NBS Source
I'm a manufacturer

"roof decking other materials"

7,906 results found

Sort by:

Showing 685-720 of 880

Sponsored
Ingliston Equestrian Centre

Ingliston Equestrian Centre

Metrotile UK Ltd

When Ingliston Equestrian Centre, a stunning Show Jumping ground based near Glasgow entered into a multi-million pound refurbishment project, they specified Metrotile Lightweight Steel Roofing to help raise the centre to international standards.Metrotile supplied over three thousand square metres of roofing materials to two new stable blocks and numerous new Chalet buildings at the site. Metrotile Slate in Bronze was specified as it combines a stunning traditional look with a swift installation and a low weight that reduces stress upon the supporting timber frame structures of both the chalets and the stables. Stunning countryside surrounds Ingliston Equestrian Centre and the Metrotile Slate compliments the local area gracefully
Sponsored
St James Road Apartments, Brentwood

St James Road Apartments, Brentwood

RYNO

Ryno Signature Decking in ‘Silver Birch’ takes pride of place in this new Brentwood development. The apartment block has a bold red brick exterior, with simple anthracite windows and detailing.The glass balustrades of the balconies allow the maximum level of light to enter the apartments, while making the paved courtyard feel even larger and more spacious.Products UsedTerraSmart® Composite in Silver Birch was used across the private balconies. Silver Birch, from the Signature Range of premium ‘capped’ decking, has an elegant textured wood-grain finish.The terrace spaces had additional height build-up requirements, so fixed-head adjustable pedestals were used to raise the decking to the door thresholds.
Sponsored
Siberian Larch Timber Cladding Case Study - NORclad - UWE Bower Ashton

Siberian Larch Timber Cladding Case Study - NORclad - UWE Bower Ashton

NORclad Limited

UWE Bower Ashton, Completed Summer 2017. Timber Cladding: Untreated Siberian Larch was supplied for this project, this will weather down to a silver grey to blend in to its surroundings, and contrast the other materials on the building. NORclad Grade B was supplied, offering a fair spread of knots, along with the distinctive grain of the species. Profiles: Horizontal cladding was a bespoke chamfered profile (Ex 25 x 100mm) Vertical timbers on the building are in a number of dimensions, Ex 25 x 100, Ex 50 x 50mm, and Ex 50 x 75mm.
Sponsored
Only genuine steel windows will do for such a magnificent property!

Only genuine steel windows will do for such a magnificent property!

Clement Windows Group

No other material could have produced such an exquisite end result as steel for this project in Surrey. Clement were contacted by the owners who wished to replace all of their original steel windows and doors. Following careful consideration of what was available Clement's EB24 suite of steel windows was chosen. The stunning double doors benefit from the use of surface mounted cremone bolts instead of a usual lever locking mechanism which means the centre bar of steel is slim and elegant just like those of the outer frames.
Sponsored
Lower Drayton Farm - Staffordshire

Lower Drayton Farm - Staffordshire

DCM Surfaces

Lower Drayton Farm is a family fun farm, offering a variety of activities in the heart of the countryside.DCM installed Evo Pro Artificial Grass as part of the new indoor soft play area. Line markings were painted onto the sports grass to create a miniature sports pitch for children to play football and other ball games.The installation took place on an upper floor level, meaning the access for the project had to be taken into careful consideration when delivering materials and getting equipment to the area of works on site.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

George Abbott SchoolBauder Thermofol single ply waterproofing system with Bauder Euroglaze rooflightsSynopsisLocated in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed.Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.Bauder Building BoardProject: George Abbott SchoolLocation: Guildford, SurreyRoof Area: 228m²Specifier: Baily GarnerApproved Contractor: Inspire Contract ServicesThe specification Bauder submitted a proposal to refurbish all areas of the failing roof:The gutter area needing standing water to be removed for which Bauder tapered insulation was proposed to create effective drainage falls.The adjoining profiled sheet metal roof requiring a new waterproofing system. The Bauder Profiled Roof Overlay system was determined to be the best solution, using bespoke profiled insulation boards specifically designed to fit the shape of the roof. The Thermofol U15 Fleece Back membrane was then specified as the waterproofing layer providing a robust yet lightweight waterproofing system to the roof.The existing rooflight unit, being one of the problematic areas of the rooftop, was also replaced with Bauder Euroglaze rooflights. Products appliedInsulation infill systemIntended for refurbishing profiled sheet metal roofs or increasing the thermal performance of existing insulated cladding systems.Bauder Euroglaze rooflightsModular rooflight designed to provide high standards of illumination, insulation and ventilation to the interior of flat roofed buildings. These are made to order and the size can therefore be tailor made to fit any roof aperture. The resultBauder approved contractor, Inspire Contracts, installed the roof system and rooflights. Bauder’s expert site technicians carried out over 10 site visits during the 4 months of works on the site. Following a final site visit and a leak test Bauder was able to issue a 20 year product and workmanship guarantee to the client.The choice to use Bauder, a single source of manufacturing for the roof systems and the rooflight, proved beneficial as it enabled Bauder’s flat roof technician team to design out a number of the detailing issues responsible for the historic leak problems and it also eased the installation process for the client and the approved contractor, as Bauder provided its integral service from the roof survey to the final site visit and the issue of the guarantee.System installed Bauder Thermofol PVC single ply waterproofing system 1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 DeckProfiled sheet metal
Sponsored
Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Hackney Central Overground Station Receives Bespoke Falco Cycle Hub with Secure Mobile App Access

Falco UK Ltd

This is the new sleek and inconspicuous cycle hub recently designed, manufactured, supplied and installed by Falco at Hackney Central Overground Station.Greeting commuters to the west of the station, the 10m cycle hub has been fitted with a combination of both reinforced safety glass and sustainable hardwood cladding.A series of 48 spaces of the FalcoLevel-Premium+ two-tier cycle rack have been installed along with a FalcoFix 2.0 cycle repair station, LED lighting, CCTV security, branding graphics, a green sedum roof and secure mobile app access. Falco also installed five separate TfL London cycle stands located outside of the cycle hub.The green sedum roof, an increasingly popular feature for Falco shelters, supports the operators sustainable development plan by providing the many advantages associated with green roof systems as well as insulation for both heat and noise. A sedum roof both reduces water discharge as well as compensating for CO2 emissions.The FalcoSmart mobile app access system uses Bluetooth technology to provide Hackney commuters with secure access to the cycle hub using their own smartphone or tablet, removing the need for physical keys and fobs. Commuters are able to apply for access to the hub via Falco and having downloaded the ‘App’ are given access rights to the cycle hub for a period of time depending on their subscription.The images attached show the new cycle hub addition, installed to the west of the station, on Graham Road.Hackney Central is a railway station located on the North London Line within Greater London, serving 4.3m annual passengers.   Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities.For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on 01538 380080.
Sponsored
Olympia London

Olympia London

CDM Stravitec

As part of cultural regeneration of the Olympia Exhibition Venue, Olympia Central Hall has been demolished and the iconic structures of Olympia National and Olympia Grand, both Grade II listed buildings, are being incorporated into the site’s overall redevelopment. The West Hall Exhibition Space is being structurally strengthened to allow for a two-story music venue to be constructed above the existing exhibition hall.It is necessary to isolate the Central building, originally known as Empire Hall, from the West Hall performance space to prevent music and entertainment noise disturbance.Three massive bearing assemblies comprising solid thick steel plates holding Stravibase VHS bearings, which were pre-compressed using our patented frozen bearing technology.A small mock-up (approx. 1/3 of the size) was also constructed, and fire tested at Liege University, comfortably achieving a two-hour fire rating.Music and entertainment noise breakout from this new venue causing disturbance to residents.A custom designed Stravifloor Deck solution with rubber bearings isolating the concrete roof flab from the structure below. This complex floating roof is laid to multiple falls by using supporting rails that are tapered to suit.
Sponsored
Heron Tower, London

Heron Tower, London

Vebro Polymers

Client: Heron Tower, LondonLocation: Bishopgate, LondonSector: Mixed-Use FacilityYear: 2021Project Size: 500 m²System: vebrodeck IDHeron Tower, a mixed-use high-rise development in London, required a bright, welcoming and durable floor coating material for its bike and scooter storage area, an environment used by the residents and staff of businesses based in the building. Heron Tower, located at 110 Bishopgate in the heart of London, is a mixed-use facility providing over 440,000 sq ft of premium office and leisure space over 36 floors. Enhanced to achieve net zero carbon, the building features a façade of solar panels and has achieved a BREEAM rating of Excellent. The impressive contemporary landmark, situated just a short walk from Liverpool Street Station, was — at the time of its construction — the tallest high-rise in the capital, standing at 230m tall including its mast. Featuring a range of corporate office spaces, restaurants and leisure spaces, as well as Britain’s largest privately-owned aquarium in its impressive lobby, the development has been designed to impress, providing building users with a premium experience throughout. This has extended to its more functional areas, with the transformation of its bicycle storage area; a dedicated space where building users are able to securely store their pushbikes and scooters. Installed in a combination of RAL 5018 Turquoise Blue and RAL 7035 Light Grey, the installation of vebrodeck ID has created a welcoming space for the building's climate-conscious cyclists and scooters to safely store their vehicles. vebrodeck ID is a durable resin deck wearing system, designed for use on driveways and parking bays of internal or basement level decks of multi–storey parking structures. vebrodeck ID is a protective deck coating system offering excellent wear resistance. The system deadens noise from unpleasant tyre squeal, is available in a wide range of colours, protects against oils, fuels and de-icing salts and can be tailored to ensure an anti-slip finish. 
Sponsored
The Terrace | Lee Valley

The Terrace | Lee Valley

RYNO

Of all our refurbishment projects, this one was one of the smoothest in its deployment, and amongst the most exciting & rewarding in its outcome.Lee Valley is a 10,000-acre (40 km2) Regional Park that offers sporting & outdoor activities, as well as the unique opportunity to get close to nature, learning & exploring its natural surroundings, gardens, and nature reserves.The Lee Valley White-Water Centre, officially opened on 9 December 2010 by Anne, Princess Royal, was constructed to host the slalom events during the London 2012 Olympic Games, and still hosts international events, attracting visitors from across the globe. Since 2012, Lee Valley has hosted the World Championships and two World Cups.In 2023, the ICF Canoe Slalom World Championships will attract over 300 of the world's top athletes to the Lee Valley White Water Centre.A local contractor who knew RYNO was impressed by our composite decking, our service & reputation, and introduced us to the project manager of Lee Valley Park Authority.The project was a full refurb of The Terrace which had an ageing & poorly installed wooden decking and a damaged waterproofing membrane that was leaking through to areas underneath. Some of the boards had already been removed to inspect the damage and reveal the extent of the work that needed to be undertaken. Such was the state of the decking that the area had been cordoned off and the café was unable to make use of this space!What was required was a like-for-like replacement aesthetically, which is why we selected & installed our TerraSmart™ Composite system, featuring our Classic Decking Boards, supported by high-load bearing aluminium substructure & RDA-C ‘Clip-on’ Self-levelling Adjustable Decking Pedestal, ideal for terraces subject to high foot traffic.We recommended Valley Provincial as installers who stated: "The TerraSmart decking system was the perfect choice for this project. The system’s ease of installation enabled our site teams to make excellent progress. From pricing through to delivery, Ryno where very supportive and we look forward to installing their decking system on future projects."The entire project was delivered on budget, on time, and, of course, by the deadline for the next event!
Sponsored
FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY™ TBA

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food WarehouseForming a fresh element to the UK’s critical food supply infrastructure, a new distribution warehouse in Wakefield, West Yorkshire, is near to completion with the specialist suspended ceiling installer making use of ZEUS Lite™ 90:30 from the range of TBA FIREFLY™, to create vertical fire barriers at intervals within the roof-space across the footprint of the building.The 15,300m2 facility at Headways in Stanley, on the outskirts of Wakefield, has been built by GF Tomlinson for the Kitwave Group, a national distribution business with a fleet of over 500 vehicles supplying hotels, restaurants and many other venues across the country. The installation of the ZEUS Lite™ was undertaken by Nottingham Suspended Ceilings, as the sub-contractor well experienced with the performance and user-friendly characteristics of the Firefly range.All the rolls of ZEUS Lite™ 90:30 material and the well proven FIREFLY™ fixings, including stainless steel staples and fire-resistant adhesive, were supplied to Nottingham Suspended Ceilings by the merchant, Minster On-line.The site agent for Nottingham Suspended Ceilings, Mark Prescott, commented: “Our company carries out commercial contracts right across the East Midlands and beyond, where we have made use of Firefly barriers on a large number of past projects. Although you have to be a competent contractor and follow the manufacturer’s guidance precisely, we find the ZEUS Lite™ and other products in the FIREFLY™ range straightforward to install. In the case of the warehouse here, we have now completed the installation of the fire barriers up to roof level in dozens of locations across the building; as well as installing all of the suspended ceilings throughout.”FIREFLY™ ZEUS Lite™ is ideally suited to this type of application, comprising a flexible woven fabric fire barrier that has been specifically developed for the vertical separation and compartmentation of extensive concealed spaces within buildings.By offering 90 minutes integrity and 30 minutes insulation, FIREFLY™ ZEUS Lite™ 90:30 exceeds the minimum requirements regarding fire barriers under the Building Regulations’ Approved Document B (Fire Safety). The specially treated glass fibre fabric is strong and resilient as well as flexible while, crucially, the system’s certification covers the inclusion of service penetrations; which many alternative products do not.
Sponsored
Case Study - Proteus Pro-System® - Emma House

Case Study - Proteus Pro-System® - Emma House

Proteus Waterproofing

Emma House, Romford, a residential apartment block built in 2007, needed a new waterproof membrane for the entire roof area after the single ply membrane, installed just 10 years earlier, had failed. The specification by our clients asked for a cold applied system to be used during the refurbishment to minimise disruption to residents, while providing a permanent waterproofing solution.The ChallengeCore samples taken of the roof build-up showed there had been extensive water penetration which required urgent remedial action. Impossible to repair, the complete roof system had to be stripped back to the roof deck by Proteus Waterproofing’s approved contractor. The approved contractor installed a new Proteus Pro-System® BUR (built up roof system) incorporating Proteus Pro-Therm insulation, to provide a new seamless roof – an area of some 150 square metres – offering a 20 year guarantee.Why Proteus Pro-System® was specifiedProteus Pro-System® was installed using no heat, providing a seamless waterproofing membrane on completion. Proteus Pro-System® is a high performance, seamless and cold-applied waterproofing membrane for flat and pitched roofs. It cures to provide completely seamless waterproof protection and has excellent thermal and UV stability, making it suitable for use in all climates.Proteus Pro-System® does not brittle, deteriorate or discolour with age. It uses atmospheric moisture to trigger its cure process and unlike conventional polyurethane systems can cure under water, without gassing or foaming. It also becomes resistant to rain damage and may therefore be applied in relatively poor weather, without any subsequent loss of performance or durability – making it ideal for Emma House.About Emma HouseEmma House consists of 14 one-bedroom and 19 two-bedroom apartments just minutes away from the centre of the market town of Romford, which offers shops, services and a wealth of bars and restaurants. When first built in 2010, Emma House offered young professionals an opportunity for affordable housing close to London and has remained at the forefront of the property market in Romford ever since.
Sponsored
Broughton & Yeomans Apartment Block

Broughton & Yeomans Apartment Block

Polyroof Products Ltd

Broughton & Yeamans House are high rise apartment blocks in Bristol, Avon, under the management of Bristol City Council. The roof areas, totalling over 3,500m2, had originally been waterproofed with asphalt and then later treated with a coating repair.Unfortunately, water ingress continued to be a problem with leaking occurring at numerous locations. Not wanting to cause further disruption to the residents and to avoid costly damage to the interior of the buildings, the council contacted Polyroof and a survey of the roof was arranged.The survey by Polyroof’s Technical Services highlighted the extent of the issues within the roof, including identifying water ingress through the many vertical sections present on the roofs, including parapet walls and the lift house building. After performing core tests on the roof, it was shown that the existing roof build, which contained insulation as part of a warm roof design, was in a suitable condition to be retained and overlaid – avoiding costly disruption for the client and residents.A bespoke specification was drawn up by the Polyroof Technical Team that provided a comprehensive set of recommendations to ensure the apartment blocks were fully protected from the elements.To make sure the roof could be left in a totally weatherproof condition, it was necessary to treat not only the flat roof sections but the vertical areas too. The client was keen to improve the thermal performance of the buildings by adding additional insulation, but it was imperative that disruption was kept to a minimum – not only would stripping works impact on the buildings’ residents, but hauling waste materials from such a great height would be costly and logistically challenging.With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that the apartment block could not be better protected for decades to come.
Sponsored
Glazing Vision Box Rooflights Feature In Stunning Homes In California

Glazing Vision Box Rooflights Feature In Stunning Homes In California

Glazing Vision Ltd

Four Glazing Vision Three Wall Box Rooflights were specified on four modern new build homes in the heart of Los Angeles which have provided the clients with access to the terrace which would have otherwise not been possible. The Three Wall Box Rooflights fit perfectly with the modern aesthetic and were chosen to not only give access to the roof deck, but to also increase the amount of natural daylight entering each home.“We think the finished rooflights look great as crowns to each of our buildings. They will be a nice addition to these homes and hopefully inspire developers and homeowners to spread the word throughout Southern California regarding the benefits of the rooflights too!” – Michael Wilson-Katsibas, Partner, KAP Studios.Following the demolition of the existing 1200 sq. ft bungalow, the remaining site was still relatively cramped considering the bungalow was being replaced by four new dwellings. In order to provide enough living space and retain the beautiful views of the Los Angeles skyline, KAP Studios had to come up with a creative solution to achieve their brief.To make the most of the small, 8,400 sq. ft plot, KAP Studios incorporated a basement and terrace area into each home which transformed the buildings from two-stories to four-stories, which helped unlock the full potential of these beautiful homes in Culver City.Starting from the ground up, the basement is partially sunk beneath the pavement and accommodates two parking spaces, meaning more space has been granted to the garden area at ground level. This gives each home its own private back garden, as opposed to a less visually impressive driveway. It also includes a pantry and wine store to round off the basement area. The second floors are occupied by an en-suite bedroom which includes a balcony area overlooking a collection of beautiful LA properties.The east side of the bedroom houses an equally impressive bathroom, making it the second Master Bedroom in the homes. The terraces of each building are by far the most unique feature of the homes. With over 20 years of experience in roof access rooflights, Glazing Vision were engaged to help with this important part of the project. Operated by the touch of a button, our Three Wall Box Rooflights were fixed to the existing building structures at the back and either end. The rooflights take up only 170 square feet on top of the roof, leaving the client with a vast amount of additional living space which can be utilised all year round. Our rooflights are installed by our very own expert installation team.“We wanted to both feature the stairs as light shafts to illuminate the interior spaces throughout the day with the California sunlight as well as allow for seamless roof deck access for the future residents.” – Michael Wilson-Katsibas, Director, KAP Studios.Our Three Wall Box Rooflights are a perfect example of how Glazing Vision can help you utilise your roof space whilst providing your home with added natural daylight.
Sponsored
Rhyl Railway Station Restoration

Rhyl Railway Station Restoration

Polyroof Products Ltd

Long standing and rich in history, Rhyl Railway station was opened on 1st May 1848 and was part of the Chester and Holyhead Railway Company’s line. The Station itself is located close to the centre of Rhyl, a lively seaside town on the North Wales coastline and a popular destination for many tourists across the country.As part of a Railway Upgrade Plan, Network Rail have invested £50 million into the restoration of stations across the North Wales Coast. Rhyl was one of the first stations to receive this upgrade and when it was shown that various roofs of the station were in need of restoration.The ChallengeRhyl was one of the first stations to receive this upgrade, and when it was shown that various roofs of the station were in need of restoration, Polyroof was chosen to help restore them to their former glory, and a survey was organised.The specified areas that were in need of refurbishment included the roof over Platform 2 and the bridge walkway roof which connected the two platforms. The existing waterproofing on these areas consisted of built-up felt with a mineral cap sheet, which was in an aged condition and beginning to show signs of failure such as splits and blisters. Leaks were now beginning to occur which were in danger of affecting the condition of the roof structure itself.The SolutionBased on the findings of the survey conducted by Polyroof Technical Services, a bespoke specification was designed that would eliminate the current issues through the installation of the BBA-approved Protec system. Due to the roof being situated above unheated areas, there was no requirement for new insulation within the build up. Firstly the existing built-up felt was stripped and removed from site to expose the original close-boarded timber which was inspected for defects, made good where required and retained where possible. Defective areas where replaced with new timberwork as required. In order to provide a sound, solid substrate a new OSB3 TG4 deck was mechanically fixed across the whole area within a phased approach, ensuring the roof was kept watertight as works progressed.The Protec system was then applied directly to the timber; with its RapidcureTM technology large areas where able to be made fully waterproof within short periods of time. Polyroof Technical Services visited site regularly to ensure works were being completed to the high standards required and regular reports were fed back to the client. Upon completion a final inspection by Polyroof led to the roof being signed off and guaranteed, giving the client complete peace of mind that their roof will be fully watertight for at least the 20 years. Polyroof were proud to be part of this project to restore Rhyl and its Railway station to its former glory.
Sponsored
Steigenberger Hotel & Spa design

Steigenberger Hotel & Spa design

Rock Unique

In the picturesque Wachau Valley, among numerous vintage taverns and art galleries, lies the city of Krems an der Donau, an ancient town on the Danube that enjoys an exclusive natural landscape surrounded by greenery.A short walk from the city centre, nestled among the surrounding vineyards, the Steigenberger Hotel and Spa offers guests a warm welcome with a modern style where they can breathe in a calm ambiance with relaxing views of the old town of Krems or the Danube Valley. In this setting suspended somewhere between tradition and the search for contemporary style, the elegance and practicality of Atlas Concorde products stand out in some indoor areas of the building. Realism, simplicity, and technical performance: the strength of a natural material inspired by stone covers the walls of the rooms in a warm shade, creating a strong yet natural and welcoming atmosphere. Veins, shading, and inclusions of materials offer a contemporary design, creating a synergy between reliability and beauty. On the other hand, the interpretation of the concrete effect in a ceramic material creates the perfect background to experience moments of relaxation in the suites and the spa. Original decorations and elegant porcelain surfaces embellish these spaces, the floors and tiles interacting in perfect chromatic harmony.
Sponsored
Eclectic, Bangor

Eclectic, Bangor

EGGER (UK) Ltd

Located in the small, but lively town of Bangor, Eclectic, a luxurious mind and body wellbeing retreat, has opened a three-story studio on the main street. The state of the art studio features wall and ceiling slats throughout the tranquil and elegant space in woodgrain decor H1146 ST10 Grey Bardolino Oak, which fits in perfectly with the contemporary interior. Its light colour tones and delicate texture complement the other materials used in the design, to create a warm and inviting space. As well as the slats, the decor was used to create wall units, door frontals and shelving.
Sponsored
Slatted wall and ceiling features in premium residential development - MicroSlat

Slatted wall and ceiling features in premium residential development - MicroSlat

Vtec Group

The MicroSlat System was specified in three areas of this premium development, each space requiring very unique shapes. Bespoke spacing was required in order to accommodate LED strips between the grooves. The client ordered MicroSlat 25-18 that was spray finished to a high quality sheen using a bespoke lacquer finish to match other materials at the site. Black slat core and black acoustic backing complete the look to help transform the interior. MicroSlat was specified as it's a lightweight, modular system that's easy to install, which provides excellent acoustic absorption for a space with such high ceilings.
Sponsored
Urban HQ

Urban HQ

Tobermore

Challenge Modern paving flags required for city centre roof terrace at flexible workspace Urban HQ situated in Eagle Star House offers state-of-the-art facilities including meeting rooms, event space, a member’s lounge and bar.  One of its most notable spaces is the rooftop terrace. The roof garden provides co-workers with a valuable communal area to foster company culture or escape from their desk. The terrace offers a flexible space to relax, socialise or entertain while taking in the views of Belfast city and beyond. The central design aspiration was to bring a New York or London feel to Belfast city. It was essential that the roof terrace hard landscaping aligned with the design ethos. SolutionContemporary Mayfair Flags installed on pedestals were the perfect choice  Tobermore’s Mayfair Flags with their granite aggregate contemporary finish were the perfect choice for Eagle Star House. A contrasting finish was created on the terrace in the colours Silver and Graphite. A simple yet effective stacked laying pattern was deployed which adds to the clean look of the contemporary roof terrace. The commercial space has more of a boutique hotel feel than a city centre office. The Mayfair paving flags were installed onto adjustable pedestals, creating a level surface throughout the terrace. The use of this installation system enables the laying of paving flags without the need for grout, sand or adhesive. It also creates a void beneath the paved surface allowing an easy and convenient route for exterior cables or other services. View our Roof Terrace Support for installation on pedestals for roof terraces, balconies and roof gardens.
Sponsored
Royal Russell School

Royal Russell School

Danosa UK Ltd

The Royal Russell School in Croydon demonstrates the vast variety of waterproofing applications with which DANOPOL membranes can be specified. From standard flat roof areas to pitched standing seam roofs, vertical applications and accessible terraces, the flexibility of specification is really showcased on this project. The most noticeable feature is the stunning standing seam roofs, which are also DANOPOL HSF+ membrane, completed with ALPHA PROFILES. These ALPHA PROFILES are raised PVC profiles made from DANOPOL materials which can be retrospectively heat welded to the surface of the completed waterproofing system. The use of Alpha Profiles is rapidly increasing as the design may be highly customised and the installed centres can be changed to suit a clients particular aesthetic preferences and are often installed to obscure any standard membrane overlaps. An advantage of selecting DANOPOL membranes over a traditional metal standing seam roof option is that at less than 3.00kg per m2 for the waterproofing membrane, the system is incredibly lightweight and may be installed onto many lightweight structural substrates. The reduced load, when compared to traditional standing seam roof options, can also translate into savings on the underlying supporting structure. Our DANOPOL+ HSF membrane was also utilised on the terrace areas, which included vertical detailing to clad the internal faces of the parapet walls, providing a fully-encompassing watertight finish to the roof areas. Waterproofing System: DANOPOL+ HSF 1.5mm - Dark GreyConstruction Type: New Build Warm Roof Sector: EducationApprox. Size: 1,300m2Warranty Period: 20 Year
Sponsored
Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement steel screens create a sensational backdrop to roof terrace at iconic film studios

Clement Windows Group

Twickenham Studios was established in 1913 and is one of the UK’s oldest and most celebrated film and TV studios. The Lounge is the Studio's new rooftop bar. This fabulous facility is accessed through brand new Clement steel screens. Made from strong EB24 steel sections, they are robust, but also incredibly slim and elegant. The bespoke doors have genuine T bars and a high glass specification, including Guardian Sun Guard offering solar protection and an argon gas filled cavity which improves thermal efficiency.
Sponsored
Lion Salt Works

Lion Salt Works

Eternit

When restoration of the UK’s last remaining open-pan salt works began, Eternit was integral to completing the £10 million industrial heritage project. Early in the design process, Eternit was consulted to assess the feasibility of using semi-compressed fibre cement profiled sheeting as roofing and cladding materials. To maintain the aesthetics of the original Lion Salt Works buildings with new products, Profile 6 and Profile 3 sheeting was used in Natural Grey.
Sponsored
Don’t let CUI ruin your investment

Don’t let CUI ruin your investment

Hempel A/S

Owned by Shaanxi Tianhong Silicon Materials Co. Ltd., the Shaanxi Yousr Polysilicon Plant in China will produce polycrystalline silicon material for the solar photovoltaic and electronics industries. When engineering company Fluor was asked to design the plant, it was faced with a specific challenge.Much of the plant’s pipework and equipment is exposed to high temperatures, making it prone to corrosion under insulation. Fluor knew that conventional anti-corrosive solutions are often not able to protect equipment in these conditions, and the company was looking for an alternative but reliable and proven coating solution.Fluor chose our Versiline CUI 56990 coating to provide long-term protection for pipework, equipment and other hot surfaces. Versiline CUI 56990 can resist temperatures up to 650°C/1202°F and thermal shock and cycling in dry or wet service conditions. Versiline CUI 56990 is extremely resistant to micro-cracking and corrosion, even in tough operating conditions.
Sponsored
Sugar House Island // A Brief Case Study

Sugar House Island // A Brief Case Study

Michelmersh Brick Holdings PLC

Sugar House Island's Cooperage Yard is part of a transformative project just south of Olympic Park intending to create a distinctive urban environment that has been carefully designed to create a balance between work, life and leisure.Set next to the Islands creative quarter, Cooperage Yard covers 8000ft2 over of the area. Its immediately recognisable sawtooth-shaped roof overlooks the river and courtyard. Natural light floods both floors of the building and a south-facing roof terrace offers further space for its inhabitants.Freshfield Lane's Danehill Yellow bricks are immediately recognisable and offer a positive contrast to the tones of other nearby brick buildings. The tones are further complimented by shafts of natural light that penetrate the pathways between buildings. When combined, the colour language and open space create a sense of optimism between the structures.
Sponsored
Friars Walk Shopping Centre

Friars Walk Shopping Centre

Shield Membranes Ltd

As one of the fastest growing towns in Wales, Newport is undergoing a comprehensive programme of regeneration, of which Friars Walk is a central part.Friars Walk has reshaped the landscape of Newport with retail sales expected to double in the city, adding £120 million per annum and the city’s catchment predicted to increase from 211,000 to 367,000 with an estimated footfall of 10-12 million per annum.The 390,000 sq ft centre features a 90,000 sq ft Debenhams Department Store as well as other retail anchors H&M and Next. The leisure offer includes an eight screen Cineworld multiplex cinema, a Superbowl UK with 12 State of the art lanes and numerous riverside restaurants.Shield Membranes supplied the full ShieldTEC hotmelt system to be used on all roof areas, along with our own ShieldBOARD XPS and ShieldDIVERSE living roof build up.
Sponsored
Clapham Park

Clapham Park

Bauder Ltd

Clapham ParkBauder Total Green Roof System (BTGRS) with BauderSOLAR G LIGHTSynopsisThe regeneration at Clapham Park involved the demolition of old housing stock to make way for new affordable homes. The 5-storey building with 21 dwellings incorporating the latest rooftop technology which blends a biodiverse green roof and unified solar PV array. This approach met the planning requirements and maximised the limited roof space to generate energy for the residents. The development was certified BREEAM ‘Outstanding’ due to its environmental, economic and social sustainability attributes.Bauder Building BoardProject:Clapham ParkLocation:Clapham Park, Lambeth, LondonRoof Area:500m² green roof layered with 116m² of PVSpecifier:PJMA Architects​Approved Contractor:EJ Roberts Ltd​PV Installer:M & M Electrical LtdThe specification The BauderSOLAR G LIGHT system has National House Building Control (NHBC) approval and meets local authority building control (LABC) requirements. The system was installed on zero falls roof deck, making it a very cost-effective solution.The biodiverse green roof which includes 35 plant species recognised by the RHS as Perfect for Pollinators, covers the totality of the roof area and offers a large variety of vegetation. The building reduces its carbon impact with the highly efficient PIR insulation and generates approximatively 10% of the flats usage with a maximum possible output of 75kWp from the 70 PV modules. The solar PV mounting units are ballasted by the substrate and vegetation, removing the need for any penetrating products in the waterproofing.Products appliedBauder Total Green Roof SystemThis system features a reinforced bituminous waterproofing system offering a service life expectancy in excess of 40 years.BauderSOLAR G LIGHTThe integration of a green roof and photovoltaics into one system drawing the maximum potential from a flat roof.BauderGREEN Flora Seed MixesA blend of 49 British native species seed, to maximise diversity of vegetation on green roofs.Project challengesOne of the major challenges of the project was the roof area, which at only 500m² needed to include a green roof and a renewable energy system to meet the main objectives of sustainability and energy efficiency of the development highlighted by the planning committee. The roof contributed towards requirements under National Planning Policy Framework (NPPF) Chapter 11: Conserving and enhancing the natural environment and The London Plan 2011 Policy 5.2 – Minimising Carbon Dioxide Emissions, Policy 5.3 – Sustainable Design and Construction and Policy 5.7 – Renewable Energy. The green roof is layered with a raised PV array so that the entire roof qualifies as a green roof whilst also providing energy generation.System installedBauder Total Green Roof System (BTGRS)1 BauderPLANT EA torch-applied, root resistant capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC KSA DUOA self-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. 3 BauderPIR FA-TEFlatboard insulation used on the lantern roof area to help meet its U-value of 0.15W/m²K. 4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder insulation adhesive.
Sponsored
Assured fire safety depends on sticking with a quality specification

Assured fire safety depends on sticking with a quality specification

Promat UK

Dame Judith Hackitt’s assertion that the building industry routinely puts cost before quality will come as no surprise to architects and contractors who often see their specifications being challenged, and changed, just to save a few pounds. ‘Value engineering’ has become synonymous with an industry obsessed seeking to do everything at the lowest possible cost. Fire rated glass, framing materials and other components must be evaluated and scrutinised at the product specification stage. Once specified, passive fire protection products must stay specified, as the slightest change to the specification can compromise the expected level of fire resistance.
Sponsored
Accoya vertical cladding for the Tintra footbridge, Norway

Accoya vertical cladding for the Tintra footbridge, Norway

Accoya

Accoya was chosen as the ideal material for the vertical cladding on a footbridge in Vossenvangen, Norway. Maintenance was an integral issue during the pre-planning & construction. Combining strength, durability and minimal maintenance over the years, Accoya wood was the natural choice for Rintala Eggertsson Architects. Constructed by IKM Steel & Facade, the project also won the Architizer A+ Award in the Transportation and Infrastructure category. Two other category winning projects included; The Royal Arena, Denmark (Jury Winner in the Sport and Recreation category) and City Hall Venlo, Netherlands (Jury and Popular Choice Winner in the Institutional-Government & Municipal Buildings category).
Sponsored
Case Study Sutton Station – Breathing new life into an old station

Case Study Sutton Station – Breathing new life into an old station

Twinfix Limited

Sutton station, owned and operated by Network Rail needed refurbishment. The station was showing signs of its age, with the old timber work in need of replacing, the roof leaking and the glass roof sections in need of some TLC. Due to their age, the glass roof sections had become fragile and had subsequently broken, Also because of the difficulty in safely cleaning them, they were proving more of a light blocker, than a source of natural light.It was decided that the glass roof sections would need replacing and in order to do this, Twinfix were consulted by Network Rail and asked to offer a solution. Twinfix were mindful of the aesthetics of the station but were also very aware that they could offer something which would provide a long-term solution for the station. Utilising their Multi-Link-Panel System, Twinfix put forward a solution which would do justice to the refurbishment work, the station was receiving whilst bringing the roof up to date and delivering an outcome which would last the test of time. By replacing the old steel and glass sections with their sustainable aluminium and polycarbonate Multi-Link-Panel System, Twinfix’s proposed solution would maintain the look and feel of the old roof, but deliver something which is virtually unbreakable, doesn’t need repairing or regular replacement and would allow routine cleaning to be carried out, keeping the station flooded with light. By replacing the old glass with a slightly obscured 6mm polycarbonate, the light inside the station would be diffused rather than harsh, and significantly brighter than the current situation.The new system would not only last the rigours of time, but is made of sustainable materials. Polycarbonate has minimal impact on the environment and is fully recyclable at the end of its long life. Polycarbonate panels, used in place of glass can be manufactured to give the same look as more traditional glass with features such as Georgian wired but with a significant weight saving. This weight saving means that transportation, manual handling of lifting is easier and requires less energy, plus the structural elements can be reduced as the weight they are required to support is reduced. The result is a total saving on energy and materials needed for installation. Once installed polycarbonate is considerably stronger than glass and is unlikely to break. Depending upon the requirements and location of the installation, Twinfix manufacture a ‘non-fragile’ version which, in testing could withstand far greater impact than an equivalent glass panel. This is especially good for areas where people might accidentally step or fall onto the panels such as rail station roofs. This inherent toughness also reduces the need to replace the glazing panel as often as glass and with UV coatings the panel doesn’t yellow with age or become brittle.Aluminium is known as the ‘Green metal’ due to its ability to be recycled again and again, without degradation of its inherent properties. Recycling aluminium also saves 95% of the energy required in the production of aluminium from raw materials. Compared to traditional steel, aluminium is approximately 2.5 times lighter, strength for strength, so again there is a weight saving comparable to that associated with polycarbonate over glass. Unlike steel, aluminium will not rust, and the application of powder coating will prevent corrosion. Powder coating is a pigment encapsulated in a powdered resin and then cured in an oven to harden the paint surface.Working with the roofing contractor, G.S. Moore, and as part of the larger station refurbishment, delivered by BAM Nuttall, Twinfix were able to replace the existing damaged glass roof in the entrance, the footbridge and the platform adding up to an area over 340 metres square, bathing the covered areas in natural light.Vicky Evans, Director at Twinfix, said; “It was a pleasure working with the team at Network Rail, G.S.Moore and BAM Nuttall. Sutton Station roof was in a dramatic need of replacement. We are proud of the finished product and that we were able to offer a long-term solution that delivers the aesthetic charm of the old roof, increases light levels for passengers, improves safety for all using the station and offers a sustainable, future proof outcome. We look forward to being part of delivering more excellent results for our clients in the future.”
Sponsored
Ravelin Park Sports Centre, University of Portsmouth

Ravelin Park Sports Centre, University of Portsmouth

Junckers Ltd

A new sports and leisure complex designed by FaluknerBrowns Architects has set a new environmental standard in ultra-low energy consumption. With an operational energy consumption of less than 100 kWh/m2/y, Ravelin Sports Centre uses only one- tenth of the energy demand of an equivalent sports centre. This is a landmark project which Junckers is proud to have participated in, a unique collaboration between architects, manufacturers, the client and BREEAM. The new building is fossil fuel-free, rated BREEAM Outstanding with extensive use of natural and sustainable materials, natural lighting and ventilation, air source heat pumps and heat recovery, including a bio-solar roof which reduces demand from the national grid by over 20%. The centre includes a swimming pool, a fitness suite, multi-activity studios, an eight-court sports hall, squash courts, climbing and bouldering facilities, a ski simulator and teaching facilities. The large sports hall has been fitted with 1600m2 Junckers SylvaSport Premium solid beech flooring installed by Junckers’ Approved Contractor Hutchison Flooring. Well-known for its high quality, performance and user safety, Junckers’ sports flooring also meet the strict criteria for sustainability and longevity required for a building of this standard. Wood is naturally low in embodied carbon, a consideration which comes more into focus when operational carbon is reduced. Junckers’ solid wood floors are sourced from managed forests with chain of custody certification through FSC® and PEFCTM and the company holds product-specific EPDs for its flooring. “When the operational carbon in a building is lowered, selecting materials with low embodied carbon becomes increasingly important. Specifying Junckers sports flooring fulfilled many criteria – durability, longevity, recyclability, and flexibility of use, which had a positive impact on the BREEAM assessment.” Irina Korneychuk, Senior Associate at FaulknerBrowns Architects With a proven long lifespan, a solid wood floor also scores highly when comparing maintenance, refurbishment, and replacement cycles. A Junckers 22mm solid beech floor can be sanded and refinished eight to ten times without loss of performance, and with typical 12-year intervals between refurbishments, a design life of 60+ years is easily achieved. An important part of future-proofing new buildings is recognising how a large percentage of embodied carbon is emitted post-completion when finishes need to be refreshed and replaced. At the same interval when a Junckers floor can be sanded and refinished, other sports flooring surfaces normally have to be replaced. This can lead to excessive use of raw materials and energy, unnecessary carbon emissions and pressure on landfill sites, especially in relation to surfaces made from fossil fuel derived materials such as vinyl and PU floors. Flexibility is another key consideration when building for a long design life. Leisure trends come and go but a multi-use sports hall is a timeless component of any leisure centre. The ability to use the flooring surface with its sprung undercarriage system for a multitude of sports, dance, performances, and competitions is crucial. Junckers sports flooring is widely used globally for all ball and racquet sports, dance, ballet, yoga, and other exercise studio-based activities. It is even hard-wearing enough to accommodate wheelchair rugby and retractable seating systems. 
Sponsored
Chatham Waters, Kent

Chatham Waters, Kent

RYNO

Chatham Waters is a large development of 199 luxury apartments in Kent, with far-reaching views over the historic Chatham Docks. Each of the 199 homes features its own large balcony space with Euroclass A1 fire-rated aluminium decking and porcelain paving used interchangeably throughout the scheme to provide zoning and interest.Systems UsedBalcaSmart® Aluminium decking system with boards in RAL 7036 (Platinum Grey) passes beautifully into Quadro porcelain in the shade ‘Argento’. Selected for their low-height build-up, TerraSmart® Pedestal and BalcaSmart® Aluminium decking systems utilise very similar low-height non-combustible RP-FR and RD-FR pedestals, which work together to achieve a seamless transition between zones. DetailThe contrasting external flooring is mirrored in the intermittent placement of the brass screening throughout the buildings in the scheme, providing a distinctive and luxurious appearance.
Sponsored
Robin Hood - Timber Pergola Awning

Robin Hood - Timber Pergola Awning

Breezefree Ltd

We were approached to transform the rear decked terrace of this lovely destination pub with stunning views on the Ridgeway in Enfield...
Sponsored
Liberty Point Student Accommodation

Liberty Point Student Accommodation

Polyroof Products Ltd

Liberty Point is a large student accommodation building positioned in a prime location in Southampton, close to the marina and city centre. The old asphalt and felt coverings had begun to display defects including splits, blisters and delamination; through which water ingress was occurring.The property management company responsible for the maintenance of the buildings decided to act quickly and find a permanent solution to the leaking that could be installed without disruption to the busy students living there.The SolutionPolyroof’s Protec System was decided upon as the best option due to the numerous details that would have to be encapsulated on the roof area. There is no liquid system that can do this quicker or more effectively than Protec; its unique RapidCure technology sees it turn from a liquid to a robust and flexible membrane that can be walked on after 30-60 minutes following application. Furthermore, its ability to coat an old roof without the need for stripping existing means that installations can be carried out within stringent time frames and with minimum disruption.CompletionWilliams Roofing Contractors Ltd, a highly experienced Polyroof approved contractor, carried out the installation. The quality of the workmanship coupled with the right choice of roofing material made for a superior refurbishment solution that remedied all the existing issues. The client was delighted with the finished roof and will have guaranteed peace of mind for decades to come.
Sponsored
Den Court

Den Court

Bauder Ltd

Den CourtBauder Thermofol single ply waterproofing systemSynopsisConstructed in 1977, Den Court is a large retirement home made up of 24 flats in the small town of Lochgelly in Fife. The regeneration of the sheltered housing by Fife Council involved the demolition of part of the building as well as replacement windows and doors, landscaping and a new car park.Bauder Building BoardProject:Den Court Care Home, CardendenLocation:Lochgelly, Fife, ScotlandProject Type:RefurbishmentRoof Area:1200m²Specifier:Fife CouncilApproved Contractor:Greenroof UKThe specificationThe client was clear that lead effect rolls were essential for this projects roof. In order to achieve this whilst keeping with the original roof of the building and with the other buildings of the area, Bauder’s Thermofol PVC system was specified and approved contractor Greenroof (UK). The resultDuring installation, the approved contractors hand-crafted over 2,000 linear meters of timber battens wrapped in the Bauder THERMOFOL U15 Fleece Back waterproofing membrane. These were then installed on to the 1200m² roof area.Thanks to the hard work and craftsmanship deployed by the approved contractor and the high-quality products used on the project, following a roof inspection from an expert Bauder Site Technician and a leak test, Bauder was able to issue a 20-year product and workmanship guarantee to the roof. System installedBauderThermofol single ply waterproofing system1 Bauder THERMOFOL U15 V FR1.5mm fleece-backed reinforced PVC membrane2 BauderPIR MTissue-faced flatboard insulation3 BauderTEC KSDElastomer bitumen air & vapour control layer, self-adhesive membrane
Sponsored
King Solomon School

King Solomon School

Axter Ltd

OverviewThis project saw the refurbishment of King Solomon International Business School, which was changing hands from office use to education. The building now features specialist science rooms, resistant materials workshop, drama studio, outdoor sports hall, music rehearsal rooms, food technology, ICT rooms and language rooms.ChallengesDue to the change of building use, a full survey of the roof covering was required. Excessive moisture was found within the existing asphalt covering, water ingress was present and the internal top floor of the building was not suitable to be used as a teaching space. The roof area presented many challenges with complex detailing to existing balustrade posts, live mobile telephone masts and large quantities of plant / M&E installed.SolutionsAs a starting point, the roof was completely stripped due to the high level of water ingress. The existing asphalt covering was removed ready for installation of a new Excel RBM system, with Hytherm ADH PIR thermal insulation. Much of the existing M&E was found to be redundant and could safely be removed from the roof area.The complex detailing to the balustrades and fire risk areas was simplified using Starcoat PMMA cold applied liquid waterproofing, allowing for a long term, robust and financially viable solution. High level roof areas were also detailed with ease using Starcoat PMMA. Successful installation provided a peace of mind roof covering for the next 25 years, supported by Axter’s Platinum Guarantee.Systems in useExcel®Starcoat® PMMA
Sponsored
APL Case Study - Aluminium Sinusoidal Firewall - Nathan Way, Woolwich

APL Case Study - Aluminium Sinusoidal Firewall - Nathan Way, Woolwich

Architectural Profiles Ltd

Client: Royal Borough of Greenwich Council Architect: Frankham Consultancy Group Assembly & Performance:·        All constructions including APL Tritherm™ structural framing system and all as non-combustible assemblies·        Roof – 10,000 m² of APL Energi Twin-Skin: Profile 31/1000RR in stucco-embossed mill-finish aluminium on walk-on roof liner plus all associated flashings, gutters, fixings and sealants, U-value = 0.18 W/m².K·        Walls - 10,000 m² of APL Energi Twin-Skin: Profile AP45HR in RAL 9006 PVF2 aluminium on wall liner plus all associated flashings, fixings & sealants, U-value = 0.16 W/m².K Special Features:·        Client required a 40-year maintenance free material for the roof in the marine location·        Multiple consultants employed by the end client to ensure the construction exceed current building regulation due to the proximity to Grenfell·        APL clamp-end lap detail for the roof to allow for thermal expansion·        APL Firewall™ with 60 minute integrity and 60 minute insulation ™ construction due to boundary walls Building Location:·        London Borough of Greenwich

Showing 685-720 of 880

Feedback