sub soil compaction.100% success rate.Continued water permeation and gaseous exchange, ensuring that nutrient supplies to the tree roots are maintained.Prevents surface rutting; optimising long term performance and aesthetics of the final surface.Simple to install.Complies with BS5837:2012, APN 12 and Tree Preservation Order (TPO) guidelines. 
Sponsored
Friargate, Coventry

Friargate, Coventry

Excelsior Panelling Systems Ltd

The Project  Friargate One is a 150,000 sq ft, 13 storey, low energy building forming part of a £700m project to create a new business district in Coventry.  The building sets the standard for the remainder of the 37 acre Friargate scheme that will include 13 more office buildings, two hotels, homes and shops all set to transform the area around the train station. This project is the largest development in the West Midlands Combined Authority.   The Challenge Deliver a product to satisfy the architects design & meet the highest standards offered within the industry. Provide a full range of accessories to compliment the system. Manufacture bespoke boxed out mirror units complete with rebated lighting strip. Ensure the system is installed to highest standard to create a seamless fronted wall of cubicles and superloos across varying floors.  The Solution Floor to ceiling Flush 44 system installed throughout male & female washrooms and unisex superloos situated over two floors.   The system encompasses a 44mm MR core with a hardwood rebated edge detail. The overall finish is modern and sleek creating a seamless flush wall of cubicles with complete privacy and comfort for the users.Close management of each phase from site survey through CAD drawings, call up and manufacture ensured we had complete control of the project and were able to accurately survey the areas and install the seamless system desired by the client.SpecificationProduct Range: Flush44 HPLDoors: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPilaster: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPartition: Partition: HPL bonded onto 38mm MR Core, Formica Folkstone F7927Ironmongery: Stainless SteelAvailable Finishes:These Systems Are Available In The Following Finishes:• Natural Wood Veneer• High Pressure Laminate• High Gloss LaminateAccessories Product Range W/C'sSpecificationProduct Range: AccessoriesMirror Backing Panels: Blanc Menuires B015 with 4mm Safety Backed MirrorsWaste Bins: Prestige Waste BinOther:Paper Towel HoldersWaste BinToilet Roll HoldersSoap Dispenser
Sponsored
Structural Waterproofing & Ground Gas Protection

Structural Waterproofing & Ground Gas Protection

Delta Membrane Systems Ltd

The project was to convert a former vehicle maintenance and repair workshop into a dwelling. Ground tests did not reveal any significant level of Volatile organic compounds (VOC’s) in the soil but the local authority required a gas membrane to be installed and independently verified.
Sponsored
Nuway Tuftiguard perfect for a busy temple

Nuway Tuftiguard perfect for a busy temple

Forbo Flooring Systems

A temple in Chorley has recently had Nuway Tuftiguard Classic in 17mm closed construction installed by the Northern team at Master Matting. As Nuway is ideal for entrance areas of all shapes and sizes, it was perfect for the design of the architecturally striking building. With three points of access, each with their own set of revolving doors, the rigid entrance flooring system will help to stop the outside from travelling in.Due to the busy nature of the temple, removing soil from soles of shoes and wheel treads was essential in providing accidental slips and protecting interior floor surfaces. Nuway Tuftiguard classic is also reversible, which effectively doubles the lifespan of the entrance flooring.
Sponsored
DAB Pumps Circulation Pumps Used for Stadium Heating and Under Pitch Heating System - San Siro - Milan

DAB Pumps Circulation Pumps Used for Stadium Heating and Under Pitch Heating System - San Siro - Milan

DAB Pumps Ltd

The San Siro playing field was designed to be heated using an under-soil system featuring single-head, in-line electronic pumps. In the wider facility areas, a heating substation was installed, incorporating wet-rotor circulators and in-line electronic pumps for the climate conditioning systems. Additionally, co-generation systems with both single-head and twin-head in-line electronic pumps were implemented for auxiliary plants dedicated to heating energy production.Despite the initial investment in inverter technology for the pumps, the operational optimization results in a lower running cost, showcasing a great example of an energy efficient installation.
Sponsored
Glasgow Underground.  Koster Injection Systems.

Glasgow Underground. Koster Injection Systems.

Koster Aquatecnic Ltd

Following successful works for the London Underground, Koster were asked to design waterproofing systems for use inside live tunnels for the Glasgow Underground. Following close analysis of the structure, surrounding ground and constant use, a bespoke design was settled upon which involved an area injection system as the main form of waterproofing protection.Koster Injection Gel G4, an acrylic injection material was selected, mainly due to the fact that it has an extremely low viscosity and will not contaminate ground water or soils.When injected in a grid pattern across the substrate (through pre -installed injection ports), it will travel through the pores of the brickwork and "Gel" forming a permanently elastic mass capable of holding back the pressure of water behind the structure.The Koster Technical team become heavily involved in these types of projects, working carefully with the design team and contractors ensuring a successful project completion.For more information or for advice on a similar project, please contact the Koster Technical team on technical@kosteruk.com.
Sponsored
HDGG

HDGG

Hahn Plastics Ltd

CHALLENGE The first of its kind for Quebec, the “living street” required a paving grid that would provide multi-purpose access along the street whilst also allowing for the aesthetically pleasing natural look to be maintained. A woonerf is a living street that is traditionally implemented as a traffic calming aid and to enforce low speed limit areas. They are often shared space streets where equal priority is given to all modes of transportation including automobiles, bicycles and pedestrians; usually with separate rights of way. The province of Quebec was looking to do a “pilot project” in the city of Montreal to create a woonerf that would not only provide the required access, including disabled access but that would also have a long-lasting beneficial impact on the environment. They were looking for an environmentally friendly ground reinforcement product which would provide the strength and durability required for a heavily used area. As a “living street”, the product needed to allow the growth of natural vegetation and contain no harmful preservatives which could affect the environment in which it is placed. The harsh weather conditions in Quebec also needed to be considered. With such extreme conditions in both winter and summer, the material needed to withstand the temperature fluctuations. Ground reinforcement products traditionally used such as concrete are susceptible to cold crack in winter as it is a porous material. As a requirement, the desired product was to absorb only limited heat in order to promote growing vegetation. The only suitable material for a project with such challenging conditions was hanit®’s recycled plastic heavy duty ground girds, with their durability and environmental credentials meeting the requirements.SOLUTIONhanit®’s Heavy Duty Ground Grids are manufactured from a blend of high-quality recycled plastic polyolefins extracted from post-industrial and post-consumer mixed waste plastics. Heavy Duty Ground Grids have a high impact resistance which makes them suitable for all vehicle access. They have an interlocking system which improves stability and also allows for quick and simple installation. As the woonerf needed to provide numerous different access levels it was important that the Heavy Duty Ground Grids were versatile. They can be filled with either grass, seed/topsoil or gravel. For this project, wheelchair access was provided through a gravel filled pathway.The rest of the “living street” was mostly completed with grass filled areas. As hanit® products transfer limited amounts of heat, they dry out the soil less than concrete. This works as a benefit to the vegetation growing through the grids. Recycled plastic material is not porous and therefore does not absorb any moisture. This gives added benefits in the winter as when absorbed moisture freezes in concrete it causes cold crack. Their open structure also allows for quick infiltration of any rainwater into the ground allowing for sustainable urban drainage requirements to be met.hanit® Heavy Duty Ground Grids are strong and durable and require no maintenance. They are not affected by weathering and decay; therefore once in place, they have a much longer lifespan than any other competing products. Made from 100% recycled material, the woonerf has been an extremely sustainable project. Providing Montreal with a living street has not only added more vegetation to the area but also allows the city to contribute to an environmentally responsible sustainable urban drainage solution. As the products are chemically inert they do not affect the environment and are harmless to all flora and fauna. In total the project has used 8,500 units of Heavy Duty Ground Grids. This equates to almost 77 tonnes of recycled plastic waste which has been saved from going to landfill. The woonerf has been an extremely well celebrated project that has won prizes for its conception and green initiatives. “I recommend Les Dalles Vertes (Heavy Duty Ground Grids) to all my clients. We laid out nearly 30,000 square feet of these pavers for the Woonerf project and it took us half the time and resources that were required to install the old concrete grass pavers." - Tony Scirocco, Ventec
Sponsored
Protan Prefabricated Roof System at Wilmslow Garden Centre, Cheshire

Protan Prefabricated Roof System at Wilmslow Garden Centre, Cheshire

Protan (UK) Ltd

Over 2,300m² of Protan SE 1.2mm PVC single-ply membrane was installed in the Protan Prefabricated roof system at Wilmslow Garden Centre, Cheshire. The main driver behind the installation of this roof system was the time constraint placed upon the roofing contractor for installation of the roof. Using Protan's unique ProPlan CAD software, a bespoke solution was created for the project - prefabricated rolls of membrane measuring 3.96x8.00m were manufactured to span the barrels of the roof. This minimised on-site waste and reduced on-site hot air welding by 1,080 linear metres.
Sponsored
Wolverhampton Interchange

Wolverhampton Interchange

Excelsior Panelling Systems Ltd

The Project Four stories of retail and office units in the heart of the city forming part of £139m redevelopment.  Quality & sustainability are key features of this building and the construction to BREEAM excellent standards make it one of the most sustainable buildings in the city. Retail units placed on the ground floor and three levels of Grade A office space above believed to be the first in Wolverhampton. The Challenge Within budget limitations produce a Grade A washroom befitting the buildings design and sustainability drivers. Keep the washroom systems off the floor and work above the height of the coving to create an opulent washroom décor. Design a bespoke vanity, concealing the pipework but not the waste and trap plus carry the weight of Solid Surface countertop and bowls.  The SolutionExcelsior Flush 30 Cubicles provide the opulence desired by the client whilst meeting the budgetary requirements of the project. Projected 150mm off the floor with stainless steel legs and ironmongery keep the cubicles clear of the coved flooring. Manufacture hybrid vanity units to carry the weight of the tops and sinks whilst allowing the chrome waste and traps to be a focal point. Delivered inline with our own business sustainability drivers, all of the washroom components are finished in Polyrey. Polyrey have a strong environmental ethos including: The Life Cycle Assessment (LCA), ISO 14001, PEFC, Chain of Custody in line with FSC.                                                               SpecificationProduct Range: Flush 30 HPLDoors: Polyrey N026 Noyer OmbrePilaster: Polyrey G029 Gris TourterellePartition: Polyrey N026 Noyer OmbreIronmongery: Stainless Steel
Sponsored
Central Scotland Police Case Study

Central Scotland Police Case Study

Dart Valley Systems Ltd

Central Scotland Police have selected DVS automatic flushvalves and wave on sensors for their new hand rinse system which have been in place since the early seventies.Due to the nature of the cells a lot of water was being wasted with each flush and hand wash. Choosing DVS flushvalves and wave on sensors for the hand rinse basins will significantly reduce their water usage. DVS flush valves and sensors have various functionalities for high security environments, including ligature resistant designs along with lock out functions to prevent any mis-use. This also prevents the system from being flooded, also minimising any potential water wastage.
Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
Easy off road parking using SureCell as a base for sureset resin bound permeable paving

Easy off road parking using SureCell as a base for sureset resin bound permeable paving

SureSet Resin Systems

The front garden consisted of the typical grass, a narrow footpath, and shrubs. It was prepared prior to arrival removing all elements including the soil which was made level and topped with a free-draining compacted stone, this is the required substrate for SureSell. Once the cellular structure is in place it's filled with loose stone and then suitable for a final layer of smooth yet permeable resin bound paving.
Sponsored
Basement Waterproofing and Ground Gas Protection

Basement Waterproofing and Ground Gas Protection

Delta Membrane Systems Ltd

To fulfil the requirements of BS8102:2022 and BS 8485:2015+A1:2019 a strategy to develop a specification which combines structural waterproofing and ground gas protection were required for this refurbishment project.The project involved creating additional living space to an existing mid terrace Victorian property in W12. The site of the property, whilst not being located on contaminated land was identified as being potentially at risk, it was near what is classed as contaminated land (an old brick yard).To satisfy Building Control requirements gas protection measures were required to meet BS 8485:2015+A1:2019.Site investigations at former brickworks and landfill sites are within expected UK guidelines for contamination. Ground investigations incorporate both soil sampling, ground gas and groundwater monitoring.In accordance with Table 3 of BS 8485:2015+A1:2019 a residential building is classed as a Type A building, creating a “high risk” requirement for ground gas protection. With the structure requiring a Grade 3 habitable environment attention as required to offer a system which meets all requirements.
Sponsored
Baldovie EFW CHP

Baldovie EFW CHP

Hart Door Systems Ltd

Baldovie EFW CHP Facility is a energy from waste site using around 110,000 tonnes of residual waste per year from Dundee and Angus to generate electricity. Project/doors:7 Insulated Roller Shutter Doors1 High Speed Door - Speedor StormThe challengeDue to the nature of the build and technical challenges from the onset, Hart worked direct with the contractor and the consultants in the design phase to provide a solution to suit each challenge faced such as corrosion, odours, noise and infestationThe solutionInsulation is a key feature of an energy saving environment. Insulated roller shutters have a thermal value of minimum 0.69w/m.sq.k and 18db to minimise operational noise. The Speedor Storm is an extremely robust door with wind class 5 up to 8m. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt controlling the escaping dirt, odours and noiseThe successFollowing extensive communication with the contractor and the consultants to ensure the smooth running of the project, the steelwork was designed and installed correctly to allow for the timely installation of the Hart manufactured doors. Each door was made to measure and each activator and safety device fitted to suit the environment
Sponsored
Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Liquasil Ltd

Another example of the BBA Approved asbestos roof coating system, Asbestsoeal from Liquasil Ltd. The asbestos cement roof was first cleaned using a closed box pressure washer. All waste was filtered and disposed of by a licensed asbestos disposal contractor. Metal fixings were treated with Liquasil SWT Corrosion Primer and then sealed, along with small cracks and holes, with Non-Sag Sealer before the roof was coated with Asbestoseal 20. The project included GRP rooflight replacement and new ridge detail and flashings.
Sponsored
Veolia

Veolia

Hart Door Systems Ltd

Veolia is the UK leader in environmental solutions, it provides a comprehensive range of waste, water and energy management services.Project/doors:Nationwide replacement of 60+ doorsThe challengeDue to difficult conditions on site including dust, dirt and moisture, the current doors were unreliable and unfit for purpose. As the doors were not manufactured in the UK, replacement parts were expensive and not readily available. Having doors out of action for long periods of time affected compliance with local authority regulations.The solutionThe Speedor Storm is an extremely robust door with wind class 5 up to 8m due to its unique guide system. The multi-layer PVC fabric is thicker and less prone tears and splits. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt. Its high-speed action control the escaping dirt, odours and noise. The successHart Doors is the oldest British manufacturer of highspeed doors and understands that one size does not fit all. Veolia was given peace of mind with parts available in stock and a 2 year warranty as standard. Reliable doors meant less repairs, less down time and less cost and Veolia had the confidence that Hart would deliver a quality product and serviceThe Review:"Excellent Service. Great workmanship, worked well." Wayne Glynne, RDF Manager, Veolia
Sponsored
Waterproofing the London School of Economics

Waterproofing the London School of Economics

Newton Waterproofing Systems

In April 2016, the world-renowned London School of Economics announced that Grafton Architects were to design their next major project. The Marshall Building at 44 Lincoln’s Inn Fields, built by Mace Group, includes an extensive two-storey, mixed-use basement that will house plant areas, squash courts, changing facilities and a sports hall, covering a total of over 2,250m2 of floorspace and presenting quite the project for Newton Specialist Contractor Cast Contracting Ltd (CCL).Newton Specialist Contractor CCL were appointed to design, supply and install the waterproofing by principal contractor Mace Group in late 2019.To provide a completely dry, guaranteed solution on such a high profile project, CCL recommended the Newton CDM System.Otherwise known as Type C waterproofing, the CDM System is the safest and most reliable form of waterproofing.Prior to installation, CCL applied Newton 906 Lime Inhibitor to the new slab to prevent free lime from the concrete from affecting the drainage membranes. The Type A liquid waterproofing membrane Newton 103-S was also applied internally to many of the concrete surfaces as a barrier to water.With preparations complete, over 2,250m2 of Newton 520 eco membrane was installed to the floor and over 570m2 of Newton 508 membrane installed to the walls to create the Newton CDM System. A drainage system of Newton Basedrain channels also directs any water captured by the membranes to the point of discharge, and the whole system was sealed with Newton OverTape.Despite requiring dedicated delivery slots, and working to an extremely tight program of work, CCL were praised on the quality and speed of their installation, which was completed well within the time limit.The Newton recycling service was also a great success, recycling 115 kg of HDPE waste and therefore preventing over 132 kg of CO2 emissions.
Sponsored
Metal Technology systems used in Oxford’s new groundbreaking SuperLab

Metal Technology systems used in Oxford’s new groundbreaking SuperLab

Metal Technology Ltd

The extraordinary, purpose built SuperLab in Oxford provides much needed lab space and fantastic facilities for the next generation of science entrepreneurs and innovators. The new state-of-the-art building is located close to the city centre and the university, which spins out around 15 science firms a year. Created and built by Oxford-based Robin Swailes Design and Development, the SuperLab offers almost 7,000 sq ft of accommodation for up to 84 staff and blends contemporary design with the latest efficiency features while meeting the needs of the modern workforce. The building is made of 95 per cent recycled aluminium and features a grey water system using collected rainwater to flush the toilets, thermal efficient panelling, air source heat pumps and solar panels to minimise its carbon footprint and keep running costs as low as possible. Metal Technology Ltd supplied a range of its high-performance glazing products for this unique development via approved fabricator Alternative Windows. Products used were: System 17 Curtain Walling, System 5-35Hi Tilt Turn Windows, System 4-35Hi Fixed Casement Windows and System 10-35 Thermally Broken Commercial Doors. Curved walls, round windows and open ceilings create a sense of space and wellbeing, topped off with advanced acoustics, quality finishing touches and a playful interior. The result is an inspiring and design-focused workplace that encourages collaboration. Outside, a roof top recreation area provides space for al fresco meetings, eating and drinking with views over Oxford’s Dreaming Spires. A fantastic project to have been involved in, which ultimately encourages young and innovative science pioneers to stay and further their career on home soil.
Sponsored
Snowhill Three

Snowhill Three

Excelsior Panelling Systems Ltd

The ProjectThree Snowhill is the final element of the Snowhill Plaza, forming part of Birmingham’s 20-year plan to redevelop Snowhill, known as ‘Vision 2030’, the largest ever speculative city centre office scheme built outside London. Featuring full height windows designed to take full advantage of the city views, and 32,000 square metres of space for office, retail, café and plant space, Three Snowhill stands as a landmark tower in this growing city The ChallengeWork alongside BAM design team to bring the clients vision to life. Bespoke Superloo facilities designed to include for boxed out mirror units with hidden services, solid surface vanity stations including soap, water and waste accessories. Coordinate delivery and installation in-line with the programme dates and in harmony with associated trades on site The SolutionExcelsior have proudly worked alongside BAM construction and Weedon Architects to bring this vision to life. Working to innovative specifications we have fitted out this office space with a combination of Flush 44 Natural Wood Veneer WC Cubicles and Superloo, all complete with stylish solid surface vanities, hidden waste disposal, and boxed out mirrored wall units housing paper towel dispensers. Building bespoke specifications, we ensure we are delivering exactly what both the customer and specific scheme requires. Here, our bespoke service has allowed for a beautiful high-end installation for optimal use in this landmark business location.Client:Snowhill Building ThreeContractor:BAM ConstructionArchitect:Weedon ArchitectsLocation:Birmingham SnowhillSpecificationProduct Range: Flush 44 Natural Wood Veneer CubiclesDoors: Natural Wood Veneer bonded onto 44mm MR Core, Excelsior ‘Toasted Oak’ VeneerPilaster: Natural Wood Veneer bonded onto 44mm MR Core, Excelsior ‘Toasted Oak’ VeneerPartition: HPL bonded onto 36mm MR Core, Excelsior White c/w Hardwood Oak Rebated JointIronmongery: SSS Stainless Steel
Sponsored
FRESH WHARF DEBUTS DBS SECURITY SYSTEM

FRESH WHARF DEBUTS DBS SECURITY SYSTEM

Zaun Limited

A former brownfield industrial site alongside the River Roding in Essex is converted into attractive mixed-use community housing. The Met Police custody and patrol base for the borough, industrial businesses, restaurants, river moorings and 1000 homes.The developer wanted to replace old and damaged wooden hoardings around a section of the Fresh Wharf Estate perimeter in Barking and prevent damage to a bus shelter from stone chips thrown up by passing vehicles on the adjacent A406.The SolutionFresh Water Developments approached Zaun to devise a bespoke solution for the site on the banks of the Roding, a Thames tributary. They wanted a sustainable perimeter, deflected flying stone chips, minimised noise and met their aesthetic, design and functional needs.Zaun has integrated a new highly resistant laminate made entirely from mixed waste plastics with its market-leading Duo fencing to produce a system that won’t rust or rot. In addition, it is low maintenance and reusable or recyclable if damaged.The innovative product design named DBS Security boasts great acoustic-loss properties, rated B3 and 36dB loss, and gives protection against damage from flying objects flicked up by passing vehicles.DBS Security protects a bus shelter close to the North Circular that constantly has to undergo repair. A large section of the perimeter to the industrial site and housing is fitted with Zaun’s twin-wire Duo fencing system. Two horizontal wires resist being welded on either side of the vertical wire.Zaun combined both standard and bespoke fencing to tailor the overall solution to the site’s specific requirements.
Sponsored
Podium Landscaping, Roofdrain & Advanced Turf System, Edinburgh Quartermile, UK

Podium Landscaping, Roofdrain & Advanced Turf System, Edinburgh Quartermile, UK

ABG

The Quartermile development is a cosmopolitan mix of luxury apartments, cafes and businesses in the heart of Edinburgh city centre. The masterplan for the new area is designed by Foster + Partners and enjoys views of some of Edinburgh’s greatest landmarks. The access to the new building (adjacent to the old Edinburgh Royal Infirmary site) is elevated from the North Meadow Walk pedestrian walkway and cycle route. The pathways and landscaped areas in front of the development needed a structural drainage solution and reinforced turf area that would be suitable for trafficking by maintenance and emergency vehicles when required.ABG’s high strength Roofdrain 60S+RX geocomposite was specified to provide sub-surface drainage across the base of the podium deck. The drainage board provides a high flow capacity void to channel water pressure to the surrounding perimeter drains. By utilising a 60mm drainage layer the need for much deeper and harder to install drainage stone layers can be minimised. The carbon footprint for the product is just 3.3 kgCO2e per m2 which is an approximate 50% saving compared to the embodied carbon of quarrying, transportation and installation of the equivalent thickness of drainage aggregates. Once installed the Roofdrain core is filled with pea gravel to provide a rigid sub-base beneath a bedding layer and resin bound gravel pathways. The drainage core features regular perforations to allow surface water to percolate and drain to the underside of the board. Adjoining rolls can be easily overlapped with the cups designed to slot  into one another. The Roofdrain was overlaid with a Terrex NW9 geotextile to prevent fines entering the drainage core. The Roofdrain can be stepped to cascade into lower sections to suit the landscaping layout. The main green area to the front of the building was cultivated using the Advanced Turf reinforced grass system. The Netlon Advanced Turf System (Netlon ATS) is a high performance, mesh-element reinforced natural grass rootzone system that provides a SuDS compliant free-draining grassed surface. It consists of a high quality, sandy soil rootzone into which thousands of playing card sized polypropylene Netlon plastic mesh elements are pre-blended. The composite mesh reinforced rootzone and selected turf are then delivered to site as a system. ATS was specified for this development to support loading by occasional MEWP vehicles such as cherry pickers, and in the event emergency vehicles need to traffic onto the grass.
Sponsored
Acoura: The Versatile Ceiling System Redefining Acoustic Comfort

Acoura: The Versatile Ceiling System Redefining Acoustic Comfort

Soundtect

Featuring bespoke sizing, design, easy installation, and use of sustainable materials, the Acoura ceiling system by Soundtect offers a highly customisable acoustic solution that can elevate your project to new heights of comfort and style.City workspace projectFor this workspace redesign, HOP Interiors sought a solution to the challenges of noise control in an expansive open-plan environment.  Leveraging Acoura's capabilities, strategic placement of the acoustic ceiling panels effectively transformed the workspace into a hub of productivity. Zoned working areas, delineated by Acoura's sleek design, provided employees with the peace and quiet needed to excel in their tasks while maintaining a collaborative atmosphere.With a clever bespoke and unique carrier system, the Acoura baffles can be easily removed and reinstalled, again and again, for easy access to the ceiling mechanical and electrical services when needed, simply and quickly.With a large range of Freestyle colour options and wood-effect finishes, Acoura offers designers a wealth of aesthetic possibilities. From bold statements to subtle accents, the choice is yours, with the added flexibility to match any wood finish and complement existing design schemes.SustainabilityLike all Soundtect products, Acoura is crafted from third-generation recycled PET. By utilising recycled materials, Acoura not only reduces waste but also minimises the demand for new resources, contributing to a more sustainable future.Soundtec thas zero CO2 emissions and zero water emissions. Utilising solar power for its factory, the company has earned several awards for its contributions to the environment, especially as the product's core material comprises post-consumer plastic with low VOC content.The Acoura sustainable acoustic ceiling not only delivers a truly bespoke, unique solution to reverberation but also a fabulous and inspiring alternative to heavy wooden beams with no impact on the environment.
Sponsored
NIBE Exhaust Air Heat Pumps installed in large apartment complex

NIBE Exhaust Air Heat Pumps installed in large apartment complex

NIBE Energy Systems Ltd

Royal Winchester HouseComer Homes is renowned for the high quality of its residential and commercial developments, which span London, Hertfordshire, Dorset and throughout the South East. Its latest project is Royal Winchester House, a landmark building of one and two bedroom apartments at the heart of Bracknell's new town centre. As a planning requirement of Bracknell Forest Council, Comer Homes was required to provide a sustainable, low energy form of heating that would offer a reduced carbon footprint, as well as being affordable to run.The SolutionComer Homes specified F730 Exhaust Air Heat Pump systems from NIBE for all 337 apartments on the development to ensure they could meet their renewable targets. The new homes builder employed MKP Consultants Limited to undertake the building services design as they had previous experience of NIBE systems on other apartment developments in the area.The NIBE F730 Exhaust Air Heat Pump system was an ideal solution, as it offers mechanical extract ventilation, alongside heating and hot water in a compact design. The heat pump units were installed in a service cupboard in each apartment, as they have a small footprint of only 0.6m2.NIBE F730 operates by recovering energy from the ventilation air and, if desired, extracted from outdoor air, the heat energy is absorbed by the heat pump using a vapour compression process and subsequently transferred to the water-borne heating system, in this case an underfloor heating system. The integrated 180L domestic hot water cylinder also ensures a plentiful supply for the one- and two-bedroom properties.A sustainable solution, NIBE F730 keeps energy consumption to a minimum. The efficient control system automatically adjusts the indoor climate for maximum comfort for the occupant, using a combination of weather compensated control and the low energy inverter driven compressor.Each apartment is also fitted with a NIBE RMU 40 room controller, to allow greater flexibility of control for users and if required can be easily connected to NIBE’s internet remotely monitoring and control platform UPLINK™.Thanks to this innovative heat pump system, residents at Royal Winchester House are set to benefit from lower energy bills and a reduced carbon footprint.The ResultsThe NIBE F730 system complies with Parts L, F and G of the building regulations, and helps to meet planning requirements designed to reduce energy consumption and carbon footprints within residential housing developments. External noise is kept to a minimum and building aesthetics are unaffected by the need for external plant.TestimonialHead of Projects at Comer Homes, Jack O’Brien explains: “We were looking for a heating and ventilation system that would be both sustainable and affordable to run. We have been impressed with the performance of NIBE’s heat pumps, with their high efficiency, low noise and low running costs further enhancing the sustainability of the whole development.”About Royal Winchester HouseRoyal Winchester House is a landmark building of high specification 1 and 2 bedroom apartments available to rent. The unique design and architecture of Royal Winchester House creates a striking and impressive presence from the ground floor retail spaces up to the luxury penthouse levels.Royal Winchester House has been built for the private rental market and the development is being managed by Chancellors estate agency. The apartments benefit from high standards of insulation and air tightness. In addition to the NIBE heat pumps, the whole development has been fitted with a biodigester for the repurposing of food waste, as part of reducing waste sent to landfill and to add to its sustainability.
Sponsored
Primary School De Verwondering

Primary School De Verwondering

Forbo Flooring Systems

Creating better education environments Primary School De Verwondering is a fully bio-based school building and the first example of a new generation of bio-based school buildings that recognizes and harnesses nature's powerful effcet on learning.The beautiful wooden building - which runs on circular energy - has a vegetation roof with chickens, green facades and remarkably large windows. The primary school recently won the 2021 Golden Frog award for sustainable construction in the Netherlands.The interior and exterior of the school have a positive influence on the well-being and performance of the pupils. The environment outside blends with the natural elements of the building, such as wood and bamboo, while inside the interior architect chose a CO2 neutral (cradle to gate) Marmoleum floor covering. Marmoleum Cocoa is made of natural and renewable raw materials with the addition of a waste product from the cocoa industry and, in that respect, it fits the building perfectly. Marmoleum is one of the flooring industry's most beautiful and also oldest bio-based products.
Sponsored
Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

Reinforced Concrete Restoration - Omni Centre Car Park, Scotland

C-Probe Systems

Challenge: C-Probe's LoCem® +chase® anode mortar has been installed at the Omni Shopping Centre Car Park in Edinburgh, Scotland to 4 levels of underground car parking as part of a comprehensive corrosion management strategy. Overtime the popular car park had succumbed to structural damage and corrosion caused by the ingress of chlorides from de-icing salts from above.Solution: This system comprised of 42 ICCP zones and 7 additional monitoring zones forlevels protected using surface-applied corrosion inhibitors. In addition to this, some 6000 C-Puck galvanic anodes were used to protect newly repaired areas to 2 levels. All the anodes and monitoring could be controlled and data accessed remotely throughoutthe car park with AchillesICP and AchillesIES, helping to extend its service life for 100+ years.Outcome: This ESG compliant approach meant there was no need for demolition or extensive reconstruction using new materials, helping to reduce waste and harmful emissions. Reconstruction was also a near-impossible strategy due to underground facility and electric tram on land, meaning something non-invasive like cathodic protection was essentialto minimise social disruption. 
Sponsored
Solihull - Metal Gutter Coating

Solihull - Metal Gutter Coating

Liquasil Ltd

This metal gutter in Solihull was corroded, flaking and soiled, and the Liquasil Gutterseal system was specified for a fast, effective repair. Once prepared and cleaned, our SWT Corrosion Primer was applied prior to the application of our Non-Sag Sealer to the joints and Liquasil One topcoat to the entire length of the gutter.The completed installation formed a seamless finish, guaranteed to last 15 years from completion.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.

Showing 1-36 of 1401

Feedback