NBS Source
I'm a manufacturer

"sections including tapes"

2,788 results found

Sort by:

Showing 37-72 of 528

Sponsored
LAUNCH OF FUNCTIONAL PARTITIONING WEBSITE FROM STYLE

LAUNCH OF FUNCTIONAL PARTITIONING WEBSITE FROM STYLE

Style - Moveable Partition Specialists

Leading moveable wall specialist, Style Partitions, has launched a new website aimed at architects, specifiers, contractors and end user clients. The new site features a whole range of benefits including the ability to view case studies by industry sector, watch videos of moveable walls in action, view technical specifications and gain access to key tools such as the NBS Specification Generator and Style’s moveable wall range on the ‘National BIM Library’. There is also a section dedicated to Style’s moveable wall service and repair division, with its UK-wide support team.
Sponsored
Novotel London West

Novotel London West

Buzon UK Ltd

Novotel London West is located in the centre of Hammersmith. The scope of works undertaken by Buzon UK included the supply and installation of the DPH support pedestal system. The DPH system offers uninterrupted adjustability and support loads in excess of 1000kg per pedestal - perfect for high traffic areas. On this project the pedestals support 800sqm of porcelain pavers providing absolute stability and a perfectly flat finish on an uneven roof base area. The Buzon ALUrail system was also installed in certain sections of the project where the positioning of small tile cuts and ramped areas were required.
Sponsored
Grand Designs: Green Roof Project

Grand Designs: Green Roof Project

Polyroof Products Ltd

The Protec System was used to waterproof the domed green roof areas of this striking, sustainable house development which was featured on Chanel 4’s Grand Designs. With an ambitious vision and a tight budget, Robert and Milla Gaukroger set about transforming a dated 1980’s house overlooking Lake Windermere into a state-of-the-art, eco-conscious home. Since the house lay in beautiful hillside surroundings, in order to blend into this setting, the domed roofs of the house were to be covered with a wildflower meadow mix to provide a green roof construction.The SolutionThe Protec System was chosen as a waterproofing membrane for the roofs as it is ideally suited for green roof applications. Lightweight, flexible and highly durable, the system can easily accommodate structural expansion movements and is tough enough to resist root penetration. The Protec system was applied to over 350m2 of domed roof to provide a long-lasting waterproofing membrane.The key reasons why Eastleigh chose Protec are the same reasons that has seen it become one of the fastest growing cold-applied liquid roofing systems in both the new build and refurbishment markets. Combined with the timber cladding to the verticals of the building, the finished aesthetics of the development blended seamlessly with the surrounding areas.A warm roof build-up that can be made waterproof at multiple stages:For larger projects the Protec system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier.The second phase follows the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.Highly flexible membrane:Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.RapidCure technology for quick installation:The application of Protec as a liquid, through to the curing process where a solid, tough membrane that can be walked over, takes only 30 – 60 minutes. This enables large sections of the roof to be fully completed in a short space of time.Installing the Roofing SystemsThe Protec System provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).The roof installation was carried out with a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.The use of a high-performance aluminium vapour barrier not only eliminates the risk of condensation within the roof, but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application – making for an extremely rapid installation. As you can probably imagine, fixing through 170mm of insulation into the crowns of the metal deck can be a tricky and time-consuming task.A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. An interesting fact when using Protec in inverted roof situations is its incredible durability performance – as tested by the BBA, Protec “can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated”.Monitoring and CompletionThroughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof’s free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner – saving the client time and money.
Sponsored
Bellshill Academy

Bellshill Academy

DCM Surfaces

In 2017, Belshill Academy invested in a new outdoor sports facility, which included three separate multi-sport courts to offer handball, basketball, hockey, tennis and football.HAGS was the successful bidder for the development, which also included a warm up / cool down section, outdoor gym, and a 400m four lane running track, and selected DCM to install the polymeric surface.The Deputy Head at Belshill Academy, John McGuire, commented:“The new MUGA facility has had a very positive impact at our school. It has brought a new dimension to PE lessons, allowing staff a far greater range of options in their delivery of lessons. The pupils love using the facility and it has been great for after school clubs as well as encouraging pupils to be active at interval and lunchtime.”
Sponsored
The Kelpies

The Kelpies

Eurosafe Solutions Ltd

Eurosafe Solutions undertook the challenge and provided a safety solutions to Scotland’s Largest Art Installation, the Kelpies. Working alongside the main contractor on the project, SH Structures, Eurosafe Solutions supplied and installed an internal ladder within each of the horse heads, one 19 meters high and another 21 meters high whilst also providing rope access assistance to the installers of the structures external cladding. The ladders provided by Eurosafe Solutions consist of multiple sections of Glideloc “Y” spar ladder sections, with a pivot section at the front of each which can be locked to prevent unauthorised use.
Sponsored
Ascot Cycle Compound

Ascot Cycle Compound

Cyclepods Ltd

The Ascot Cycle Compound can help contribute towards gaining ENE8 Cycle storage credits when used in the appropriate situation Shelter manufactured from hot dipped steel Galvanised box section to BSEN ISO1461 Several cladding options including; Wooden slats Wooden boards Waved sheet metal Perforated sheet metal Toughened glass Polycarbonate Aluminium fixing straps Anti climb end panels No crawl under perimeters Angled roof Various gate options i.e swing, slide or automated Padlock/Hasp locking mechanism, swipe or keyed.
Sponsored
LEEDS TRAIN STATION, YORKSHIRE

LEEDS TRAIN STATION, YORKSHIRE

Dural (UK) Ltd

Dural worked in conjunction with Northern Star flooring to renovate a section of floor within the new south entrance concourse. Northern Star Flooring is an experienced resin floor contractor based in the North of England. The first phase began in 2018 and the project involved the redevelopment and modernisation of the main southern concourse. The plans also included a new roof and stunning glazed façade in addition to more floor space. The flooring specified will be used by the station’s 100,000 daily users. Dural has been integral in offering technical advice on how to install their coloured movement joints for this huge expanse of floor. 
Sponsored
DECOTHANE IS EFFECTIVE MEDICINE FOR WEST SUFFOLK HOSPITAL ROOF

DECOTHANE IS EFFECTIVE MEDICINE FOR WEST SUFFOLK HOSPITAL ROOF

Sika Liquid Plastics

Sika Liquid Plastics has specified and supplied a roof upgrade solution for West Suffolk Hospital to renew the waterproofing membrane on multiple areas of the hospital campus and create a gradual pitch to aid drainage while enhancing the building’s thermal performance. Delivered by specialist contractor, Allard Construction, the phase four programme included seven sections of the building in a 20 week programme. The seven areas that needed work were all under heavy coverage of mechanical plant and pipework, and consequently there were large areas of restricted access, these issues made Sika Liquid Plastics the perfect choice for the project
Sponsored
Great Blakenham Energy Park

Great Blakenham Energy Park

Marshalls plc

he Great Blakenham incinerator plant is a joint initiative between Suffolk County Council and waste management company SITA UK. This energy-from-waste facility uses the household and business waste left after recycling, burning materials which would otherwise go to landfill, and generates enough electricity to power 30,000 homes. Although operations carried out at the plant are largely industrial, the appearance of the building itself including the suspended, glass fronted office section required hard landscaping to increase overall aesthetics, as well as providing a SuDS solution to ensure safe and practical surface water removal in the car parking areas...
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing
Sponsored
Broughton & Yeomans Apartment Block

Broughton & Yeomans Apartment Block

Polyroof Products Ltd

Broughton & Yeamans House are high rise apartment blocks in Bristol, Avon, under the management of Bristol City Council. The roof areas, totalling over 3,500m2, had originally been waterproofed with asphalt and then later treated with a coating repair.Unfortunately, water ingress continued to be a problem with leaking occurring at numerous locations. Not wanting to cause further disruption to the residents and to avoid costly damage to the interior of the buildings, the council contacted Polyroof and a survey of the roof was arranged.The survey by Polyroof’s Technical Services highlighted the extent of the issues within the roof, including identifying water ingress through the many vertical sections present on the roofs, including parapet walls and the lift house building. After performing core tests on the roof, it was shown that the existing roof build, which contained insulation as part of a warm roof design, was in a suitable condition to be retained and overlaid – avoiding costly disruption for the client and residents.A bespoke specification was drawn up by the Polyroof Technical Team that provided a comprehensive set of recommendations to ensure the apartment blocks were fully protected from the elements.To make sure the roof could be left in a totally weatherproof condition, it was necessary to treat not only the flat roof sections but the vertical areas too. The client was keen to improve the thermal performance of the buildings by adding additional insulation, but it was imperative that disruption was kept to a minimum – not only would stripping works impact on the buildings’ residents, but hauling waste materials from such a great height would be costly and logistically challenging.With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that the apartment block could not be better protected for decades to come.
Sponsored
New Public Services Hub to open its doors in Ellesmere Port

New Public Services Hub to open its doors in Ellesmere Port

Metal Technology Ltd

'The Portal' is a new £16 million public services hub in Ellesmere Port, delivered by Vinci Construction UK for Cheshire West and Chester Council. The new facility will be home to more than 500 council and public sector staff, a Job Centre Plus and a Citizen’s Advice Bureau.The building has been constructed with many environmentally friendly elements including solar panels, air source heat pump and electric vehicle charging points. The Portal’s envelope is wrapped at the top and bottom with an attractive, copper coloured metal cladding and a newly formed public realm area will surround the exterior, with bench seating and green landscaped sections.Internally, 'The Portal' consists of large open plan working areas with smaller subsection meeting rooms, break out and kitchen spaces which are present on each level and a main central staircase for circulation.Metal Technology Ltd supplied its 10-35Hi+ commercial entrance doors and System 17 capped curtain walling for the large, glazed sections of the build to approved fabricator and installer RED Systems Limited.Due to open its doors in Spring, it’s fantastic to have been involved in this state-of-the-art, commercial project, which is a catalyst for the wider Ellesmere Port Town Centre regeneration master plan.
Sponsored
London Museum of Water and Steam

London Museum of Water and Steam

Chemfix Products Ltd

Project description: 8 skylights - Repair and Re-glaze in Georgian wired obscured glass.The units were in an awful condition as you can see from the pictures, showing extensive rot. All of them were stripped back to bare wood, the putty removed and glazing taken out. We then used a Sadolin Super Dec in white to bring in the parts under the window and replaced the hooked with more tradition lead ones.  Once puttied, we removed the tape as to give it the best possible line before it dried (Timbabglaze is normally paintable after just 1 hour). Once dry we re-masked and used a Dulux UK weathershield system. This was a supergrip primer, oil based Dulux weathershield under coat and finally 2 top coats of Dulux weathershield gloss. The tape was removed and you have the finished product for the first 6 windows.The last 2 windows proved to be a problem. They had been re glazed previously but had been done very badly. The wood was rotten and had to be repaired. After struggling to get the glass out as it had been silliconed in... We used Timbabuild products again. To start with we raked out all the rotten wood back to a hardish part. We then used a Timbabuild 2 part EWS wood primer to give the wood some structure and a base for the next part. Once the EWS had gone off we applied Timbabuild EHB60 epoxy repair. This was left over night (as it was applied last thing in the day) and sanded back to an edge the following day. We then used the Timbabuild ERC10 Rapid curing epoxy adhesive over the top to fill any gaps that needed it. Then a surface layer of 2 part Timbabuild FINISH. They were sanded using a 180 grit paper and received the same paint system as the other 6 windows. The glass was replaced as well as the hooks and the finished results speak for themselves. 
Sponsored
Severn Trent Operation Centre

Severn Trent Operation Centre

Armourcoat Ltd

Severn Trent Water’s new £60m operations centre in Coventry, which aims to set new industry standards with one of the lowest carbon footprints for any UK office building, incorporates equally eco-friendly Armourcoat polished plaster.Designed by Birmingham-based Webb Gray Architects, and built by BAM Construction, this highly-sophisticated energy efficient building featuring the latest eco-technology. Designed for low-energy and low-carbon consumption, the offices include thermal adaptive cooling, biomass boilers, photovoltaic panels, solar panels and rainwater harvesting; justifiably achieving a BREEAM ‘excellent’ rating.Armourcoat was used within the reception and main atrium space, to create a stunning and original design statement. Totaling nearly four hundred square metres of hand-applied decorative plaster, Webb Gray specified colourfade artwork for feature panels and curved walls using Armourcoat Spatulata. For the 30-metre high atrium panels, artisan plasterers blended over seventy colours of paste to achieve the seamless finish. Known as ‘stucco lustro veneziano’, Spatulata is a superfine stucco paste that is trowel applied in a series of fine layers to create a highly polished decorative surface. In keeping with the eco specification, the product contains 40% pre-consumer recycled marble.The project also included the use of ‘Anti-Crack’ - an innovative substrate preparation system from Armourcoat which ensures fast-track construction and a tough, unrivalled backing for Armourcoat polished plaster wall finishes. This cost effective, skim-coat plaster is designed for application in 3-4mm layers over plasterboard surfaces. Its use eliminates the need for taping, jointing and sealing the plasterboard surface and provides a first class substrate for Armourcoat finishes.
Sponsored
ASF Bespoke Corten Planter / Seat

ASF Bespoke Corten Planter / Seat

Architectural Street Furnishings part of WB White Foundry

ASF Manufactured this large planter and seat from corten steel. The structure of the planter is 100% corten, manufactured as modular sections that were transported to site in sections and simply put together in situ. The seat area is a lowered platform alongside a running edge of the planter with hardwood seat slats attached to the top with invisible fixings. The seat area brings the lowered side up to full planter height so people can sit alongside the raised garden bed the planter creates.
Sponsored
LED Lighting - Alhambra Theatre

LED Lighting - Alhambra Theatre

Gradus

Gradus, has installed LED Step Lighting & LED Architectural Lighting at the historic Alhambra Theatre in Dunfermline. The theatre, which recently celebrated its centenary, has undergone a refurbishment, which involved the use of several Gradus products to enhance its overall aesthetic.The Gradus ATD71L Aluminium Step Profile has been installed on the steps of the theatre, offering both upward and downward-facing illumination. This enables patrons to easily locate their seats, while also creating an attractive and inviting glow inside the theatre. In addition, the Gradus DLA45 Aluminium Architectural Lighting profile has been installed within the floors to illuminate the aisles and walkways, providing wayfinding assistance, and adding a subtle touch of elegance to enhance the theatre experience. Both profiles were installed with Gradus’s brand-new Impression LED system, featuring a 5w spotless LED tape in red.
Sponsored
GEC Anderson Worktops Just The Tonic For GMC HQ

GEC Anderson Worktops Just The Tonic For GMC HQ

Anderson, GEC Ltd

The General Medical Council protects patients and improves medical eduction and practice in the UK by setting and upholding standards for students and doctors.GEC Anderson were employed to supply and install new worktops within its HQ building, located on London’s Euston Road. The project was undertaken by Carmelcrest who asked GEC Anderson to provide the new 5m worktop within the Pantry Kitchen. Access to the room was fairly restricted and, as it was on one of the upper floors of the tower, it was necessary to supply it in two sections. A clamp-joint was used to provide the near seamless and hygienic join. Two sinks were included at one end of the worktop whilst the other end provides the clear, plain, work surface required within the busy kitchen space.
Sponsored
Kestrel Aluminium. Case Study: Alder Hey Children's Hospital, Liverpool

Kestrel Aluminium. Case Study: Alder Hey Children's Hospital, Liverpool

Kestrel Aluminium Systems

Kestrel Aluminium Systems worked closely with Axis Automatic Entrance Systems to ensure the successful delivery of their part of the refurbishment project of Alder Hey Children’s Hospital. The contract saw the installation of over 200 doorsets into the new hospital building, the design of which had been inspired by children associated with the hospital. Alder Hey is the first hospital in Europe to have sliding glass doors on every room and Axis Automatic needed a new section to help achieve this ambitious plan. Kestrel assisted by designing a new header section for the project.
Sponsored
London Victoria Tube Station

London Victoria Tube Station

Eurosafe Solutions Ltd

A Noracon Travelling Gantry was installed to the full width and length of the North Ticket Hall suspended from aluminium monorails concealed within the ceiling. The Gantry was designed to travel parallel to the escalators beneath utilising a rope driven trolley which removed the requirement for any electrical connections. To enable the platform to travel the full length. part of the gantry was designed to become detached from the main section, allowing it to be “jettisoned” at the point where the new lift obstructs travel. The two sections become independent allowing the gantry to travel the remaining distance.
Sponsored
Bibliotheca, Alexandria

Bibliotheca, Alexandria

dormakaba UK & Ireland Ltd

Does the new library bring the Bilbao effect to Alexandrina?The cultural centre Bibliotheca Alexandrina opened in April 2002 was built under the auspices of UNESCO, and aims to build on the glorious past of the ancient library.dormakaba's contribution to the projectOnly 30 metres separate the library from the Mediterranean. Its deepest sections lie 18 m underground and 12 m below sea level, calling for sophisticated structural measures. Library stocks had to be wellprotected against both water and fire.To guarantee this protection and user comfort, the architects turned to dormakaba. The fire protection and smoke check concept includes TS 93 cam-action door closers and ITS 96 integrated door closers, some with electromechanical hold-open, plus BTS 80 and BTS 80F floor springs.
Sponsored
Lateral Bellows for Airport
Expansion

Lateral Bellows for Airport Expansion

FlexEJ

FlexEJ has designed and manufactured lateral expansion joints with Inconel 625 bellows designed to install in existing pre-cast concrete forms.The London City Airport terminal expansion is being built on a concrete deck supported on over 1000 piles. Between the sections of the deck there can be movement and where critical services pass between sections a fully enclosed expansion joint is required.INSTALLATIONDesigning the expansion joints for installation at site into the existing concrete sections was a challenge. FlexEJ designed and supplied installation tooling which allowed the expansion joint to be inserted into the concrete from one side – complete with internal removable pre-extension bars – and then finally seal welded.FURTHER DETAILSIf you are interested in finding out more about our expansion joint design and manufacturing capabilities, or if you have enquiries for utility related projects, please contact our Technical Sales Team on +44 (0) 1384 881188 or send an email to sales@flexej.co.uk.
Sponsored
HS2 - Firefighting Sets

HS2 - Firefighting Sets

DAB Pumps Ltd

DAB Pumps have provided BS EN 12845 firefighting sets to be installed on the London to Birmingham section of the prestigious HS2 rail project
Sponsored
Fragatta Tower, Colombia

Fragatta Tower, Colombia

Genesis Global Systems Limited

The construction company wanted a strong aluminium profile that provides a simple, safe secure edge for steps covered in ceramic tiles. The flange sits underneath the tile and the top section protects the riser tile and prevents water ingress into the joint gap. The top section provides a perfect step edge with a grooved profile face for extra grip and has a generous 10-12mm deep front face to highlight the step edge from the bottom of the steps. Contractors decided Genesis NLM123 would fit perfectly and have since ordered 303 linea meters to be installed in Fragatta Tower, Colombia.
Sponsored
Oxford University Sports Centre

Oxford University Sports Centre

Acoustic Products Ltd

Built on the historic Iffley Road track where Sir Roger Bannister broke the four-minute mile. This state of the art multi sports facility is part of the Acer Nethercott Sports Centre built by Beard Construction, which was part of the Universities new redesign. The walling was split in two sections; from 1.8m up hosts our Topperfo 16/16/8 (aw 0.75, Absorption Class C, NRC 0.90) whilst the lower section has had the Topperfo plain installed. Both with a European Oak Veneer both installed to withstand impact according to DIN 18032.
Sponsored
ASF Balmoral PGR Panel Post, Keighley Town Centre

ASF Balmoral PGR Panel Post, Keighley Town Centre

Architectural Street Furnishings part of WB White Foundry

ASF were approached by Bradford Council to manufacture and supply the Balmoral Posts with Panels set up as a guardrail - with a vertical infill panel in the lower section and topped with a sight gap and top rail.The site had a variety of straight and curved sections with slight gradients in some areas of both.ASF manufactured the posts and panels to meet the needs of each individual part of the site, whether that be a straight run, cambered around a gentle curve or with the panels following the physical curves if needed.All posts are 100% recycled, made from used vehicle brake discsThe system meets and exceeds 1.5kN loading
Sponsored
Refurb of historic former Coventry Evening Telegraph building achieved using SMARTPLY ULTIMA OSB/4

Refurb of historic former Coventry Evening Telegraph building achieved using SMARTPLY ULTIMA OSB/4

MEDITE SMARTPLY

The rear section of the former Coventry Evening Telegraph Building is being transformed into a brand-new cultural venue, using SMARTPLY ULTIMA OSB/4 for its flooring.
Sponsored
LPCB LPS1175 testing on our Security Rated Platinum Turnstile

LPCB LPS1175 testing on our Security Rated Platinum Turnstile

Frontier Pitts Ltd

Following the release of our Platinum LPS1175 Turnstile with a 90° rotor (4 section walkway) in December 2019 our customers asked us to develop a security rated turnstile with a 120° degree rotor (3 section walkway). Frontier Pitts worked closely with LPCB during the lockdown months, co-ordinating safe, socially distanced testing in our factory, to ensure our R&D program continued to produce products to meet our clients requirements.Now the LPS1175 Platinum Turnstile, like many other Turnstiles, have the option of 90° or 120° rotors. A first for the LPCB LPS1175 market!
Sponsored
ASF 5006 Handrailing at Bradford Library Steps

ASF 5006 Handrailing at Bradford Library Steps

Architectural Street Furnishings part of WB White Foundry

ASF were approached to replace some tired yet serviceable handrailing at the old Bradford Library in a change of use project. ASF used the popular 5006 posts with mitred tops and supplied a large central double handrail alongside a single handrail for a walled section. There was also a small section of single handrail supplied for a small side entry to the area. Pleasingly, ASF mitred the top of the bollard to match the angle of descent of the steps rather than just do them at the usual 45 degrees.ASF combined this with glass balustrade for the elevated walkway on the building concourse, which can be seen on some of the images.
Sponsored
UCLan Engineering Innovation Centre, Lancashire

UCLan Engineering Innovation Centre, Lancashire

Technal

As a key part of the University of Lancaster's Preston Campus, the £32 million Engineering Innovation Centre provided the university and Lancashire based manufacturers with state-of-the-art teaching and research facilities. This helps to train an extra 500 graduates, including an increasing number of female students, gaining degrees in subjects such as mechanical, energy technologies and aerospace engineering. Throughout the entire project, there were a number of technical challenges that needed to be met. These include the building's proximity to a very busy roundabout, the floor to floor heights, physical security, the expected levels of solar gain as well as design detailing requirements. Having a total glazed area of 3,100m2, the aluminium curtain wall carries over 40 different types of IG units, along with high density foam inserts utilised alongside decoupling joints in the mullion section - achieving 50 Dnfw flanking sound reduction, as well as 37 dB sound reduction for noise outside the building. In addition to achieving high levels of thermal insulation, being fabricated from aluminium, the curtain walling frame elements can be recycled, helping to achieve the BREEAM rating of Excellent.
Sponsored
PRIVATE VILLA, FACADE CLADDING, DEMANDING STRUCTURES AND MASSIVE CANTILEVERS

PRIVATE VILLA, FACADE CLADDING, DEMANDING STRUCTURES AND MASSIVE CANTILEVERS

Technowood UK

Designed by architects from Qatar, this complex villa has a very different design from the usual house models; Clean and angular forms which are broken up with massive section of timber structures. These structures are not ordinarily large section of timber. They are created in house at Technowood and serve as a “reduced timber option”. Furthermore, with only using 2% when compared to using sold timber for the same project.Stone, metals and glass are the main texture of the design. These white tones of concrete structured against panels of natural timber, it’s most eye-catching feature. Located in Dohada, one of the most modern cities of Qatar, this futuristic house is also accompanied by the tranquil nature of the pool and the wooden sunbathing areas surrounding the secluded exterior.When working with designs for projects, Technowood allows the Architect to think big and realise big at the same time. Unsupported beams of this natural material can span up to 12 metres unsupported… imagine this section in a hard wood, the weight would be tonnes in comparison to the lightweight Technowood option.Credits and Further informationLocationDohada, QatarMaterialsCantilevered Bris Soleil, solid forms and cladding in TechnowoodProjectPrivate Villa
Sponsored
ASF Birkenhead Quayside Railings

ASF Birkenhead Quayside Railings

Architectural Street Furnishings part of WB White Foundry

ASF were approached to manufacture and supply a quayside post and rail system for the old docks on Birkenhead, as part of a regeneration project. The client didn't want the traditional curved cast iron post option, nor the usual version of the same but in stainless steel.ASF worked with the client to agree a design that combines a robust steel panel, bolt fixed to the dockside with a large diameter stainless steel handrail on top. Sections were both straight and curved and panels were bespoke manufactured for each section of the dock.The outcome is a striking, cranked quayside panel system that has the clean straight lines of a contemporary product but still works remarkably well in this regenerated industrial landscape
Sponsored
Case Study – Liverpool Heart & Chest COVID-19 Testing Facility

Case Study – Liverpool Heart & Chest COVID-19 Testing Facility

Twinfix Limited

When Liverpool’s leading specialist heart and chest hospital trust wanted to set-up a drive through COVID-19 testing facility, Twinfix were approached by Actua to find a solution to provide shelter within their client’s COVID 19 testing pick up points.The area was a small courtyard and the proposal was to create a turning circle where vehicles could drive in and pick up their testing kit and drive out, the canopy would provide shelter for the vehicles whilst doing so.There were further complications as the area is also used for general hospital deliveries therefore meaning the height of the canopy needed to facilitate lorry/wagons.With the hospital’s requirements in mind, Twinfix designed two bespoke structures spanning a total of 82 sqm:Section 1: Free standing duo-pitch canopy completely independent of the building·Section 2: Wall mounted lean-to mono-pitch canopy with vertical glazed screen to side & front elevation.Section 1 comprised of galvanised steel posts with upper aluminium sub-frame roof, whereas, the full structure of Section 2 was manufactured in aluminium.Both structures were fitted with our non-fragile Multi-Link-Panel roof-glazing system glazed with 25mm clear polycarbonate.Joe Astley, Capital Projects Officer at LHCH commented: “The trust is very pleased with the services received. From a quick turnaround in manufacturing to a trouble free and speedy installation, Twinfix did a great job at LHCH.”These canopies not only look great, but also utilise the outdoor space providing shelter for patients and staff throughout the testing process.
Sponsored
Creating Safe and Hygienic Entrances to Grange University Hospital

Creating Safe and Hygienic Entrances to Grange University Hospital

INTRAsystems

With health and wellness a top priority, a high performance commercial entrance matting system is essential within hospitals and healthcare settings. Using INTRAform DM Low Profile entrance matting with a combination of inserts, BDP created multiple safe and hygienic entrance points to Grange University Hospital (GUH). About the building Serving over 600,000 people, this world-class healthcare facility treats patients needing complex emergency or critical care. Offering 471 beds, it is home to more than 40 specialist services. In addition to the main entrance, the building has multiple access point including staff changing areas, ambulance entrance with associated trolley traffic and other pedestrian entrances to different clinical areas. Many of these entrances are in use 24 hours a day and exposed to the elements. The Solution Following consultation with the INTRAsystems specification team, the architect selected clear anodised INTRAform DM Low Profile entrance matting. With its heavy-duty closed construction aluminium planks, INTRAform DM Low Profile is ideal for locations with high foot and wheeled traffic, such as this busy hospital. The closed construction offers ease of cleaning, while the low-profile design provides a cost-effective solution without compromising performance. Extra-wide insert sections ensure maximum contact with footwear and wheels to deliver optimum dirt and moisture absorption over smaller areas. Along with the clear anodised finish, they also help to minimise strobing which can be an issue when specifying contrasting fibre and wiper bars. Modified Zonal System To maximise performance, all entrances to the hospital use a modified zonal system within a single internal, recessed matwell. All the mats feature an initial section of multidirectional rubber inserts which gives exceptional scrapping action to remove debris and excess moisture at the threshold. At the main and ambulance entrances to the hospital where traffic is heaviest, the mats feature between 2 and 4-metre sections of rubber to ensure multiple footsteps or wheel rotations are affected. Following the initial sections of rubber, INTRAlux Elite fibre inserts thoroughly remove the remaining dirt and moisture. INTRAlux Elite offers exceptional tufting per square metre which provides superior comfort and acoustic absorption. With 92,990 tufts per square metre, INTRAlux Elite can absorb and retain 5.4L/m² - perfect for the inclement Welsh weather. By specifying a modified zonal system, the architect has created a robust yet cost effective entrance matting system to maintain safety within the building and extend the life of internal floor coverings. Learn more With entrance matting providing the first line of defence against dirt and contaminants a robust entrance matting specification in hospitals and healthcare settings is critical. To learn about the nuances of specifying entrance matting in a healthcare setting, read our article on Specifying Entrance Matting for Hospitals & Healthcare on ribacpd.com
Sponsored
Panne S Vintage Pantile

Panne S Vintage Pantile

Edilians

Great use of the Panne S in vintage colour on this cow shed to café conversion in East Yorkshire. Tile choice was critical to allow the new built section to seamlessly blend in with the existing pantile roof.
Sponsored
Host Helix Student Accomodation

Host Helix Student Accomodation

Polyroof Products Ltd

The Host Helix building, also known as the “Helter-Skelter,” was a unique and striking structure built in 2011 with stunning views of North London and Wembley Stadium. Over time, the building experienced general wear and tear and water began to enter the buildings’ complex structure.Polyroof Products were called in to consult with the clients and offer a seamless, encapsulated solution that could address the many unusual details associated with the building’s design.The SolutionA full survey of the roof terrace areas was conducted by the Polyroof Technical Services, after which a bespoke specification was produced for the works. The proposal document detailed a comprehensive set of recommendations for producing a seamless solution to encapsulate the problematic roof, therefore solving the issues that had arisen over the years due to its condition and age, as well as the issues associated with the original design of the pitched, curved roof.Polyroof SA Carrier Layer was then applied over the cement particle boards with Polyroof pre-formed GRP Drip Trims fixed to the external edge. For continuity and to create a uniform finish, the SA Carrier Layer was extended onto the main roof sections as a substrate for the Protec system.Any details requiring local reinforcement were treated with Protec Resin and 75mm wide Polymat 450. The curing process was allowed to take place. To accommodate structural expansion / contraction movements at appropriate details, 25mm disbondment tape was installed prior to local reinforcements.The first coat of Protec Resin and Polymat 450 was applied at a minimum coverage rate of 1.3 – 1.5Litres/m² (0.66 – 0.77m²/Litre) and was allowed to cure. To complete the system, a second coat of Protec Resin was applied at a minimum coverage rate of 0.5Litres/m² (2.0m²/Litre) and was allowed to cure.ComplexitySuch an iconic building in the local community, the client wanted to protect the original aspects of the building to the fullest extent, so the Protec system installed at the perimeter was color-matched to the original blue and grey colours. This was achieved by blending pigments until they matched the desired colors, in turn the pigment was then blended into the Protec resin before application. The survey revealed concerns about the original building designs from 2011 and the roof’s drainage system. Due to the roof’s pitch, rainwater was cascading down the curved slopes at high velocity and causing water to bounce into the building under the original capping.After many discussions between the main contractor and Polyroof, as well as the provider of the external cladding, it was agreed that the perimeter detail needed to be encapsulated with the new waterproofing system to prevent further water ingress. Fire-retardant cement particle boards were fixed to the internal and top faces of the external parapet walls, and the Polyroof SA Carrier Layer was applied over them with Polyroof pre-formed GRP Drip Trims fixed to the external edge.The Protec System was then applied to encapsulate the entire parapet detail, meaning its waterproof integrity would be covered under the Polyroof Guarantee. The curvature of the building added complexity to this process, and the contractor took great care in cutting the trims to size and fixing them to the external edge to ensure they followed the profile of the structure. Due to the building’s height, all the trims were face-fixed to prevent wind uplift.WorkmanshipIn order to improve drainage and prevent water from accumulating in hotspot areas of the roof, the contractors were instructed to install new internal curved gutter channels at the point where the roof and building met. These channels were designed to have a sufficient height and angle to effectively direct rainwater towards the outlets, preventing water from pooling on the roof. However, the installation process was made more complex due to the curved nature of the building’s architecture, which required careful measurement and customization of the gutter channels to fit the unique shape of the building.Additionally, the contractors had to consider the many joins of the gutters and how they would hold up to the elements over time as the building structure expands, contracts and moves. Extra steps were taken to ensure the gutters liquid membrane was properly sealed and secured to prevent leaks.The contractors were instructed to repair all protrusion and mansafe post details as necessary in order to allow the Protec System to be installed to a minimum height of 150mm, and to terminate it underneath a suitable weathering flange or jubilee clip. In addition, all right angles were to be reinforced with double taping. Any protrusions that were liable to significant movement was required to have disbondment i.e., bond break, tape applied to it to stop the external coating from stressing on expansion. Furthermore, all pipes were to be abraded, solvent wiped, and where necessary, primed in accordance with the Polyroof coatings manual. A flashing detail was also to be created with a weathering flange or seal.All outlets were inspected to ensure that they were functioning properly. Any outlets that were deemed unsuitable were replaced with new ones. The outlets were cleaned, prepared, and primed as necessary. The Protec system was then dressed into the outlets as far as was practical. The inspection and replacement of the outlets and the preparation of the Protec system helped to ensure that the drainage system functioned effectively.ConclusionThe refurbishment of the roof was completed within the client’s target timeframe and budget. Following a final inspection by Polyroof Technical Services, which highlighted quality workmanship of Tower Asphalt Ltd, the client received Polyroof’s trusted Accredited System Guarantee and now has the peace of mind the roof will be leak-free for decades to come.
Sponsored
Canterbury Cycle Shelter

Canterbury Cycle Shelter

Cyclepods Ltd

A Classic versatile bike shelter. Galvanised box section construction with a clear UV rated PET-G roof and optional sides. Can be easily configured to form compounds as well as add on extension units. Shelter manufactured from hot dipped steel Galvanised 50 x 50 box section to BSEN ISO1461 Transparent PET 4mm roof Optional Transparent PET 4mm sides Aluminium fixing straps Anti climb end panels No crawl under perimeters Angled roof BREEAM AND CODE FOR SUSTAINABLE HOMES COMPLIANT This cycle compound can help contribute towards gaining ENE8 Cycle storage credits when used in the appropriate situation

Showing 37-72 of 528

Feedback