NBS Source
I'm a manufacturer

"mechanical cleaning chemical systems"

6,946 results found

Sort by:

Showing 109-144 of 1964

Sponsored
City College Norwich

City College Norwich

S&P UK Ventilation Systems Ltd

S&P UK was appointed by local Mechanical and Electrical (M&E) contractors to specify the bespoke ventilation requirements. Following in-depth analysis, our recommendation to supply our newly-expanded RHE 15000 was given the go-ahead. The heat recovery unit provides the highest rate of airflow for large spaces, indoors or outdoors, and is capable of pumping 4 m³ of fresh air per second
Sponsored
Biscuit factory use FasTop TG69 flooring solution

Biscuit factory use FasTop TG69 flooring solution

Sherwin-Williams

Resin flooring systems from Sherwin-Williams for food and drink manufacturing areas are seamless, strong, slip-resistant and safe for pedestrian traffic. Textured products including FasTop TG69 are independently tested as having low slip potential when tested with the TRRL Pendulum method promoted by the Health & Safety Executive.In order to reduce the impact on daily operations and allow food production to continue, FasTop TG69 is low odour and can be installed as quickly as possible in line with fast-track programmes to avoid disrupting manufacturing procedures as much as possible.This flooring system can withstand high temperatures, thermal exposure to reflective heat from ovens, as well as heavy impact, heavy machinery and equipment, and a high volume of footfall. It can also resist particularly harmful chemicals used as part of the Clean-In-Place CIP process such as caustic soda, nitric and phosphoric acid.
Sponsored
Peak Ascent Cycles

Peak Ascent Cycles

Forbo Flooring Systems

An old Edinburgh Woollen Mill store in Buxton was recently transformed into a bike shop to cater fro the needs of the avid cyclists in the local area. Peak ascent Cycles also specialises in bike servicing and repairs which in turn, results in dirt and moisture from threads of wheels being rolled into the shop on a daily basis. Recognising the necessity to stop dirt in its tracks and protect the shop's shiny interior floor coverings, Patrick Healy, the owner of Peak Ascent cycles had our Coral Duo entrance flooring system installed at the front door. In a green Bellagio colourway- which is new for 2021- the vibrant green shade matches the bike shop's brand colours perfectly and reflects its ethos of nature and the great outdoors. Indeed Coral Duo is proven to stop up to 95% of dirt and moisture from entering a building and can reduce cleaning time by up to 65%.
Sponsored
University of Illinois

University of Illinois

Forbo Flooring Systems

The University of Illinois street dining renovation project includes a high-end micro-restaurant dining concept that serves over 3,000 students a day. The University has successfully used Flotex floor covering amounting in 8,000 m2 on campus, installed in student housing and shared areas for dining and student union activities. The university has repeatedly chosen Flotex for its proven clean-ability, durability and hygiene.
Sponsored
CEEQUAL WINNING PROJECT USES VOLTEX

CEEQUAL WINNING PROJECT USES VOLTEX

CETCO

Kings Cross Package 4. The tanking material had to succeed where the specified competiton fell short : all weather installation; self-healing/sealing capabilities; one product application ; mechanical not chemical bond to concrete. It also had to meet the specified requirements of BS8102 1990 Grade 4. The solution was 8000m2 of Voltex, containing zero VOC, installed in almost any weather conditions to green concrete, and proven effective on both new and remedial waterproofing projects worldwide. Aided by CETCO holding both ISO 14001 & 9001, and the properties of Voltex, the project achieved its CEEQUAL award, scoring above 75%, and rating Excellent.
Sponsored
Buncrana Primary Care Centre, Co. Donegal

Buncrana Primary Care Centre, Co. Donegal

K Systems Insulated Facades

BackgroundThe new multi-million euro Buncrana Primary Care Centre development was an exceptional project to be involved with. This high-profile project was funded by the HSE, with the aim of bringing many healthcare services together in one new state-of-the-art centre. Construction was led by local company McCallion Group and the 56,500sq ft. facility, which is spread across three storeys, boasts underground car parking which can house 126 staff. The centre is an excellent asset to the local community, ensuring the vital health services people need to avail of on a regular basis are available in one central location. For the client, the key requirement was to build a modern, aesthetically pleasing, energy efficient facility that achieved a target U-value of 0.15W/m ² K. After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems provided a full technical specification and a comprehensive delivery plan.Our ServiceOur dedicated team of technical specialists were on hand to fully support throughout the duration of this project, ensuring the highest levels of construction were achieved. The K Systems Technical Manager, Gerry McErlean regularly visited the project to inspect progress and offer hands-on-guidance and technical support. Local installer GD Plastering worked very closely with Gerry to ensure a high standard of work was achieved and great attention to detail is evident throughout this project. Due to the size and scale of the Care Centre, Gerry recommended that the TC render finish was spray applied to ensure a consistent finish and aid the speed of application. GD Plastering took this advice on board and invested in a spray machine, resulting in a uniform finish, faster completion and reduced labour.Technical Project Details After numerous design meetings taking into consideration client requirements, budget and timeframes, the K Systems E EWI system was specified. This high-performance, light-weight and cost effective system based on expanded polystyrene (EPS) insulating panels offers a great fire rating of B-s1,d0 and is available in a range of finishes. The mixed substrate of reinforced concrete and lightweight block had alignment issues. We specified the use of multiple thicknesses of insulation boards, that were fixed adhesively and mechanically to overcome these alignment issues. Our specification included bespoke technical detailing, such as compression joint detailing on every floor and our site inspection teams were on-site when required to offer a range of support and guidance. For the finish, thin coat silicone render (Silicone TC) was specified. Providing a variety of benefits, K Systems thin coat render offers silicone and polymer-modified technology to provide long term weather protection, alongside excellent breathability and water repellency properties. With the unpredictable Irish weather, this durable finish will withstand the elements and offers an eye catching, clean design, creating a modern and crisp aesthetic. Available in a wide range of colours, K Systems silicone render is the most flexible on the market, making cracking over its lifetime less likely. Its ease of application made it an ideal choice for a project of this scale and size and its hydrophobic properties provide a low-maintenance finish for years to come. We delivered a long-lasting, safe, eye-catching design for the Buncrana Primary Care Centre that brings exceptional thermal comfort to the property. The target U-value was achieved, allowing energy savings and reduced costs for the client throughout the lifetime of the Centre.
Sponsored
Education | Rainbow Nursery

Education | Rainbow Nursery

Venesta Washroom Systems Ltd

A functional, child-friendly washroom design featuring Genesis toilet cubicles was created for Rainbow Nurser. The nursery opted for Venesta’s Genesis toilet cubicles, a popular choice for early education settings due to it's versatility and many customisable features including low-level doors and curved partitions. The toilet cubicles were specified in High Pressure Laminate (HPL) making them ideal for nursery usage, allowing for easy cleaning and simple maintenance, meaning they really will stand the test of time.For cost savings and reduced installation times, our Vepps pre-plumbed panelling system was specified. In addition, low level vanity units were installed featuring semi-recessed basins. A favourite for our youngest customers as they don’t get the water from the basin on their clothes when washing hands. Read the full case study for more details.
Sponsored
Education | Royal Grammar School

Education | Royal Grammar School

Venesta Washroom Systems Ltd

“The Venesta cubicles offer easy maintenance and cleaning. The product has really improved since the original product twenty years ago and there are some lovely colour schemes to choose from.” - Christina Roper, Boarding Administrator. Having previously installed Venesta cubicles in the late 90s, the school decided it was time for a total refurbishment of the washroom areas, and Vanesta was the natural choice for this new project. Needing something that was easy to clean and maintain, built to last and simple to install, Award cubicles in High Pressure Laminate (HPL) were chosen with matching Solid Grade Laminate vanity units.
Sponsored
Basement Pumping System, Kent

Basement Pumping System, Kent

Newton Waterproofing Systems

Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
Sponsored
DPG Media

DPG Media

Forbo Flooring Systems

It's always been a pleasure to work with Forbo Flooring. Thanks to Forbo's many years of experience, they always manage to propose the right flooring with a good price/quality ratio, regardless of the project or the application.For this project we looked at maintenance-friendly floors that are easy to clean - an important consideration in a working environment. That is why we chose Tessera carpet tiles and Allura Flex. The resulting floors accord perfectly with the look that DPG aspires to, while the good acoustics and luxurious textures are a welcomed extra.
Sponsored
15 years on, and still going strong.

15 years on, and still going strong.

SureSet Resin Systems

This case study tells you about a project we completed 15 years ago and shows how it looks now, we also clean the area and it looks like new again.
Sponsored
Strathclyde University Andersonian Library

Strathclyde University Andersonian Library

Forbo Flooring Systems

The robust qualities and unique geometrical design of Forbo Flooring Systems’ Flotex Triad planks has helped to refresh the entrance level of this busy university library in Glasgow.The Andersonian Library, located in the Curran building at the University of Strathclyde, is a public facility for thousands of students and staff across Glasgow’s universities. After years of heavy footfall, the original carpet that was fitted in the reception area and corridors of the library was fast deteriorating and imminently becoming a trip hazard.Dawn McNeil, Building Surveyor at the University of Strathclyde said: “When we saw the carpet starting to fail within the entrance level, we knew that we needed a new flooring solution which would be robust stand up to the high levels of traffic, yet also able to retain its aesthetics in years to come. What’s more, as it’s a busy library, it was important for us that the flooring was also easy to clean, as the floors are very prone to food and drink spillages."
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Golden Jubilee Hotel

Golden Jubilee Hotel

Forbo Flooring Systems

Sitting on the banks of the River Clyde, the Golden Jubilee Conference Hotel (GJCH) has recently been refurbished to a create hygienic, neutral and relaxing environment for guests. Designed by SPACE Solutions, Forbo Flooring Systems’ Allura Luxury Vinyl Tiles (LVT) were specified to fulfil the cleanability and design requirements set by the hotel.The GJHC provides accommodation and conference facilities in the centre of Glasgow and sees a range of guests, from hospital staff and pre/post-operative patients to conference goers and more. As such, it was important that the rooms could satisfy the needs of every guest.SPACE Solutions was tasked to refurbish the 53 rooms, prioritising hygiene and comfort. Gillian Ralston, Senior Architect at SPACE Solutions spoke on the brief they received, saying: “With this project we wanted to create a welcoming, warm and inviting setting, with easily cleanable furniture and flooring. To make this happen, we had to design the rooms in a way that would minimise the risk of contamination for not only the guests, but also the staff who have to clean the rooms after a stay. However, we had to do this without compromising on the aesthetic value of the rooms. That’s why Forbo’s Allura LVT was perfect for this project.”Forbo’s Allura Decibel was specified in the Seagrass Anthracite and Light Grey Seagrass colourways, which both have a similar patterning. As well as this, the grey and green hues matched some of the design inspiration Gillian took from the surrounding environment.Gillian continued: “We chose Allura as it was available in designs that matched the scheme we had in mind, whilst also being easy to clean, fulfilling the hygiene requirements, and providing underfoot comfort. We also specified the Decibel format, which helps to reduce impact sound by 19 dB – an important factor for a hotel, where people expect a good night’s rest!”The Golden Jubilee Conference Hotel won ‘Commended’ in the Forbo Escapes 2021/22 competition.To find out more about Forbo’s Allura LVT products, visit www.forbo-flooring.co.uk/allura or to learn more about the Forbo Escapes competition, visit www.forbo-flooring.co.uk/forboescapes
Sponsored
Luxury apartments benefit from NIBE Exhaust Air heat pumps

Luxury apartments benefit from NIBE Exhaust Air heat pumps

NIBE Energy Systems Ltd

Salthaven Apartments, Tower Road, Poole, DorsetThe Salthaven apartments in Dorset aimed to deliver luxury living for occupants. Bayview Developments not only constructed beautiful homes for them, but also opted for highly energy efficient heating within the new development.Each of the 12 two or three bed apartments have been fitted with their own individual exhaust air heat pump (EAHP). This technology has been installed in buildings across continental Europe for many years but is now being used more commonly within the UK. Bayview Developments were looking to exceed their planning requirements by reducing carbon emissions and providing cost savings for occupants. NIBE’s innovative EAHPs were therefore the ideal solution.The solution to the projectA NIBE F730 EAHP system removed the need for gas boilers, something Bayview were keen to do given the UK’s net zero targets and commitment to phase out the technology. As heat pump technology is powered by electricity, no gas has been installed at the site.The NIBE F730 unit can be found in the utility room cupboard of each apartment and is comprised of a ventilation system, a hot water cylinder and a heat pump – a complete ‘all-in-one’ product. It works by drawing warm air from the kitchen and bathroom to feed the heat pump, which extracts the heat energy. The recovered energy from the ventilation system is used to drive the heat pump process, which heats the underfloor heating and provides water for the integrated 180litre hot water cylinder. The stale air from the ventilation system is then released outside, whilst fresh air from outdoors is introduced via wall inlets with cleanable filters. The efficient system minimises energy consumption by combing ventilation heat recovery with heat pump technology, that is perfect for well insulated new build properties such as these.The ResultsThe EAHP systems meet the average annual heat demand of 6019 kWh for each individual flat whilst also providing instant hot water. Occupants are able to schedule their heating to suit their timetable and energy tariffs, and therefore benefit from lower energy bills. The system performance factor (SPF) measures 3.33 – this means the system is very efficient as every kW of electricity used to run the unit produces approximately 3 kW of heat energy.NIBE utilised connected electricity meters in 3 apartments to remotely monitor the systems performance across a 12-month period. NIBE was thus able to see how the systems met energy demand consistently for residents, keeping them comfortable and warm throughout the year.Energy consumption data shown in Figure 1 visualises electricity consumption data from the monitored apartments throughout the year. This data also covers the provision of all heat pump controls and continuous mechanical ventilation.Figure 1: 2022 Energy Consumption data for monitored apartments.The all-in-one system has shown a noticeable reduction in energy bills for each apartment too, with all 3 monitored apartments experiencing both monthly and cumulative cost reductions in their energy bills as shown in Figures 2 and 3. This comes with the additional peace of mind that consumers will be kept cool in the summer months with ventilation with no increase in costs.Figure 2 and 3: Monthly and Cumulative Heating Bills for Apartment 11 with the NIBE F730 heat pump compared to a natural gas boiler.The occupants of Apartment 11 are saving on average £130 on their annual heating bills with the heat pump system in comparison to a natural gas boiler, even with the additional provision of mechanical ventilation. We expect that these savings will continue to increase as the Government seeks to rebalance green levies to decrease electricity prices.Sunstone Energy Ltd, the installer for this project, told us how easy the control system is to use for this heat pump, allowing for heating and hot water to be available at any time during the day. The building also benefits from insulation, underfloor heating, smart controls, double glazing, hot water cylinders and mechanical ventilation with heat recovery (MVHR).TestimonialVictoria and John are both residents of the Tower Road apartment complex and have been comfortably living with the exhaust air source heat pump system for a year. They added “We are delighted so far with the new heating system, and love that it has been providing us with heating and hot water throughout the year, keeping us warm in the cold winter months. The heat pump works just as well as our older systems and it is great to know that we’re also doing our bit for the environment in the process.”About the installerSunstone Energy Ltd takes responsibility for delivering complete renewable solutions appropriate to their client’s properties. Their expertise includes the installation of ground source and air source heat pumps, underfloor heating, solar panels, biomass boilers and MVHR.  
Sponsored
MetroLine Case Study

MetroLine Case Study

Dart Valley Systems Ltd

During the design and specification stage of the Metroline washroom installation contract, Lan Services considered the fact that the products chosen would have to be installed within washrooms of varying sizes and layouts. Also, due to a large volume of people using the facilities each day, the specification called for a highly durable and reliable washroom solution that is hygienic, easy to clean and maintain.
Sponsored
Broadway Apartments, Morecambe

Broadway Apartments, Morecambe

K Systems Insulated Facades

BackgroundLocated in a prominent location on the Morecambe seafront, the Broadway Apartments project was large new build steel frame apartment block.A challenging project to be involved with, as M H Stainton Homes wanted to create an iconic building on a corner location. The steel frame was key, combined with curved glazing on the corner elevation of the building. Then a lightweight cladding solution was required for the rest of the façades.K Systems approved installer M & M Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.Our ServiceWe worked in close partnership with M & M Façades throughout the duration of the project. The K Systems Technical team offered on-site technical and installation support throughout the build process and supported the M & M Façades team at all stages of the project.As the building is over 18 metres, a bespoke specification was produced to ensure compliance with the current building safety regulations.A direct fix system suitable for steel frame structures and all building heights was specified, ensuring the safety of both the building and future residents.Technical Project DetailsAfter numerous design meetings the K Systems Direct Fix M (Mineral Wool) EWI system with a Silicone Render (TC 15) finish was chosen, meeting the requirements of M H Stainton Homes.This system provides high levels of fire resistance and non-combustibility bringing the apartments in line with mandatory Government requirements for buildings over 18 metres tall.We specified the use of multiple thicknesses of insulation boards (50mm, 100mm and 170mm) to allow for the line and level of the steel frame. A U-value of 0.28 W/m²K was achieved, meaning the residents will enjoy thermally efficient homes.For the finish Silicone TC 15, our high-performance thin coat render, was used. With the coastal location, this durable, weather resistant finish offers an eye catching, clean design, creating a modern and crisp aesthetic. Its hydrophobic properties provide a low-maintenance finish.We delivered a safe, thermally efficient, eye-catching design with a long-lasting finish that residents will appreciate for years to come.
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.
Sponsored
North Devon NHS Trust Case Study

North Devon NHS Trust Case Study

Dart Valley Systems Ltd

Dart Valley Systems Ltd has been working closely with Northern Devon Healthcare NHS Trust, Capital Engineering Manager to improve infection control measures. An initial trial set was set up at North Devon District Hospital using the AquariTherm™ Manual tap. As the AquariTherm range was designed with healthcare environments in mind, it was a great match.One of the taps main selling point, was the patented isolation feature, which allows the tap to be removed for servicing or exchange without the need to isolate the water or remove any panels. This unique feature reduces any down time during servicing or disinfection, with easy to access filters these can be removed, replaced or cleaned in a matter of seconds.
Sponsored
Historic Restoration - 230 Park Avenue (The Helmsley Building)

Historic Restoration - 230 Park Avenue (The Helmsley Building)

C-Probe Systems

Challenge: Many elements of the iconic skyscraper were facing embedded steel corrosion, including the structural steel lattice columns within the colossal terracotta enclosures. The expansion of the steel caused by the corrosion was severely damaging the masonry cladding and cracking the six-foot-tall terracotta bison heads.Strategy: Installation of an impressed current cathodic protection (ICCP) system at the steel sections with the colonnades on 29th to 32nd floors. The system consisted of LoCem® +point® anode mortar was applied within the bed joints and drilled in to provide 360° protection of the steel surfaces. The bison heads were deconstructed, steel cleaned-up and masonry reconstructed. LoCem® is a low carbon cement alternative (AACM), which can also act as a cathodic protection anode for controlling steel frame corrosion.Outcome: The ICCP system resulted in long-term performance and control for the whole life preservation of our clients’ assets. Using AchillesICP for control over corrosion rate, and AiMS to collect the data, the client had full transparency over structural health and the power to make predictive maintenance decisions.
Sponsored
Retail Store, Sheffield.

Retail Store, Sheffield.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light, Flexi heavy & Flexi access. Services: Plantroom, Generator, Air-handling units, VRF condensers and bespoke access solutions. Roof build-up: Inverted roof design. The mechanical services contractor on the project, had a number of different heavy building services that required supporting. This included a 6000kg plantroom, 6000kg generator, two 4500kg air-handling units and a 1150kg air-handling unit. Utilising our Flexi-Heavy Duty range of supports, we designed and calculated individual frameworks for each item of plant, paying particular attention to ensuring that the correct load management through our frames.
Sponsored
Technowood Privacy & Shading Screen system at London Hilton on Park Lane

Technowood Privacy & Shading Screen system at London Hilton on Park Lane

Technowood UK

London Hilton on Park Lane, an iconic hotel renowned for it’s luxury, elegance and history have recently updated and renewed it’s Grand Ballroom with the pre-function area which now features an extensive wood veneered aluminium privacy & shading screen system by Technowood.One of the challenges that the team at GA Design have faced was the privacy & shading solution for the large windows that are running along the whole pre-function area.Their designers wanted to utilise a rotatable shading system which is both extremely luxurious and fits in with the aesthetic, yet functional and practical.The desired finish was authentic, real Walnut that is heavily stained to a beautiful beige tone while the visible wood grains create a unique texture for the light reflections and touch.The required sizing for both appearance and practicality have ruled out natural solid wood right away. Panel width of 440mm – yes; nearly half a meter! – with only 40mm thickness would have made these elements way too unstable and heavy if solid wood was used.Technowood UK was able to provide a complete bespoke privacy and shading system for this project: Walnut natural wood veneered aluminium profiles for a synchronized, mechanical rotating system of our design with brushed bronze finish elements & cover plates.Our approved installers PSBK Limited did an outstanding job! The complete installation took less than 2 days during the Easter bank holiday weekend.Some of the key advantages of the system:The privacy & shading blades are near 3 meters long unusually wide and slim; while remaining rigid, solid and dimensionally stable. The bespoke nature of the whole system allowed for a perfect and seamless integration between the marble columns. Installation time is unparalleled. 4 separate systems measuring over 6 meters by nearly 3 meters each. Over 72 square meters of area utilising 57 blades in total.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.
Sponsored
Margam Country Park

Margam Country Park

Bushboard Washroom Systems Ltd

Margam Park’s new washrooms needed to be durable, easy to maintain and impress their visitors.Margam Country Park in Wales is owned and administered by Neath Port Talbot County Borough Council. The estate containing a Tudor Gothic Mansion was once owned by the Mansel Talbot family in the 1800s. The 850 acre country park is rich in history, with evidence of over 4,000 years of continuous habitation and use by man. This means it has exceptional historic value, with some of the country’s finest architectural treasures. Paired with its natural beauty, wildlife and many activities and facilities, the Margam Country Park has evolved into a popular attraction which is visited by 350,000 people per year, including locals and tourists alike.Neath Port Talbot Council came to Bushboard Washrooms for the refurbishment of the public washrooms. The main concern for this project was ensuring that the toilets were able to withstand the high traffic the park receives each year. As Alison Lloyd, the Commercial Officer at Margam Country Park, explained “visitors often judge a site on the quality of the loos”, this meant opting for a robust washroom range which offered a modern, high quality finish that will remain presentable at all times.Initially designed for secondary schools with the key focus on privacy, our HiZone for Schools toilet cubicle at standard height was decided as the perfect specification for the country park’s needs. Alison put emphasis on requiring an “indestructible build”, the cubicles pilasters and partitions are fixed to the floor in aluminium channels which creates a strong foundation. The toilet cubicles were manufactured in Solid Grade Laminate which has a compact core making it a highly durable material. It is also impervious to water which makes it easy to clean as the panels do not need to be dried meticulously afterwards to prevent damage.The design of the public washroom was carefully considered. The council wanted to cater for everyone who would visit their park, with additions such as child height basins, family changing areas and enlarged toilet cubicles with grab rails for ambulant/disabled users. In particular, the park recognised parents with their children would regularly visit the park. They designed a superloo style room to utilise space, this was larger than a typical toilet cubicle which gave users more room to manoeuvre within the washroom space.Ease of cleaning was fundamental to the project because of the high traffic the toilet cubicles will endure. Our own brand SanCeram’s Langley WCs and urinals were chosen which both offer a smooth and rimless design to eliminate dirt traps, it also suited the “clean lines” Alison was looking for. Margam Park had sanitaryware and brassware ready plumbed which meant that that it arrived pre-fitted to panels assembled onto a rigid steel frame, this saved both time and money. Being a refurbishment project it meant the washrooms did not have to stay closed to the public for a long period of time.Vanity units were also supplied as Ready Plumbed Modules and designed to hit the parks public washroom brief. Solid Surface Counter Top vanity units are ideal for busy washroom environments as they are easy to maintain. Alison wanted to make sure that the washroom had ‘clean lines to clean’, so integrated inset wash hand basins were supplied which have a flush design leaving no dirt traps for a hygienic hand wash station whilst also creating a seamless, high-end overall look.Alison told us that the colours were “chosen to fit with the Country Park, a wood feel and green panels to make it bold and stand out”. Lime Green and Bleached Oak laminates paired with Apple Solid Surface colours from our standard range complemented the mansion scenes within the washroom perfectly. Overall the review of the new washrooms at Margam Park were “ABSOLUTELY BRILLIANT! We opened in time for the Early May Bank Holiday and feedback from public was great and staff love the clean lines and bright colours.”
Sponsored
Acoura: The Versatile Ceiling System Redefining Acoustic Comfort

Acoura: The Versatile Ceiling System Redefining Acoustic Comfort

Soundtect

Featuring bespoke sizing, design, easy installation, and use of sustainable materials, the Acoura ceiling system by Soundtect offers a highly customisable acoustic solution that can elevate your project to new heights of comfort and style.City workspace projectFor this workspace redesign, HOP Interiors sought a solution to the challenges of noise control in an expansive open-plan environment.  Leveraging Acoura's capabilities, strategic placement of the acoustic ceiling panels effectively transformed the workspace into a hub of productivity. Zoned working areas, delineated by Acoura's sleek design, provided employees with the peace and quiet needed to excel in their tasks while maintaining a collaborative atmosphere.With a clever bespoke and unique carrier system, the Acoura baffles can be easily removed and reinstalled, again and again, for easy access to the ceiling mechanical and electrical services when needed, simply and quickly.With a large range of Freestyle colour options and wood-effect finishes, Acoura offers designers a wealth of aesthetic possibilities. From bold statements to subtle accents, the choice is yours, with the added flexibility to match any wood finish and complement existing design schemes.SustainabilityLike all Soundtect products, Acoura is crafted from third-generation recycled PET. By utilising recycled materials, Acoura not only reduces waste but also minimises the demand for new resources, contributing to a more sustainable future.Soundtec thas zero CO2 emissions and zero water emissions. Utilising solar power for its factory, the company has earned several awards for its contributions to the environment, especially as the product's core material comprises post-consumer plastic with low VOC content.The Acoura sustainable acoustic ceiling not only delivers a truly bespoke, unique solution to reverberation but also a fabulous and inspiring alternative to heavy wooden beams with no impact on the environment.
Sponsored
Frankley Industrial Estate - Birmingham

Frankley Industrial Estate - Birmingham

Johnstone's Trade Paints - a brand of PPG Industries

Part of a wider £30,000 refurbishment project, PPG's High Build Epoxy Floor Coating was applied to all internal floor areas. Perfect for application onto new and existing concrete floors, PPG EP301 is a two component, solvent free product that provides a smooth, easy to clean finish resistant to oil and chemical spilage and has excellent wear resistance to low moderate abrasion; such as foot and rubber tyre traffic. To complete the refurbishment, Johnstone’s Jonmat Premium Contract Matt in Brilliant White was applied to the walls and ceilings to provide excellent coverage, leaving a permeable breathable finish.
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
Arla Foods

Arla Foods

Hart Door Systems Ltd

Arla Foods is a major dairy company producing the best dairy products. It is a farmer-owned company committed to high standards.Project/doors:Over 40 doors across multiple sitesThe challengeThe existing doors which were made from aluminium were unreliable and had started corroding. Hygiene is a priority and food production areas require specialist doors to promote cleanliness and avoid contamination. Due to the lack of space, one of the doors required a special solution to be able to effectively install the doorThe solutionHart replaced unreliable aluminium bi-parting doors installed by a competitor with Harts stainless steel Speedor Minis. The Speedor Mini is a made to measure high speed roll up door with multi-layer PVC fabric which is thicker and less prone tears and splits. Stainless steel allows for easy cleaning, contamination prevention and extended life. The Speedor has a life expectance of 20+years.The successHart Doors is the oldest British manufacturer of highspeed doors and has worked with Arla for over 20 years supplying a range of door systems. Arla knows that by choosing Hart its high standards will not be compromised. Arla was given peace of mind with a 2 year warranty as standard and the confidence that Hart would deliver a quality product once again. The Review:"The fitters who attended site were excellent and professional. Well done to them." William Beale, Arla Foods
Sponsored
Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Liquasil Ltd

Another example of the BBA Approved asbestos roof coating system, Asbestsoeal from Liquasil Ltd. The asbestos cement roof was first cleaned using a closed box pressure washer. All waste was filtered and disposed of by a licensed asbestos disposal contractor. Metal fixings were treated with Liquasil SWT Corrosion Primer and then sealed, along with small cracks and holes, with Non-Sag Sealer before the roof was coated with Asbestoseal 20. The project included GRP rooflight replacement and new ridge detail and flashings.
Sponsored
Triton Systems Specified For Underground Car Park Upgrade

Triton Systems Specified For Underground Car Park Upgrade

Triton Systems

Triton Systems supplied waterproofing systems specified by waterproofing design specialists, Ink Technical Services, for the upgrade to a below ground car park in North London. BS 8102 (2009) recommends the involvement of a waterproofing specialist at the design stage of any below ground waterproofing project. Involving an expert at this stage also minimises the risk of system failure in the future.
Sponsored
Sto Insulation System Specified For New Hospital Building

Sto Insulation System Specified For New Hospital Building

Sto Ltd

Sto has supplied the StoTherm Mineral K external wall insulation system with StoLotusan render for the new Day Case and Eye Unit building at Chorley and South Ribble Hospital. Specified by Gilling Dod architects of Chorley, who worked closely with the main contractor Tilbury Douglas, the StoTherm Mineral K system combines impressive insulation with excellent fire protection characteristics. With an A2-s1, d0 reaction to fire classification in accordance with BS EN 13501-1, the non-combustible mineral fibre insulation is fully bonded to the substrate and therefore no additional firebreaks are required. Ideal for both new-build and refurbishment projects, its efficient single-leaf construction also means that interior space within the building is not reduced.  For this project, the system’s mineral fibre insulation boards were secured to the lightweight steel frame and sheathing board substrate with mechanical fixings and StoLevell Uni adhesive and levelling mortar. A StoLevell Duo Plus reinforcing coat embedded with Sto-Glass Fibre Mesh was then applied to the face of the insulation boards, with StoLotusan and StoSilco renders used for the final finish on different sections of the building, using light colours from Sto’s architectural colour range.  StoLotusan is the only render available that uses Sto’s patented Lotus-Effect® technology which delivers impressive water and dirt repellence. It forms a unique surface texture, similar to that of the lotus leaf, that causes the rainwater to run off the render quickly and easily, removing any dirt or dust as it goes. Providing outstanding resistance to the growth of algae and fungus, the building will retain its looks for many years to come.  The new Day Case and Eye Unit is the result of a major £17.5 million investment in developing enhanced ophthalmology and day case services. The new Day Case and Eye Unit now offers an extensive range of diagnostic and treatment facilities for patients with medical eye conditions.
Sponsored
Modern parking system for classic cars enables 141 spaces in Munich

Modern parking system for classic cars enables 141 spaces in Munich

Lödige Industries

Automated parking system will combine storage and service for classic, racing and luxury cars.Lödige Industries has secured a contract from SSR-Performance to deliver an automated car storage system. The 141-space facility in Munich, Germany is billed to be the most modern automated system aimed at luxury and classic car owners.About the new classic car parking facility in Munich SSR-Performance is constructing a 10,000 m² classic, racing and luxury car hub with specialist repair and styling facilities, race sports services and showroom. The new automated classic and sports car storage facility complements these plans. The contract with Lödige Industries includes the planning, construction, installation and servicing of the new robotic system. Work on site has already begun and is scheduled to complete in early 2020. Combining maintenance and storage of classic, racing and luxury cars on a restricted footprintConsistent humidity and reduced levels of oxygen are important to reduce corrosion and fire risk when storing classic cars. Humidity, temperature and atmosphere inside the robotic parking system are controlled to cater for the specific requirements of vintage cars. “I have been looking for a facility like this myself for several years now. When it became clear that it didn’t exist, I decided to build one myself,” says Stefan Schlund, Managing Director of SSR-Performance. “After visiting Europe’s largest public robotic parking facility in Denmark a few months ago, I was impressed. In working with Lödige Industries, I have chosen an experienced partner that not only understood my needs but also knew how to make them happen.”In the fully automated facility, cars will be parked in one of the access cabins from where they will be transported into the system by a flat robot carrying them by their tires onto a transport vehicle and from there onto the parking space.About the customerStarting in spring 2020, SSR Performance GmbH will offer a demanding clientele automotive services with a focus on sports cars, classic automobiles and motor sports under one roof. SSR is opening an automotive competence and service centre in the north of Munich, which will offer a large number of lifting platforms, an air-conditioned four-wheel drive performance test stand, a showroom and fully automated nitrogen storage areas for exclusive cars on 10,000 m² of floor space and six levels.Challenges of storing classic, racing and luxury carsThe German market for classic cars is constantly growing and faces a gap in combined storage and service for classic, racing and luxury cars.Providing enough parking spaces on the restricted footprint, is one major issue SSR Performance faces.When storing classic cars, consistent humidity and reduced levels of oxygen are important to reduce corrosion and fire risk.High security standards need to be provided in storing classic, racing and luxury cars, as they value significantly higherA thorough maintenance and cleaning of the classic, racing and luxury cars is the basic requirement for an optimal storage. This prevents the formation of rust or other deposits on the vehicle.Our solution and benefits for the customerSSR Performance recognised the market gap and took the opportunity to serve high-quality service and storage for classic, racing and luxury cars within a new facility in Munich.Humidity, temperature and atmosphere inside the robotic parking system are controlled to cater for the requirements of vintage cars.The automated parking systems, provided by Lödige, delivers high security for customers, as access to the cars stored within the system is only for authorized personal.Our CUBILE technology uses a flat transport robot, which carries the cars by their tires and therefor reduces the risk of damages.The customized automated parking system for SSR Performance features direct automated access to mechanic workshops. With this fully automated link, SSR can provide the unique combination of storage and maintenance for classic, racing and luxury cars to their customers.“I have been looking for a facility like this myself for several years now. When it became clear that it didn’t exist, I decided to build one myself. After visiting Europe’s largest public robotic parking facility in Denmark a few months ago, I was impressed. In working with Lödige Industries, I have chosen an experienced partner that not only understood my needs but also knew how to make them happen.”- Stefan Schlund, Managing Director of SSR-Performance
Sponsored
STEM building, University of Bedfordshire, Luton

STEM building, University of Bedfordshire, Luton

BTS Fabrications Limited

Installer – Metclad ContractsMain Contractor – R G Carter, CambridgeArchitect – MCW ArchitectsClient – University of BedfordshireSystem(s) – Vantage®️ SF in Anodised Regency Gold and PPC 9006 Syntha Pulvin Bespoke Curved Internal Rooflights and bespoke flashings throughout.The University of Bedfordshire has invested 40 million pounds in this new STEM building at its Central Luton campus.STEM stands for Science, Technology, Engineering and Mathematics (STEM) subjects, however Pharmaceutical and Chemical Science, Nutrition, Biochemistry, and Mechanical Engineering are also taught there.The project was a very big challenge to our design teams as the specification from MCW architects was predominately regency gold anodised . This spec calls for a special grade of aluminium and the finish means that we must leave welds as laid. Consequently, we had to consider different methods of fabrication to resolve with stunning resultsWe supplied our Vantage®️ SF Hook on rainscreen in both regency gold and powder coated, 9006 Silver however, the pinnacle of our supply was the bespoke curved anodised rooflight in silver 9006
Sponsored
Allenby Barracks

Allenby Barracks

Langley Waterproofing Systems Ltd

Our purposeOn behalf of Amye Defence Services, Acclaim Contracts Ltd was commissioned to address the aging roof of the building, which was leaking despite receiving patch repairs over the past 20 years. The Ministry of Defence’s Project Allenby/Connaught demonstrates the Government’s commitment to maintaining defence estates.The £1.45bn scheme is a 35-year commitment to providing modern, high quality, fully serviced, purpose built living and working accommodation for 18,700 soldiers. It involves the new build and refurbishment of more than 550 buildings across Salisbury Plain and Aldershot, including upgrading Allenby’s Building 51, otherwise known as the Sports Pavilion.Our solutionAcclaim turned to Langley to provide all the material necessary to complete the work. After stripping the original roof to the existing plywood deck, the team fitted new treated timber around the perimeter and new uPVC fascia. The current edge trims, perimeter check kerbs, and extended flues were removed to ensure regulatory 150mm clearance was achieved once the new roof covering was installed. Langley’s HT180 attachment layer was loose-laid and nailed into place to provide appropriate protection to the timber deck while the “hot works” above were undertaken. Langley’s TA-20 Flat Roofing System was installed across the roof area, with insulation to achieve the regulatory requirement of 0.18W/m2K. SA-20 Flat Roofing Detailing System was used in fire risk areas, in line with Safe2Torch guidance. The range of Langley’s TA systems complies with Broof(t4) classification and has a Local Authority Building Control (LABC) assured accreditation. Under MOAT 31, Langley’s Parafor 30 GS (cap sheet to the TA system) achieves a ‘resistance to damage” rating of R4. It is independently certified by the BBA to deliver a life expectancy of at least 40 years, one of the longest available in the UK.Acclaim fitted Langley’s ParaFurb Refurbishment Outlets to upgrade the internal outlets where possible, cleaning and priming those where the design precluded the use of ParaFurb. We installed New Code 5 lead pipe sleeves to flues and hot pipes to a minimum 150mm above the waterproofing. In addition, Langley’s ParaTrim GRP Edge Trim was fitted to all the kerbs.“It carried great weight with us that Acclaim worked in partnership with Langley, who offers an independent insurance-backed guarantee. That is indicative of pride and confidence in its work, giving synergy with Amey. It also gives us, and our client the Ministry of Defence, that the refurbished estate at Allenby will serve and be fit for purpose for decades to come.”Will Loates, Service Delivery Area Manager, Amey
Sponsored
Healthcare | Cardigan Integrated Care Centre

Healthcare | Cardigan Integrated Care Centre

Venesta Washroom Systems Ltd

Cardigan Integrated Care Centre is a brand new healthcare centre in West Wales, housing a GP practice, dental service and pharmacy.Each unit was pre-plumbed and tested at the Venesta factory, reducing installation time by 50% and giving the end user added peace of mind.The aim of the £24m development was to provide safe, sustainable, integrated care for local residents. The anticipated high footfall meant durable and hardwearing solutions were required in all consultation rooms and washroom areas.Hygiene and infection control were of paramount importance, so we worked closely with Accredited Installers, Shire Integrated Systems, to ensure fit for purpose healthcare solutions were selected.Vepps Boxed-Out Units were specified for all the consultation rooms and offered speedy installation, while maintaining the integrity of rear fire walls and acoustic rated walls. The Solid Grade Laminate (SGL) box sides in ‘Shadow’ were rebated into strong extruded aluminium frames that provide flush, easy to clean surfaces.Meanwhile, Vepps Wall System panelling was specified for the toilet areas, which meant the WCs, flushes, basins and taps were pre-plumbed and thoroughly tested before being delivered to the Centre for installation.Read the full case study for full details.

Showing 109-144 of 1964

Feedback