NBS Source
I'm a manufacturer

"natural insulation products"

11,416 results found

Sort by:

Showing 145-180 of 1681

Sponsored
150 Holburn

150 Holburn

URSA UK LTD

A 9-storey, 18,000m2, mixed use development at 150 Holborn in the centre of London. It incorporates retail on the ground floor, offices above and 13 apartments in an adjacent block. Architect Perkins & Will specified URSA’s Walltec 32B slab in critical areas of the new build structure.URSA has supplied 1000m2 of URSA Walltec 32B slab as part of the multi million pound development in London. The mixed use scheme replaces a 1980s office block and feature a café, exhibition and reception space, atrium and roof pavilion with rooftop gardens. The overall building height was limited in order to maintain views of the nearby St Paul’s Cathedral.  The new building aims to offer a healthy work place with natural daylight being a key design feature. As a result the design also incorporates measures to minimise solar gains. Additionally the scheme aims to achieve a LEED ‘Platinum’ rating, BREEAM rating of ‘Excellent’ and Fitwel certification. URSA products assisting here with BS EN ISO 9001 and BS EN ISO 14001 certification along with a BRE Green Guide rating of ‘A+’.Ian Claydon, Technical Manager at URSA commented: “We worked closely with Perkins & Will in developing the specification for those areas of the external walls incorporating URSA Walltec 32B. Including options for the type of insulation to be used and U-value calculations. A particularly critical requirement was for the insulation to be non-combustible, Euroclass A1”.
Sponsored
Park Parade, Stroud

Park Parade, Stroud

K Systems Insulated Facades

BackgroundLocated in Stroud, the Park Parade, Park Road refurb project was part of a large refurbishment planned by Stroud District Council. The shopping area and sheltered accommodation scheme were given a complete revamp with internal and external work being completed.MD Group from Bristol were awarded the contract by Stroud District Council and were appointed as the main contractor. A new external wall insulation system was installed, along with an extensive refurbishment to the communal areas, external balconies and roofing. Our approved installer Elite Rendering Systems were contracted by MD Group to complete the exterior wall insulation.Alongside Elite, we transformed the premises aesthetically creating modern homes and commercial premises. The buildings were given a new lease of life, and together with Elite we delivered safe, stylish and energy efficient buildings that will help to reduce fuel bills for residents and help decarbonise the Council’s housing stock.Our ServiceOur Technical team were available to provide hands-on-guidance throughout the duration of the project. As part of our service commitment, our K Systems Site Technician regularly visited the project to inspect progress, offer support and ensure high levels of construction quality.As the ground floor of Park Parade is used for commercial premises, one challenging aspect of the project was the detailing and installing around complex interfaces such as air conditioning/refrigeration units. We transformed the outside of the properties with a durable, low maintenance solution that is fully compliant with fire regulations and fulfilled the Council’s criteria.The combination of finishes used not only delivered the desired contemporary aesthetic but provided an additional benefit of cost savings for the client. Residents of Park Parade, Park Road will enjoy reduced energy bills and better living conditions thanks to the U-value improvement.Technical Project DetailsFollowing design and site meetings with the K Systems Technical team, K Systems M (Mineral Wool) was specified by Bailey Partnership Architects and Stroud District Council. This system incorporates eco-friendly mineral wool insulation boards. As an A2-s1, d0 firerated solution, it is widely specified to provide thermal and aesthetic improvements to buildings, reducing energy usage and therefore energy costs.K Systems M, utilising non-combustible insulation, ensured the latest building safety regulations were met. Thanks to its exceptional properties, the thermal performance of the walls after installation has been significantly enhanced. A U-value of 0.27 W/m²K was achieved, which will help to reduce the residents fuel bills and reduce the level of condensation forming on the inside walls – two key objectives for the client.For the finish, high-performance Silkolitt+ silicone renders were supplied along with our lightweight synthetic brick slips (VBriQ). This combination improved the aesthetics of the buildings for its residents.Silkolitt+ silicone thin coat renders are available in a wide range of colours offering a contemporary finish. The excellent vapour permeability allows the building to breathe and prevents interstitial condensation. The flexibility of the finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish to the properties. It is very user friendly, and its hydrophobic properties reduce maintenance requirements.Accredited by the BBA, the K Systems VBriQ brick slips provide top tier Cateogory 1 impact performance and are ideal for use on this project. This lightweight system is quick and simple to install and has high UV resistance while also allowing the original brick colour to be maintained. An extremely durable finish that will withstand the day-to-day demands placed Park Parade, Park Road.
Sponsored
Darwin Centre, Natural History Museum

Darwin Centre, Natural History Museum

dormakaba UK & Ireland Ltd

Accessible for every visitorThe landmark £78 million Darwin Centre is the most significant development at the Natural History Museum since it moved to South Kensington in 1881. With over four and a half million visitors passing through its doors every year, choosing the right door products was crucial if this popular tourist attraction was going to stand the test of time.dormakaba’s contribution to the projectdormakaba TS 92, TS 93, and ITS 96 cam-action door closers were specified due to their low opening forces in accordance with BS8300 and their aesthetical design, which is in keeping with the overall style of the Darwin Centre. The TS 92 and TS 93 cam-action closers have been installed with the electro-magnetic hold-open feature and have been designed to remain open, closing automatically if the fire alarm is triggered. Offering the illusion of an invisible closer, the ITS 96 is a concealed cam-action closer hidden within the door leaf and frame, complementing the overall modern and sleek design of the new centre.As part of the brief, a wall of glass was to surround the technology and displays within the Darwin Centre, only accessible by staff through glass doors. Due to the small diameter between the wall and the glass door, specialists in glass interior products, Harbrine, overcame this by using dormakaba’s EA pinch free patch fitting which allowed safe access with a clear view of the museum display.dormakaba BTS 75V and BTS 80 floor springs also feature at the redevelopment. These floor springs feature a hydraulically controlled closing cycle, adjustable closing speed and mechanical backcheck.Also installed is dormakaba’s ED 200 – an automatic swing door operator that offers an optimum solution for safety in high traffic areas. During an emergency, fire doors and exit doors must continue to open for people to exit, but close firmly to prevent the fire or smoke spreading. The ED 200 is particularly appropriate for internal fire door applications and has been successfully third party fire tested to EN 1634-1 on timber doors. Its unique package of safety, security and interfacing features means that when a fire alarm is actuated, or when the power is cut, the closer will revert from automatic to manual operation with a hydraulically dampened spring close action.
Sponsored
Buckley View, Rochdale

Buckley View, Rochdale

K Systems Insulated Facades

The refurbishment scheme at Buckley View in Smallbridge was completed in March 2022 and is one of a series of demonstrator projects that Rochdale Boroughwide Housing are completing.These projects are part of an ongoing approach to improve the energy efficiency of homes and reduce carbon emissions, helping to identify the best ways to meet Greater Manchester’s 2038 target to be carbon neutral.The scheme has seen 23 bungalows in Buckley View receive investment to help improve the energy efficiency of the homes and reduce carbon emissions using a whole-house, fabric first approach.The work carried out included replacing cavity wall and roof insulation, installing External Wall Insulation (EWI), upgrading ventilation and installing new windows and doors.We worked in close partnership with our approved installer Profac and provided a suitable EWI solution for the project and complementary finish. A brick slip finish was utilised, which was supplied in three colours to totally refresh the facades.The bungalows in Buckley View were totally transformed and will enjoy increased energy efficiency, improved thermal comfort, reduced fuel consumption for residents and, as a result, lower carbon emissions.Our ServiceK Systems prides itself on having an inspiring and effective solution for every style, and this project is just one example of how it provides the flexibility to fulfil any specific design criteria.We tailored the specification process for the project based on the set and very specific requirements of Rochdale Boroughwide Housing and its properties, and every single request / objective of the client was not only met but exceeded in the refurbishment.The design and delivery of the refurbishment not only received 100% satisfaction ratings from all parties involved, but has also gained external recognition for its excellence and already been shortlisted for three prestigious industry awards:Large Scale Project of the Year at the North West Energy Efficiency AwardsSustainability Project of the Year at the Aico HomeLink Community Awards 2022Best Retrofit Initiative at the Northern Housing AwardsOverall, an outstanding and successful refurbishment by our team that has given Buckley View in the North West a new lease of life.Ryan Robson at Rochdale Boroughwide Housing, said:“We are delighted and incredibly proud to have worked on the refurb project at Buckley View which has been recognised with three award nominations so far. These nominations are a testament to the great partnership approach by all involved parties, the highest levels of construction quality showcased throughout, and the exceptional performance outcomes of the entire project, for the housing residents, housing provider and for the wider area.”Technical Project DetailsThe external façade and sheathing boards on the existing, poorly insulated timber frame structures were removed. The sheathing boards were replaced with A1 rated carrier boards and the K Systems M, Mineral Wool Insulation System was specified.This system not only generates exceptional thermal performance and provides high levels of fire resistance (A2-s1, d0), but also boasts exceptional environmental qualities – by choosing it, we not only demonstrate our innate understanding of best-suited solutions but our dedication to sustainable working.The bespoke system specified for Buckley View was designed using 110mm non-combustible mineral wool insulation to meet the desired u-value of 0.20W/m2K, improved from 0.43W/m2K. This meant homes were more energy efficient, warmer, and less expensive to heat – a major bonus given the current cost of living crisis.For the finish, we specified a unique finish of VBriQ+ clay brick slips. This cost-effective, lightweight traditional clay brick slip system replicates traditional brick construction on low-rise buildings like the Buckley View bungalows.Our unique and innovative VBriQ+ clay brick slip finish was specified due to its robust, durable characteristics and wide range of colours. The brick slips were supplied in three colours, which totally transformed the facades aesthetically and with their low maintenance and element resistance qualities, will ensure the homes avoid cracking and maintain their appearance over time.At K Systems we are confident that we have the inspiring solution for every style, and this project is just one example of how we provide the flexibility to fulfil any specific design criteria.We tailored the specification process for the project based on the requirements of Rochdale Boroughwide Housing and their properties. Bespoke technical detailing included use of pistol brick slips around window reveals with a soldier course detail specified above window heads to create a contrasting aesthetic feature to the main walls. A band of silicone thincoat render was added as a design feature around the doors– yet again showcasing K Systems’ unrivalled attention to detail.
Sponsored
Bespoke Pyramid Rooflights Provide Luxury Apartment Building With Natural Daylight

Bespoke Pyramid Rooflights Provide Luxury Apartment Building With Natural Daylight

Glazing Vision Ltd

250 Houston Street is a luxurious 13 story residential building in the vibrant Lower East Side of Houston, New York. The building is home to a number of one, two and three-bedroom residences where the occupants can enjoy a full suite of amenities including a serenity garden, fitness centre, and rooftop terrace which includes the iconic Tibor Kalman clock and offers beautiful New York views.The client was looking to inject some much needed natural daylight into their new fitness centre, and so Architects, Stephen B Jacobs Group PC, and Glazing Vision worked closely together to make sure the best rooflights were chosen to meet the brief.Considered an architectural feature as well as a rooflight, and an evolution of the traditional roof lantern, three of our Double Glazed Bespoke Fixed Asymmetrical Pyramid Rooflights were specified to help inject as much natural daylight into the fitness centre as possible. This was important to the client as natural daylight has been proven to help our bodies produce Vitamin D, improve our sleep, and help us focus.“For, Stephen B Jacobs, the inspiration for the pyramid shaped rooflights and the surrounding gravel court yard came from the Louvre in Paris.” Thorsten Foerster, Architect, Stephen B Jacobs ArchitectsThe rooflights were constructed of 4 panes with glass-to-glass silicone joints, minimising framework and therefore offering excellent light transmission. Our pyramid rooflights are straightforward to fit, and only require a raised upstand on your roof built to our standard specification. The units are supplied with high specification heat soak tested low e safety glass for optimum thermal performance and durability. The product is also robust and long-lasting, boasting excellent thermal performance and air tightness.
Sponsored
Thatchers Cider Co. - Glazed Clay, Naturally Drawn, Facet

Thatchers Cider Co. - Glazed Clay, Naturally Drawn, Facet

Milliken

This large, cavernous office space has been installed with Milliken's cushion backed modular carpet and demonstrates the acoustic performance of this product. The biophilic colour palette has been chosen to zone the space and plays an important role in reflecting the values and products at the heart of this business.
Sponsored
St Stephen’s Primary School

St Stephen’s Primary School

Polyroof Products Ltd

A friendly and welcoming school based in Blackburn in the North West of England, St Stephens Church of England Primary School is a place where pupils can develop their skills in a school that is proud of its Christian values and high standards of teaching. The school has been praised for its philosophy of continuous improvement by a recent ofsted inspection, providing a nurturing environment for children.Continuing the high level of teaching facilities was paramount for the school, and after discovering that the gutters and parapets of the building were aged and leaking, it was vital that a solution was found before this caused issues.The ChallengeIn coordination with Polyroof Products Ltd a survey was scheduled to take place at the site to determine the exact nature of the issues and formulate a solution. Upon inspection it was discovered that the existing waterproofing consisted of a single-ply membrane which had become aged with various leaks being reported and localised repairs carried out with not much effect. The underlying build-up consisted of a galvanised steel metal deck and had been coated in plasticol. Once the survey was complete it was clear that the gutters and capping’s would benefit from a high-performance waterproofing system installation, this would protect from further leaks occurring.The SolutionThe System of choice for this project was Protec Xtraflex. Protec Xtraflex is a highly flexible version of the Protec system designed for coating gutters. Its fast curing technology and imperviousness to standing water fulfilled the rapid solution needed to offer durable waterproofing performance for this project. Taking into consideration the information obtained from the survey, a bespoke Polyroof specification was created to combat all of the issues discovered. The chosen Polyroof Approved Contractor to carry out the work on this project was the KSD Group, a contractor with a wealth of experience in the roofing and construction sector.Once all these aspects were in place, work could officially begin. Firstly, it was highlighted that falls and drainage were already present, so the Polyroof specification made use of the existing falls, combining this with the chosen waterproofing system. During this project, there was no need to strip back any of the existing waterproofing. It was made good where required, allowing a smooth substrate for the new system to be bonded to. Once this stage was complete, the area was cleaned and prepared for the new system by removing any dirt and debris. The Protec Xtraflex system was now ready for installation. Firstly, all surfaces that required it were primed, including the single ply existing waterproofing, which required a Polyroof SP Primer 202. During this installation, all lap joints and bolt heads were applied with Polyroof Butyl Tape and Polyroof Butyl Lap Tape, reinforcing these points before application. Pre-formed high-quality Polyroof drip trims were installed to the outer edge of the metal capping, and new flashings were also installed to cover the exposed insulation at this detail.The first coat of Polyroof Protec Xtraflex was applied to the substrate. This consisted of Xtraflex resin and Polymat 450 and was allowed to cure. Due to the rapid cure technology of the system, this only took 30 – 60 minutes, allowing for quick installation. Once complete, the second coat of Protec Xtraflex Resin was installed and allowed to cure.CompletionThe project was efficiently managed by both the contractor KSD Group and regular Polyroof Technical Services visits to ensure that each aspect of the project from start to finish was carried out within the client’s specification, time frame and budget. The project was a great success showing the high-quality work from KSD Group. The customer can now be confident that this new Polyroof Protec Xtraflex membrane will last for many decades to come.
Sponsored
Devonshire Mansions, Eastbourne

Devonshire Mansions, Eastbourne

K Systems Insulated Facades

BackgroundFor the perfect example of architectural excellence which not only delivered an impressive aesthetic, significant environmental benefits, and a more robust structural foundation, but also improved thermal performance, look no further than the eight-storey, three-building Building Safety Fund (BSF) project Devonshire Mansions.Situated in beautiful Eastbourne on the south-east coast of England, Devonshire Mansions were an extremely attractive choice for those wanting stunning sea views and some peace and privacy. However, due to their location in a high exposure area, the buildings were aged and weather-beaten, and required a full overhaul and refurbishment to modernise, align with current safety regulations for high rise buildings, and strengthen the buildings at their core whilst rejuvenating the exterior.Understanding and appreciating K System’s renowned ability for outstanding refurbishment projects, Pavehall contracted K Systems to completely refurbish this residential development and deliver on the following four primary objectives:- Remediate unsafe cladding- Improve the thermal performance rating of each home- Update and seamlessly replicate existing façade features- Deliver a solution with acoustic benefitsOur ServiceIn collaboration with Archiflair Design, Pavehall, and Fullers Plastering, K Systems delivered an industry-leading, insulated façade solution that fulfilled the desired criteria, achieved a U-value of 0.26 W/m²K and resulted in an outstanding architectural structure.The commitment of K Systems team, their continuous communication, in-depth level of reporting, and consistent presence on site not only ensured a perfect refurbishment, but also instilled 100% confidence in the supply chain throughout, showing exemplary levels of customer service.This project is a great example of how K Systems overcame various construction challenges to deliver within the agreed time constraints.The make-up of the façade had multiple protrusions in forms of balconies meaning that every sheathing and insulation board had to be cut to fit. Replicating this without compromising on the strict site deadlines was a challenge but under the great install team and K Systems’ expertise and onsite presence, this was achieved.Additionally, Devonshire Mansions had a problematic substrate and challenging aesthetic deliverables. Working closely with all partners, and utilising digital technology, K Systems mapped out the refurbishment and specified the ideal solution to Pavehall for implementation.Technical Project DetailsAfter a comprehensive scoping process, K Systems discovered that the existing system had a drained cavity build up and when removed, the sheathing boards were compromised by water. With the buildings being high rise, steel frame and multi-occupancy, the industry-proven K Systems Exicco Cavity Drainage EWI System was specified.In the Exicco system, the drained cavity behind the insulation ensures that any interstitial moisture escapes without detriment to the performance of the system. Due to their seafront location, Devonshire Mansions were prone to fierce rain and water exposure, so this system was the ideal choice to ensure any future moisture or condensation build up was allowed out to avoid compromising the substrate or newly installed façade.Once the strip out of the existing façade had occurred, further challenges were discovered – the substrate was far from line and level. This meant that every rail within the newly installed EWI system had to be packed out using steel shims to create a level vertical façade, subsequently adjusting the specified fixing lengths to suit.Some elements of the substrate were high strength concrete incorporating a flint aggregate which proved problematic for standard mechanical fixings. Via K Systems’ on site support, a suitable, more bespoke fixing was specified which ensured proper anchoring of rails and intumescent fire barriers. A swift solution was achieved with no detriment to the construction programme.The newly installed Exicco system was combined with the K Systems M (Mineral Wool) system. This high performing system provides optimal levels of fire resistance and noncombustibility and its installation at Devonshire Mansions meant that the fire classification of the buildings was upgraded to A2-s1,d0 meaning that the development is now compliant with the latest building regulations for all high-rise dwellings in England, further ensuring the safety of residents.Devonshire Mansions is visually impressive with its feature balconies, architectural cornices, ashlar panelling and quoin detailing. It was a specific requirement of the client to remediate the unsafe cladding without losing these exterior design features.K Systems created two specifications; one for the elevations and one for the balconies and provided bespoke detailing to allow them to seamlessly harmonise as one façade. Ashlar panelling and quoin detailing was replicated cost-effectively using varying thicknesses of non-combustible mineral wool insulation which was over-rendered skilfully by the contractor using K Systems Silicone Thincoat render.The more intricate cornice features were all bespoke manufactured using compliant non-combustible materials and integrated into the design with K Systems providing robust detailing to create a water-tight barrier and eliminating cold bridging. Decorative columns were installed at ground level to complete the façade.The eye-catching, waterfront dwellings were finished with Silkolitt+ - a versatile, easy to apply, water repellent, durable, and low maintenance thin coat render, perfectly paired and formulated for use with our Exicco systemOverall, K Systems specified a fit-for purpose, non-combustible façade with a high level of complex architectural detailing using cost effective solutions. The installation process was overseen by our unrivalled site support team who were frequently on hand to solve any issues as they arose.“Working alongside K Systems on a project of the size and nature of Devonshire Mansions was a true pleasure. From initial scope and specification to intricate detailing and innovative finishes, the K Systems team lead by example and made the process and delivery a slick and seamless operation. The refurbishment was a complex case but working together in partnership, we all delivered on excellence, and the beautiful Devonshire development is something we can all proudly put our names to.”James Fuller, Fullers Plastering
Sponsored
A Natural and Locally Sourced Construction Required an Anti–Root Roofing System

A Natural and Locally Sourced Construction Required an Anti–Root Roofing System

Iko Ireland

The Down to Earth Training Centre, built almost exclusively with natural and locally sourced materials required an anti–root roofing system, ready for the install of a green roof.
Sponsored
Restaurant Facade

Restaurant Facade

Longboard Products

A highly popular west-coast restaurant chain with over 30 locations in and around Vancouver, Canada required a design solution that provided them with a natural look that aligned with strict building codes. They had to find a replacement for their wood cladding that still looked great and reflected their preference for a west coast aesthetic but also aligned with strict non-combustibility requirements on all their buildings. We worked with the architects to determine a design solution and now our product can be seen on several of the Cactus Club locations.
Sponsored
Henry Moore Archive Foundation

Henry Moore Archive Foundation

Kingspan Insulated Panels

The archive’s single-storey extension was clad in Corten steel Hook-on cassettes on both the walls and the mono-pitch roof. These weathered steel panels naturally oxidise to form a patina veneer, giving the façade a distinctive “rusted” look that shifts from a vibrant orange before settling to a dark red after several years of exposure to the elements. Architect: Hugh Broughton Architects
Sponsored
Natural Warmth

Natural Warmth

SieMatic Holding GmbH

SieMatic kitchen Awaiting details
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.
Sponsored
Broadway Apartments, Morecambe

Broadway Apartments, Morecambe

K Systems Insulated Facades

BackgroundLocated in a prominent location on the Morecambe seafront, the Broadway Apartments project was large new build steel frame apartment block.A challenging project to be involved with, as M H Stainton Homes wanted to create an iconic building on a corner location. The steel frame was key, combined with curved glazing on the corner elevation of the building. Then a lightweight cladding solution was required for the rest of the façades.K Systems approved installer M & M Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.Our ServiceWe worked in close partnership with M & M Façades throughout the duration of the project. The K Systems Technical team offered on-site technical and installation support throughout the build process and supported the M & M Façades team at all stages of the project.As the building is over 18 metres, a bespoke specification was produced to ensure compliance with the current building safety regulations.A direct fix system suitable for steel frame structures and all building heights was specified, ensuring the safety of both the building and future residents.Technical Project DetailsAfter numerous design meetings the K Systems Direct Fix M (Mineral Wool) EWI system with a Silicone Render (TC 15) finish was chosen, meeting the requirements of M H Stainton Homes.This system provides high levels of fire resistance and non-combustibility bringing the apartments in line with mandatory Government requirements for buildings over 18 metres tall.We specified the use of multiple thicknesses of insulation boards (50mm, 100mm and 170mm) to allow for the line and level of the steel frame. A U-value of 0.28 W/m²K was achieved, meaning the residents will enjoy thermally efficient homes.For the finish Silicone TC 15, our high-performance thin coat render, was used. With the coastal location, this durable, weather resistant finish offers an eye catching, clean design, creating a modern and crisp aesthetic. Its hydrophobic properties provide a low-maintenance finish.We delivered a safe, thermally efficient, eye-catching design with a long-lasting finish that residents will appreciate for years to come.
Sponsored
Coleg Cymunedol y Dderwen

Coleg Cymunedol y Dderwen

Kingspan Insulation

Our products have helped Coleg Cymunedol Y Dderwen become the first BREEAM ‘Outstanding’ rated high school of its kind in the UK
Sponsored
The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

Promat UK

The implementation of the Future Homes Standard (FHS) policy to move away from fossil fuels to heat UK homes again highlights the need to rethink how well insulated properties could and should be. Most new build and refurbished homes could be insulated to a much greater standard than the current Building Regulations specify whilst providing more floor space, through more widespread use of advanced vacuum insulation panels (VIPs). This insulation technology, which was pioneered by Promat more than a decade ago, delivers superior thermal performance without the thickness usually associated with panels for cavities, flooring, roofing, balconies and terraces.
Sponsored
Primark - stainless steel floor grating serving as a light-well, introducing natural light to a basement shopping area

Primark - stainless steel floor grating serving as a light-well, introducing natural light to a basement shopping area

Lang+Fulton

Primark’s flagship store on Edinburgh’s premier shopping street has undergone recent refurbishment. This has included the installation of stainless steel grating, supplied by Lang+Fulton, as flooring within the window display. Apart from its stylish contemporary appearance, the grating serves as a light-well, introducing natural daylight to the shopping area in the basement. Product: Stainless Steel
Sponsored
XPS Insulation and Chip Board Overlay at Premier Inn, Greenock, Inverclyde

XPS Insulation and Chip Board Overlay at Premier Inn, Greenock, Inverclyde

Soundis

Many people have benefitted from Premier Inn’s guarantee of a good night’s sleep, which goes some way to explain why the Whitbread Plc hotel chain now have over 700 hotels in the UK.To help ensure that that a good night’s sleep is enjoyed by every guest, Premier Inn insist on the best soundproofing available. Chip Board Overlay was installed on the upper floor, giving a robust, high density monolithic floor with a remarkably shallow profile.The demands of the ground floor were a little more specialised. Soundis advised the main contractor, Key Property Solutions Limited, that a combination of 115mm thick XPS Insulation, together with a layer of chipboard together with a layer of chipboard would exceed the tight acoustic and heat insulation specification.
Sponsored
REEMA Properties, Swindon

REEMA Properties, Swindon

K Systems Insulated Facades

BackgroundK Systems’ retrofit of the REEMA non-traditional construction Properties in Swindon, South-West England, is a stellar example of the company’s ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Swindon Borough Council had a development of 50+ properties in Upper Stratton all with aged facades and poor thermal qualities, some with U-values as inadequate as1.59W/m ² K.K Systems supported Swindon Borough Council, led by Projects Surveyor John Black, to completely refurbish this residential development and deliver on five primary objectives:- Improve the thermal performance rating of each home (SAP rating)- Deliver greater thermal comfort for residents- Choose a solution with acoustic benefits and non-combustable benefits- Reduce tenants’ energy consumption- Deliver an attractive aesthetic that would uplift the areaHaving a good reputation for matching systems with finishes to deliver its clients’ visions, K Systems partnered with approved installer, Rateavon Ltd, to scope out theproject and specification in fine detail, with particular focus on insulating properties and aesthetic.Our ServiceK System worked in collaboration with Swindon Borough Council and Rateavon Ltd to upgrade these poorly insulated houses and deliver a total revamp of the properties, resulting in thermally efficient homes.One of the primary requirements was to improve the performance rating of each home, with a target U-value of 0.30W/m²K. In fact, K Systems exceeded that in the project delivery by achieving a U-value of 0.29W/m²K.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Digital technology was deployed from the very beginning to produce models and CGIs (Computer Generated Imagery) to not only assure Swindon Council the finished project would meet its specific requirements, but to also guide the design process and ensure compliance with all health and safety regulations.Regular inspections and site audits were carried out alongside Swindon Council to ensure the same level of care and attention to detail that applied when specifying theproject was being applied during its implementation and delivery.Technical Project DetailsOn initial inspection, K Systems found a problematic substrate. The REEMA hollow panel non-traditional construction properties are constructed of a concrete frame with thin concrete panels to the exterior façade. This type of thin panel construction created a significant challenge for the team to find a suitable EWI fixing, but with the help from Rawlplug, one of our EWI fixings suppliers a robust and safe fixing solution was found, without compromising the existing REEMA construction.Harnessing years of EWI system design knowledge and unrivalled expertise in this field, K Systems worked closely with Rawlplug and a structural engineer to identify a suitable fixing detail and pattern which would not only be robust but also suitable for this type of substrate.With a structurally strong solution agreed, focus then turned to the appropriate insulation solution.After a comprehensive scoping process taking into consideration client requirements, project objectives, budgets and timeframes, K Systems specified the industry proven K Systems M, Mineral Wool EWI system to not only significantly boost thermal performance of the buildings but also reduce noise pollution for the tenants.K Systems 100mm Mineral Wool insulation has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the refurbishment as it would combat the increased heating costs faced by residents whilst retaining the solid foundations of the existing building and reducing the risk of condensation or mould damage.Other technical benefits which made the K Systems Mineral Wool system the ideal specification for this refurbishment include:- non-combustibility, A2-s1,d0 fire rated- its excellent acoustic properties, reducing noise pollution- its environmentally friendly composition as the insulation is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)- its workability and easy to cut format, reducing labour time across the board for the team.Having identified solutions that improved structure and thermal performance, K Systems then offered the best quality finish for the properties – an aesthetically pleasing, cost effective combination of VBriQ+ clay brick slips and Silkolitt+ silicone render that both Swindon Council and the residents would be proud of.VBriQ+ is a lightweight, highly durable, clay brick slip system and a more cost-effective finish option in comparison to tradition brick systems without compromising on quality, weather resistance, workability and durability. This made it perfect for a project of this scale – a project which required maximum and long-lasting impact without incurring maximum costs.The Silkolitt+ silicone render finish rejuvenated the properties’ exteriors and massively enhanced the area’s overall aesthetic, making it a much more appealing place to set up home.Yet again going the extra mile for clients to ensure unrivalled workmanship and longevity, K Systems finished all 52 properties with K Pro - a water-based protective treatment used to provide long term enhanced water repellent properties to external render and other masonry surfaces, helping combat the problems associated with water intrusion including efflorescence, frost, water-soluble pollutants and algae growth meaning the substrate will stay clean and dry for longer.K Systems and approved installer Rateavon Ltd delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Swindon Council, and the residents of the newly improved homes.John Black, Projects Surveyor at Swindon Borough Council, said:“Throughout the project K Systems have supported Swindon Borough Council agreeing all detailing to ensure current day Building Control Regulations were met. They supported resolutions throughout the project lifecycle and were really reactive, visiting site and supporting when required. They carried out weekly detailed spot check reports with photographic evidence and also checked batch numbers of materials. They delivered a great service. A really successful project.”
Sponsored
The Dixon

The Dixon

Kingspan Insulation

A London court house has been extensively renovated and converted into a boutique hotel.
Sponsored
The Poets

The Poets

Kingspan Insulation

Kooltherm K108 Cavity Board has been installed on the first phase of houses constructed in the major redevelopment of The Poets in Swinton
Sponsored
Grid

Grid

Kingspan Insulation

Heriot Watt is shaping the future with its new Global Research, Innovation and Development building.
Sponsored
Northumbria Specialist Emergency Care Hospital

Northumbria Specialist Emergency Care Hospital

Euroform Products

This groundbreaking project required a sheathing board that would form an integral part of an insulated render system, providing 60-minute through-wall fire resistance and meeting project-specific acoustic requirements. Project: Northumbria Specialist Emergency Care Hospital Project Value: £70 million Architect: Keppie Design Main Contractor: Lend Lease Subcontractor: Farpod Dry Lining Product: Versapanel Size: 2800mmx1200mmx12mm Quantity: 30,000m2
Sponsored
Liverpool waterfront apartments combine hard landscape with a softer, natural living wall option

Liverpool waterfront apartments combine hard landscape with a softer, natural living wall option

Mobilane

Another great example of the LivePanel natural living wall at Liverpool waterfront apartments. Modern building designs often create clean, crisp lines and an urban streetscape of hard landscaping and walkways. Adding a natural element might be considered a challenge as space, access and amenity compete, leaving little leeway for extensive planting. There is, however, the most beautiful of options available: the living wall. A solution that can allow a vibrant living expanse of planted material on a vertical plane. That is what has been achieved with this Mobilane LivePanel installation alongside this prestigious new residential development on Liverpool’s waterfront.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
Soundis Dry Screed Interlocking Floor & Insulation System at Kings College Student Accommodation in London

Soundis Dry Screed Interlocking Floor & Insulation System at Kings College Student Accommodation in London

Soundis

XPS Insulation and Dry Screed Board Acoustic FlooringKing’s College London is one of the Top 20 Universities in the world, according to the international world 2013-14 ranking. They are the fourth oldest university in England, holding over 25,000 students. As well as this, the college includes more than 10,600 postgraduates and over 7,000 employees. The College also has research earnings of nearly £587million overall annually.The Architect specified a combination of Soundis Dry Screed Board and XPS Insulation, both of which are recyclable and amongst the most effective insulation materials available for acoustic performance and thermal performance in this student development.
Sponsored
The Harris Academy

The Harris Academy

Acoustic Products Ltd

Taking sustainability to new heights, the London Borough of Surrey awarded the largest UK nonresidential Passivhaus scheme to Willmott Dixon.We supplied the Laudescher Linea 4.2.4 in a pine natural finish to Ash Drywall who superbly installed the acoustic product. The Laudescher system was specified due to its beautiful aesthetics but most importantly the acoustic properties. The common areas need to be acoustically treated ensure the students and teachers receive the optimal environment to communicate and learn.
Sponsored
Crown Paints Brings an Ode to the Natural World to Taunton's Historical Hestercombe House

Crown Paints Brings an Ode to the Natural World to Taunton's Historical Hestercombe House

Crown Trade, product of Crown Paints Ltd

Stately Home, Hestercombe House, has unveiled the first milestone in an extensive 18-month project, which will see 15 rooms in the 320-acre estate being redecorated.Thanks to specialist redecoration services and expert colour insights from Crown Paints, the interior of the Portman and Jekyll rooms now reflects the estate’s luscious 50-acre Georgian landscape garden, blending the boundaries between indoors and outdoors.
Sponsored
New Scotland Yard

New Scotland Yard

Acoustic Products Ltd

This Laudescher LINEA Bespoke 2.4.3 acoustic slatted panels with the purpose of managing the reflective nature of the walls within the main entrance area. The extremely specific design of the ceiling panels here where each slat cut from a glulam block so as to achieve a curve that is not stressed. The same product is used inside and outside so as to achieve a seamless finish through the glass.
Sponsored
Walkways Community Centre, Belfast

Walkways Community Centre, Belfast

K Systems Insulated Facades

BackgroundBelfast City Council designed Walkways Community Centre with the local community in mind, providing them with places to both work and play. In this £1.37m project, the original portable modular building was demolished and replaced with a new 575 square metre build. The two storeys include a creche and soft play area, a 250sqm sports hall and a series of multipurpose rooms for meetings and courses aimed at the local people. Main contractor, McKelvey Construction led the project and worked alongside Michael Whitley Architects to design and deliver the most appropriate solution for Belfast City Council and the local community. K Systems provided on-site technical support and installation guidance throughout the build which resulted in delivery of a modern, aesthetically pleasing facility that achieved the target U-value of 0.18W/m ² K. Our ServiceHaving originally specified rainscreen cladding, K Systems technical team worked with the architect to design a bespoke engineered system with the drained cavity to suit the metsec frame. Regular site visits from our team ensured support was available throughout the build. The Centre is located on a busy street with limited surrounding space, so we had to manage a very congested, condensed site with deliveries planned and arranged by appointment only. We worked closely with McKelvey Construction to manage such challenges and ensure that local access for residents was uninterrupted, as well as ensuring the overall safety of the site area. From design advice through to installation, we offered a partnership approach which ensured a smooth installation process with minimal disruption, and the delivery of a fantastic community centre for the local area to enjoy. Technical Project Details Originally rainscreen cladding was specified for the Walkways project. However during the construction process, due to spiralling material costs and budget restraints, this was deemed too expensive so alternative solutions had to be sourced. It was decided an external insulation system would be used and a ventilated cavity system was required, as this provides a secondary defence in commercial buildings like Walkways. The K Systems Exicco E drained cavity façade system was specified as it ticked all the boxes. Exicco provides excellent protection and can offer an excellent fire rating of up to A2-s1,d0, providing high levels of fire resistance and non-combustibility. The drained cavity behind the insulation in the Exicco system will ensure that any interstitial moisture will escape without detriment to the performance of the system. As EWI was not originally specified for the project, no metsec frame had been designed. This is a crucial element for the Exicco system, which meant a bespoke metsec frame had to be designed specifically to suit our system. The Exicco E system for Walkways used Expanded Polystyrene (EPS) insulation boards that were mechanically fixed and attached to 12mm BBA Approved sheathing boards to create a 25mm drained cavity. EPS boards are extremely light-weight and the system offers a great fire rating of B-s1,d0. It is a high performing, economical system that generates high levels of thermal performance and ensured the target U-value of 0.18W/m ² K. was achieved. For the finish, Silkolitt+ silicone renders ensured a clean, crisp contemporary finish that offers protection to the exterior of the community centre. The flexibility of this finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish for Walkways. 
Sponsored
VDG Warehouse Schiphol II opts for nature-inclusive building with MobiPanel green facades

VDG Warehouse Schiphol II opts for nature-inclusive building with MobiPanel green facades

Mobilane

VDG Property Development has recently joined forces with their own construction company Unibouw to develop the new VDG Warehouse Schiphol II. The new building is equipped with a total of 636.5 square meters of vertical greenery divided into two green walls with the MobiPanel system.In addition to the sustainability requirements, BREEAM-NL certification ‘Excellent’, this also enables the building to meet the high-quality requirements in the areas of nature inclusiveness, biodiversity, ecology and living environment. The green appearance of the buildings is the ‘new normal’ at the business park. Schiphol Trade Park aims to be the most sustainable and innovative business park in Europe.‘The area developer and the ambitions of the Schiphol Trade Park area set high requirements in the area of nature inclusiveness. For example, 95% of the end walls of the building had to be green upon completion. The green facades give the building a fantastic appearance. Nature inclusiveness is becoming increasingly important in project development and this is also the future. It will make the Netherlands look all the better,’ says Richard van Campen – project manager at Unibouw B.V.Nature-inclusive buildingFor the development of VDG Warehouse Schiphol II, design choices were made that enhance the ecological value for the surrounding area. For example, the warehouse not only facilitates an efficient logistic process but also creates space for more greenery and biodiversity.Diversity in plant speciesFor each façade, the climatic conditions have been examined and the choice of plants has been adjusted accordingly. The green façade oriented to the North-West contains the plant species; Campanula Stella, Alchemilla Molis, Vinca Minor, Lonicera Maigrun, Geranium Rozanne, Carex Oshimensis ‘Evergreen’, and Bergenia Bressingham White. In the green façade oriented to the southeast are the plant species; Alchemilla mollis, Dryopteris Erythrosora, Bergnia Bressingham White, Lonicera Maigrun, Riarella cordifolia, Carex Oshimensis ‘Evergreen’, Asplenium scolopendrium and Geranium Spessart. In total, there are approximately 23,400 plants in both green walls.VDG Warehouse Schiphol IIVDG Warehouse Schiphol II comprises 9,636 m2 of modern logistics space and consists of two units. With green facades and panels on both sides, VDG Warehouse Schiphol II presents itself as an extremely sustainable distribution centre. With its ecological elements, the development is not only connected to the surrounding nature, but also to the adjacent distribution centre where a MobiPanel green facade has also been installed.Client: UnibouwArchitect: VDG Real EstateConstruction period: 2022Installation: Mobicare
Sponsored
EUROSPAR, Ireland - Firetite Case Study

EUROSPAR, Ireland - Firetite Case Study

ECON Building Products – BASF Distributor

After considering various products, PABIA Consulting engineers chose FIRETITE as the ideal solution for upgrading the Newtown EUROSPAR building complex in Cobh, Co Cork. FIRETITE met the insulation requirements, fire regulations, and could be retrofitted externally with minimal disruption to tenants and customers.
Sponsored
Marineside, Bracklesham Bay

Marineside, Bracklesham Bay

K Systems Insulated Facades

BackgroundWith stunning southerly views across to the Isle of Wight and also westerley along the Solent to Hayling Island, Portsmouth and the Millenium Tower, Marineside, a development of three-storey properties at Bracklesham Bay, is a dream location for anyone to live.However, whilst a prominent beachfront location comes with spectacular sunsets and unrivalled tranquillity, it does leave buildings highly exposed and prone to weather damage.This was the case with the Marineside development which showed signs of high coastal corrosion and were in severe need of regeneration both aesthetically and internally to address thermal underperformance.K Systems teamed with CBG, Envirorend SE, and Harrington Design to complete the low-rise refurbishment project, with three main objectives:- Remediate problematic substrate- Improve thermal performance for the benefit of residents- Revitalise a tired and unattractive exteriorAs with all projects, K Systems began a detailed scope and specification process with full involvement from all parties, including deploying digital technology to provide an inspirational viewpoint for the client to understand what the refurbishment would look like at completion.Our ServiceFollowing extensive planning, K Systems brought the client’s vision to life and created a beautiful collection of revitalised waterside homes on the banks of Bracklesham Bay.The refurbishment of Marineside wasn’t a straightforward project and required comprehensive scoping to ensure optimal delivery and 100% satisfaction levels amongst current residents.Therefore, it is a notable triumph for K Systems to have delivered a successful project, within budget, without delay or compromise on quality, that not only met but exceeded the requirements and expectations of the client.Each structurally sound, aesthetically pleasing dwelling boasted excellent thermal performance properties, achieving a U-value of 0.30W/m²K, allowing residents to benefit from more thermally efficient homes and experience a reduction in energy consumption.K Systems in collaboration with CBG, Envirorend SE and Harrington Design delivered beautiful, clean, crisp, aesthetically attractive properties, each with a protective exterior finish which will provide resistance to the elements for years to come.Technical Project DetailsOnce the existing façade was removed it was clear that the block substrate had high level corrosion due to the harsh coastal environment it had endured since being built in the 1940s.Multiple areas of the three buildings had to be completely removed and replaced using a medium density block that achieved superior pull-out test results. This was a recommendation by K Systems which enforced confidence with not just the client but the homeowners too as the best way to ensure longevity of the buildings.The removal also revealed that the substrate was uneven and unsafe. K Systems identified that extensive dubbing out was also needed with these buildings. Dubbing out meant the insulation boards were installed line and level giving a crisp and professional finish.The Marineside buildings were solid block construction making them extremely inefficient and presented an expense to the homeowners during winter months due to insufficient thermal performance.Utilising its years of unparalleled expertise, K Systems specified the industry-proven Mineral Wool insulation system for the project to address the aged façade and significantly boost the thermal performance of the building.K Systems Mineral Wool insulation (a mat of rock fibres which prevents the movement of air) has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the Marineside refurbishment as it would combat the heating issues faced by residents whilst retaining the solid foundations of the existing building.Other technical benefits which made the K Systems 110mm Mineral Wool system the ideal specification for this refurbishment include:- its level of fire resistance and non-combustibility, ensuring the building met all safety regulations required for residential buildings in England- its excellent acoustic properties, ensuring coastal noise absorption further enhancing the peaceful and tranquillity of the area- its environmentally friendly composition as it is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)Due to the coastal location and exposure to the elements, it was vital that this refurbishment guaranteed total water tightness. K Systems worked closely with the roof installers ensuring that the parapet details were correctly detailed making the system as a whole watertight.The exterior finish was just as important as the internal construction and detailing. The Bracklesham Bay area has a level of prestige and the aesthetics needed to reflect that. K Systems finished the Marineside complexes with a silicone thin coat render, which is extremely breathable and resistant to the elements, in shades Limestone White and Granite. This completely transformed the aesthetic of the residential blocks making them much more appealing to potential dwellers.Envirorend SE commented:“ We secured the refurbishment works at Marineside , for a good client and works started in January 2022. The scope of works was to make the 3 blocks more energy efficient. Situated directly on the beach, the location made the install very challenging as the weather was not very forgiving at that time of year. The existing substrate was all over the place so a lot of effort was put in to get the walls looking line and level while staying within the remit of the specification. Works were completed in July 2022 and to a very high standard for all to see. “
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Agriculture Industrial Doors- Cargill

Agriculture Industrial Doors- Cargill

Hart Door Systems Ltd

Cargill is an international food, agriculture, financial and industrial products and services business. Cargill connects farmers with markets, customers with ingredients, and people and animals with nourishment.Project/doors:32 doors across six facilities12 Storm, 3 Super, 3 Mini, 6 Insulated Fast Action Roller Shutters, 4 Electric Operated Roller Shutter 4 Special Doors. Ongoing replacement of old doorsThe challenge Hart were consulted to help reduce vermin access mainly from pigeons, seagulls and geese attracted by the feed/agricultural nature of the production process. The doors needed to be capable of thousands of operations in dusty conditions allowing large vehicles fast access to the facilities. The solution With over 30 Hart doors installed across six production facilities, the latest contract replaced existing roller shutters, which remain open all day, with seven Speedor Storms, one Speedor Super and one fast action roller shutter. The emphasis was on speed of open/close cycles to significantly reduce the vermin access and improve energy efficiency. The success The investment by Cargill is also part of a drive to improve energy efficiency by 5% and to maintain a better working environment and temperatures within the building as well as preventing unauthorised access to different areas of the plant. The Review:“I wanted to say I was really pleased with the job David and guys have done. They showed great work ethic, housekeeping was spot on and their attitude to safety on site was great- whenever they were challenged they were very patient and helpful.”Gavin Dunn, Project Engineer, Cargill
Sponsored
SIGA Heritage - Cotsway

SIGA Heritage - Cotsway

SIGA Natural Slate

Trowbridge County Hall.

Showing 145-180 of 1681

Feedback