NBS Source
I'm a manufacturer

"liquid fuel tanks"

1,449 results found

Sort by:

Showing 37-72 of 237

Sponsored
Moreby Hall

Moreby Hall

Cemfloor Liquid Screeds

Project LocationNorth YorkshireProduct Used:Cemfloor ThermThe Jacobean-style property, built between 1828 and 1831 and designed by renowned architect Anthony Salvin, is being turned into homes set in 10 acres of private parkland overlooking the River Ouse.Originally commissioned for the High Sheriff of Yorkshire, the family still owned the estate into the 20th century.The first completed phase of the stately home's renovation is seven homes and apartments.Cemfloor Therm was the product of choice for this project thanks to its many benefits;Reduced drying time compared to other screedsCement based screed that is compatible with all cement based adhesives; including fast track systemsEasy Installation which reduced time and costsFoot traffic allowed after 24/48 hours which meant other aspects of the project could continue
Sponsored
LPG for hotels, restaurants & pubs

LPG for hotels, restaurants & pubs

Calor Gas Ltd

If your hospitality establishment is off grid, here at Calor you can benefit from our versatile LPG heating solutions which translate into both fuel and CO2 savings when compared with oil, keeping your customers happy with hot water and piping hot food. Follow the link to read through the case study with one of our clients, Nash Manor House. ''The oil tank has rusted and started leaking and I was concerned about the impact that this might have on the environment. I also didn’t like the fact that oil was a target for thieves – so I wanted a fuel that could not be easily stolen. On paper LPG appeared to be more expensive than oil, but in practice that has not been the case.''
Sponsored
Residential Balconies

Residential Balconies

Liquid Roofing Systems Ltd

Product: RapidDeckProject: Residential BalconiesSize: 65m²Completed in: 3 days
Sponsored
Ballymore Royal Wharf

Ballymore Royal Wharf

Cemfloor Liquid Screeds

Ballymore Royal Wharf3,385 Apartments & Homes11,150 m² Of Retail & Business UseMain ContractorBallymoreScreed Installed byProgressive GroupSectorMixed UseJointly developed with Ballymore and Oxley Holdings Ltd, the development incorporates a high street, side streets, and the occasional mews, taking inspiration from the great estates that emerged in London, throughout its history.Just minutes from Canary Wharf, and less than half an hour from Oxford Street, this is a rich, textured neighbourhood, focused around the lively central high street, a broad market square and a rolling riverside park.
Sponsored
Devenish College, Enniskillen

Devenish College, Enniskillen

Cemfloor Liquid Screeds

Devenish College,EnniskillenMain Contractor Glasgiven ContractsScreed Installed by Alpha Flow ScreedSector EducationCirca 9,500m2Devenish College is a new Post Primary School, includingSchool Meals Accommodation, Play Grounds and ssociatedPlaying Fields, constructed to cater for a long-term enrolment of 800 pupils on a green field site, circa 11.5H accessed off the Tempo Road on the outskirts of Enniskillen.The Educational and Ancillary Accommodation is circa10,600M2. School Meals Accommodation is 600M2.
Sponsored
Capital Docks, Dublin

Capital Docks, Dublin

Cemfloor Liquid Screeds

Capital Dock, a 22-storey mixed usedevelopment, including office blocksand residential areas, is in the vibrantDublin Docklands and was developed byKennedy Wilson.John Sisk & Son were the main contractors, and Clarke Contracts installed 25,000m² of Cemfloor, the chosen screed for the project.The main advantage Cemfloor has over the flowing screeds is the quicker drying time. It also eliminates any risk of incompatibility with cement-based adhesives and levellers and no special preparations are needed before hand. After looking at their options, Cemfloor was chosen for the project due to its faster installation time and drying time compared to traditional sand and cement screeds. This helped to keep the project on track with its tight building schedule.Due to its flowing nature, Cemfloor was pumped and placed 20 stories high without issue. The limited space available on site was also a factor to be considered and was resolved by using Cemfloor. It was delivered to the site ready mixed which eliminated the need of on-site mixing and storage of sand and cement on site.
Sponsored
FedEx Transfer Station

FedEx Transfer Station

Liquid Roofing Systems Ltd

Project: FedEx Transfer StationProduct: Elasto-Kote (Portland Grey)Project size: 25,000m²Completed in: 2 WEEKSApplication: Spray appliedGuarantee: 20 years
Sponsored
Glasgow Commercial Units

Glasgow Commercial Units

Liquid Roofing Systems Ltd

Product: Elasto-KoteProject: Commercial Units, GlasgowProject size: 1400m²Location: Glasgow
Sponsored
Honeywell Multi-roof

Honeywell Multi-roof

Liquid Roofing Systems Ltd

Product: FastCoat ProProject: Honeywell Multi-RoofProject Size: 6000m² in: Approx. 3 months
Sponsored
Liquid gutter lining system by Liquasil

Liquid gutter lining system by Liquasil

Liquasil Ltd

The metal gutter to this gymnasium in Eastbourne was corroded and leaking. Liquasil's Gutterseal system was specified because it could easily cope with some unusual protrusions present in the gutter. Heaqvy rust was removed and the surfaces treated with SWT Primer - a marine quality corrosion treatment. Joints were sealed using Non-Sag Sealer, which has 1400% elasticity and then the entire gutter was coated with Liquasil One to provide a flexible, seamless and permanent gutter lining.
Sponsored
Carlisle Race Course

Carlisle Race Course

Liquid Roofing Systems Ltd

Product: FastCoat ProProject: Carlisle Race CourseProject size: 600m²Location: Carlisle
Sponsored
Niles Bakery, St Austell

Niles Bakery, St Austell

Cemfloor Liquid Screeds

Project Name:Niles Bakery, St AustellProject Location:St Austell, CornwallProduct UsedCemfloor C30Based in the scenic town of St. Austell, this project consists of a ground floor baking factory over 630m2 and first floor office space of similar size.Cemfloor was chosen for this project thanks to its many benefits including easy installation and reduced drying time.The floor needed to be strong enough to carry the weight of the baking machines so Cemfloor c30 at75mm was the proposed solution for the ground floor.On the first floor, heavy foot traffic and office equipment needed to be considered and Cemfloorc30 at 50mm was installed.Time on site was limited and the screed needed to be installed in a short time frame. NMA Flooring started the pour at 8am and were offsite by 11:30am. Light site traffic work was able to commence 48 hours after the pour
Sponsored
Battersea Power Station Redevelopment

Battersea Power Station Redevelopment

Cemfloor Liquid Screeds

Product UsedCemfloor C30F6The iconic Grade II listed Battersea Power Station is at the heart of one of central London’s largest new developments. The £9 billion project will see the creation of a vibrant new destination for London, housing a community of homes, shops, cafes, offices, leisure and cultural venues, withover 19 acres of public space. As part of the redevelopment of the power station, a lightweight floor build-up was required.Cemfloor C30F6 was chosen for this project as part ofan ultra-lightweight flooring solution and was supplied by Capital Concrete and installed by B&K Systems.The new proposal for Battersea was for energystore TLA to be installed at various thicknesses to level out the existing un-even substrate with 30mm depth of Cemfloor CT C30 F6 screed then bonded directly onto the insulating screed. This system had the following benefits of the original specification:• Significant weight reduction: the original specification had a weight of 300kg/m2 whereas the new proposal had a weight of 120kg/m2.• Greatly reduced installation time: the original specification was a semi-dry system, which would have been manually placed and compacted. The proposed products are both flowable systems that are pumped into place and tamped to provide a smooth level surface.• Vast reduction in deliveries of materials to site and minimal storage on-site. • Reduced cement content leading to a lower CO2 footprint.• Faster turnaround time allowing follow-on trades to progress with works without any delays.• Lower curing time of the new system allowed the floor to be loaded with MEWPs faster.• Significant cost savings were also achieved.Following the installation of the system in-situ crushing resistance testing (ISCR) was carried out throughout the floor area; with each test easily meeting the CAT Arequirements. The system was delivered ahead of schedule and a significant time saving was achieved compared with the original specified floor build up. The slab was covered with various types of flooring all of which were compatible with the screed topping.
Sponsored
Cambridge City Football Clubhouse

Cambridge City Football Clubhouse

Cemfloor Liquid Screeds

After several years without a permanent base, Cambridge City FC are hoping to move into their new stadium ahead of the 2024/25 season.Their new club house will be an asset to Cambridge football club allowing them to host events and have refreshments for match days.Cemfloor was chosen as the screed of choice for this stage of the project thanks to its many benefits includingthe speed of install and depths necessary, with Flowscreed laying 90m3 of screed, at a depth of 60mm, over 2days.Other factors such asReduced drying time compared to other screeds Easy Installation which reduced time and costs Foot traffic allowed after 24/48 hours meant that other aspects of the project could continue without delay
Sponsored
Addenbrookes Hospital Surge Centre

Addenbrookes Hospital Surge Centre

Cemfloor Liquid Screeds

Addenbrookes Hospital Surge Centre2000m² Of CemfloorA temporary surge facility on the site of Addenbrookes Hospital to relieve pressure on the main hospital as part ofthe NHS' regional surge planFloor Screeding Solutions installed 2,000m2 of Cemfloor, the chosen screed for the project, which was supplied by Mick George Concrete, Cambridge.With the rising case numbers of Corona virus during the pandemic, hospitals were coming under increasing pressure for more critical care beds, and Surge Plans were put in place across the country to help alleviate this pressure.Addenbrooke Hospital in Cambridge sought to construct a ‘Surge Centre’ to cope with the additional demands on the hospital, and Cemfloor was chosen for the project due to its faster installation time and drying time compared to traditional sand and cement screeds. This helped to keep the project on track with its tight building schedule.Lewis Deck construction offered a strong light weight flooring option for the large pour area. As Cemfloor is a flowing screed, 500m2 of screed per day was poured over this by Dave Washbrook and his team from Floor Screeding Solutions, eliminating the need for on-site mixing.The main advantage Cemfloor has over other flowing screeds is the quicker drying times, and that it can accept foot traffic after 24 / 48 hours, meaning that construction could continue quickly and efficiently to meet the project deadline.
Sponsored
Grant Solar Thermal system helps family home reduce fuel bills

Grant Solar Thermal system helps family home reduce fuel bills

Grant Engineering (UK) Ltd

A Grant Solar Thermal system has been installed at a five-bedroom property with gas central heating, helping the family to not only significantly reduce their carbon footprint but also lower their monthly heating bills.
Sponsored
Fast Food Franchise HQ

Fast Food Franchise HQ

Liquid Roofing Systems Ltd

Project: Fast Food Franchise HQProduct: RapidRoof Pro & FastCoat ProProject size: 300m²Location: Maidenhead
Sponsored
Former Babergh District Council HQ

Former Babergh District Council HQ

Cemfloor Liquid Screeds

Project LocationIpswich, SuffolkProduct UsedCemfloor Therm C20 The former Babergh District Council offices are located within the town centre.The area comprises five buildings with listed status, historic maltings, and a former industrial gasworks, as well as a contemporary office block.The plan is to integrate the listed structures into a fresh residential project, achieved through a combination of renovating and constructing new apartments and houses.Cemfloor Therm was chosen for this stage of the project thanks to its many benefits including;Reduced drying time compared to other screedsCement based screed that is compatible with all cement based adhesives; including fast track systemsEasy Installation which reduced time and costsFoot traffic allowed after 24/48 hours which meant other aspects of the project could continue
Sponsored
Oval Village, Kennington, North London

Oval Village, Kennington, North London

Cemfloor Liquid Screeds

Oval VillageKennington North LondonScreed Supplied By: Capital ConcreteScreed Installer: The Progressive Group Ltd.Product Used: Cemfloor NH C25F5Berkeley Group is one of the UK’s leading developers and has won numerous awards for its commitment to quality, design and customer service.Oval Village, located next to the famous Surrey Cricket Grounds, and built on the old Gas Works, is a new luxury development of 1300 homes, along with Retail, Food, and Office spaces.As part of the project brief, there was a need to install a low depth flooring solution. Due to its high flexural strength Cemfloor NH provided the solution as it allowed a 40mm screed depth to be installed, without compromising onquality. Thanks to the pumpability of Cemfloor, Progressive Group were able to pump to height, and install the screed over 18 stories, with the material being pumped over a distance of 160 meters without any issues.The main advantage Cemfloor has over other flowing screeds is the quicker drying times, and that it can accept foot traffic after 24 / 48 hours, meaning that construction could continue quickly and efficiently to meet the projectdeadline.
Sponsored
Metal roof coating and liquid gutter liner

Metal roof coating and liquid gutter liner

Liquasil Ltd

The metal roof was first prepared using high powered jet washing equipment, to remove loose and flaking materials. Liquasil corrosion primer was applied to the corroded cut edges and the entire roof was sprayed with a single coat of Metalseal 20. The metal box gutter was heavily corroded. The loose and flaking material was removed and Liquasil’s Corrosion Primer was applied all along the gutter. The joints in the gutter were sealed with Liquasil’s unique Non-Sag Sealer and then the entire gutter was coated with Liquasil One to provide a seamless gutter finish.
Sponsored
Liquid gutter liner applied to metal gutter in Glasgow

Liquid gutter liner applied to metal gutter in Glasgow

Liquasil Ltd

This project involved sealing a metal gutter in Glasgow. Leaks were present at most of the steel profile joints and rust was evident throughout. Heavy rust and soiling was first removed and then the entire length of the gutter was treated with Liquasil's corrosion primer, to prevent further rusting. Once cured, Liquasil Non Sag Sealer was applied to all joints. Non Sag Sealer has 1400% elasticity, to cope with extreme thermal movement. The whole gutter was then coated with Liquasil One to form a seamless and leak-free gutter lining.
Sponsored
Metal roof coating & liquid gutter lining Derbyshire

Metal roof coating & liquid gutter lining Derbyshire

Liquasil Ltd

This project in Derbyshire involved treating cut edge corrosion, re-coating the roof and lining the gutters. Products used were * Metalaseal BBA Approved metal roof coating system * SWT Primer (to treat rust in the gutters and cut edges) * Liquasil One and Non-Sag Sealer to line the gutters. The project is covered by the unique Liquasil Latent Defects Guarantee, which is written specifically for Liquasil and underwritten by an A-Rated, Lloyds of London insurer.
Sponsored
Hydrostop AH-25 Liquid Roofing - Sacred Heart Primary School

Hydrostop AH-25 Liquid Roofing - Sacred Heart Primary School

AccuRoof

Hydrostop AH-25 product was chosen to refurbish 450m2 of roof at the Sacred Heart Primary School in the Bridgeton area of Glasgow. Areas of the roof had been leaking, leading to considerable water damage and disruption to some classrooms. The priority for the roof works was to procure a waterproofing system with minimal hot works that would cause as little disruption to the school’s everyday activities as possible.
Sponsored
Chobham Manor Waterproofed with 14,000 m2 of Alsan Liquid PMMA

Chobham Manor Waterproofed with 14,000 m2 of Alsan Liquid PMMA

Soprema UK

Nestled between parklands, at a mere stone’s throw from Lea Valley and Hackney Marshes, and in the heart of Queen Elizabeth Olympic Park with its world-class sporting facilities, an incredible new neighbourhood is arising. Chobham Manor is the first of five new developments to be built in this history-rich area in Stratford, east London. 6,800 new homes will be constructed in total over the next 20 years, along with health centres and multi-purpose community spaces. SOPREMA provided the waterproofing solution and insulation materials for Chobham Manor, as well as collaborating closely from the design stage onwards with Taylor Wimpey, one of the top-five housebuilders in the UK, and SOPREMA-approved contractor Skyler Contracting.
Sponsored
Cut Edge Corrosion Treatment & Liquid Gutter Lining, Snodland

Cut Edge Corrosion Treatment & Liquid Gutter Lining, Snodland

Liquasil Ltd

The metal roof to this large distribution centre was affected by cut edge corrosion and all of the metal valley and eaves gutters were affected and leaking & corrosion. The gutters were first cleaned and dried, then treated with Liquasil’s corrosion primer. All gutter joints were coated with non-Sag Sealer, a highly elastic silicone polymer, before the whole gutter was coated with Liquasil One to provide a seamless gutter lining to prevent further leaks. Liquasil systems are covered by a unique Latent Defects Guarantee.
Sponsored
SIKALASTIC PROVIDES RAPID CURE FOR SOCIAL HOUSING RESIDENTS IN NORWICH

SIKALASTIC PROVIDES RAPID CURE FOR SOCIAL HOUSING RESIDENTS IN NORWICH

Sika Liquid Plastics

Refurbishment of the walkways was required as part of a wider upgrade programme delivered by main contractor, Thomas Sinden. The existing asphalt covering had been damaged and the resulting water ingress was not only causing leaks into the properties below but was also compromising the building fabric with signs of damp in the external walls. The project had to be carried out while the apartments remained occupied so it required a solution that could be installed quickly with minimum disruption to residents and excellent performance over an extended service life.
Sponsored
SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE

SIKALASTIC® RAPID PROTECTS WALKWAYS FROM RAIN ON STATION PARADE

Sika Liquid Plastics

All apartments are accessed at the rear of the building via stairs and walkways and the existing asphalt walkway surfaces had blistered, causing various leaks and creating a trip hazard for residents. There was an urgent requirement to carry out the walkway refurbishment while the building remained fully occupied and with minimal disruption for occupants. The building’s flat roof had also reached the end of its service life, requiring a refurbishment to protect the apartments from water ingress.
Sponsored
General Binding Rules 2020

General Binding Rules 2020

Marsh Industries Ltd

2020 General Binding RulesFor decades, millions of septic tanks have been installed throughout the UK in rural and urban areas. Septic tanks are known to be ineffective at processing sewage to modern environmental standards, causing long-term damage to the country’s natural water infrastructure and wildlife.It was therefore inevitable that new rules and a code of conduct would be introduced to prevent the effects of wastewater pollution once and for all; The Environmental Permitting (England and Wales) (Amendment) (England) Regulations 2014 came into force on 1 January 2015 creating the General Binding Rules (GBRs) for septic tanks or small sewage treatment plants for domestic use. These rules are designed to reduce the level of pollution from sewage in the nation’s watercourses.The rules state that any existing septic tank discharging to surface water, ie, to a water ditch, stream or river, etc, must have been upgraded or replaced with a new package sewage treatment plant by 1st January 2020.  Failure to comply can incur significant fines from the Environment agency and delays in selling impacted properties.OptionsCurrent methods of discharging wastewater from septic tanksPrevious to the General Binding Rules, wastewater from septic tanks was typically discharged in the following two ways:Drainage fieldWastewater is released through a network of pipes in surrounding sub-soils, providing an additional form of treatment for the waste from the septic tank. This helps to ensure that the wastewater being dispersed does not cause pollution.Septic tanks discharging into a drainage field are not affected by the 2020 septic tank regulations.Directly to surface waterWastewater flows through a pipe directly into a stream, river or lake. Binding rules state that direct discharge from a septic tank into a watercourse is not permitted.So, what are your options?1. Connect to the main sewerThis may not be possible in remote locations, although pump chambers can be used to direct wastewater to the mains sewer.2. Install a drainage field(Designed in accordance with BS6297)This allows the septic tank to discharge wastewater into the ground instead of surface water. In many cases, the installation of a drainage field is not possible due to site constraints such as space and/or the soil not having sufficient drainage potential (ie, rock, clay, high water table).3. Install a Uni:Gem septic conversion unitA Marsh Uni:Gem can be installed and connected to a pre-existing septic tank. This treats the wastewater to a sufficient quality allowing it to be discharged to surface water. See below for further detail.4. Upgrade your septic tank to a Marsh sewage treatment plantThis eliminates the need for a drainage field and ensures that the wastewater is fully treated before being discharged. Options include the Ensign, Ensign Shallow and Ultra Poylok L.Uni:Gem★Marsh Industries, the leading UK manufacturer of package sewage treatment plants, produces over 3000 units per year. However the company’s range of Uni:Gem★ septic conversion units is the only product available on the market which can treat wastewater from an existing septic tank without the need for a complete replacement product or drainage field upgrade.To comply with the GBRs and current EN standards, the entire Uni:Gem range was redeveloped from the ground up and tested, not only to meet, but to exceed UK and International standards. The Uni:Gem★ was born – creating an ‘industry first’ 2020 compliant septic conversion unit with outstanding processing performance.The Uni:Gem★ range was tested in accordance with BSEN12566-3/A1:2009 and EN12566-6 standards at the PIA GmbH test facility in Aachen, Germany, over the course of 38 weeks with a daily loading of:Flow: 900 litres/day BOD: 360g NH4: 48gTesting occurred between November 2018 and August 2019 to ensure all seasons were covered whilst minimum/maximum temperatures were tested to assure Ammonia and BOD process reduction for the UK climate. Holiday periods were also simulated during the test procedure. Final test results yielded an output of 12.5:16:4mg/ltr (BOD:Suspended solids:Ammonia) that is well within national discharge consent requirements.The Uni:Gem★ is an extremely cost effective solution for converting any polluting septic tank into a fully compliant sewage treatment plant ensuring homeowners, estate managers, water companies/amenities have an effective way to keep the environment clean whilst providing a quick and efficient installation process.
Sponsored
Improving water water in Manchester

Improving water water in Manchester

Marshalls Civils & Drainage

The modernisation programme of the multimillion pound project involves significant remediation of previously abandoned land, followed by construction of six circular primary settlement tanks (PST) and a large activated sludge plant (ASP) with 10 circular final settlement tanks (FST). This work will lead to significant environmental benefits for the site, improving the outflow, and subsequently the quality, of water entering the Manchester Ship Canal.
Sponsored
ABG blueroof - Green Extensive, Huddersfield University, UK

ABG blueroof - Green Extensive, Huddersfield University, UK

ABG

The design in this project was to have a Green Roof and warm roof system The aim was to place standard green roofs which retains water but allows most of the rainfall to run into buried SuDS tanks. Following consultation with ABG the design was changed to the ABG Blueroof system. The primary advantage of the system is that utilising the roof construction for water storage reduced the need for underground attenuation tanks. The simplicity of the design allowed for attenuation capacity and green roof installation at the same time saving the client time and money.
Sponsored
All Saints Academy, Mansfield

All Saints Academy, Mansfield

Sika Limited

Sika Liquid Plastics’ Decothane Ultra cold-applied liquid roofing membrane has been used to refurbish the roof of All Saints Catholic Academy in Mansfield, providing a solution that has addressed water ingress, thermal performance and awkward detailing around roof lights without causing any disruption to lessons or health and safety concerns on site.Components:Sika Liquid Plastics Decothane Ultra.
Sponsored
North Ayrshire Council

North Ayrshire Council

Marley Ltd

Combating fuel poverty through solar power was at the heart of Marley’s project with the North Ayrshire Council.
Sponsored
Greenham Dwelling Upgrade

Greenham Dwelling Upgrade

Kingspan Klargester

A residential dwelling with a failing septic tank located very far from the property, no longer fit for use required a new sewage treatment plant.
Sponsored
Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

HAG Ltd. - The Door Specialists

2021 sees Rolls Royce unveil Testbed 80, the world’s largest & smartest indoor aerospace testbed, as part of a £90million investment. It has been a hard year for the aerospace industry, with production slowing, and cuts in jobs, however this ground breaking facility shows Rolls Royce’s confidence in the future of aerospace for decades to come.HAG Ltd. have proudly worked alongside Buckingham Group to assist in this ground breaking facility that will not only test propulsion systems of the future, but also secure jobs in Derby, UK for many years to come.HAG Ltd. were tasked with designing & manufacturing a roller shutter for this distinctive & state of the art facility, to enable Rolls Royce to test the largest, smartest and most powerful engines in the world by MDS Aero Support Corporation of Ottawa, Canada.HAG Ltd. designed, manufactured and installed 2 Armourguard F1 insulated roller shutters that were 7.5m by 15m. The F1 model is a high quality insulated security shutters delivering the highest level of security and offering thermal protection. A composite of foam filled sections is encased in a flat double skinned interlocking galvanised steel lath.The project:£90million project3 years of construction7,000 square metres, the same size as a Premier league football groundHouses the world’s largest exhaust pipeContains 3,218 tonnes of steelAnd 27,000 metres3 of concreteEquipped with a 40,000 litre fuel tankCapable of testing engines on Sustainable Aviation FuelThe most capable & complex testbed ever designed & builtWarren East, Chief Executive, Rolls-Royce, said: “Testbed 80 is the largest facility of its type in the world. However, it is not only big, it is also smart and features the most advanced testing technology we have ever used. As the new global hub of our testing capability, it will support the next stage of our UltraFan programme as we begin ground testing the first demonstrator in 2022. This incredible piece of infrastructure is a very visible sign of our commitment to this site and secures the future of Derby as the home of large engine development, continuing a history that began in the late 1960s with the RB211.”HAG Ltd. are proud to be part of this monumental development in the aviation industry.
Sponsored
ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG

Moreland Primary School is a purpose built school, nursery and Children's Centre requiring a multipurpose usable outdoor space. Due to lack of space, the ground attenuation tanks planned would reduce site storage and limit access to other trades, therefore delaying the project, The challenge was to develop a storage/discharge system which wouldn't impact the project and be sensitive to the local biodiversity action plan. ABG designed a versatile Blue Roof System removing the need for attenuation tanks and allowing the roof finishes required. ABG bio-diverse roof system helped maximise the BREEAM credits laid out in the action plan
Sponsored
baseTherm® is an NSAI Agrément certified BEPS liquid floor insulation, complete with its own EPD.

baseTherm® is an NSAI Agrément certified BEPS liquid floor insulation, complete with its own EPD.

SMET Building Products Ltd

baseTherm® is produced and installed on-site by our local team using our Mobile Floor Insulation Factory - without waste or fuss.�baseTherm® KEY BENEFITS: � Seamless, void-free poured floor insulation� Factory-produced on-site, without waste - using our Mobile Floor Insulation Factory� Rapid pumped installation� Non-combustible� Ultra-lightweight with acoustic benefits� Highly insulating, from 0.041 W/mK� National Standards Authority of Ireland (NSAI) Agrément certified � EPD Certified – available to download on Irish Green Building Council's platform EPD Ireland� Available for spec on NBS Source and as BIM Digital ObjectsContact your local team baseTherm® for amazing insulation results:�+353 (0) 87 333 0683�+353 (0) 87 223 2456� sales@basetherm.com�basetherm.comClick here to view more finished jobs on our GALLERY:https://lnkd.in/e9zh-nwx#EPD #basetherm #BEPS #pouredinsulation #insulation #koreinsulation #liquidfloorinsulation #floorinsulation #beadscreed Fast Floor Screed Ltd Eddie Hussey Smet Building Products Limited KORE Insulation NBS

Showing 37-72 of 237

Feedback