Project Name:

Niles Bakery, St Austell


Project Location:

St Austell, Cornwall


Product Used

Cemfloor C30



Based in the scenic town of St. Austell, this project consists of a ground floor baking factory over 630m2 and first floor office space of similar size.


Cemfloor was chosen for this project thanks to its many benefits including easy installation and reduced drying time.


The floor needed to be strong enough to carry the weight of the baking machines so Cemfloor c30 at75mm was the proposed solution for the ground floor.


On the first floor, heavy foot traffic and office equipment needed to be considered and Cemfloorc30 at 50mm was installed.


Time on site was limited and the screed needed to be installed in a short time frame. NMA Flooring started the pour at 8am and were offsite by 11:30am. Light site traffic work was able to commence 48 hours after the pour

Products featured in this case study

View all products (9)
Cemfloor CT C30F6 - Liquid Screed

Cemfloor CT C30F6 - Liquid Screed

More case studies from Cemfloor Liquid Screeds

View all case studies (16)
Devenish College, Enniskillen

Devenish College, Enniskillen

Randox Laboratories

Randox Laboratories

Ballymore Royal Wharf

Ballymore Royal Wharf

Oval Village, Kennington, North London

Oval Village, Kennington, North London

More case studies from Ready-mixed levelling and wearing screeds

View all case studies (5)
EcoWorld Brentford

EcoWorld Brentford

Lululemon - Vancouver, Canada

Lululemon - Vancouver, Canada

Saxton Lane

Saxton Lane

81 Piccadilly

81 Piccadilly