NBS Source
I'm a manufacturer

"roofing contractors"

5,859 results found

Sort by:

Showing 1-36 of 1103

Sponsored
Social Housing – Oxfordshire

Social Housing – Oxfordshire

Russell Roof Tiles

Russell Roof Tiles worked closely with the roofing contractor to supply tiles for a rural exemption scheme.
Sponsored
Del Carmen Takes Home Roof Slating Award

Del Carmen Takes Home Roof Slating Award

Spanish Slate Quarries UK Ltd

A project utilising our Del Carmen Spanish Slate took home the award for Roof Slating at this year’s UK Roofing Awards, hosted by the National Federation of Roofing Contractors (NFRC). The NFRC is the largest and most influential roofing trade association in the UK, promoting both quality products and contractors, while ensuring that its members are at the forefront of all roofing developments. Contour Roofing (Essex) was given the task of providing the roof coverings to St Joseph’s College, a Grade II listed building (1866) on the fringes of Mill Hill Village.
Sponsored
Replacing the 55,000m2 Roof Area at Euston Station

Replacing the 55,000m2 Roof Area at Euston Station

Iko Ireland

The 55,000m2 roof area of one of London's busiest train stations was in an advanced stage of deterioration. IKO PLC liaised with roofing contractors Weatherproofing Advisors to refine the specification. Working with the public, and in a commuter environment, Weatherproofing Advisors had the added challenge of completing the project through one of the worst winters in 50+ years.
Sponsored
Conservation-Area School Receives New Cost-Effective Roof

Conservation-Area School Receives New Cost-Effective Roof

Iko Ireland

City of Edinburgh Council required a new roof for one of its local authority primary schools, Parsons Green. Built in 1961, the school had a copper pitched roof which was in need of replacement, and an upgrade to the insulation of the building was also required. The council also required a 20 year single point insurance-backed guarantee and a reputable installing roof contractor.
Sponsored
School Receives New Single Layered Roofing System

School Receives New Single Layered Roofing System

Iko Ireland

The roof on Bede Primary School and Community Centre in Gateshead was in great need of repair. Installing roofing contractors Hodgson and Allon liaised with IKO to refine the specification to meet the client’s requirements. This included a full strip and re-cover with a flame free system to carry a 20 year guarantee. IKO chose an IKO Mach One single layer bituminous system incorporating a site specific cut-to-fall system. This project was a complex roof replacement system with multi-trades required for specialist operations.
Sponsored
Protan Vacuum Roof System at Butlins Splashworld, Skegness

Protan Vacuum Roof System at Butlins Splashworld, Skegness

Protan (UK) Ltd

Over 1,200m² of Protan SE 1.2mm PVC single-ply membrane was installed in the Protan Vacuum roof system at Butlins Splashworld, Skegness. The roof system required no mechanical restraint or adhesives (except for around the roof perimeter and penetrations), as it relies upon the wind to keep the membrane in place with the help of Protan vacuum vents installed at locations designed by Protan's Technical Services Department. William Bird of Protan partner roofing contractor, Roofdec Ltd, commented, "Protan's vacuum roof system is quicker to install than conventional fully-adhered or mechanically-fixed systems."
Sponsored
Protan Prefabricated Roof System at Wilmslow Garden Centre, Cheshire

Protan Prefabricated Roof System at Wilmslow Garden Centre, Cheshire

Protan (UK) Ltd

Over 2,300m² of Protan SE 1.2mm PVC single-ply membrane was installed in the Protan Prefabricated roof system at Wilmslow Garden Centre, Cheshire. The main driver behind the installation of this roof system was the time constraint placed upon the roofing contractor for installation of the roof. Using Protan's unique ProPlan CAD software, a bespoke solution was created for the project - prefabricated rolls of membrane measuring 3.96x8.00m were manufactured to span the barrels of the roof. This minimised on-site waste and reduced on-site hot air welding by 1,080 linear metres.
Sponsored
Green Roof - The Liner Apartments Falmouth

Green Roof - The Liner Apartments Falmouth

Sika Limited

Luxury coastal apartments able to withstand the elements with Sika roofing system. Owing to its beautiful coastal location, The Liner, a nautical-inspired £35 m residential new-build in Falmouth, presented a compelling roofing challenge. Exeter-based roofing contractor, Progressive Systems, assisted by Sika, took on the task, installing a roof to withstand the harsh seaside conditions with an immaculate finish.Green roof composed of:Sika® Sarnafil® G410 18EL PVC Single Ply Waterproofing Membrane.Sarnavap® 5000E SA Vapour Control Layer.Sarnafil® Primer 610.Sarnatherm® ‘G’ insulation.Sikalastic® 625.Sarnafil® G445-13 PVC Protection Sheet.Sika® Green Roof System.
Sponsored
A blue roof for a green city

A blue roof for a green city

RENOLIT Cramlington Ltd

Blue-green roof solution on a London dwellingCHALLENGE8a Belmont Street comprises two unique semi-detached dwellings, which have been constructed in Chalk Farm, London by a private developer Maygrove Projects in collaboration with Martin Evans Architects. The total roof area covers only 55.03m² but features an unusual roof design; it is divided into five sections comprising two glazed roofs and three blue roof areas. For this warm roof construction, an alternative durable waterproofing was sought, suitable for blue roof application. SOLUTION Approved Roofing Contractor Gribben Solar Roofing provided an alternative blue roof solution to the original design proposed by the project architects, fully complying with their needs. Together with partner and single ply manufacturer RENOLIT they proposed a waterproofing solution for the blue roof in the form of a fully bonded RENOLIT ALKORPLAN L35A77 membrane, to be combined with the RENOLIT ALKORPLAN Green roof system. So, actually, a blue-green roof!
Sponsored
Data Centre - Green Roof

Data Centre - Green Roof

MOY

This project involved the construction of a Data Centre just outside Dublin, with a focus on incorporating a green roof. MOY collaborated with the client, their design team, the main contractor, and the roofing installer to execute the roof installation for an extensive green roof. The green roof utilized MOY's Paraflex FM Global approved Warm Roof System, featuring Paratherm T 120mm insulation board and an anti-root cap sheet. The final touch included the installation of a sedum blanket grown in Ireland, containing native Irish sedum species registered in the national biodiversity database, creating a durable and vibrant living roof.
Sponsored
St Martins goes back to the future with Welsh Slate

St Martins goes back to the future with Welsh Slate

Welsh Slate

Welsh Slate has supplied roofing slates from both its Penrhyn and Ffestiniog quarries to provide a like-for-like replacement for an old 19th century roof at London’s famous St Martin-in-the-Fields church complex through roofing contractors NDM Leadsheet Specialists Ltd working for main contractor Costain Ltd.
Sponsored
Oasis Academy, London

Oasis Academy, London

Alumasc Roofing

Brand New Oasis Academy, Silvertown Leads Education Facilities by a Mile with Garden Roof Spaces, and Rooftop Sports Pitch In the heart of what is now the Royal Docklands, a former industrial zone south of Royal Victoria Dock lies a brand new carefully considered Academy. Set to serve 600 students in this emerging community, the “superblock” thrusts modern educational facilities well into the 21st century. Despite the constrained site, the building design harmoniously incorporates vantage points from outdoor social spaces at varying levels.There’s no need to worry about a gravelly all weather pitch causing havoc at your hockey match. There’s a state-of-the-art full size Multi-Use Games Area, lush planted external roof spaces, a double height sports hall, and main hall/performance area making up the core of the building inside.CLIENT BRIEF AND DESIGNRenowned in their field, regeneration experts Morgan Sindall required a single sourced end-to-end roofing solution that could deliver a full system specification underpinned by a 35-year system warranty, installation expertise and site management.Understanding the Architect’s vision at award winning Rivington Street Studio to create a transformative educational haven and maximise the potential of the outdoor roof areas helped the Alumasc Roofing team bring this roof to life.PARTNERSHIPWorking with the project teams across Morgan Sindall, Rivington Street Studio and Fenland Flat Roofing pushing the boundaries and setting the standard for the future of the built environment in the Education sector.Tim Mott, Senior Design Manager, Morgan Sindall, “Brian and the Alumasc team have been on-site with additional safety constraints and delivered high-quality regular progress reporting to achieve the deadlines for the students to move in next year and really put these fantastic facilities to use.”Brian Cottington, New Build Regional Manager - South East & London, “The original specification included warm roof build ups which utilised tapered insulation, however this was subsequently adapted and working closely together with the Architect, Morgan Sindall and Fenland Flat Roofing we implemented a universal standard build up using an inverted system, with less complexity whilst achieving the high system performance and BRoof (t4).”Richard Trew, Associate, Rivington Street Studio, “The garden roof areas and outdoor space bring this building to life and against the industrial backdrop create a nurturing school environment. It was great working with the Alumasc team solving problems and overcoming design challenges along the way.”Chris Preston, Estimator, Fenland Flat Roofing, “Working closely with the local Alumasc Roofing Site Technicians and engaging in extensive discussions agreeing the final system requirements meant the installation process ran smoothly.”ENVIRONMENTALLY FOCUSSED SOLUTIONThe high performance Hydrotech inverted roof is a special formulation of refined asphalts and synthetic rubbers with 30% recycled content. Installing insulation with exceptional thermal properties including 300mm extruded polystyrene insulation and 56mm inverted upstand insulation effectively reduces heat loss.SAFETY PERFORMANCEThe application is a one-component, hot-applied, fully reinforced, flexible, self-healing hot melt monolithic membrane, applied in a liquid state to the substrate giving a 100% absolute and seamless bond.The Academy has a 35-year warranty for the works and has a fire classification of BRoof (t4) in accordance with BS EN 13501-5.ABOUTThe Oasis Academy is set to open its doors February 2022. Images courtesy of Rivington Street StudioCompletion: Autumn 2021Main Contractor: Morgan SindallAlumasc Registered Roofing Contractor: Fenland Flat RoofingArchitect: Rivington Street Studio
Sponsored
Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Liquasil Ltd

Another example of the BBA Approved asbestos roof coating system, Asbestsoeal from Liquasil Ltd. The asbestos cement roof was first cleaned using a closed box pressure washer. All waste was filtered and disposed of by a licensed asbestos disposal contractor. Metal fixings were treated with Liquasil SWT Corrosion Primer and then sealed, along with small cracks and holes, with Non-Sag Sealer before the roof was coated with Asbestoseal 20. The project included GRP rooflight replacement and new ridge detail and flashings.
Sponsored
Asbestos Roof Coating - Norwich

Asbestos Roof Coating - Norwich

Liquasil Ltd

This asbestos cement roof in Norwich was soiled with moss and lichen covering the surface and had leaks in several places. Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating was specified to extend the life of the roof and provide an aesthetically pleasing finish. The Contractor, ID Asbestos Ltd, carried out the works safely and efficiently.After being steam cleaned, the metal fixings were treated with our SWT Corrosion Primer and all fixings and cracks were sealer with Non-Sag Sealer. The whole roof was then coated with Asbestoseal 20 to provide a sleek new finish to the old asbestos sheets.Liquasil's Latent Defects Insurance Guarantee was provided upon completion.
Sponsored
Social Housing – Leicester

Social Housing – Leicester

Russell Roof Tiles

Russell Roof Tiles supplied social new build contractor Robert Woodhead Ltd with Grampian tiles in Slate Grey for a ground-breaking project by Leicester City Council to build hundreds of affordable homes for families across the city.
Sponsored
Fast Liquid Waterproofing Solution for Flat Roofs

Fast Liquid Waterproofing Solution for Flat Roofs

Iko Ireland

IKOpro Acrylic Roof Coat has been used to provide a quick (taking only 4 days to complete) and seamless waterproof solution to a leaking roof at Bellman’s Auctioneers & Valuers in West Sussex. Contracts Manager for M Holmes Construction (contractor) admits that it was much less labour intensive than traditional roof refurbishments. He said, “The beauty of this system is that you don’t have to re deck the roof, unlike some alternative liquid systems. So this means you save one day of labour, typically four men on a job this size, plus material costs.”
Sponsored
Southern Water Otterbourne

Southern Water Otterbourne

Polyroof Products Ltd

Working with Williams Roofing Contractors Ltd of Eastleigh, Hampshire, the winning project involved the refurbishment of a large water treatment plant that imposed stringent environmental and performance requirements.The outstanding workmanship and attention to detail by the Polyroof approved contractor during this large scale installation allowed this project to really stand out from the crowd. The below is a case study for this LRWA award-winning project, highlighting the many challenges and how they were overcome through innovation, workmanship and product choice.The SolutionFollowing a survey of the roof area conducted by Williams Roofing and Polyroof Technical Services, a detailed report was carried out after which a bespoke specification was produced and handed to the client. This document detailed a comprehensive set of recommendations for solving the issues that had arisen due to the aged condition of the roof coverings.The client, satisfied that the solution proposed would provide the lasting peace of mind they were looking for, awarded the contract to Williams Roofing Contractors Ltd to install the Polyroof Protec System.There were many challenges on this project as this was a live ‘Clean Water’ environment site, so all Williams Roofing Contractor staff on the project had to have the EUSR National Water Hygiene Cards and be fully inducted by Southern Water’s high standards. Working within these type of environments brings additional Health & Safety implications as the National Water Hygiene scheme is in place to ensure the protection of public health and promote safe drinking water practices. Further risks had to be considered and covered including the risk of working over open water areas with additional buoyancy aids on site to reduce the risks as described under CDM regulations.Williams Roofing Contractors Ltd had to be especially vigilant providing additional protection to ensure that no potential contamination or spills caused any contaminants to the clean water processes/water courses and environment with additional spill kits on hand. Due to the varying conditions of the roof construction(s)/substrates the preparation had to be thought through thoroughly. Certain roof areas needed to be scarified which would have caused reverberations through the roof/concrete deck. This would have possibly created contaminants by spooling of concrete/debris/dust to within the MF Compound Water Lanes/Tanks.
Sponsored
Green roof on Starbucks cafe

Green roof on Starbucks cafe

Wallbarn Ltd

This project involved a brand new Starbucks drive-thru being built in West London where the customer wanted the overlooked rooftop to be green. The customer was able to give the basic dimensions to our team and describe how they wanted the roof laid out. We then calculated the exact quantity of units needed with our inhouse software and gave delivery and installation guidance to the contractor and end client. Wallbarn also supplied the materials for the semi-extensive border including geotextile fleece, drainage board and our specially-developed substrate for a comprehensive green roof solution,
Sponsored
University of York Student Residences

University of York Student Residences

Alumasc Roofing

Heslington East Campus Student Residences: Sustainable and Efficient Expansion Alongside the preservation of listed buildings, the University of York is investing in a flagship £130m development for students that promotes wellbeing, community, and sustainability. The initial phase sees 16 brand new student accommodation blocks and 2 communal hub buildings providing flexible social spaces. Surrounded by stunning lake views and natural habitats, the buildings are part of a huge initiative to expand the student accommodation offering.GOALSArchitects Sheppard Robson alongside Graham Construction sought to futureproof accommodation by incorporating multi-use buildings, including catering outlets and social hubs. Key to the brief was using the latest in safety, energy efficiency, longevity, and warranty credentials. Graham Construction’s use of modular external sandwich panels, prefabricated steel bathroom pods, and pre-assembled services distribution racks used Modern Methods of Construction with off-site construction techniques.CHALLENGESThe major challenge was to specify a roofing system that could keep up with the pace of the build, given the typical building was constructed from start to finish in circa 14 weeks.The roof deck comprised of precast concrete slabs which facilitated the works programme for speed of construction and consistency in build quality.Alumasc’s challenge was to find not only a waterproofing solution that was able to keep up with such speed of construction but also to meet a truly sustainable life cycle equalling the lifetime of the building.A key consideration in the design was the roofing materials’ thermal properties. To meet the u-value target of 0.15, Alumasc’s XPS Plus insulation was specified, providing a single layer of 175mm, which reduced the height of the overall build-up when compared traditional XPS.SOLUTIONHydrotech 6125 Waterproofing System / Derbigum Hybrid Upstands For over half a century Hydrotech Monolithic Membrane has been successfully used by architects and specifiers, ensuring some of the world’s most prestigious buildings and structures are kept watertight. With no product failures in over 50 years and guaranteed waterproofing integrity for the lifetime of the structure, Hydrotech offers a total life cycle solution for the building.Hydrotech was specified on the main roof areas for this project as it easily meets individual requirements of the buildings. In addition, the system is designed to last the lifetime of the building or structure to which it is applied, giving long-term waterproofing integrity and no future replacement costs.Applied in a hot liquid state to the deck, and including a polyester reinforcement, the bond of Hydrotech MM6125 is 100% absolute. There is no risk of water tracking below the membrane and because it is monolithic, no possibility of lap failure.DERBIGUM WATERPROOFINGDerbigum sustainable roof system was selected for the upstand areas. This hybrid solution was developed to improve the thermal efficiency in all areas to mitigate against cold-bridging with minimal insulant thickness. Derbigum bituminous membranes are high-performance waterproofing systems offering extended warranties and the highest levels of project support. The upstand zones benefited from Derbigum Mineral which is a mineral surfaced composite reinforced membrane.ROOFTOP MANAGEMENT STRATEGYIn addition to the waterproofing solution the buildings benefit from the full Alumasc rooftop management service. This included the design and supply of safety systems, accessories, and over 20 AOV smoke hatches meeting all British and European standards.Specific safe zones were designed by Alumasc Roof-Pro and positioned around all roofs for safe access. Purpose made clips for installing lightning conductor tape without roof penetration were also provided. All rooftop accessories are part of the Alumasc Roofing specification and therefore can be found back-to-back within the Alumasc 35-year system warranty.PROJECT DATACompletion: Autumn 2022 BuildingType: Student Accommodation ProductApplication: Hydrotech & Derbigum waterproofing systems Certification: BBA Approved & European Technical Approval Architect: Sheppard RobsonMain Contractor: Graham ConstructionAlumasc Registered Roofing Contractor: Tandragee Roofing
Sponsored
Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s Slate 2000 product in a housing association project. The project, carried out by Saltash Construction, encompassed a total area of 290 square meters and aimed to improve the infrastructure of the existing leaking roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. The housing association sector plays a vital role in providing affordable and secure housing to individuals and families. To support their mission, housing associations often undertake infrastructure improvement projects to enhance the living conditions of their residents. This case study focuses on a project to revamp a housing association's infrastructure using the lightweight metal roofing panel, Slate 2000.The Slate 2000 is a durable and aesthetically pleasing lightweight roofing material with long-term performance and weather resistance. Its stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of residential buildings. The project involved upgrading the roofing system of a housing association's properties spanning a total area of 290 square meters. Saltash Construction, a reputable main contractor, was tasked with implementing the project. Benefits and Challenges Slate 2000's robust composition ensured long-lasting performance, reducing the need for frequent maintenance and repairs. The product's Titanium Grey colour provided a modern and visually appealing finish to the housing association's properties, significantly improving their appeal for residents and building owners. The roofing material demonstrated excellent resistance to harsh weather conditions, including heavy rain, strong winds, and extreme temperatures, thus ensuring the longevity of the roofs. The installation of the Slate 2000 required skilled labour and meticulous attention to detail due to its specific design and interlocking mechanism whilst coordinating the installation across multiple housing association properties within a specified timeframeProject Outcomes The application of Slate 2000 transformed the appearance of the housing association's existing roof, making it more visually appealing and modern. The durable properties of the Slate 2000 lightweight roofing panels significantly increased the lifespan of the roof, reducing the need for frequent maintenance and repair costs. This also improved the long-term value of the housing association, offering improved durability, weather resistance, and a refreshed aesthetic, which contributed to the overall satisfaction of the residents. Conclusion The utilization of Slate 2000 in the housing association project executed by Saltash Construction proved to be a successful choice. The product's aesthetic appeal, durability, and weather-resistance qualities enhanced the project's overall value, ultimately benefiting the housing association and its residents. This case study demonstrates the positive impact of choosing high-quality construction materials and the importance of skilled execution in infrastructure improvement projects.
Sponsored
Extensive green roof on multi-storey car park Hornschuchpromenade in Fürth, Germany

Extensive green roof on multi-storey car park Hornschuchpromenade in Fürth, Germany

Mobilane

A new car park has been constructed near the Hornschuchpromenade in Fürth and covered with an extensive green roof system. The car park has capacity for 380 cars and has been designed by The Max Bögl Group (MBG) with ease of construction, cost efficiency, visual impact and low maintenance in mind. In collaboration with contractors Isobautec, they selected MobiRoof green roof system from Mobilane as the most suitable option to cover the 1300 square metre roof expanse.
Sponsored
Asbestos Roof Coating with maximum attention to health & safety

Asbestos Roof Coating with maximum attention to health & safety

Liquasil Ltd

This project, to coat approximately 2000 sq metres of asbestos roof with the BBA Approved Asbestsoeal system is a lesson for all in correct health and safety. Liquasil provides all approved installers with H&S training as standard. This deals with correct use of netting, scaffold, walkways, work platforms and waste water filtration from asbestos roof cleaning. Having already completed 500sq metres on a unit a year previously, the contractor was invited back to complete the rest of the block, which is the best possible endorsement.
Sponsored
easyHotel, Cardiff

easyHotel, Cardiff

Alumasc Roofing

Derbigum + BluRoof = Sustainable Drainage Solutions Mitigate your risks with Alumasc BluRoofs Think Stormwater Management - Derbigum BluRoof SolutionsA 5-minute hop from Cardiff Queen Street and you’ll find the first blue roof in Wales. Upon what was formerly 1960’s office accommodation the Cromwell House site has been transformed into an 8 storey, 120-bedroom easyHotel with a rooftop stormwater management system. OUR DESIGN PROCESSOur clients at Carter Lauren Construction were interested in learning about the benefits of a blue roof to meet planning conditions. ” Working in a compact city centre environment where ground attenuation was not possible, it made sense to install a blue roof. The Alumasc team demonstrated how their BluRoof System attenuates stormwater via controlled discharge over a 24-hour period at roof level.” Kevin Jenkins, Surveying Director, Carter Lauren Construction. CLIENT BRIEF AND DESIGNWorking closely with the appointed consulting engineer and architect, our team of technical experts designed a solution for stormwater attenuation to comply with planning and meet all other project objectives. Alumasc’s Matt Davies, Area Technical Manager - Mid, West & South Wales commented, “Given the urban location, the Alumasc BluRoof system was the perfect fit in providing a fully warranted single-source waterproofing and sustainable drainage solution.”The Alumasc technical team provided a full specification service and specialist drainage design using key data from the project brief. By incorporating our BBA Accredited Derbigum APP polymer modified bituminous waterproofing system the longevity of the total solution is assured with a proven track record since 1967. Other key components comprise of a BluRoof geotextile filter fabric, BluRoof interlocking void former, flow control outlets, and overflow system.ENVIRONMENTALLY FOCUSSED SOLUTIONExtreme weather events are now the new normal, says the World Meteorological Organisation. Our rainfall patterns are becoming increasingly unpredictable, and we must plan accordingly to adapt the built environment to help alleviate flood risk. PARTNERSHIPWorking with the contractor to construct the first blue roof in Wales. Kevin Jenkins, Surveying Director, Carter Lauren Construction, “Matt and the Alumasc team were available throughout the design and installation process. We knew that installing the BluRoof by Alumasc was the right decision for the future of the easyHotel and the benefit to reduce pressure off the drains.” SAFETY PERFORMANCEThe easyHotel has a 35-year warranty for the works and life expectancy of up to 50 years.ABOUTEasy Hotel Cromwell House, Cardiff - Wales’s first blue roof. Completion: Spring 2021 Main Contractor: Carter Lauren Construction Architect: Axiom Architects 
Sponsored
Museum of London - Visionary Roof

Museum of London - Visionary Roof

Bauder Ltd

Museum of London - Visionary RoofSynopsisThe Museum of London opened in 1976 on the historic London Wall and is a few minutes’ walk from St Paul’s Cathedral. A visionary approach to roofing had been adopted on a building that, will not only green as much of the exposed roofs as possible, but also provide a strong research aspect for future green roof projects. As with many buildings, the original roofs needed to be upgraded or replaced, at the same time as being brought up to date using environmental and sustainable solutions.Through the recommendation of waterproofing and green roof manufacturer Bauder Ltd, the Museum invited Dusty Gedge, one of the UK’s leading independent green roof consultants, to work directly with them to design 3500m² of varying habitats that encompassed the museum’s sustainable vision. and help in the provision of environments that would attract a range of wildlife, as well as being able to help the city adapt to climate change.Bauder Building BoardProject:Visionary roof, Muesum of LondonLocation:LondonProject type:RefurbishmentRoof size:9512m²Specifier:Museum of LondonRoofing contractor:Russell Trew LtdThe specificationAn independent consultant had previously carried out an energy model on the Museum of London buildings. When the museum inputted the green roof specification, it showed a potential energy saving of 10% per year, as well as a reduction on the future replacement costs of the heating and cooling plant. Some of the green roofs were funded through Drain London, a partnership project led by the Greater London Authority and funded by Defra. The project aims to better understand surface water flood risk across London, with a view to promote interventions (such as green roofs) to reduce surface water flooding. The museum has used the Bauder green roof system and worked closely with Dan Costen of Bauder and the roofing contractor Russell Trew Ltd, to deliver the various green roof spaces.These include:The refurbishment of the lower garden in the central courtyard with hard landscapingThe installation of Bauder’s new wildflower blanket to the upper garden in the central courtyard (funded through Drain London)Plug planting the roofs of the recently completed garden and terrace rooms that provide high quality corporate hire (matching the colour scheme chosen for the rotunda garden refurbishment and integrated with the new rainwater harvesting system funded by Renaissance London)An integrated sustainable urban drainage system (SuDS)Plug planting in other individual small roof areas including outside the boardroom and committee roomsTwo different planting schemes on an area of the main museum roof where the Drain London Project aims to carry out water attenuation researchThe resultRetrofitting green roofs will help to realise the Mayor of London’s ambition, to increase green cover in central London by 5% by 2030. The Museum of London is one of the largest retrofit green roof projects in the City and is certainly to be commended for allowing its roofs to be used for research purposes. Not only will it provide a benchmark for best practice, but it also demonstrates that retrofitting green roofs onto existing buildings is both environmentally and economically viable and is the way forward in helping London adapt to climate change.System installedBauderflex Green 1 BauderPLANT E 42A torch applied SBS elastomeric bitumen capping sheet. This product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green.AdvocacyGavin McCourt MRICS, Project Manager for The Museum of London said:“In producing the business case for installing green roofs, reference was made to the extensive published documents on the benefits of green roofs. In this case as the museum building had already been energy modelled by outside consultants, it was decided to input the green roof specification into the model. The results showed a potential energy saving of 10% per year, as well as a reduction in future replacement costs for heating and cooling plant. These factors, combined with the longer life cycle replacement of green roofs compared with normal felt roofing systems, enabled me to produce a robust business case for green roofs. With increasing energy prices the economic benefits of installing green roofs can only become more viable”Dusty Gedge added:“One of the major issues that London faces is flash floods during the summer, when sudden rainfall levels overwhelm the current drainage network. With the support of Drain London we will be researching the rainwater run-off for different green roofs. This will help us validate the kind of roofs and depth of substrates that will negate the costly effects that the sudden rainfall has on the infrastructure of the City.”
Sponsored
Kier Construction HQ

Kier Construction HQ

ROCKWOOL Ltd

Kier Group is a leading property, residential, construction and services group, which invests in, builds, maintains and renews buildings operating across many sectors, including housing, defence, education, power, transport and utilities.Kier handled both the design and delivery process and worked directly with Cottenham-based roofing contractor, Voland Roofing, on this project.Kier wanted the roof to not only insulate against airborne sound, but also to reduce noise from the impact of raindrops on the roof.
Sponsored
Clarence Road, Hale

Clarence Road, Hale

Wienerberger Ltd

The customer wanted to find a new tile that had a similar aesthetic look to the original clay tiles but also needed to ensure an economical overall installation cost. James Bros Roofing Contractors, who specialise in the re-roofing of domestic properties using natural slate, clay plain tiles or more modern concrete tiles, selected Wienerberger's 20/20 Antique Slate roof tiles to achieve this brief perfectly.
Sponsored
Contempory Look Zinc Effect Roof

Contempory Look Zinc Effect Roof

Polyroof Products Ltd

The proprietors of this domestic property in Harrogate added a large extension with a total roof area of 150m2. The client wanted the new roof sections to complement the slate work and aesthetics of the original building whilst adding a contemporary and stylish look to the extension.Originally considering a zinc sheeted roofing system, the client explored alternative materials that could achieve the same visual impact but at lower cost. After discussions with Cure Roofing Ltd, a Polyroof simulated metal finish was proposed as a roofing solution that would meet all the client’s requirements.Not only do Polyroof’s range of liquids offer cost savings over traditional metals, but they are also lighter in weight, totally seamless and can be pigmented to any RAL colour. Having no scrap value, the client also had the added peace of mind that the roof would not be a target for theft.A timber warm roof was constructed which incorporated 120mm PIR insulation to achieve a U-Value of 0.18 W/m2K in compliance with building regulations. An OSB3 TG4 deck was fitted above the insulation and Polyroof pre-formed GRP standing seam trims were fixed at 600mm centres into the deck. Next, the first coat of the Protec waterproofing system was applied over the whole roof area and encapsulating the standing seam trims. The roof was finished with a second coat of Protec pigmented to RAL 7016 providing an anthracite grey colour to the whole roof, accurately simulating the appearance of zinc roof sheets.The workmanship by Polyroof approved contractor Cure Roofing was second to none and the quality of the finish left the client delighted with their new roof. With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that their new extension could not be better protected for decades to come.
Sponsored
Green Roof at Seaford Head Golf Club

Green Roof at Seaford Head Golf Club

Danosa UK Ltd

When developing new buildings, it is always important to consider the environmental impact. Responsible sourcing of materials is high on every priority list, along with reducing waste to landfill. But what about the local impact, such as the effects on local wildlife? A living roof/green roof system, such as the one installed by the Premier Contractor at Seaford Head Golf Club, is a very clear example of the steps that can be taken towards reducing this impact and providing an alternative space for wildlife to inhabit. A warm roof system was installed onto a structural plywood deck, after which a vapour barrier and insulation boards were mechanically fastened to provide both thermal efficiency and air leakage control. After the underlying installation had been suitably restrained in accordance with a site-specific wind uplift calculation, the roof membrane was mechanically fastened to complete the waterproofing system. Our PVC roof membranes have been tested and can be utilised without the need for additional root prevention barriers (test standard EN 13948), and because PVC is extremely lightweight, they are the perfect choice for these applications, reducing pressure on the underlying structure. In conjunction with our Living Roof/Green Roof specialists, a site-specific living roof system was supplied and installed over the completed waterproofing.Waterproofing System:DANOSA Single Ply 1.5mm - AnthraciteConstruction Type:New BuildWarm RoofSector:LeisureApprox. Size:900m2Warranty Period:20 Years
Sponsored
Woodland Trust Curved Roof

Woodland Trust Curved Roof

Polyroof Products Ltd

As described by the Woodland Trust, Glen Finglas is a great expanse of ancient woodland, lochs and open heathland, sitting at the heart of Loch Lomond and The Trossachs National Park and home to one of the best examples of upland wood pasture in Scotland.The newly constructed Gateway Building was designed to blend in with the surrounding woodlands and featured a circular timber-clad exterior with a spiralling, curved roof. The Woodland Trust approached RTA Building Limited, a Polyroof Approved Contractor, to provide a guaranteed waterproofing solution that would complement the aesthetics of the building.After comprehensive discussions and careful evaluation, we recommended the Polyroof 185 Warm Roof System for this unique project. This system stood out due to its exceptional BBA 30-year durability rating, impressive life-cycle costing performance, and an insurance-backed guarantee that offered the client peace of mind.The implementation process involved the meticulous installation of the Polyroof membrane, which flawlessly covered the flat roof areas while seamlessly following the curved perimeters and intricate spiral design. To ensure a fully waterproof edge detail that complemented the building’s contours, we installed a bespoke GRP capping. This robust combination provided Woodland Trust with a reliable and long-lasting roofing solution.Through our collaboration with Woodland Trust, we successfully implemented the Polyroof 185 Warm Roof System, delivering a durable, and cost-effective roofing solution. Our system’s exceptional durability rating, long-term life-cycle costing performance, and insurance-backed guarantee provided Woodland Trust with the confidence that they had chosen a roofing solution that would stand the test of time. With Polyroof, Woodland Trust achieved a seamless, reliable, and environmentally conscious roofing solution for their unique project.
Sponsored
Luxury access to the roof terrace by LAMILUX roof access hatch

Luxury access to the roof terrace by LAMILUX roof access hatch

Lamilux Rooflights Ltd

In densely populated urban areas of the cities, where the number of floors in housing is sometimes limited and private gardens are rare, a rooftop terrace or patio is becoming a popular design choice. However, many residential buildings with rooftop gardens don’t see much daylight and careful consideration is required to determine an access point to the roof terrace. For such rooftop projects, a new dimension of roof access is offered by the LAMILUX Flat Roof Access Hatch Comfort range, designed to give a generous daylight intake in attic apartments alongside convenient access to the roof terrace creating an air of grace and beauty both internally and externally. The LAMILUX Flat Roof Access Hatch Comfort range now introduces its fourth product into the family, giving more choice and flexibility when creating a luxurious living space with an exclusive ambience. Featuring unrestricted use as a natural ventilation device and convenient access to the roof terrace, the indoor climate also benefits from the high energy efficiency of the range thanks to the thermally broken frame and excellent air tightness values.The existing Solo and Duo Flat Roof Access Hatch products from LAMILUX open laterally by moving one or two panels horizontally to create direct access to step onto the roof terrace, whilst the space-saving hinged opening Swing variant swiftly opens its one meter by 3000 or 3500 mm long aperture to 84 degrees in just 25 seconds. The fourth, and newest addition to the Access Hatch Comfort repertoire the Square, makes it possible, for the first time, to also use spiral and platform staircases underneath. Until now, access to the roof was limited to straight stairways due to the elongated rectangular shape of the roof access hatch range. The Square only takes 45 seconds for the concealed hydraulic drives to silently open the 4m² glass element of the skylight by 70 degrees. As with the Swing, the new variant does not require any additional space on the roof terrace than its own size in closed form, even when open, thanks to its swing mechanism.   Visually, the aluminium border frame throughout the product family, attracts attention as an architectural highlight. The aluminum profiles and the reveal surface can be coated in all RAL colours offering further choice and exclusivity. Since the glass panes and frame feature a flush edge detail both internally and externally, and all variants are designed with an inclined surface, the range boasts not only a visually appealing seamless design, but also ensures that rainwater can run-off easily without leaving any dirty edges or water ponding. Safety is standard in the Flat Roof Access Hatch Comfort product family with fall-resistant glazing which can be walked on to a limited extent for cleaning purposes. As an additional safety feature, a light barrier is installed as standard which prevents the closing of the access hatch as soon as it detects something in the entrance area. In terms of energy, the new roof access hatch continues the tradition of all LAMILUX skylights: The overall system, which is free of thermal bridges and isothermally balanced and the option of special glazing meets modern demands for sustainability, energy efficiency and climate protection which ultimately save heating costs and minimizes condensation. All four products in this family have one further thing in common: They are delivered completely pre-assembled to the construction site, lifted onto the roof by a crane provided by the customer and then installed swiftly and easily. This minimizes the risk of errors and saves valuable time – both for the contractor and for the apartment user who ultimately gains access to the roof terrace. 
Sponsored
Tew Farmhouse & Barns

Tew Farmhouse & Barns

The Rooflight Co.

Tew Farmhouse and Barns is a Grade II Listed farmhouse situated in the Cotswolds. The derelict barns were developed into six luxury holiday lets. With nearly thirty rooflights on the scheme, the Rooflight Company in-house design team worked with the roofing contractors to make sure the installation into the zinc roof would be effortless.In total 28 neo® roof windows in two different sizes were specified with a mixture of manual and cill motorised opening and blinds in varying styles and sizes.
Sponsored
Residence benefit from a flame-free roof installation

Residence benefit from a flame-free roof installation

Iko Ireland

Hundreds of homes have been refurbished as part of a multi-million pound revamp of housing association properties.Tristar Homes spent £8m on the scheme at Kennedy Gardens in Billingham where they carried out work on 225 properties across the three housing blocks as well as creating 12 new one and two bedroom homes which have been made available for rent.The development, completed in September 2014, includes the fitting of new windows, new bathrooms and improved living space due to the new balcony extensions.The roof area before its refurbishment had a U-value of 0.4 W/m²K. This existing build-up would not have met the requirements of the current building regulations Part L.The lower roof had been overlaid at least twice since its original construction. In all but one core sample, the existing insulation was wet through and therefore it was apparent that 90% of the existing roof build up needed stripping to the original asphalt. A further inspection was needed when the asphalt was exposed to ascertain the condition and depth of the asphalt. The asphalt was deemed in reasonable condition so the new system could be installed onto the original asphalt.IKO worked with installing contractors BriggsAmasco to refine the roof specification and recommended IKO Mach One single layer bituminous membrane system, installed to the recommendations of wind uplift calculations and performing to a 0.18U value as per requirements.IKO Mach One membranes are a robust, flame-free, single-layer roofing system with added fire-retardancy. IKO Mach One can be mechanically fastened, ballasted or bonded with polyurethane adhesive.A 20-year insurance-backedfire retardancy guarantee was issued to cover all materials, design and workmanship covering contractor insolvency.
Sponsored
Cyns Tavern, Little Hulton in Salford

Cyns Tavern, Little Hulton in Salford

Sika Limited

Cyns Tavern, is a traditional community pub located in the Little Hulton area of Salford. Since its construction in the 1970s it has maintained its popularity with local residents. The existing felt covering on an area of the roof had reached the end of its service life and in order to prevent further damage to the building fabric, the owner wanted to carry out a roof refurbishment.The project provided an ideal opportunity for roofing contractor, LRL Roofing Solutions, to leverage the team’s experience in bituminous roofing systems and use the innovative, new SikaShield® Safe2Torch system in a project for one of the company’s major customers, Forviva.
Sponsored
Northamptonshire Schools

Northamptonshire Schools

Sika Sarnafil

Financed by county council capital funds, Northamptonshire County Council undertook a multi-million pound remedial works programme on a number of schools originally built in the 1960’s and 1970’s. All of the buildings were suffering from some degree of water ingress, and the roofs needed to be brought in line with current building regulations for improved thermal performance. Sika Sarnafil’s specialist roofing contractors installed over 50,000m2 in light and lead grey of G410-18EL single ply membrane to the school roofs.
Sponsored
West Kirby Railway Station

West Kirby Railway Station

Whitesales Rooflights

West Kirby railway station’s 1930s platform canopy was long overdue refurbishment. Whitesales were brought in by Briggs Amasco, Network Rail’s roofing contractor, to design, manufacture and install a series of non-fragile rooflights for the 900sq m replacement roof. After our initial roof survey, we specified bespoke polycarbonate Em-Vault continuous barrel vault rooflights. They’re compatible with the chosen Sika Liquid Plastics roofing system and have light transmission of up to 88%. The standard mill finish frame would keep costs low and blend with the canopy's concrete finish.
Sponsored
Wigan Wallgate Station roof glazing project.

Wigan Wallgate Station roof glazing project.

Twinfix Limited

The Multi-Link-Panel system glazed with Georgian wired polycarbonate from pioneering polycarbonate roofing supplier Twinfix was specified by Network Rail for the entrance canopy element of a £1 million refurbishment of historic Wigan Wallgate station in Lancashire. The glazing panels, each comprising fast-track “fix and link” aluminium structural bars glazed with 6mm solid Georgian wired polycarbonate, were pre-assembled at Twinfix’s factory in Warrington, Cheshire, for delivery to site for installation by specialist contractor Everlast Rail.

Showing 1-36 of 1103

Feedback