This groundbreaking project required a sheathing board that would form an integral part of an insulated render system, providing 60-minute through-wall fire resistance and meeting project-specific acoustic requirements. Project: Northumbria Specialist Emergency Care Hospital Project Value: £70 million Architect: Keppie Design Main Contractor: Lend Lease Subcontractor: Farpod Dry Lining Product: Versapanel Size: 2800mmx1200mmx12mm Quantity: 30,000m2
Contact Euroform Products by clicking the button below to find out which products were used in this case study.
Premier Inn, Southend-on-Sea
Chi-Gasket - A Simplified Route to BR135 compliance for Scotland’s Largest Timber Structure