Rhenofol CG and green roofing forms a key part of the roof design at Barking Riverside

Rhenofol CG and green roofing forms a key part of the roof design at Barking Riverside

AccuRoof

Green roofing forms a key part of roof design as part of a model for sustainable living in 21st century London. Barking Riverside is a joint venture project between Bellway Homes and the Homes & Community Agency. It is an element of the Mayor of London’s plan to build 10,800 new homes, retail, transport links and new town facilities in the Barking region of East London.
Sponsored
Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s flat-to-pitch conversion system, BritFrame, and lightweight metal roof tile, Slate 2000. The project, carried out by Jennings Roofing encompassed a total area of 500 square meters and aimed to improve the infrastructure of the existing roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. This case study highlights the successful implementation of Britmet's Slate 2000 roofing system and Britframe structural solution in a social housing project. The client, a new customer of Britmet, discovered the systems at the UK Construction Week (UKCW) exhibition. Impressed by the innovative design and features, the client expressed interest in utilising Britframe for a flat-to-pitch conversion project in their social housing development. The client is a housing association responsible for managing and maintaining a portfolio of social housing properties. They were seeking an effective solution to address various issues with one of their buildings, including an ageing roof with multiple repairs, inadequate insulation, and inefficient rainwater management. The objective was to enhance the building's aesthetics, improve water tightness, increase energy efficiency, and minimize future maintenance requirements. The initial meeting between the client and Britmet took place at the UKCW exhibition, where the client became acquainted with Britframe, a lightweight and versatile structural solution. Intrigued by its potential, the client arranged for an on-site visit to further assess the feasibility of utilising the Britframe and Slate 2000 roofing system for their project.Slate 2000 is a durable and aesthetically pleasing lightweight roofing material that offers long-term performance and weather resistance. It's stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of roofs and cladding. During the initial site visit, Britmet's team evaluated the existing roof condition, rainwater management system, and insulation levels. After careful assessment, they provided the client with a budget price estimate for the proposed project. The estimate included the cost of materials, labour, and necessary ancillary items. To streamline the project, the client signed a Project Assist agreement with Britmet. This allowed Britmet to obtain planning drawings and submit the necessary applications on behalf of the client. Additionally, Britmet provided structural calculations, design drawings, and rainwater calculations to ensure compliance with regulatory standards and best practices. The main objective of the project was to convert the existing flat roof to a pitched roof using Britframe and install Britmet's Slate 2000 roofing system. This conversion offered numerous advantages, including improved water tightness, increased insulation, and resolved rainwater management issues. Notably, the internal gutters, which had caused maintenance problems, were relocated externally as part of the new design.Beyond functionality, the new roofing system and structural solution significantly enhanced the building's aesthetic appeal. The modern design of Britframe, combined with the stylish appearance of Slate 2000, seamlessly integrated the property with its surroundings. The improved visual aesthetics added value to the social housing development. One of the key benefits of choosing Britmet's Slate 2000 and Britframe was the assurance of minimal maintenance requirements. Unlike the previous roof covering, which had undergone numerous repairs and reached the end of its life, the new system was designed to be durable and long-lasting. This eliminated the need for ongoing maintenance and reduced future costs for the housing association.Through the adoption of Britmet's Slate 2000 roofing system and Britframe structural solution, the social housing project achieved its objectives of enhanced aesthetics, improved water tightness, increased insulation, and efficient rainwater management. The collaboration between the client and Britmet, from the initial meeting at UKCW to the successful implementation of the project, demonstrated the value of innovative roofing and structural solutions in the social housing sector.
Sponsored
Bilco Roof Access Hatch Provides Safe Roof-top Access at Blair Castle

Bilco Roof Access Hatch Provides Safe Roof-top Access at Blair Castle

Bilco UK

Bilco UK's CS-50TB Roof Access Hatch provides the perfect solution for roof-top access at Blair Castle, Scotland. The Category A listed building is said to have been constructed in 1269 and has been extensively added to over the years. Maintaining such a historic monument is a massive task. The Atholl Estate employ an army of staff to ensure this iconic property is preserved for future generations. One of the many problems in looking after such a building is the fact that it was not designed with ease of access to the roof in mind.
Sponsored
University of Wales – Trinity St David’s, Swansea.

University of Wales – Trinity St David’s, Swansea.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light – flexi frames. Flexi heavy – flexi modular frames. Application: Smaller Air-handling units. Roof build-up: Inverted roof design. Diversitech supplied a number of their flat roof plant support frames to the University of Wales new SA1 development, Trinity St. David’s in Swansea. The mechanical contractor chose Flexi Support Systems to support a number of air-handling units, where our flexi light and heavy duty modular frames were required. The flexible nature of our systems combined with even load distribution through our non-penetrative feet, provides the simplest and most cost effective method of support.
Sponsored
Heron Tower, London

Heron Tower, London

FOAMGLAS®

FOAMGLAS® READY BOARD T4+Design Architects: Kohn, Pedersen, Fox Associates – KPF London, Marcus BlanesMain contractor: SkansaConstruction: 2011Application: Compact Roof - FOAMGLAS® Ready Board T4+Finish: Umicore VM ZincThe roof level 41 of the Heron Tower (with a height of 120m) is designed to the most exacting standards for sustainability and efficiency.The building received the BREEAM rating of 'Excellent', with FOAMGLAS® thermal insulation being part of a green and energy efficient building. The roof is composed with FOAMGLAS® READY BOARD insulation and Umicore VM Zinc roofing as a durable finish.FOAMGLAS® insulation has the ability to withstand high structural loads and has developed a special fixing system for metal roofing.Square metal fixing plates are inserted into the upper surface of the insulation and covered with a waterproofing and a separation sheet.This is the perfect system to fully support metal standing seam roofing which is screwed to the metal plates without thermal bridging between the metal roof sheet and the building structure.
Sponsored
Cupa r4 slates on show at welsh art gallery

Cupa r4 slates on show at welsh art gallery

Cupa Pizarras

A private art gallery in Betws Y Coed has been roofed using CUPA R4 natural Spanish slate, selected by the client and their contractor on the basis of appearance, performance and cost, as well as their ready availability through local stockists. Work on The Galeri was begun by the owner some three years ago, with locally based Willparr Roofing being tasked with sourcing and installing the thousands of new slates required to weather a structure featuring a dormer window, the valley junction to an existing pitch, and other challenging details.
Sponsored
Welsh Slate tops a sustainability exemplar

Welsh Slate tops a sustainability exemplar

Welsh Slate

Roofing slates from Welsh Slate feature on the Duchy of Cornwall’s Nansledan development. As work continues at Nansledan - the Duchy of Cornwall’s award-winning 218-hectare mixed-use urban extension to Newquay – Welsh slates are continuing to make their mark. Hundreds of Welsh Slate’s Penrhyn Heather Blues in two sizes – 500mm x 300mm and 400mm x 250mm - are being installed on the roofs, and as vertical slating on window bays and under-window panels, by a pair of specialist contractors for two of the scheme’s three housebuilder developers. H
Sponsored
Natural stone paving using pedestals - Douglas, Isle of Man

Natural stone paving using pedestals - Douglas, Isle of Man

Wallbarn Ltd

This was a large roof terrace on a private domestic project. The area was flooded and had needed to be re-laid with waterproofing and a significant fall constructed into the deck to allow the often considerable amounts of rainwater to escape the roof deck. The contractor asked Wallbarn for a suitable but cost effective solution so we recommended Wallbarn 9mm rubber supports along with levelling shims. The area was re-waterproofed in the inverted waterproofing method, the membrane being covered with rigid insulation boards and a loose laid geotextile fabric to act as a separation layer .
Sponsored
Roof Coating - Flat Roof Waterproofing, BBA Approved

Roof Coating - Flat Roof Waterproofing, BBA Approved

Liquasil Ltd

Liquasil Ultra PU is a BBA approved flat roof waterproofing membrane. Cold-applied, the system comprises an embedment coat, into which a chopped strand reinforcement mat is laid to provide exceptional strength. The mat dissolves and allows for hand-moulding around difficult details. Once cured, the Liquasil PU UV coat is applied to provide additional strength, durability & protection. The completed system comes with the unique Latent Defects Insurance Guarantee, which provides cover for Professional Design. Specify with 100% confidence. Made in the UK.
Sponsored
The Shmuseum

The Shmuseum

WestWood Liquid Technologies Limited

Specialist contractors, Cure Roofing Ltd. from Sheffield, installed a race track design using WestWood products inside his 1,000 sq. m car garage. The building, which was a former milking parlour on a farm outside of London, has undergone refurbishment to house Shmee’s ‘Shmeemobiles’
Sponsored
Durham University Gateway

Durham University Gateway

Polyroof Products Ltd

The Durham Gateway project is a major new development at the Durham University that houses a variety of departments. Although aesthetically stunning, the concept presented several challenging issues.The project was carried out to a BREEAM ‘Excellent’ Standard and as such only used components that had minimal environmental impact. Cold-applied liquid roofing membranes, such as those manufactured by Polyroof, have been recognised by BRE to help roofing elements achieve up to an A+ rating (depending on the roof construction).Part of the works involved the construction of three curved roof areas that required a high-performance and durable waterproofing system which was to be covered by a timber shingle system. The shingles were supported by over 1,170 steel stanchions – all of which were seamlessly waterproofed with the Protec System.The main contractors of the project, Laing O’Rourke, were able to achieve the visual impact they wanted with the peace of mind that the roof was protected by a totally seamless and highly durable waterproofing membrane.
Sponsored
an M-Tray®  Green Roof reaching the parts other green roofs cannot reach

an M-Tray® Green Roof reaching the parts other green roofs cannot reach

Wallbarn Ltd

This project had incredibly restricted access, where the client wanted a green roof on an existing bitumen rooftop overlooked by hotel rooms. The M-Trays® had to be transported on a trolley through the hotel kitchens. They were winched onto the roof itself using a genie lift and slotted into position in a matter of hours. Trying to construct a roll-out green roof was impossible, given the restricted access. Installation was fast and effective, taking only a day and giving an instant green roof. M-Tray® dramatically improved the view from the rooms and improved the guests’ experience.
Sponsored
Social Housing – Ashfield

Social Housing – Ashfield

Russell Roof Tiles

Russell Roof Tiles su.pplied 200,000 Highland roof tiles in Cottage Red for a reroof project
Sponsored
Degaflex Flat Roofing Repair

Degaflex Flat Roofing Repair

Degafloor Ltd

London GRP Roofing Ltd, specialists in fibreglass flat roofs and terraces, recently completed a Degaflex roofing installation using our high-performance system and gave their professional opinion.Stephen Knuckey, the Director of London GRP Roofing Ltd. posted on LinkedIn photos of their project along with a comment of ‘our "Degaflex overlay. Safe to say I am extremely pleased with the finish on this. Being a felt overlay and turning out this smooth, I’ll be looking forward to applying it directly to an OSB deck.’
Sponsored
Britmet Lightweight Roofing: The Ultimate Solution to the RAAC Concrete Crisis Case Study

Britmet Lightweight Roofing: The Ultimate Solution to the RAAC Concrete Crisis Case Study

Britmet Lightweight Roofing

The Royal Blackburn Hospital, located in Lancashire, England, was dubbed a “ticking time bomb” that could “collapse without warning” due to the failure of its existing reinforced autoclaved aerated concrete (RAAC) roof. This issue was part of a larger nationwide crisis, with 34 NHS buildings, including Blackpool Hospital, and thousands more schools, offices and more at risk of collapse due to the deterioration of RAAC structures. The estimated cost of repairs for these buildings loomed at over £1 billion. In the face of this urgent and challenging situation, The Royal Blackburn Hospital sought a solution to ensure the safety and integrity of its infrastructure.The Royal Blackburn Hospital's existing RAAC roof had reached a critical state of disrepair. The risk of a catastrophic collapse was real and imminent, posing a serious threat to patients, staff, and the hospital's ability to provide essential medical services. The financial burden of repairing or replacing such a roof was substantial, and the hospital needed an innovative, cost-effective, and expedient solution.The hospital administration and engineering team explored various alternatives to address the RAAC roof crisis. After careful evaluation, they opted for Britmet's Tactray 90 Structural Liner System as the best solution to mitigate the risk of a roof collapse. Tactray 90 offered the necessary structural reinforcement while ensuring long-term durability and stability. The installation could be completed with minimal disruption to hospital operations, a critical consideration given the hospital's 24/7 operation.Project Outcomes:Implementing Britmet's Tactray 90 Structural Liner System at The Royal Blackburn Hospital resulted in several significant benefits. The hospital's roof regained its structural integrity, mitigating the risk of collapse. The hospital saved a substantial amount by opting for the Tactray 90 system as it provided a weatherproof roof covering to minimise the impact of construction so that the hospital could resume full medical services quickly, ensuring continuity of patient care. Conclusion: The Royal Blackburn Hospital's adoption of Britmet's Tactray 90 Structural Liner System offered an innovative solution to a critical structural problem caused by the failure of the existing RAAC roof. This case study demonstrates that even in challenging situations involving aged infrastructure, cost-effective and efficient alternatives exist to safeguard structural integrity, ensure safety, and enable the continued provision of vital healthcare services. The success of this project serves as a model for other NHS facilities grappling with similar RAAC-related challenges, providing hope for the resolution of the wider national crisis.
Sponsored
Barony Campus

Barony Campus

Bauder Ltd

Barony CampusBauder Thermofol PVC single ply waterproofing system withBauderSOLAR FSynopsisBarony Campus is a new build project situated in Cumnock, Scotland. The campus will incorporate a range of primary schools, learning centres and academies within the area, and is the biggest capital project undertaken by East Ayrshire Council.Bauder Building BoardProject:Barony CampusLocation:Cumnock, ScotlandProject type:New buildRoof size:5,230m²Client:Sheppard RobsonMain contractor:Morrison ConstructionApproved contractors:EJ ParkerW.G. Walker & Co                             Q9 Cladding SolutionsThe specificationThe client required flat roof waterproofing as well as a sustainable energy source in the form of solar PV panels. Due to Part L regulations there was a requirement for a large PV array. Main contractors, Morrison Construction, bought into the risk-averse, zero-ballast, zero-penetration solution that the BauderSOLAR system offers. As Morrison Construction had not yet used this system, Bauder conducted a technical seminar to share the benefits of using BauderSOLAR in conjunction with a Bauder single ply membrane and to discuss the acoustic considerations for a building of this nature.The technical support and advantages of a single-source supplier resulted in a specification of a 176.80kWp BauderSOLAR PV system generating an estimated 157,800kWh per annum. The system proposed by Bauder ensured the solution was compliant in relation to the SAP calculations that had been carried out.Products appliedBauder THERMOFOL PVCThis single ply membrane is lightweight and has a high-grade virgin polymer formulation. The PVC formulation ensures it is resistant to chemicals and micro-organism attack making it well suited to receive a green roof.BauderPIR M 60This PIR insulation has aluminium foil facing on both sides and rebated edges to remove a thermal bridge. The matt black facing on both sides enables the board to be installed either way up. BauderSOLAR FThe lightweight, integrated system ensures that the integrity of the roof is upheld throughout the installation of the PV array. The panels are designed to create a 12º angle with modules delivering up to 455w per panel.Project challengesThe client had limited space for the storage of 544 solar panels and they could not be stored on the single ply roof. To overcome this, deliveries of the panels were coordinated with the roofing contractors finishing sections so that the panels could be raised, installed and welded as they arrived to site, mitigating the need for storage. Due to the reduced labour time of BauderSOLAR compared to ballasted systems, the site team managed to install the system quickly and efficiently, making back time lost due to weather delays and enabling the deadline to be met.The BauderSOLAR system is the lightest system on the market at 11.5kg/sqm. The system is also warrantied in combination with the roof membrane to ensure peace of mind is given to the client if any leaks or damage were to occur.System installedBauder Thermofol PVC single ply system1 Bauder THERMOFOL U15 FR1.5mm polyvinyl chloride membrane (PVC) reinforced with a pre-coated polyester cross-weaved matting for mechanically fixed installations. 2 BauderPIR M 60This efficient tissue-faced flatboard insulation has been specially developed for use within Bauder single ply systems. 3 BauderSYN DB-PE 100A blue, polyethylene air and vapour control layer. The product is installed by loose laying and suitable for Thermofol mechanically fastened and ballasted single ply systems.BauderSOLAR PV F SystemThis system provides a risk-free, zero penetration installation with a single source for integrated design of waterproofing and PV. Depending on the module selected, this system can weigh just 9-12.5kg/sqm, making it suitable for single ply applications. AdvocacyJordan from EJ Parker:“Our site team found the system very easy and quick to install. However, we found some challenges getting started due to the bad weather but once we finally began it was very straight-forward and fast to install. The technical help received from Chris and the team from design through to project completion was second to none.” 
Sponsored
Lords Cricket Ground

Lords Cricket Ground

Bauder Ltd

Lord's Cricket GroundBauder LiquiTEC Balcony and Walkway, LiquiBALKON SystemSynopsisLord's Cricket Ground is a famous cricket venue located in St John's Wood, London. There are various Bauder waterproofing systems installed throughout the venue but these images are from the Edrich Stairs on the third level.Bauder Building BoardProject:Lord's Cricket GroundProject type:RefurbishmentLocation:Basingstoke Waterproofing:LiquiTEC Balcony and Walkway systemRoof size:25m²Specifier:Rider Levett Bucknall LimitedApproved contractor:Higham Flat Roofing Ltd
Sponsored
Lakenheath Community Primary School

Lakenheath Community Primary School

Sika Sarnafil

After worrying roof leaks and subsequent damage were discovered at Lakenheath Community Primary School in Suffolk, an urgent refurbishment of some areas of the roof was required to keep the school open and in a good state of repair. Concertus chose the Sarnafil Plus refurbishment team for the project, as they could provide support every step of the way, making sure the refurbishment ran smoothly. From initial surveys and bespoke specification, to finding the right contractor for the job and supporting them on-site, the Sarnafil Plus package offered a complete solution for a fast, hassle free refurbishment.
Sponsored
The Hilton Garden Inn, Sunderland

The Hilton Garden Inn, Sunderland

Stone Cladding Systems

Architect: Redbox Design GroupMain Contractor: Tolent Construction Installer: Metcalfe Roofing & Building Services LtdStone: Cebecca LimestoneThe Sunderland Hilton Garden Inn, on the banks of the River Wear, is a 141 room hotel featuring MX curtain walling as well as Aztec 20mm Cebecca limestone Ventilated Rainscreen. Designed By Redbox the architects wanted a light and spacious building without the need for a heavy support system. The glass and limestone mix imparts this vision perfectly. Completed in 2016 The Aztec system was installed by Metcalf Roofing & Building.
Sponsored
Westminster Quarter development

Westminster Quarter development

Eclisse UK

ECLISSE are delighted to have been the supplier of choice for this prestigious development in the heart of historic London. The Westminster Quarter development comprises of 102 private luxury apartments, many with private outdoor space. Residents will also benefit from an exclusive gym, 24hr concierge service and landscaped courtyard and the roof terrace and roof lounge have stunning views of the Houses of Parliament and other iconic landmarks. Completion: 2017 Residential Units: 102 Construction Cost: £35.5m Architect: White Ink Architects Client: Taylor Wimpey Contractor: McAleer & Rushe
Sponsored
Eastcheap, City of London – iDecking

Eastcheap, City of London – iDecking

Wallbarn Ltd

Project involved decking a 350m2 the rooftop of a commercial block in the heart of the city. The owners wanted to create a roof terrace for staff. The customer chose the iDecking complete solution for it's superior look. Installation was carried out on an inverted roof. The contractor laid down a double layer of our aluminium frame onto Wallbarn MegaPad pedestals which provide a stable footing for the framework. The composite Moor Oak boards were stamped into position. Installers were able to achieve a great finish by accurately cutting the boards to fit neatly to edges and corners.
Sponsored
Dungannon Council Offices

Dungannon Council Offices

Polyroof Products Ltd

The roofs of The Dungannon & South Tyrone Borough Council offices had fallen into a poor condition and a large amount of standing water was threatening to leak into the offices below. With the office roof areas in such a poor state, the council turned to Polyroof to refurbish nearly 1,000 square metres of roof, split into 13 areas, before they fell into a further state of disrepair. DTL Construction, a local Polyroof Approved Contractor, were tasked with installing the Protec System, removing the issue of standing water and giving the roof a long service life, whilst giving the council peace of mind that leaks would not pose an issue in future.The standing water was cleared before the existing roof materials were stripped back in order to install the new system. This allowed a new warm-roof system to be installed, along with new cut-to-falls insulation. Polyroof’s Protec Cut-to-Falls insulation is an innovative two-layer system which doesn’t only improve thermal performance, it also directs standing water away from the roof.Following this, the BBA-approved Protec system was used to seamlessly waterproof the entirety of the office roofs. The system, once inspected by Polyropof’s Technical Services team, was issued with a 20-year guarantee, so the client could now have reassurance their roof would last for decades to come.
Sponsored
Worthing Pools

Worthing Pools

Fixfast Ltd

The architects WilkinsonEyre were appointed to design this stunning swimming pool for the Worthing Borough Council following a RIBA competitor.Located adjacent to the existing Aquarena on the Worthing seafront, the Splashpoint Centre's design incorporates flexible space for all types of leisure activity.Main contractor Morgan Sindall looked to Kingsley Specialist Roofing for all the exterior cladding and roofing - with our versatile DuraMet hard metal system being used to clad this stunning landmark building. Challenges were met and solved with ease and the project completed to the full satisfaction of the client."We couldn't have been more pleased - all the deliveries were on time and the fasteners were great, excellent service!"Daniel Madell - Procurement Manager at Kingsley Specialist Roofing Ltd
Sponsored
Blackfordby St Margaret’s Primary School

Blackfordby St Margaret’s Primary School

Polyroof Products Ltd

The building that would be the St Margaret’s Primary School, officially opened by Robert Leitch the local parish vicar in 1889 provided education to children up to fourteen. The school underwent many changes in structure throughout its over 100-year existence continuing to provide the high level of teaching it always held. In 2012 it underwent a further change in the form of a huge modernisation project that would extend the school and allow more students to be taken. Unfortunately, leaks were reported on the older parts of the building and despite localised repairs were not ultimately solving the problem.After reports of leaks it was imperative that the roofs in question were inspected to find where the issues were originating, in action to this a site survey was undertaken. The survey highlighted the original build-up consisted of an asphalt on a timber deck, this original system was in a aged condition. It was also shown that standing water and vegetarian had developed on the roof. In order to protect the building from further leaking it was determined that the roof would benefit greatly from the installation of a high-performance waterproofing system.Along with waterproofing improvements, there would also be improvements made to the falls which would reduce the amount of standing water present on the roof.Waterproofing would not be the only recommendation; the roof was also to receive a full thermal upgrade which would further provide the benefit of increase fuel bills and less energy consumption for the school.Taking into consideration all these points, the Polyroof Technical team began creating a bespoke specification that would provide the details needed to make these recommendations a reality. The Polyroof Approved contractor Thomas Cassie & Sons was specifically chosen to undertake this project due to their experience in liquid roofing systems. With a specification and approved contractor ready the project could officially commence.
Sponsored
Barrel roof, Peckham

Barrel roof, Peckham

Intelligent Membranes

This Awkward Passivhaus design barrel roof made airtight with ease with Spray applied Airtight vapour control membrane Passive Purple
Sponsored
Bitumen Case Study: Whitburn Partnership Centre

Bitumen Case Study: Whitburn Partnership Centre

Bauder Ltd

Whitburn Partnership Centre was designed by Project Architects, Matthew Fair, Neil Forrester and Jamie Bateman at Smith Scott Mullan Associates for West Lothian Council. The design of the contemporary £4M building restores the historic Whitburn Burgh Hall original façade as it is one of the towns most renowned buildings and incorporates a new-build two-storey extension.Located in the centre of Whitburn, this building is a community hub that embraces the West Lothian Council’s model of bringing together services that benefit local communities whilst delivering financial efficiencies through the decrease of council buildings. This building facilitates a library, community halls, museum and customer information service office, making it an important community resource. Project:Whitburn Partnership CentreProject type:New buildLocation:West Lothian, Scotland,Waterproofing:Bauder Total Roof System (BTRS)Roof size: 525m2Energy generated from PV array: 10.35kWp Specifier: Smith Scott Mullan AssociatesMain Contractor: Maxi ConstructionApproved contractor: ProCladd (Scotland) LimitedSolar PV installer: Intelligent Electrical SolutionsThe specificationTo support the West Lothian Council's sustainability objectives of achieving high energy efficiency, it was our responsibility to specify a waterproofing system and provide a solution for natural energy generation. The bituminous Bauder Total Roof System (BTRS) was chosen for this project as it features membranes that can withstand impact and tearing, as well as thermal insulation that met the required U-value of 0.15 W/m²K. This waterproofing system is verified by the BBA and offers a service life in excess of 35 years.The BauderSOLAR system was also specified, as it incorporates photovoltaic arrays for natural energy generation. The photovoltaic mounting system is attached to the roof without penetration of waterproofing or the deck, safeguarding the integrity of the waterproofing to fulfil its full-service life.Project challengesThe Architect’s design incorporated unusually high parapet upstands, which posed a challenge for installers. Area technical manager for Bauder, Christopher Langton, attended design meetings with the Architects and Main Contractor to discuss the best solution for installation. A mutual agreement was made for the underlayer to be mechanically fixed to prevent any slippage of the capping sheet membrane. Due to the height of the upstand, non-combustible insulation BauderROCK was incorporated into the design at these details.The installation of BauderSOLAR F uses prefabricated bituminous BauderK5K membrane sleeves to slip over the mounting plates and welded into position, anchoring the plates to the surface of the Bauder waterproofing system. Approved BauderSOLAR installers, Intelligent Electrical Solutions, installed the BauderSOLAR system, collaborating with ProCladd, approved contractor for the waterproofing installation, and other trades during the roof installation.There is a junction where the flat roof meets the original slate roof of the adjacent building, this detail fell under the torch free zone that hot air welding techniques are used to install the membranes within these areas.The resultInstallation of the Bauder waterproofing system may only be carried out by trained and certified operatives approved by Bauder. A project pre-start meeting was held by Bauder site technician, Duncan Hastings, and area technical manager, Christopher Langton inviting the Site Manager from Procladd and their Bauder badged operatives. During this meeting, they discussed the installation of the project, and identified the areas that required torch-free and torch-safe detailing. They also discussed how the project was going to be delivered in co-ordination with other trades working on the site at the same time, for example cladding and lead that was installed atop the waterproofing upstand details.Weekly site-inspections were carried out by Bauder site technician, Duncan Hastings during the project. Visiting the site frequently meant that Duncan could provide consistent support to the installers and answer any questions they may have had directly. It also meant that the quality of the roof installation was being monitored regularly to ensure it would be to a high standard, achieving the comprehensive guarantee.The approach taken to deliver this project on time and to budget was through meticulous planning and working to tight time frames. The organisation of the delivery of Bauder products to site had to be in line with the schedule to ensure that the site was ready to receive a delivery. With the project located in the busy centre of Whitburn next to a cross junction with traffic lights. This meant that timed delivery of products to site was required in addition to prebooked off-loading by pump truck and tail lift or by telehandler.Health, safety and environment was managed during the planning, design and installation of this project by advising that all installers follow the advice shown in the “Responsible Specification Checklist” produced by the National Federation of Roofing Contractors.In accordance with the Workplace (Health, Safety and Welfare) Regulations 1992, roof edge protection in the form of scaffolding was installed during installation. The project’s perimeters were surrounded by Heras fencing to isolate the construction site from the public. All scaffolds that were on the elevation next to the public had toe boarding and safety mesh where required.As standard, there was a one-hour Firewatch after the Bauder membranes have been installed using a gas torch. This was carried out by Procladd operatives each day when they were working on the project to ensure the welfare of the workforce, and the safety of other trades and that of the building. The 19kg gas cylinders were used on this project as they are easily transportable on the roof area. At the end of each working day, the cylinders were stored in a locked and designated gas storage unit on site.System installedBauder Total Roof System (BTRS)1 BauderK5KElastomeric bitumen torch-on capping sheet in charcoal grey. This product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUOA self-adhesive, elastomer bitumen underlayer. This product features distinctive technology for lap sealing.3 BauderPIR FA-TE flatboard insulationA rigid polyurethane foam board faced on both sides with aluminium foil.4 BauderTHERM DS 1 DUOA self-adhesive, elastomer bitumen air & vapour control layer.
Sponsored
The Roof Gardens, Manchester

The Roof Gardens, Manchester

Zeroflame

- Location: The Roof Gardens, Apartments, Manchester - Developer: DeTrafford Estates Group - Challenge: The previous intumescent varnish on external timber panelling on walls and decking broke down after just 12 months. - Solution: Remove existing coating, apply Zeroflame Treatment - Result: Original beauty of the decking and timber paneling on the walls is resorted, the timber is compliant with building regs and the property owner is happy.
Sponsored
Walsall - Metal Roof Coating

Walsall - Metal Roof Coating

Liquasil Ltd

This 6,500m² metal roof at Axcess 10 Business Park, Walsall was soiled, delaminating and affected by spot corrosion in numerous areas, which would have eventually spread and perforated the sheets if a treatment was not applied.Bosworth Cladding Services Ltd ensured that the roof was cleaned and the peeling factory finish was removed with a 4000 psi pressure washer. The laps were ground back and primed as necessary.The whole roof area was then coated with Liquasil's single-coat BBA Certified Metalseal 20 system to provide a 20 year product guarantee upon completion.The completed installation left a metal roof on its way to failure looking brand new, with a protective silicone coating that will last 20 years.For more information, or to make an enquiry, contact Liquasil on 0121 709 5352.
Sponsored
Uni of Reading Library, Berkshire

Uni of Reading Library, Berkshire

Sika Limited

A £40 million investment, 13 roof areas, eight different roof levels, and a steady stream of visiting students to keep happy throughout – the University of Reading (UoR) Library’s complete refurbishment was a large and challenging project spanning three years.Originally opened in 1964 and later extended in 1985, the library’s internal and external revamp was designed to increase space, improve facilities for individual study, provide better access and security across the building, and improve energy efficiency.In addition to a new-build Café extension, a new entrance canopy, a new ground-to-roof level lift and stair core extension – each featuring a new flat roof area – there were also 10 existing flat roof areas refurbished, coupled with the replacement of windows and re-cladding of the building’s exterior.Following a competitive tender based on an outline specification, Owlsworth Roofing, Sika Sarnafil single ply flat roofing specialists, impressed with the level of detail included in their quote and were awarded the contract by main contractor ISG.Roofing:Sika® Sarnafil G410-12 ELF.Sika® Sarnafi G410-12 EL.Sarnavap®-5000E SA.Sarnavap® HD SA.Primer 600.Sikatherm® PIR Insulation and Sarnacol®-2162.
Sponsored
Weavers Quay and Flour Building, Manchester

Weavers Quay and Flour Building, Manchester

Taylor Maxwell

Weavers Quay and the Flour Building are two projects that form part of the Manchester City Council strategy managed by the Manchester Life Development company. Completed in 2019, the £28m development was designed by Buttress Architects and managed by main contractors Graham Construction. The building’s facade was completed using the Corium brick cladding system, installed by Range Roofing.
Sponsored
Rusty Barn roof

Rusty Barn roof

Powdertech (Corby) Ltd

Using materials, shades and textures that work in harmony with rural surroundings is always an important consideration for designers and planners. In Hertfordshire an ancient barn has recently been converted to provide additional accommodation for the nearby house.The new roof of the C16th barn was constructed with Cadisch Welltec perforated profiled aluminium panels over a waterproof membrane. Visible roof lights on such an ancient barn were not permitted but some light is able to penetrate through unobtrusive roof lights which are entirely covered by the perforated Welltec. The outline of the windows can just be made out in the photograph.The corrugated effect of the Welltec already lent a rustic charm to the roof and the owners needed a coating for the aluminium that would both protect the roof and also give the appearance of an old building.Taking inspiration from natural elements, EvolutionTM powder coatings allow architects and designers to achieve the look they need, together with using the most appropriate materials for the job and satisfying planning requirements on a local level.  The panels and ridge cappings totalling over 200 square metres, were pre-treated in a chrome-free system and powder coated in EvolutionTM ‘Peat fire’ at Powdertech’s Corby plant, before being delivered to site for installation. Peat fire is an earthy shade, instantly giving an aged look to the roof. It is a shade that one might expect on a weathered ‘tin roof’ – but in this case the metal stands the Evolution™ system.”  BenefitsA wide range of effects to reflect the patinas that occur naturally on metalsExcellent visual and tactile detailHigh performance weather resistanceGood edge coverageAll powders are Qualicoat 1Leaves no residue or stainTwenty-five year guarantee.
Sponsored
London Dock Block F, London

London Dock Block F, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley GroupLondon Dock Block F is situated in the heart of Wapping, London, with a magnificent choreographed central water feature and the finest selection of high-quality new homes.The building, which will provide a total of 360 new apartments, is split into blocks at different heights to a maximum of 16 storeys, including communal roof gardens, courtyards and green roofs.The OBEX Class B Interface Sealing System and the Class A1 Breather Membrane System were specified in order to achieve full regulatory compliance and meet the correct performance standards.Quality Apartments: 360
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
Asbestos Roof & Cladding Refurbishment Coating

Asbestos Roof & Cladding Refurbishment Coating

Liquasil Ltd

The finish to the asbestos roof and asbestos cladding on this property was faded and the roof leaked in several places, along with the gutter. Liquasil's silicone roof coating, Asbestoseal, was chosen to seal the roof and dramatically improve the aesthetic appearance using specially made RAL colours to the match the original finishes. The asbestos cement gutter was also lined with the Liquasil liquid gutter liner to form a permanent, bonded solution.
Sponsored
Byker Wall

Byker Wall

Bauder Ltd

Byker WallBauder Total Roof System (BTRS)SynopsisAs part of the £26 million refurbishment of this Grade II listed residential estate, which features a continuous block of over 600 properties, work was performed to not only repair the existing roof but to bring Byker Wall to the forefront of modernday roofing technology with the installation of a state-of-the-art photovoltaic system.Bauder Building BoardProject:Byker WallLocation:Newcastle upon TyneRoof Area:4,500m²Specifier:Your Homes NewcastleMain Contractor:KeepmoatApproved Contractor:Hodgson SayersProducts appliedBauder Total Roof SystemAn integrated bituminous system with a life expectancy in excess of 40 years as stated in BBA cert,BauderSOLARPhotovoltaic system was installed with 132 PV modules being fitted.The resultBefore replacing the existing waterproofing the team needed to convert the pitched metal roof back to its original flat roof status by removing the profiled metal sheets and timber framework. Subsequently, Hodgson Sayers then installed 4,500m² of Bauder’s top quality reinforced bitumen system, which included a highly efficient 120 mm PIR insulation. Four of the ten housing blocks were fitted with 132 PV Modules, enabling Byker Wall to generate at least 39.6 Megawatt Hours of solar power each year. All work was completed on time and to budget in December 2015, much to the delight of all project stakeholders.System installedBauder Total Roof System (BTRS)1 Bauder K5KA heavy duty, torch-applied SBS elastomeric bitumen capping sheet, featuring a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture. The mineral finish provides protection against UV degradation.2 BauderTEC KSA DUO 35A technically advanced self-adhesive SBS elastomeric bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures.3 BauderPIR FA-TEAn efficient PIR insulation board with aluminium foil facing on both sides. The top facing features a printed grid pattern to aid site cutting. It is lightweight and has zero ozone depletion potential.4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.AdvocacyKevin Scott, Property Services Manager at Your Homes Newcastle:“Byker Wall is an exceptional example of how modern roofing can revive a historical landmark. Bauder and Hodgson Sayers delivered a roofing solution of the highest quality giving us total confidence in the future performance of the roof.”
Sponsored
Metal roof coating project in Leicestershire

Metal roof coating project in Leicestershire

Liquasil Ltd

Failing factory finishes and cut edge corrosion were present across the entire roof and Liquasil's Metalseal metal roof coating system was specified as the most appropriate solution. The roof was cleaned and all failing finishes and rust was removed as far as reasonably practicable. The roof was then coated. In this case, two colours were employed. Liquasil is the only company able to produce silicone coatings in any RAL colour.