NBS Source
I'm a manufacturer

"parking"

2,475 results found

Sort by:

Showing 973-1008 of 1024

Sponsored
Hopton Hall Gardens - Raised Planters

Hopton Hall Gardens - Raised Planters

WoodBlocX Ltd

Six of our large raised planters can be found in the walled garden of the historic Hopton Hall on the outskirts of the Peak District. The hall has a rich 600-year heritage and has hosted the likes of Oliver Cromwell and Mary Queen of Scots. Today the hall is a privately owned home with holiday cottage accommodation. Its beautiful gardens are open to the public, who travel from all over the world to see its famous snowdrop displays in spring and its fragrant rose garden in summer.The kitchen garden sits within the walled rose garden and is used to grow vegetables, herbs and varieties of pollinator-friendly flowers.There are two rows of three raised planters. This area of the garden is sloped, therefore the planters needed to be built into it to maximise the space large beds have been built into the slope.Hopton’s head gardener opted for high planters for ease of access and each design is 0.85m high.WoodBlocX modular planters are a popular choice for parks and gardens. The combination of versatile design and superior finish means the structures work well in historical and heritage settings and equally well within modern schemes by simply switching from traditional to contemporary capping, which sits flush with the structure.Raised planters can also be designed with integrated seating and in bespoke shapes and sizes, and we offer all clients a Free Design Service which will visualise your design in a series of CAD views.Bei
Sponsored
Cycle Canopies for the New Ellesmere Port Sports Leisure Village

Cycle Canopies for the New Ellesmere Port Sports Leisure Village

Falco UK Ltd

Falco recently manufactured, supplied and installed four bays of FalcoSpan cycle canopy for the new £15m Ellesmere Port Sports Leisure Village in Cheshire!The FalcoSpan cycle canopy was chosen for it’s light and spacious design providing maximum accessibility but great cycle coverage. The shelter was powder coated in RAL 9005 Jet Black to both increase durability and match the colour scheme of the leisure centre. Additionally hard wood cladding was added to the legs to soften the feel of the shelters and maintain a coherent theme of the overall design. For cycle parking, below ground fix Sheffield stands provide secure accommodation for up to 40 bikes.Ellesmere Port Sports Leisure Village is the prestigious leading regeneration project for Cheshire West and Chester Council (CWAC). CWAC has a forward thinking cycling policy and this installation provides real support towards that strategy. The development has been co-funded by Sport England on the site of the former Stanney High School and is home to a new purpose built sports and leisure facilities including an 8no lane 25m pool, separate teaching pool, 8 court sports hall to National Premier League Basketball standards with 1400 retractable seats, dance and exercise studios, gymnasium, spinning zone, wet and dry changing areas and café. The new state-of-the-art development is part of a £70m investment in leisure facilities across the borough.
Sponsored
National Maritime Museum, London

National Maritime Museum, London

FOAMGLAS®

FOAMGLAS® T4+ (Slab)Design Architects: C.F. Moller & Purcell Miller TrittonMain Contractor: Bovis Lend LeaseApplication: Compact Roof - Gallery Roof & Restaurant Terrace FOAMGLAS® S3 (Slab )Finish: PaversFOAMGLAS® insulation was specified for the new gallery terrace and restaurant of the National Maritime Museum. With limited height available upon the roof there was no space for a concrete screed to falls. Therefore, architects Purcell Miller Tritton needed a factory machined tapered insulation with a slope to shed water. In addition, the limestone terrace paving must withstand the loads imposed by vehicles and so the insulation beneath had to withstand these dynamic loads without any compression.FOAMGLAS® T4+ slab insulation was specified for the project due to these conditions. FOAMGLAS® does not move or deflect under loads, and is available factory machined with a tapered slope. Its thermal performance is reliable and permanent and it is guaranteed for the lifetime of the building. The new roof of the gallery has paved areas, and green planting with hidden drain age and water supplies.The restaurant terrace gives wonderful view of the World Heritage Site, Greenwich Park and the Royal Observatory. The gallery has some fascinating objects; including jewels which belonged to Sir Francis Drake, journals written by Captain Cook’s during his long voyages, and personal items that survived the sinking of HMS Titanic.
Sponsored
St Ann Court, Jersey

St Ann Court, Jersey

URSA UK LTD

Urban development within St. Helier, the capital of Jersey is gathering momentum with URSA seeing its specialist insulation products specified at one of the capital’s newest and most ambitious developments. The largest of the Channel Islands, St. Helier is a lively harbour town and has become one of the UK's most popular tourist attractions, creating a high demand for ongoing residential and commercial development. Both its commercial port and marina, as well as the centre and the main neighborhoods, are undergoing an in-depth study for the renovation of its building stock and the transformation of the urban landscape it offers. The ultimate objective is a profound urban regeneration carried out through the creation of a commercial heart open to the sea, in the city centre, and modern, sustainable and healthy residential developments on the outskirts to ensure the demands of future growth. It also aims to reduce traffic and create a walkable city for pedestrians and cyclists with green spaces and open spaces. In the north of the city is Ann Court, a large development located next to a large municipal park built on the site of a former car park that has been demolished. Being developed by Andium Homes, construction is nearing completion on the development of 165 new homes of different sizes and orientations (with internal and external courtyards), but with a common standard: the energy efficiency and sustainability of the whole complex. To support the sustainable objectives, architects have specified a ventilated façade that guarantees thermal and acoustic comfort, whilst preventing moisture penetration and condensation. A correctly designed ventilated façade system also guarantees a fire safe structure, prolongs the life of the building and enhances its energy efficiency. As part of the specification, 2,400 square meters of 220mm URSA Walltec Black 32 were specified. The choice of material was the direct decision of the architect Stephen Marshall of Axis Mason Architects, who decided on the glass wool slabs after learning about their performance and the knowledge provided by URSA's technical office. URSA Walltec Black 32 is a semi-rigid glass wool slab treated with a water repellent additive. The slabs have a black glass fibre tissue to one side only that helps to hide the insulation in ventilated façades with open joints. It is a non-combustible product that does not contribute to the spread of fire, is water repellent and has high performance to ensure the thermal and acoustic comfort of the entire residential complex. Once the insulating material has been fixed, the façade is completed with the installation of the cladding to create cavity that ensures the properties of the system. This imposing façade enveloping the courtyards of Ann Court facilitates a new building in the north of St. Helier where social interaction, tranquility, quality, comfort and healthiness are guaranteed.  Ian Claydon, URSA UK Technical Manager, said: “We first became involved in this scheme in June 2020. We were approached by the architect for recommendations on correct choice of product and the thermal assessment for the external walls.  “During the early stages of the project, we were in regular contact providing advice on the target U-value in the wall(a commendably low 0.18 W/m2K), as well as the impact on Jersey SAP energy assessment and the technicalities of rainscreen cladding. The team were particularly impressed with the speed of response and our wider technical knowledge, helping to support the perfect specification.” 
Sponsored
Yorkswood Primary School

Yorkswood Primary School

Excelsior Panelling Systems Ltd

The Project Yorkswood Primary School forms part of Solihull’s Regeneration Project, investing in the area through the creation of new schools, housing, parks, village centres, and local enterprise.The £5.7m new school will replace the current outdated buildings as part of the £60m scheme in place to improve every single primary school in the North Solihull Regeneration Area benefitting the learning of over 4,000 children. The ChallengeThe Architects vision for the washrooms was to create a vibrant, innovative space with multi coloured cubicles working in harmony throughout the colour pallet. The challenge for us was to ensure full usage of the core material was utilized throughout the scheme to ensure optimal yield and competitive pricing.Construction took place alongside the existing occupied school buildings, and therefore keeping the school operational and safeguarding the pupils and staff was an important factor for this project. The SolutionRepeating the pallet throughout the washroom areas ensured as much of the core material as possible was utilised.Harlequin Mariner & Harlequin Peardrop Cubicles and Duct panelling were used through the scheme. Solid Grade Laminate is the perfect choice of material for the Education Sector offering extremely high levels of durability.SpecificationProduct Range: Harlequin MarinerDoors: 20mm Laminate Faced Compact Density FibreboardPilaster: 12mm Compact SGL, Polyrey Érable Nordique E028Partition: 12mm Compact SGL, Polyrey Érable Nordique E028Ironmongery: SBAAAvailable Finishes:These Systems Are Available In The Following Finishes:• High Pressure Laminate• High Gloss Laminate
Sponsored
Residential Townhouse Composite Fencing

Residential Townhouse Composite Fencing

EnviroBuild Materials Ltd

Taw Wharf is a new waterfront destination placing contemporary design and modern amenities alongside the historic listed buildings of the medieval Long Bridge. The full development will encompass a range of apartments, penthouses and townhouses adding up to a 172 newly designed homes. Hyperion Composite Fencing was selected for this project. Project BreakdownLed by local housing experts North Devon Homes and Pearce Homes, the 30-acre site will have close references to the character and materials of the site’s maritime history and its riverside wharf location to create a vibrant community.Located in the premier town of North Devon, the project is close to both the country and the coast. To enhance its natural beauty and rural living, all new release townhouses will offer an outdoor area. The development is nearing completion with the first viewings taking place beginning of August 2019.The SolutionEnviroBuild provided 3,118 m² of Hyperion Pioneer stone fencing for the townhouses’ front gardens and parking spaces. The non-rot, low maintenance panels made it the perfect material to fence the residential homes. The contemporary design also made the development blend in perfectly with the area’s historic charm.Working closely with the contractor Pearce Construction, the fencing was installed using granite fence posts included in the purchasing price.Project DetailsSize: 3118 m²Product: Stone Hyperion Pioneer FencingClient: Pearce ConstructionArchitect: Woodward SmithContractor: North Devon Homes & Pearce HomesSub-contractor: Pearce ConstructionLocation: Barnstaple, North Devon
Sponsored
CUBRIC, Cardiff University

CUBRIC, Cardiff University

Lusso Systems Ltd

The £44m state of the art Brain Research Imaging Centre (CUBRIC) brings together world-leading expertise in brain mapping with the very latest in brain imaging and brain stimulation. This multi award-winning project is home to the Clinical Research Facility and is part of Cardiff University’s Maindy Park site.The new building is four times larger than the old facility, meaning staff from different departments now benefit from being housed under one roof, allowing for increased collaboration and innovation. Research carried out at the centre aims to help scientists understand the causes and find treatments for brain changes that lead to disordered cognition and mental health issues.This hub offers a range of facilities including an NHS standard medical suite with drug trial unit, specialist scanning suites, laboratories, office accommodation and large seminar facilities within an open-plan environment. For the interior, architects, IBI Group, chose rich materials such as wood, bold colours and geometric shapes which were complimented by Lusso’s glass partitioning. This has created a professional yet welcoming space. In keeping with the design, Lusso 105 double glazed frameless partitions were installed for offices and meeting rooms.  Fitted with interstitial blinds, users can create privacy whenever needed. The use of glazed partitions also makes best use of the natural light and creates an inclusive space. Lusso also installed bespoke high acoustic glazed vision panels with specialist glass for the scanning suites. The overall effect is an inspirational space for research and innovation at an international level.
Sponsored
Logistic Warehouse Heating

Logistic Warehouse Heating

Powrmatic Ltd

OverviewPowrmatic was selected to supply a frost protection warehouse heating solution for a massive 81,000m² building at Plot 2 at the Midland Logistic Park installed by Phase Mechanical Projects. a combination of 7 TE61 heating units and TE61 Destratifcation units were installed.Project BackgroundThe 81,000m² industrial logistic warehouse required frost protection with design parameters of -5°c external and +5°c internal.SolutionOne of our largest installations to date, 4 x TEG61 air rotation heaters were installed by our trusted partners Phase Mechanical Projects. Each TEG61 heaters boasts an impressive 525kW of heat output and were installed alongside 3 x TE61 destratification units to assist with the air turnover due to the size of the building. The 4 TEG61 heater units selected were designed to move 39m3/s of air around the building per unit, and when combined with 3 TE61 destratification units also at 39m3/s this gave a total air volume of 270m3/s which achieved the required 0.8 air movements per hour from the end client.ResultThe newly styled Powrmatic Air rotation units in our new RAL 7015 colour were installed expertly by Phase Mechanical Projects. The racked logistic warehouse will now benefit from a frost protection system which will protect the internal sprinkler system from freezing in the colder months. Each T.E manufactured at Powrmatic is custom built to specific project requirements.
Sponsored
Hudson Quarter, York (2021)

Hudson Quarter, York (2021)

Artform Urban Furniture Limited

Hudson Quarter is a modern development consisting of four buildings that surround a central courtyard. The £35 million investment has provided 127 apartments over three buildings and a Grade A office space.The site sits on the former grounds of the city’s first railway station and within the ancient city walls. To remain sympathetic to these historic factors and York’s distinctive character the buildings have been deliberately built close together, to mimic tight spaces in the city. The external walls are angled to reflect the organic nature of York’s core. As a connection with its railway past the apartment blocks are all named after stations – Waverley, Victoria, and Kings. Hudson Quarter’s buildings have been carefully designed to step down from Toft Green towards the City Walls to create a new public pedestrian connection between the nearby train station and the Micklegate area. It is here that Artforms Cestis Litter Bins have been supplied to provide a robust waste management solution.The Cestis litter bin features a stylish and simple design with a cast aluminium pole, a galvanised steel container and cast aluminium cover. Further to this, a number of Cafe Cycle Stands with matching powder coated finish to the bins have been installed running parallel to the exterior of the building and ancient walls. Cafe cycle stands offer a unique approach to cycle parking that elevates a space whilst maintaining a secure structure for cycle locking.Using a careful and considerate approach in a highly sensitive location Hudson Quarter has successfully provided a vibrant new place to live and work in the City of York.
Sponsored
Fast, sustainable construction of fibre reinforced floor slab for London academy school

Fast, sustainable construction of fibre reinforced floor slab for London academy school

Tarmac

This major redevelopment of Charlton Park Academy school involved replacing temporary mobile classrooms and a single storey building with a two-storey steel framed brick building to better meet the needs of students, teachers and carers. A structural flooring solution was required for use over precast planks, covering 800m2 on the ground and upper floor at a depth of 75mm to 120mm. Space and access would be challenging, due to the small footprint of the site, proximity to the existing school building and access from a busy main road. Given the large floor area, a traditional sand cement screed would have been very time consuming to place. Tarmac’s TOPFLOW SF a self compacting steel fibre reinforced concrete was chosen as the solution. Its flowing nature would allow it to be quickly pumped into place and adapt to the variable thickness criteria. TOPFLOW SF is designed to act as a structural topping with both, steel mesh & fibre reinforcement. The steel fibres added to the TOPFLOW SF gave its robustness and flexural strength as it was being placed over a precast plank system that could flex with loadings. They also reduced the risk of cracking. By replacing steel mesh reinforcement, it helped avoid problems with access, storage and handling and kept the site open for parallel trades. Using TOPFLOW SF rather than a sand cement screed or reinforced concrete, improved productivity and saved time. This saved 13 days or just over 2.5 weeks on the programme. 
Sponsored
Streamlight Tower, London

Streamlight Tower, London

Valcan (Fairview Europe Ltd)

Streamlight Tower is a residential skyscraper in London that was completed in 2012. The building has 24 stories and contains a total of 174 dwellings ranging from 1-5 bedroom apartments. The upper floors of the tower offer panoramic views of the city, and many of the apartments feature floor-to-ceiling windows.The Streamlight Tower is a striking addition to the Providence Square development in the London Borough of Tower Hamlets. The slender, tower stands out against the brick and glass of its surroundings, and its simple form is punctuated by a series of recessed balconies. The tower has a signature angled roof, which provides a dramatic focal point for the development. The Streamlight Tower is an excellent example of contemporary architecture, and its unique design is sure to make it a popular landmark in the area.Just a stone’s throw from Streamlight Tower are restaurants, coffee shops, a gym, convenience stores and much more. A short drive is The O2 which is home to many shopping outlets, bars, restaurants and a Cineworld cinema. There are plenty of places to visit including Central Park and Crazy Putt London.The Facade has recently been updated with approximately 3400m2 of Valcan’s VitraDual which has been installed onto the building. VitraDual’s benefits from a A1 rating (to BS EN 13501-1 fire classification) which means the product non-combustible.As always, it’s been great working with MK Facades on this project who have installed the cladding panels. The team at MK Facades has worked hard on this project and we’re very happy with the progress, and look of this magnificent building.
Sponsored
Bradstowe House, Harrow

Bradstowe House, Harrow

Valcan (Fairview Europe Ltd)

Bradstowe House is a fascinating opportunity to not only rescue a historic building but also do it in such a way that will make the property sustainable. When Comer Homes decided they wanted their piece back after experiencing one too many economic downturns under this roof (pun intended), what came up wasn’t anything short of astounding: The long-abandoned concrete frame had become nothing more than dust and decay; its glory days are forgotten — until now!Bradstowe House, designed by Comer Homes’ UK in-house architects is a contemporary landmark for Harrow. The building’s curving glass and steel form give way to ample underground parking as well the rooftop terraces which make this development an iconic example of modern architecture that can be found anywhere from London city all too small towns across England!Bradstowe House offers a diverse range of rental apartments that are designed to suit your needs. With modern kitchens and fully integrated appliances, our high-quality homes offer the perfect space for gatherings with family or friends alike!The old cladding of the building was very outdated and it required a lot of maintenance. The new planning permission allows for an aluminium panel (Valcan VitraDual) curtain walling system, which is much more durable than granite panels while also having better insulation qualities!Valcan supplied and delivered approx. 4100m2 of Valcan VitraDual in Cornish Granite & Riddle Grey.
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
One Thames City

One Thames City

RYNO

Thames City is a spectacular location and presence in Zone One of the River Thames. With some of the city’s most breathtaking views, especially for those not afraid of heights, this is a fresh district featuring three residential towers, a development of 12 buildings, beautiful apartments with private luxury amenities, high-end retail, and fine dining venues.The overall experience of this amazing project is made even more appealing thanks to its network of interconnecting parks, cosy green courtyards, and romantic city squares.This project was complex, involving both TerraSmart Rail Paving and TerraSmart Pedestal Paving Systems. Both these systems are designed for waterproofed substrates with TerraSmart Rail being the ultimate raised paving system, unbelievably solid thanks to its unique lattice framework.Due to the height of the tower, we worked closely with Midgard Design Services to develop and install an appropriate wind uplift mitigation solution to keep the project within budget.The TerraSmart Rail Paving System was weighted using ballast weights, and installed in the joist frame to mitigate uplift – it couldn’t be fixed into the structural slab due to it being an inverted roof. The pavers were then mechanically fixed to the joists using a wind uplift visual fixing, which clamps down the entire system.The TerraSmart Pedestal Paving System was mechanically fixed to the structural slab as there was no waterproofing membrane to penetrate underneath. The wind uplift mechanical fixing was screwed into the top of the pedestals to retain the concrete pavers and prevent any movement in strong winds.The installation of the systems was beautifully done by ANC Construction and the proof is in the photos you see on our website.
Sponsored
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were planned for installation in the hospital parking lot.It was determined that a ramp with a wide platform was necessary to accommodate the diverse range of daily users of the system, including those operating patient-moving equipment, carts, and pedestrians accessing the cabins.END RESULT:A fully compliant ramp featuring an extra-wide metal walkway was designed and successfully installed. This product boasts a secure loading capacity of over one ton!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Sponsored
Lockers, Cubicles and Bespoke Products at Lee Valley Ice Centre

Lockers, Cubicles and Bespoke Products at Lee Valley Ice Centre

Helmsman

Lee Valley Ice Centre originally opened in 1984, and before closing in 2021 welcomed over 279,000 visitors each year. With the old centre reaching the end of its operational life, it was time to design and build a brand new Ice Centre at Lee Valley Regional Park. The new centre, due to open in April 2023 will be home to 2 new ice rinks, doubling the capacity of the old centre, and inviting in new visitors as well as welcoming back those who visited before.As part of the redevelopment of Lee Valley Ice Centre, 95% of the concrete from the old centre was used in the foundations of the new centre. With this and many other environmentally friendly choices made in the construction, Lee Valley Ice Centre will become the UK’s most sustainable Ice Centre.The fully accessible centre will maximise the opportunity for sports for everyone, and with two Olympic-sized Ice Rinks, a brand-new café, gym, exercise studios and various other facilities, Lee Valley will be able to welcome up to 500,000 visitors. The range of facilities will encourage a variety of new visitors, from committed skaters, though to people stopping for a drink in the café before enjoying the green space in Lee Valley Regional Park.At Helmsman, we were pleased to be contacted by the main contractors for Lee Valley, The Buckingham Group, to supply the lockers, cubicles, vanity units and bespoke high-level cladding. We manufactured and installed 268 Bespoke Heavy Duty Laminate Lockers, with a variety of compartment configurations, and a range of different locking options.Our Heavy Duty Laminate lockers are a great option for high traffic areas, as they are more likely to withstand scratches and dents, so were a perfect choice for Lee Valley Ice Centre. The lockers also feature bespoke perforations in the doors and aluminium number plates. A selection of the lockers also have seat stands with the slats in matching laminate. A variety of locks were also used across the lockers in this project, with Ojmar Hasp locks the main choice for users to use their own padlocks, as well as Ojmar coin return locks and Lowe and Fletcher cam locks.The cubicles chosen for this project were our Front Line Cubicles with Hidden Fixings. These cubicles are tailored to suit the needs of the particular project, with bespoke sizing available. The fixings are hidden to provide a smooth surface and aesthetic finish. The cubicles were manufactured with 12mm Solid Grade Laminate from BioCarbon Laminates in colour Luna Grey, a fantastic carbon-neutral option which aligns perfectly with Lee Valley’s aim to be the first sustainable Ice Centre in the UK.As we manufacture all our products in house, and to order, we specialise in bespoke items. The project at Lee Valley Ice Centre featured bespoke high-level cladding, which our highly experienced installation team fitted on-site.Other products on this project included metal framed IPS panels, using both Luna Grey and Elegant Grey laminates from BioCarbon Laminates, and Helmsman High Pressure Laminate Vanity Units.It was great to work alongside Buckingham Group again for the Lee Valley Ice Centre project. Should you have a similar project, or want any more information on the products mentioned, give us a call on 01284 530 427 or contact us here.
Sponsored
Nine Elms Parkside Case Study: Under Screed Acoustic Layer

Nine Elms Parkside Case Study: Under Screed Acoustic Layer

CMS Danskin Acoustics

Nine Elms Parkside: Under Screed Acoustic LayerWhen carrying out a large-scale housing development it pays to rely on tried and tested products to provide acoustic certainty. Regupol 7210C (REGUPOL sonus core 5) is one such product. With a long history of reliability, it is now being installed in the UK’s largest single-phase build to rent development.The ProjectNine Elms Parkside is the redevelopment of a 5.6 hectare Royal Mail depot site in Wandsworth, a key part the Vauxhall Battersea Opportunity Area, sitting between Battersea Power Station and Nine Elms market and adjacent to the new US Embassy. The scheme is master planned around the new Nine Elms Linear Park, part of a new green link connecting Battersea Park in the west, along the Thames to Lambeth Palace Gardens in the east.Blocks B and D Nine Elms Parkside were acquired in 2019 by real estate groups Henderson Park and Greystar who contracted Telford Homes to construct 641,000sft of residential space to a design by Allies & Morrison.The scheme consists of 894 build to rent apartments in two twin blocks of 10 to 17 storeys, each of which also features 12,500sft of amenity space with a rooftop swimming pool, gym, pet spa, children’s play space, private dining rooms, cinema rooms and a sky lounge. There are two large outdoor terraces, yoga gardens and community herb gardens complete with beehives. The scheme will also contain 25,000 sq ft of retail and community space.CMS Danskin is supplying Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer to Stanmore, the leading drylining and façade specialist subcontractors who are carrying out the screeding between floors in the apartments.The project to supply commenced in 2020 and we have to date supplied over 96,000m2 of the product. Topping out took place in July 2021, residents will begin to occupy the scheme in 2022 and the units are expected to be fully complete in 2024.Acoustic insulation for new build apartmentsSince 2004 the Building Regulations require that separating floors between apartments meet specific requirements for airborne and impact sound transmission. The requirements are set out in Approved Document E, Resistance to the passage of sound.With a 150mm concrete slab, common in multi storey new build apartments under 18 storeys, a product is required to isolate the structure from a floating screed, thereby significantly reducing impact and airborne noise and enhancing the living conditions of occupants of the apartments.Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer is an isolating layer specifically designed for this purpose and is the go-to product for floating screeds over 150mm concrete slabs.Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer isA high performing insulation that delivers superior impact and airborne performance.An under-screed product designed to isolate screeds from the main structure simply and conveniently.Manufactured from recycled materials – typically aircraft tyres – making it cost effective and sustainable.Compatible with all types of floor screed, making it adaptable across a project and between projects.Aimed at constructions where Pre-Completion Testing (PCT) is preferred to a Robust Detail (RD) approach.Testing under screed insulation for acoustic performancePre-Completion Testing of acoustic floor installations gives a contractor more flexibility, allowing alternative layouts between apartments. If the designer wants to make changes to the layout of apartments, they won’t need to change the Robust Detail as each eventuality can be tested on site. With a project of over 860 flats a 10% required test rate would produce 86 acoustic tests, but the flexibility of using a PCT solution like 7210C (REGUPOL sonus core 5), and its reliability as an established product, makes that regime cost effective.Telford Homes, a long-standing customer of CMS Danskin, were looking for a Pre-Completion Testing product for Nine Elms blocks B and D. Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer is an established product from an established brand, so not only were Telford Homes familiar with the product, but their experienced screeders Stanmore were also confident that testing on site would not raise any issues.Over a year into the project all the tests carried out so far have been successful.Supply chain reliabilityFor a large project with over 100,000m2 of product required over a long contract period, reliability of supply is essential. Any delay in supply can hold up wet trades and affect the critical path. With support from our supply chain partners, CMS Danskin has ensured over 96,000m2 of product has been delivered on time to date.Specify Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient LayerRegupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer is a tried and tested solution to under screed insulation over a concrete slab, be it in apartments, hotels, education buildings or student accommodation. It provides excellent impact and airborne performance, is approved by NHBC for ADE 2003 compliance, and offers long term performance even under high loads.The product is completely recyclable and is produced from recycled materials. It provides Zero global warming potential (GWP) and zero ozone depletion potential (ODP).Regupol 7210C (REGUPOL sonus core 5) Acoustic Resilient Layer is supplied in easy to handle sheets which are quick and easy to install without the need for separate perimeter strips.
Sponsored
Doddington Housing

Doddington Housing

Forterra Building Products

13 new dwellings situated in the small village of Doddington, Lincolnshire are providing much-needed affordable housing for people working at nearby Doddington Hall.Located on Main Street, the development enhances this area of the village, providing important infill on the site once occupied by the local school, which was demolished in the 1960s and has latterly been used as a car park and general storage area. It is bordered by a mix of farmland, mature trees and shrubs, and existing housing, and lies partially within a conservation area.The development comprises two 2-bedroomed, five 3-bedroomed and six 4-bedroomed terraced and semi-detached dwellings. One of the terraces fronts onto Main Street while the remainder have been sensitively designed to create an attractive group of dwellings centred around a newly-created ‘village green’.Perhaps the most significant element of the appearance of the scheme is the elevation of the terraces towards Main Street. In developing the specifically tailored to design for this elevation, account was taken of the nature of the surrounding buildings within the village.Although not prominent to public view, the balance of the development has been designed in a manner sympathetic to the architectural vernacular found within the village. With a common thread running-through which will serve to unify the development and reinforce the sense-of-place which is presented by the scheme.In particular, simple, uncomplicated/uncluttered designs have been developed. High quality materials have been utilised for the development, essential in reinforcing the architectural character of the development, reflecting the high-quality of other developments which have been executed within the village recently.The brick selected was Forterra’s Butterley Breckland Multi Reserve, a red brick with a tumbled texture.
Sponsored
HMP Five Wells

HMP Five Wells

Keim Mineral Paints Ltd

HMP Five Wells, Millers Park, Wellingborough HMP Wellingborough is Britain’s biggest prison holding 1,680 inmates. A flagship, mega, category C jail, aimed to rehabilitate offenders with rooms flooded by natural light and barless windows. There are dedicated classrooms and workshops for ‘high quality academic and vocational learning’.The new seven staggered cross-shaped buildings ensure that corridors are broken up into smaller zones, which enables staff to have more direct contact with inmates. They have been designed in this way to offer better use of outside space for sports and gardening facilities.The aim of the programme was to modernise the prison estate to build a more efficient, safer and focused supporting rehabilitation for inmates.KEIM paints were specified for the project due to it being recommended and applied at HMP Wrexham previously.Dave Smith, Senior Sales Executive of KEIM Mineral Paints, was on hand to help during the entire decoration of the prison. Discussions were carried out with the contractor regarding VOC (Volatile Organic Compounds), BREEAM and algae and fungal resistance.In order to maintain a consistent colour, KEIM recommended that the precast concrete was painted. This provided both a cost effective solution for colouring the concrete as well as ensuring consistency of finish.A training session was held by Dave & Nicola Young, Senior Colourist of KEIM, for the sub contractor to show them the application of the paint.KEIM Concrete Cleaner and KEIM Soldalit-ME were specified to clean and decorate the concrete exterior of the housing, administration block, and the medical wing. KEIM Soldalit-ME has particular environmental benefits as it helps to degrade nitrogen oxide pollutants from the atmosphere, offering durable protection for years if not decades to come.
Sponsored
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

NCC – Emseal Movement Joints

Client: Canary Wharf Group Consultant: Adamson Associates Architects Main Contractor: Kilnbridge Construction Ltd Main Products Used: Emseal DFR-2 SystemsWood Wharf Development is certified as a BREEAM Outstanding rated, sustainable mixed-use development that covers a 23-acre site. It consists of 6 individually designed building structures that provide 2 million square feet of curated workspaces and offices, more than 3,500 new residential homes and 500,000 square feet of retail space. The site is being developed as a new 5G and Wi-Fi-6 enabled, London District to include more than 9 acres of interconnected riverside leisure space with boardwalks, squares, and parks to create an oasis of urban green space. The new multistory building structures were designed with 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. These joints also had to minimise any noise transmission through the floors and provide a minimum of 2-hours fire resistance, which is a key reason the consultants selected the Emshield DFR-2 System as it could easily meet all these stringent requirements. In fact the innovative Emshield DFR-2 System can accommodate more than 100% joint movement capability and is CE Marked to EN-1366-4 for up to 4 hrs fire resistance. This unique Emseal solution also has the advantages of not requiring any potentially damaging mechanical fixings into the structure, as it is easily bonded into the joint, with access only required from above. 
Sponsored
JLR, Aston Martin, McLaren

JLR, Aston Martin, McLaren

Lusso Systems Ltd

This new Multi-Brand Dealership is comprised of three showrooms for the three prestige automotive brands, Jaguar Land Rover, Aston Martin and McLaren and has been built in Hatfield Business Park, Shropshire by the award winning MCS Group. Each of the showrooms have been designed to allow freedom to explore the range of vehicles in a contemporary environment that is both luxurious and inviting. The Aston Martin and McLaren showrooms are also the first in the UK to showcase the newest corporate identities for the brands.The Jaguar Land Rover £15 million showroom is both light and spacious. It provides 18 vehicle display spaces and dedicated vehicle handover suites. There is also a drive-in service area, valet and preparation area. The Lusso 25 single glazed frameless glazed partition system was installed to create office spaces which allows uninterrupted visibility to the showroom. McLaren has a history of exceptional design and engineering, so it is not surprising that the design for the showroom includes a feature curved glazed partitioning system with curved glass sliding doors. Lusso rose to this challenge and bravely executed the complex design requirements. With this statement partitioning, the showroom becomes a be-fitting space for the stunning range of McLaren supercars, providing the customer with an unforgettable shopping experience. As a prestigious brand, Aston Martin is well-known around the world for being a car manufacturer that produces vehicles that turn heads. Their stylish new showroom has been designed to provide a luxurious backdrop for their stunning supercars.The development of the facility has created a bespoke environment with a dedicated customer specification lounge, private handover area and aftersales facilities.With the use of Lusso Glazed Partitioning System, the bespoke showroom has been given a sleek look which was required for this brand.Image - 8
Sponsored
Woodland Trust Curved Roof

Woodland Trust Curved Roof

Polyroof Products Ltd

As described by the Woodland Trust, Glen Finglas is a great expanse of ancient woodland, lochs and open heathland, sitting at the heart of Loch Lomond and The Trossachs National Park and home to one of the best examples of upland wood pasture in Scotland.The newly constructed Gateway Building was designed to blend in with the surrounding woodlands and featured a circular timber-clad exterior with a spiralling, curved roof. The Woodland Trust approached RTA Building Limited, a Polyroof Approved Contractor, to provide a guaranteed waterproofing solution that would complement the aesthetics of the building.After comprehensive discussions and careful evaluation, we recommended the Polyroof 185 Warm Roof System for this unique project. This system stood out due to its exceptional BBA 30-year durability rating, impressive life-cycle costing performance, and an insurance-backed guarantee that offered the client peace of mind.The implementation process involved the meticulous installation of the Polyroof membrane, which flawlessly covered the flat roof areas while seamlessly following the curved perimeters and intricate spiral design. To ensure a fully waterproof edge detail that complemented the building’s contours, we installed a bespoke GRP capping. This robust combination provided Woodland Trust with a reliable and long-lasting roofing solution.Through our collaboration with Woodland Trust, we successfully implemented the Polyroof 185 Warm Roof System, delivering a durable, and cost-effective roofing solution. Our system’s exceptional durability rating, long-term life-cycle costing performance, and insurance-backed guarantee provided Woodland Trust with the confidence that they had chosen a roofing solution that would stand the test of time. With Polyroof, Woodland Trust achieved a seamless, reliable, and environmentally conscious roofing solution for their unique project.
Sponsored
Crossrail Place

Crossrail Place

Radmat Building Products Ltd

Radmat Building Products has supplied the waterproofing roofing system for the Crossrail Place shopping development and roof garden in Canary Wharf. The system provides high performance waterproofing and thermal insulation – guaranteed for the lifetime of the structure – and has enabled the construction of an extensively planted living roof.• The 310m long roof arches 30m over the park and opens to allow natural irrigation• Highly insulating roofing materials help create a microclimate for the gardensRadmat Approved Contractor Prater delivered a 9,300m² roofing solution using PermaQuik PQ6100 Hot Melt Monolithic Waterproofing Membrane, EshaFlex 370 WS Root Barrier and ProTherm insulation.Construction access to the complex inverted timber roof was challenging, so Radmat’s products were chosen for their quick and flexible application and fast-sealing properties.PermaQuik is widely used beneath green roof installations where long-term weather tightness is a necessity, and it was chosen to support the extensive and densely planted gardens, which are the main feature of the Crossrail Place roof terrace.The PermaQuik membrane was followed by EshaFlex 370 WS Root Barrier, a reinforced bitumen membrane that is torch applied to the base sheet. It was selected because of its thermal efficiency and suitability for use with living roof systems. Partnered with ProTherm’s excellent insulation, the complex timber roof now boasts a waterproof system that is BBA Certified to last the lifetime of the building.The wooden structure evokes the ships that once sailed into West India Dock and provides a warm, natural counterpoint to the steel and glass towers of Canary Wharf.And with Radmat’s high performance products and lifetime guarantee, the green roof terrace at Crossrail Place will be a living oasis in the heart of London’s financial district for years to come.
Sponsored
Den Court

Den Court

Bauder Ltd

Den CourtBauder Thermofol single ply waterproofing systemSynopsisConstructed in 1977, Den Court is a large retirement home made up of 24 flats in the small town of Lochgelly in Fife. The regeneration of the sheltered housing by Fife Council involved the demolition of part of the building as well as replacement windows and doors, landscaping and a new car park.Bauder Building BoardProject:Den Court Care Home, CardendenLocation:Lochgelly, Fife, ScotlandProject Type:RefurbishmentRoof Area:1200m²Specifier:Fife CouncilApproved Contractor:Greenroof UKThe specificationThe client was clear that lead effect rolls were essential for this projects roof. In order to achieve this whilst keeping with the original roof of the building and with the other buildings of the area, Bauder’s Thermofol PVC system was specified and approved contractor Greenroof (UK). The resultDuring installation, the approved contractors hand-crafted over 2,000 linear meters of timber battens wrapped in the Bauder THERMOFOL U15 Fleece Back waterproofing membrane. These were then installed on to the 1200m² roof area.Thanks to the hard work and craftsmanship deployed by the approved contractor and the high-quality products used on the project, following a roof inspection from an expert Bauder Site Technician and a leak test, Bauder was able to issue a 20-year product and workmanship guarantee to the roof. System installedBauderThermofol single ply waterproofing system1 Bauder THERMOFOL U15 V FR1.5mm fleece-backed reinforced PVC membrane2 BauderPIR MTissue-faced flatboard insulation3 BauderTEC KSDElastomer bitumen air & vapour control layer, self-adhesive membrane
Sponsored
SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

ABG

When Brexit terms were finally decided in 2020, the end to the freedom and movement of EU goods was agreed to begin from the 1st January 2021. HMRC therefore required an Inland Border Facility to be urgently mobilised to perform the new series of checks required on HGVs crossing the UK Border at the Port of Dover and the Channel Tunnel. This site acts as a location for checking movements of goods inbound (Defra and HMRC) and outbound (HMRC only).Each location is to include parking areas for HGVs and other vehicles, with security measures and facilities to enable the checking of vehicles and goods entering and exiting the sites. There are also temporary office buildings, staff and driver welfare amenities.The design of the facility onto 48ha of former agricultural land was developed with a view to maintaining the landscape and biodiversity of the surrounding area and to screen views of the site from the local villages.Excavated materials were sustainably reused as part of this process in order to create bunds, whilst surface water drainage of the site is directed to local wildlife ponds and wetlands via 30,000 square metres of aggregate filled Truckcell cellular paving.The site is trafficked by up to 950 HGVs at any one time and provides a free-draining, sustainable and durable SuDS surface to withstand the traffic levels without damage or abrasion.Throughout the project, ABG’s in house technical team provided design guidance and site installation support for the customer. Truckcell is a heavy duty cellular paving system manufactured from 100% recycled and recyclable plastic, capable of sustaining frequent HGV loads up to GVW 60 and 10 tonne wheels loads. It can be filled with angular gravel (as was the case on this project) or topsoil and grass seeded, according to the application.
Sponsored
EcoWorld Brentford

EcoWorld Brentford

Cemfloor Liquid Screeds

Verdo, Kew BridgeEcoWorld BrentfordCemfloor Level PlusA luxury development of apartments, shops, restaurants, parks and offices situated next to Brentford Football Club in West London.Cemfloor Level Plus was chosen for this project as the contractor required a screed that could be installed at low thicknesses. Cemfloor Level Plus was supplied by Capital Concrete and installed by Advance Screeding UK ltdClose to the River Thames, and next to Brentford football club in West London, Kew Bridge is a selection of beautiful new homes, as well as shops, cafes and restaurants. It is part of the wider Brentford regeneration project, and developed by EcoWorld.There are a total of 6 blocks on the site, and Cemfloor was the screed of choice for the main contractor.The main contractor had problems with the floor levels on site, so Cemfloor provided a thin screed system to work alongside the unique low profile UFH system; a castellated mat system installed onto Superfoil insulation. The UFH system was supplied by Compact Underfloor Heating. The complete floor build was only 45mm in depth and included acoustic insulation, thermal insulation, castellated UFHsystem, and Cemfloor Level Plus.Advanced Screeding installed Cemfloor Level Plus throughout the development. In total 800m3 of screed was easily pumped to height, over 11 floors without issue,providing an excellent, fast drying low profile floor, and saving significant time on the project.As Cemfloor Level Plus is a ready mixed solution it removed the need for any site mixing, material storage and material disposal from the site. Given the volume of screed required; if a self leveling compound product was used this would have equated to approx. 55,000 x 25kg bags of material having to be mixed on site.
Sponsored
Network of 130 Bikehangars delivered for Glasgow

Network of 130 Bikehangars delivered for Glasgow

Cyclehoop

Cyclehoop are set to introduce a major network of on-street cycle storage to neighbourhoods across Glasgow following a successful Bikehangar pilot scheme.With around 70% Glasgow’s homes in flat or tenements, finding safe spaces for cyclists to park their bike can be a real challenge when communal property rules often prevent storage on stairwells. Even then, having to carry bikes up and down flights of stairs can act as a deterrent to people cycling regularly.But the introduction of 130 Bikehangars on streets throughout Glasgow will support the growth of cycling in the city and make cycling a more attractive travel option that residents rely upon routinely.Councillor Anna Richardson, City Convener for Sustainability and Carbon Reduction, backed the scheme as a way to build greater reliance on more sustainable forms of transport as part of the effort to tackle the climate emergency.Councillor Anna Richardson said: “With so many of us in Glasgow living in tenements or flats, bike storage is a real issue for people who cycle or who are keen to take up cycling. Keeping bikes in stairwells can cause obstructions, which creates a safety risk and can put owners at odds with other residents. Bikes kept on stairwells are also at a greater risk of theft. But having access to secure storage that’s easy to use will take away a significant barrier that deters people from relying on a bike. Our new scheme with Cyclehoop will make using a bike more attractive and ensure how we get about Glasgow is more active and sustainable. Encouraging greater reliance on the bike as an ordinary mode of transport is a vital part of our efforts to decarbonise the city’s transport system.”
Sponsored
Stockport Exchange, Stockport (2020)

Stockport Exchange, Stockport (2020)

Artform Urban Furniture Limited

Stockport Exchange has been undergoing extensive refurbishment since 2014 with improvements to the train station, a new multi storey car park, new retail and leisure facilities as well as office buildings. Given its location on the doorstep of one of the busiest train routes in the country, connections to London in under 2 hours, and less than 10 minute journey into Manchester - The potential and popularity of the scheme has seen well known brands such as Stage Coach, Music Magpie and many others fully occupying the office spaces. The external area surrounding the buildings is completely pedestrianised with a combination of paved walkways, grass plots, and raised concrete edging for plants and trees. An open green space that is the first thing visitors see of Stockport after leaving the train station.Artform Urban were asked to provide their popular Stone Benches in HPC Granite with a smooth Velluto finish. The unique design and polished finish invites users to interact whether to rest or to climb and play. The solid stone bench becomes an immovable barrier offering security and protection once it has to be maneuvered into place with cranes. A modern and monolithic design that creates a striking visual contrast to the contemporary glass and steel architecture. The stone bench range has recently been expanded with three sizes now being offered in new finishes.The client, George Cox & Sons, have a mission to present a high quality finish on all their projects that provide essential transport links. Stockport Exchange is another excellent scheme added to their portfolio. The regeneration scheme has and continues to be a success for Stockport Council and is a benchmark for future renovations to the town centre. 
Sponsored
King’s Cross – The Tapestry

King’s Cross – The Tapestry

The Safety Letterbox Company

THE PROJECTThe Tapestry project is a high-end residential development located in the heart of King’s Cross, London. The area is home to internationally renowned St. Pancras Station and Saint Martins College of Arts and Design, and is in the midst of a major urban redevelopment.The Tapestry building was designed by Niall McLaughlin Architects who have created a clear relationship between the internal and external areas of the building, with breath-taking views over Gasholder Park, Regent’s Canal and the city of London beyond.The project is influenced by the heritage of the King’s Cross area, reflected in the refined interiors meticulously created using a combination of the finest materials hand-picked by interior design architects Johnson Naylor, and the design and layout of the mailboxes and their location was no exception.THE PRODUCTOur mailboxes were designed to blend into the background of the reception lobby area with a clean elegant finish, configured into a visually interesting layout staggering each vertical column of mailboxes.The mailboxes are located in the reception lobby area of the project where residents will walk through to access their apartments. The model of mailbox used in the project was chosen for its minimalistic and flexible design proven on other notable projects in London such as the Fitzroy Place building.The NW2 mailbox is a horizontal product which is perfect for projects requiring a high quantity of mailboxes in an area with a restricted height. The banks of mailboxes have been recessed into the wall, which ensured that there was maximum room for residents to access their mail whilst other building users had unobstructed access in the area.The mailboxes are finished in a special matt finish which compliments the finish of the reception area. The door of each mailbox has been engraved with a bespoke font and infilled gold – matching the brief of the project.
Sponsored
The Skou Building, Aarhus University, Denmark

The Skou Building, Aarhus University, Denmark

Altro

Bringing natural, simple and light aesthetics to busy campusIssueThe Aarhus University campus is easily recognisable with its long yellow brick buildings rising between trees, mature plants, lakes and paths in a park close to the city centre. The architecture of The Skou Building, which was named after Nobel Prize winner Jens-Christian Skou and is home to the Institute of Biomedicine, needed to be retained, while modernised.ApproachArchitect company CUBO Arkitekter designed the space, which was opened in 2018 and won the City Architects Award in 2019, with a focus on reinterpreting the campus architecture. The building is designed as two staggered lengths that meet in a central atrium. Glass slits have been inserted vertically throughout the building, affording wonderful views of the external spaces and the local cathedral.Inside there has been an emphasis on reducing the number of different materials used, to create a simple, bright and natural look throughout. At the same time, some of the organic, natural shapes in the green spaces outside are drawn into the building, promoting the biophilic design.SolutionThe first two levels of The Skou Building now feature white walls, oak interiors and large glass sections, continuing the biophilic feel. To provide safety throughout the 9000 m2 of corridors and laboratories on the top six floors, Altro Walkway 20 in Cloud has been used, reducing the risk of slipping to one in a million. In addition, 750 m2 of Altro Walkway 20 SD static dissipative flooring in Fog has been used in laboratories which had specific safety requirements. To complete the biophilic design, works of art have been used throughout the building to bring the outside in.
Sponsored
Colindale Residential Apartment Decking

Colindale Residential Apartment Decking

EnviroBuild Materials Ltd

Colindale Gardens is a unique mixed-use development in the heart of north west London. Commissioned by Redrow, the full development will bring over 2,900 new homes along with cafes, restaurants and retail facilities to the local community.Project BreakdownDesigned in a collaboration between Broadway Malyan, Fielden Clegg Bradley Studios and Fourpoint Architects, the extensive 19.17 hectare project will encompass a range of residential spaces, from studios to 4 bedroom homes. Each new development will overlook over 9 acres of landscape gardens.Close to Fryent Country Park with 250 acres of rolling fields and woods, the development has been designed with an emphasis on creating a community for relaxation, sports and play. To further enjoy indoor/outdoor living, all new release apartments and duplexes offer a tranquil private balcony and/or outdoor terrace space. The full development is due to be complete 2021.The SolutionEnviroBuild provided just under 400 m² of Hyperion Pioneer Walnut and Oak decking for the residential terraces. The minimal water absorption rate of Hyperion decking made it the perfect material to frame large outdoor planters in the centre of the residential hub.Working closely with sub-contractor Horohoe, the terrace decking was installed on a sub-frame of Manticore plastic Lumber and MESA Support adjustable decking pedestals.Project DetailsSize: 400 m²Product: Oak Hyperion Decking, Walnut Hyperion DeckingSubstructure: Manticore Plastic Lumber & MESA Support Adjustable PedestalsClient: RedrowArchitect: Broadway Malyan, Feilden Clegg Bradley Studio & Fourpoint ArchitectsContractor: RedrowSub-Contractor HorohoeLocation: London
Sponsored
Tough Patch repairs dangerous pothole on M180

Tough Patch repairs dangerous pothole on M180

Instarmac Group plc

Leading infrastructure services company, Amey, have used UltraCrete Tough Patch® to repair a failed pothole on the M180.BackgroundLocated between Junction 3 and Junction 2 of the M180, a dangerous pothole was once again in need of urgent repair and Amey Highway Infrastructure Area 12 were the team to fix it for the last time.The ChallengeThe biggest challenge facing Amey was the location of the pothole. The repair needed to be carried out quickly, but permanently, to keep motorists and operatives as safe as possible whilst working on this extremely busy road.The SolutionTo complete the repair, Tough Patch® was applied in 100mm layers and compacted until the same level as the surrounding carriageway.Tough Patch® is a PTS PAS approved, cold lay surface material for road repairs, which utilises a reactive binder that rapidly cures to create a first time, permanent repair that will accept traffic immediately after installation. By utilising Tough Patch®, the amount of time needed for closures and traffic management can be reduced, resulting in a significantly safer working environment for operatives carrying out the work.Quick and easy to apply, Tough Patch® can be used to repair defects in pavements, driveways, car parks and on high speed roads – it even provides a first time permanent repair in wheel turning locations such as junctions, traffic lights and roundabouts.ResultsThe hazardous site was repaired quickly and motorists along the M180 are now enjoying a pothole-free journey.On using Tough Patch®, an Amey representative commented: “Tough Patch is very easy to use and spreads with no big chunks and doesn’t go hard if opened and only used half of the tub.”
Sponsored
TECHNODRAIN DELIVERS ON DRAINAGE FOR AN EAST SUSSEX EQUESTRIAN CENTRE

TECHNODRAIN DELIVERS ON DRAINAGE FOR AN EAST SUSSEX EQUESTRIAN CENTRE

Clark-Drain Ltd

Ashdown Forest in East Sussex is a major destination for horse lovers, with several stables and riding schools amidst miles of bridleway. Clark-Drain supplied drainage solutions to one of the forest's prestigious equestrian centres, which is undergoing development of its visitor amenities.The centre has installed 3,000 square metres of new paving and parking areas, along with other upgrades to its facilities. Contractor Codrin Iordache of Cody Building took the opportunity to use Clark-Drain’s new HD-PE Technodrain solutions for the first time. Codrin says: “I was interested when I heard about Technodrain as an alternative to the polymer concrete drainage channels we generally use. Technodrain seemed to combine value with meeting all our technical specifications.“We found that the lightweight system is easy to handle. It’s also clear that, despite being light, the drainage channels have all the strength required.”All the Technodrain channel installed at the centre is in fact load rated to D400 and able to accommodate vehicles up to 40 tons. This means the area is equipped to handle even the biggest horseboxes, including HGVs carrying up to nine horses.Channels of two sizes were sourced from the range for this project:1. An external depth of 210mm, internal width of 100mm and max through-flow of 8.25 litres per second. 2. An external depth of 310mm, internal width of 200mm and max through-flow of 42.6 litres per second.Integrating sump units with channel drainageAlso supplied were several Technodrain sump units. These remove silt from the surface water, preventing dirt and debris from entering the drainage system and causing blockages. Codrin says: “I was impressed by the sump units. As with the channels, the galvanised steel edging made it simple for us to integrate them with the 80mm paving. They also feature grating that bolts in place, which is really easy to remove for maintenance inspection and cleaning of the unit and the channels.“The design of the Technodrain system also means that it’s easy to connect units together. Simple tongue and groove joints allow for the installation of channels with a ready-mounted grating, saving time on site and providing accurate connections. We will definitely be using Technodrain again on future projects.”Cody Building sourced the Technodrain products through the Tunbridge Wells branch of Professional Building Supplies, who specialise in drainage products as part of their wider range. Terry Hallett says: “We have been talking to customers since Clark-Drain introduced the Technodrain range and have had a really positive response. People like the value the range offers, and the fact that the light weight makes the units easy to handle.“The light weight is also good for us as a merchant. It makes this product sustainable to transport, and the HD-PE construction means there’s less likelihood of channels cracking in transit. It will also make storage at our central warehouse and branches simpler, with fewer issues around safe handling to deal with.”WHY THESE PRODUCTS WERE CHOSEN:Value - Technodrain consistently adds great value to excellent specifications.Load ratings - units chosen for this project were rated at Group 4 (D400), suitable for HGV parking. Robust - the HD-PE (high density polyethylene) channels and sump units are resistant to a wide range of acids, salts and hydrocarbons.Ease of installation - the 210mm deep channels used in this project weigh just 15kg each, including the ductile iron grating and galvanised steel edge.System integration - products in the Technodrain range connect easily together using simple tongue and groove joints.
Sponsored
The Pyramids Centre Leisure Complex Project

The Pyramids Centre Leisure Complex Project

Helmsman

The Pyramids Centre in Portsmouth has had a new lease of life with a £2.5m makeover. The ageing facility is now a modern leisure complex offering a fun attraction to the local families. The new facilities include a state-of-the-art gym, trampoline, and soft play park.Helmsman was sub-contracted to supply the lockers and cubicles package providing a turnkey solution to create a modern and sharp changing room area with a comfortable feel.For the Pyramids Centre leisure project we manufactured, delivered, and installed modern laminate lockers of 3 and 5 doors. They are heavy duty and suitable for a wet environment. A row of three-compartment lockers have an integrated cantilever seat stand matching the Abet Walnut (616) laminate lockers and cubicles. The integrated seat stand on these lockers is a great space-saving solution and is perfect for this area.The front line cubicle range fitted the requirements for the toilet and shower cubicles, installed alongside the lockers. The Walnut laminate runs throughout these changing rooms as one of the dominant colours. The cubicle partitions are in Abet Light Grey (478) to separate each cubicle and bring light into the space to complement the rest of the interior.The vanity units and timber integrated plumbing system (IPS) panels are also manufactured from the matching laminate. The IPS in the toilet cubicles are the same colour as the partitions, giving a natural flow throughout. The wall to floor benches and free-standing benches are in Walnut laminate colour as laminate slats are perfect and protected in the wet areas.Most importantly Helmsman has a dedicated and experienced in-house design team supported by its on-site factory. From the outset, we bring a combination of skills and creativity to influence our clients’ decision-making to ensure that concepts turn into reality. From start to finish, we are committed to providing high standards and exceeding customer expectations.
Sponsored
A STYLISH KEUCO BATHROOM IN A TEMPORARY HOME

A STYLISH KEUCO BATHROOM IN A TEMPORARY HOME

KEUCO

Private Clinic Blomenburg stands for holism when it comes to the therapy and design concept.A haven in the middle of a beautiful environment in the north of Germany: The 19th Century Blomenburg („Burg“ for castle), is surrounded by a huge park. Away from the everyday hustle and bustle, offering 69 furnished in premium quality, spacious single rooms and suites. The modern bathrooms are equipped with KEUCO furnishings and complement the syntonic interior design. Here the guests can dedicate their soul to regeneration in a quiet and peaceful stylish ambience.The elaborate restoration of the building was carried out taking the historic importance and special use of the Blomenburg into consideration. The new building with its generous glass facade was constructed under the castle rock and now accommodates the guest rooms. Between the old and the new building, there is an approximately 800m² big spa and pool area engrafted in the topography of the castle rock. The historic buildings surrounding the castle yard are used for social purposes, medical fitness, healthy living and mindfulness training of the body, soul and mind. The exclusive design of the indoor rooms is not to be compared with the magnificence of the outside of the buildings.Noble materials and luxurious items of furniture in the guest rooms create an ideal setting for convalescence and relaxation. This temporary home equipped with KEUCO furnishings and accessories in the bathroom offer the guests plenty of storage space for personal care products. Not only do the PLAN vanity unit and tall unit in unobtrusive truffle offer generous storage space, but the light mirror with a frame offers additional storage space. The perfect light lets the windowless bathrooms appear brighter and friendlier. The integrated mirror heating makes it possible to look in the mirror after a hot and relaxing shower.IXMO fittings in a strong design offer intuitive use to reach the right temperature. Matching accessories nicely round-off the bathroom interior in a coherent way and perfectly match the high-class concept of the clinic.
Sponsored
St Anns P22 Project

St Anns P22 Project

KWC DVS Limited

St. Anns, London, new mental health inpatient building Blossom Court is undergoing it’s second phase and specified DVS and Franke products for the project. The unit is due to be completed in Autumn 2002 and aims to replace its old mental health wards with modern, state of the art facilities for patients requiring inpatient care. The full range of products provided was: • 2 x VR01-072 V2 High security WC pan less abled with grey top • 3 x VR01-010 High security ligature resistant toilet • 5 x VR01-030 High security V2 basin with integrated backplate (not including sensors) • 5 x VR07-004 Washroom control system kit – for DVS high security backplate & WC • 5 x WC02-014 Concealed plastic cistern kit – vertical – 2” unit • 4 x F0354P Single bowl • 4 x F0359P Single bowl • 6 x F0360P Single bowl • 1 x G22025L DUH hospital disposal unit • 1 x G20605N Stainless steel cistern • 3 x G20055N Centinel janitorial unit – HTM64 The plans for the redevelopment of St Ann’s Hospital were developed with patients, staff and local stakeholders and involve a series of improvements. Following completion of the new inpatient unit in summer 2020, Phase 2 includes the refurbishment of other buildings, a new restaurant for visitors and staff and improvements to the site power and water supplies, roadways, car parking and landscaping. Designing sanitaryware for mental health and high-security environments can be a challenge, however, the DVS branded safe ensuite range is manufactured using advanced technologies, provides the perfect solution. These high-security and ligature resistant products are virtually unbreakable and create a safe solution within all mental health facilities.

Showing 973-1008 of 1024

Feedback