NBS Source
I'm a manufacturer

"industrial fire doors"

8,345 results found

Sort by:

Showing 145-180 of 920

Sponsored
PUCKLECHURCH INDUSTRIAL BUILDING

PUCKLECHURCH INDUSTRIAL BUILDING

Tata Steel

Refurbishment of two former WWII barrage balloon hangars in Pucklechurch, South Gloucestershire into striking new industrial facilities has been completed with the help of Tata Steel’s Trisomet® insulated roof and wall panels.
Sponsored
The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

Norwood Group Limited

PROJECT OVERVIEW IQE, the leading supplier of advanced wafer products and material solutions to the semiconductor industry, planned a £100million investment to create a state-of-the-art semiconductor facility over the next ten years. The works were undertaken on the old LG site in Newport, which had stood redundant for twenty years. The new compound semiconductor wafer foundry is set up at the site as part of the Welsh Government’s commitment to creating the world’s first ‘semiconductor cluster.’We were first engaged by the architects Atkins, who was looking for a system that could be installed to expeditated programme but still achieve the GMP standards, including ISO 4 to ISO 7 cleanrooms. Atkins saw the Norwood Mediline partition 60min fire rated system as the perfect solution, allowing the build to be prefabricated and modulated, however still giving their second fix subcontractors full access to the partition void, which included gases and electrical works. We worked closely with Atkins, developing a design that could be installed quickly but maintained a high quality and specification.  During the construction phase, we worked closely with the appointed principal contractors, CMB Engineering. The project was delivered on time and recognised in Wales by winning the Constructing Excellence awards. Norwood’s relationship with CMB Engineering and Atkins has continued to grow, securing several future projects with the team.As part of our scope, we designed, manufactures and installed our Medline solid and glazed partitions, walk on ceiling and fire rated single and double doors.
Sponsored
Temple Back Fire Station

Temple Back Fire Station

Kingspan Insulation

The size and poorly insulated design of the Avon Fire & Rescue Service's existing building makes it uneconomically expensive to maintain and run. To address this, the building is being demolished in stages with a new fire station being built on a much smaller footprint. The energy performance of the building envelope was a key consideration. A target U-value of 0.23 W/m²·K was set for the walls of the building. To help achieve this Kingspan Kooltherm K15 Rainscreen Board was specified. This has allowed the Service to not only save lives, but also energy and money.
Sponsored
Darlington Fire Station

Darlington Fire Station

Ronacrete Ltd

MJF Group completed the coating of Darlington Fire Station using RonaFloor HB200. The bays were completed using dark grey with the borders in brick red. Before the application of RonaFloor HB200, they were required to install a damp proof membrane and opted for our RonaFloor Epoxy DPM which can be applied to substrate with an RH of up to 97%.
Sponsored
PREMIERS OFFERS SOLUTIONS TO SCHOOLS HIT BY VANDALISM

PREMIERS OFFERS SOLUTIONS TO SCHOOLS HIT BY VANDALISM

Premier Security & Fire Consultants Ltd

VANDALISM to schools’ property is a continuing issue but one that is being addressed by Premier Security & Fire Ltd.Working in partnership with Swedish company Hammerglass, Essex-based Premier is providing security options that include unbreakable glass for windows and doors. Several London schools and colleges that have been repeat victims of vandalism have already engaged the company to replace existing installations.Hammerglass is 300 times stronger than traditional glass and weighs half as much. Premier Security & Fire Ltd manufacture and install their own designs, including security options that reach counter-terrorism threat level.If you would like more information, call us on 0208 559 8295.#UnbreakableGlass #SchoolsSecurity #Facades
Sponsored
Fire Rated Decking and Class A substructure

Fire Rated Decking and Class A substructure

Wallbarn Ltd

Refurbishment of terrace with Class A fire rated non-combustible decking system. Exadeck porcelain decking boards were fitted to Wallbarn aluminium rail substructure with Class A MetalPad EX adjustable height pedestals. Retro-fitting of entire terrace to comply with fire regulations Approved Doc B and BS 8579.
Sponsored
HSBC UK

HSBC UK

HAG Ltd. - The Door Specialists

HAG was entrusted to provide a range of fire protection products, including fire curtains and Fire shutters to HSBC UK’s head office, One Centenary Square, in Birmingham. This state-of-the-art ten-storey building conversion represented a £200m investment in the West Midlands. This project presented a challenging work environment, operating at great heights over the 1.5m sq ft plot. However, HAG rose to the challenge, ensuring optimum safety at all times. As one of the greenest buildings in Birmingham, their new head office will now better reflect their renowned brand with high levels of fire safety from HAG.
Sponsored
Tough, heavy duty asphalt for fire station

Tough, heavy duty asphalt for fire station

Tarmac

The new, purpose-built Community Fire and Police Station on a two acre site in Prescot required a durable surface for the main yard area, car park and access road. This was a large site, incorporated three fire engine bays, a practice drill tower and community meeting rooms. Having replaced two local fire stations it was expected to be a busy station used by a range of vehicles. With each fire engine weighing up to 13 tonnes and using power-assisted steering the new surface would be subject to extreme turning forces. It would need to offer long-term durability and loss of aggregate due to surface abrasion. After considering the options, Tarmac’s ULTIPHALT HD was chosen, a tough, high performance 10mm asphalt with advanced modified binder. ULTIPHALT HD has been proven to deliver enhanced resistance in challenging environments like container ports and distribution centres. The modified binder enhances durability but also helps to maintain workability and aid compaction, even in low temperatures.
Sponsored
WOODLANDS GARDEN CENTRE - AUTOMATIC SLIDING DOOR

WOODLANDS GARDEN CENTRE - AUTOMATIC SLIDING DOOR

Next Doors Ltd

In the heart of a bustling garden centre, our team was tasked with revamping the entrance to a popular cafe. The existing domestic grade UPVC door system struggled to cope with the high pedestrian traffic and lacked the necessary user-friendliness and accessibility features.To address these challenges and elevate the cafe’s entrance, we embarked on a comprehensive redesign product. Our solution revolved around the design and fabrication of a commercial-grade aluminium shop front system, meticulously crafted to cater to the diverse needs of the cafe’s customers. At the core of this system, we installed a large single sliding automatic door with integrated electronic locking and a safety pocket door, ensuring both safety and reliability. This upgrade not only facilitated seamless and quiet operation but also significantly improved accessibility, particularly for disabled visitors, while effortlessly managing the constant flow of foot traffic.In addition to functionality, aesthetics were a key consideration in our design approach. Custom graphics were incorporated into the shop front, giving the entrance a distinct company identity that resonated with the cafe’s brand. Moreover, we installed an internal dividing glazed screen to provide wind and chill resistance for diners, enhancing their overall comfort. The end result was a sleek, modern, and stylish entrance that not only addressed the cafe’s immediate needs but also positioned them for future growth and success, allowing them to easily accommodate increasing footfall and expand their business operations.
Sponsored
Hybrid operating theatre doors for The London Clinic, Harley Street

Hybrid operating theatre doors for The London Clinic, Harley Street

Dortek Ltd

The London clinic is one of the UK’s largest private hospitals. Located in the heart of London’s world famous medical district it is the first hospital to have hybrid theatres. Hybrid operating theatres combine the surgical capacity of traditional operating rooms with the imaging capabilities of a catheterisation lab.BriefThe trust required specialist hybrid operating theatre doors for its new hybrid operating suite. The hybrid theatre provides the surgical technology to enable surgeons to switch between open vascular surgery and endovascular surgery as necessary, with real time imaging support.SolutionDortek’s hygienic hybrid operating theatre doors were installed in theatre areas. Dortek’s hybrid operating theatre doors can combine a number of key properties all in one hygienic door. Whether its x-ray rated, automated, fire rated, waterproof or hermetically sealing sliding, these doors were a versatile solution for these new breed of hybrid operating theatres. Doors were also automated to allow staff to open and close them without touching any surface to reduce the risk of infection.
Sponsored
Superior Folding Shutters, Hong Kong Fire Stations

Superior Folding Shutters, Hong Kong Fire Stations

Bolton Gate Company

Bolton Gate’s Superior folding shutters have been specified and used on over 100 Fire Stations in Hong Kong & Macau, the latest being the station built to service the infrastructure associated with the new Hong Kong–Zhuhai-Macau bridge, the longest sea-bridge in the world. The doors are designed to meet an onerous specification including typhoon loads up to 3kPa and fast operating speeds (approximately 700mm per second). They are designed and manufactured in the UK and shipped to Hong Kong where they are installed by Deacon & Co., Bolton Gate’s local agent.
Sponsored
Canberra Metro

Canberra Metro

Jewers Doors Ltd

Jewers Doors’ Australian reseller, Max Doors Solutions (MDS), have recently completed the installation of four sets of Swift-SEW doors on the Maintenance Depot for the new Light Rail system in the country’s capital, Canberra.
Sponsored
Platform Lift for Fire Station

Platform Lift for Fire Station

CIBES Lift UK

This colourful Cibes A5000 platform lift is installed in an old fire station in Falun, Sweden.
Sponsored
Veolia

Veolia

Hart Door Systems Ltd

Veolia is the UK leader in environmental solutions, it provides a comprehensive range of waste, water and energy management services.Project/doors:Nationwide replacement of 60+ doorsThe challengeDue to difficult conditions on site including dust, dirt and moisture, the current doors were unreliable and unfit for purpose. As the doors were not manufactured in the UK, replacement parts were expensive and not readily available. Having doors out of action for long periods of time affected compliance with local authority regulations.The solutionThe Speedor Storm is an extremely robust door with wind class 5 up to 8m due to its unique guide system. The multi-layer PVC fabric is thicker and less prone tears and splits. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt. Its high-speed action control the escaping dirt, odours and noise. The successHart Doors is the oldest British manufacturer of highspeed doors and understands that one size does not fit all. Veolia was given peace of mind with parts available in stock and a 2 year warranty as standard. Reliable doors meant less repairs, less down time and less cost and Veolia had the confidence that Hart would deliver a quality product and serviceThe Review:"Excellent Service. Great workmanship, worked well." Wayne Glynne, RDF Manager, Veolia
Sponsored
Taking the right steps to combat fire

Taking the right steps to combat fire

Premier Loft Ladders Ltd

A fire rated loft hatch and ladder provides safe and convenient access into a loft or attic, while still providing up to 120 minutes of fire resistance. It can also provide high levels of thermal insulation and therefore help to keep energy costs down. Premier Loft Ladders has released an application solution guide for fire rated loft ladders. It provides useful tips and advice on subjects such as the choice between aluminium or wooden fire rated loft ladders, as well as considerations such as thermal insulation and strength. You can also find details of their fire rated product range.
Sponsored
The Curtain - Mondrian Hotel, featuring Reynaers Slim Line aluminium windows and doors

The Curtain - Mondrian Hotel, featuring Reynaers Slim Line aluminium windows and doors

Reynaers Aluminium

The next generation of CS 38 is now available from Reynaers – Slim Line 38 (SL 38) is a highly insulated inward and outward opening aluminium window and door system, that combines elegance and comfort with a unique design. The special slender steel look offers the perfect windows and doors for modern architecture and the renovation of steel-frames, respecting the original design but offering a thermally improved solution. Large-framed Crittall Windows complement the industrial aesthetic and gives the building a unique character and identity of its own. The fabricator on the project was AWS Turner Fain Ltd, part of AWS Group.
Sponsored
AOV for Smoke and Fire Safety

AOV for Smoke and Fire Safety

Surespan

Product:Surespan 140° thermally broken aluminium smoke ventilator and roof hatch designed to EN12101-2. ]The AOV also offers push-button comfort ventilation in one package! This one-stop solution for smoke vent requirements to meet building control can achieve 1m² airflow and is available in standard stocked sizes or made to any size in between 900 x 900 and 1260 x 1260. Wind deflectors to improve airflow. RE 1,000 Ventilation 10,000 Vent Offset mechanism for Roof Access Snow Load SL500 Wind Load WL1500 Temperature Class T (-15°) Fire Resistance B300
Sponsored
The Auditorium at the Fire Station - Sunderland

The Auditorium at the Fire Station - Sunderland

Vox Ignis Limited

The £11 million Auditorium at the Fire Station is a new live music and events venue in the heart of Sunderland city centre, developed by the Music, Arts and Culture (MAC) Trust, that required an Emergency Voice Communication System (EVCS). Officially opened by His Royal Highness Prince William and Catherine, Princess of Wales in 2018, the project forms a key component in the masterplan for the city’s Music and Cultural Quarter, built around the refurbished Dun Cow pub and the recently renovated adjacent Engine Room at the Fire Station.Products used - Lexicomm Network disabled refuge system, including integrated emergency assistance alarm.
Sponsored
DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Fires

O1A Architects oversaw the conversion of a former Gordon Ramsay restaurant in Islington into two luxury town houses with roof gardens and many unique features. O1A chose DRU Metro 100XT/2 corner gas fires for the main living areas in the properties. They utilise the balanced flue system to be flexibly located anywhere in the building without the need for a chimney. False chimneybreasts have been created in each property to house the impressive log-effect fireplaces. They also accommodate the flat screen TVs making perfect focal points and conceal the concentric flues, which exit the building through the roof.
Sponsored
Scottish Policy on Unwanted Fire Alarm Signals

Scottish Policy on Unwanted Fire Alarm Signals

Safety Technology International Ltd

The Scottish Fire and Rescue Service (SFRS) have announced their new policy on Unwanted Fire Alarm Signals (UFAS) that came into effect at the start of this month.The policy affects all calls to the fire control operators who will confirm a fire before the incident requires the fire service to be dispatched.Scotland have a continuously high rate of false alarms attended by the Scottish Fire and Rescue Service, with over 57,000 unnecessary journeys a year. This is why the new policy adopts a ‘call challenge’ policy to reduce the number of false fire alarms attended by the service.False fire alarms cause disruption in various ways, from impacting the time and resources of fire and rescue services, implicating people’s safety and harmfully impacting the environment. False alarms are also costly procedures, not only for the Fire Service but also businesses where the false alarm takes place.These UFAS have many detrimental effects:They impact on resources available to attend real fires.They impact on time available for other valuable work, such as training and community safety activities. Where fire crews comprise on-call (retained) fire fighters, the crews may be unnecessarily taken away from their place of work.They impact on road safety, as a result of fire appliances travelling under emergency conditions.They impact on the environment from the number of appliance journeys. The new guidance on safe investigation of unwanted fire alarm signals aims to challenge calls to confirm fire or signs of fire in order to ensure resources and time are being used effectively. However, the SFRS will continue to attend calls received from automatic fire alarm systems and if the signal has been initiated by a manual call point (MCP), heat or smoke detector or sprinkler system, in premises in which people sleep. There will also be fire service attendance in non-sleeping risks if there is physical signs or technological indication of a real fire, such as the fire alarm signal triggered by a manual call point.Although the policy will significantly reduce the number of false alarms attended by fire crews, there is still more to be done to decrease the vast number of unnecessary call outs.Protective covers from STI help to reduce both malicious and accidental activations of manual call points, available in various sizes, mounting options and custom text available to suit all applications. The tough polycarbonate covers have been specifically designed to help deter false alarms and prevent vandalism of various devices. The range of Call Point Protectors are highly effective without restricting legitimate operation of the devices, meaning they are easily accessed in emergency situations.For more information on the new policy, visit the FIA website here: https://www.fia.uk.com/news/guidance-on-safe-investigation-of-fire-alarm-signals-in-scotland.html?utm_source=Fire%20Industry%20Association&utm_medium=email&utm_campaign=14001136_June%202023%20MMU
Sponsored
New Product  - Fire Rated Overbox

New Product - Fire Rated Overbox

Trade Access Panels

Due to a high demand from our valued customers, we are proud to announce the latest product to our range - electric meter cover. Our Fire Rated Overboxes are a retrofit solution for keeping your gas and electrical meters safe from fire and tamper. These are ideally suited for refurbishment and newbuild products for multi-occupancy properties such as apartment blocks.
Sponsored
Adelphi Wharf Case Study

Adelphi Wharf Case Study

PFC Corofil Fire Stop Products

To meet the fire stopping requirements for a major new residential development in Salford, PFC Corofil has provided a proven range of fire-stopping insulation systems.
Sponsored
Valhall Oilfield BP - Interzone 1000, Chartek 7, Interzinc 52  - Fire Protection

Valhall Oilfield BP - Interzone 1000, Chartek 7, Interzinc 52 - Fire Protection

International®, brand of AkzoNobel

Our high-performance coatings systems, designed to stand up to the rigors of offshore environments, were chosen to protect the new platform. The two key areas for us were passive fire protection (PFP) and the ability to provide systems that were approved to the NORSOK M-501 standard. The aim of the standard is to obtain a coating system which ensures optimal protection of the installation, with minimum need for maintenance over a fifteen year period. Chartek is the world’s most complete range of epoxy intumescent PFP coatings and the first choice for the oil and gas industry worldwide. With an in-service track record of over 45 years, Chartek provides safety, durability and efficiency through proven, economical and easy-to-apply solutions, successfully meeting project and customer requirements in the most severe environments. Its combination of both corrosion and fire protection is unbeatable and vital for the Valhall BP oilfield. Chartek was the first jet-fire rated epoxy PFP coating that passed the corrosion performance requirements without a topcoat as set out in the NORSOK standard, demonstrating global technical leadership.  
Sponsored
Fire Escape Hatches - Under Ground Metro, Portugal

Fire Escape Hatches - Under Ground Metro, Portugal

Surespan

Project:Surespan manufactured and supplied a series of fire escape hatches at Portugal’s €950 million underground Metro in Porto. The huge double-leaf hatches automatically open if the fire alarm system is activated to allow passengers safe exit to ground level. In addition, they can be manually opened with the touch of a button. This project was undertaken after Surespan successfully carried out similar work at Athens Metro.
Sponsored
Fortis Quay Case Study

Fortis Quay Case Study

PFC Corofil Fire Stop Products

PFC Corofil’s proven range of fire-stopping insulation systems form part of the façade system and will maintain fire compartmentation at a stylish new high-rise residential development in Manchester.
Sponsored
One Parkside

One Parkside

SELO

Nestled in East London, Hoxton Press stands as a testament to contemporary urban living, comprising two hexagonal towers of 16 and 20 stories, with a total of 198 private apartments. This residential development is a key component of Hackney Council’s estate regeneration program, specifically the third phase of the Colville Estate redevelopment. Selo proudly participated in this groundbreaking project by supplying bespoke metal riser doors, seamlessly integrating safety, aesthetics, and functionality.Key Features of Hoxton Press:Architectural Excellence:Two towers of 16 and 20 stories, designed by Karakusevic Carson Architects, contribute to the area’s masterplan.Faceted tower forms create landscaped spaces, with a rotation that minimizes overlooking.Concentric arrangement of apartments maximizes daylight and natural ventilation.Handmade bricks, differing in colors, contribute to a robust monolithic quality.Seamless transition between exterior and interior spaces.Awards and Recognition:Hoxton Press received accolades, including the What House Awards 2018 for Best Exterior Design.Shortlisted for additional awards, reflecting the project’s impact and excellence.Acoustic and Technical Achievements:The site presented challenges with high acoustic requirements, met through meticulous testing.Complete CWCT Sequence B Testing ensured that the development surpassed industry standards.Urban Gateway and Community Integration:Towers serve as an urban gateway, connecting the Colville neighborhood with Shoreditch Park.Sale of private apartments partially subsidizes new social housing, contributing to the local community.Selo Doors played a crucial role in the success of Hoxton Press by supplying bespoke metal riser doors, contributing to the concealed, flush, and fire-rated doorsets throughout the development. The riser doors, hidden within the structure, enhance the overall safety and aesthetic appeal of the project. Selo’s commitment to excellence aligns with the aspirations of Hoxton Press, creating a synergy that elevates the living experience for residents.Hoxton Press stands as a remarkable example of urban regeneration, architectural ingenuity, and community integration. Selo’s contribution to this award-winning project, particularly in providing bespoke metal riser doors, exemplifies the company’s dedication to delivering high-quality solutions that blend seamlessly with visionary developments like Hoxton Press. The completion of this development marks a milestone in the evolution of East London’s landscape, creating a legacy that combines modernity with community-centric design.
Sponsored
Arla Foods

Arla Foods

Hart Door Systems Ltd

Arla Foods is a major dairy company producing the best dairy products. It is a farmer-owned company committed to high standards.Project/doors:Over 40 doors across multiple sitesThe challengeThe existing doors which were made from aluminium were unreliable and had started corroding. Hygiene is a priority and food production areas require specialist doors to promote cleanliness and avoid contamination. Due to the lack of space, one of the doors required a special solution to be able to effectively install the doorThe solutionHart replaced unreliable aluminium bi-parting doors installed by a competitor with Harts stainless steel Speedor Minis. The Speedor Mini is a made to measure high speed roll up door with multi-layer PVC fabric which is thicker and less prone tears and splits. Stainless steel allows for easy cleaning, contamination prevention and extended life. The Speedor has a life expectance of 20+years.The successHart Doors is the oldest British manufacturer of highspeed doors and has worked with Arla for over 20 years supplying a range of door systems. Arla knows that by choosing Hart its high standards will not be compromised. Arla was given peace of mind with a 2 year warranty as standard and the confidence that Hart would deliver a quality product once again. The Review:"The fitters who attended site were excellent and professional. Well done to them." William Beale, Arla Foods
Sponsored
False fire alarms on the rise across NHS Trusts

False fire alarms on the rise across NHS Trusts

Safety Technology International Ltd

False fire alarms have risen by nearly 16% in just 6 years at NHS trusts across England; stretching resources, unsettling patients, and disrupting vital healthcare.Figures from NHS Digital reveal there were 19,566 false fire alarms at NHS trusts throughout 2020/21, with some trusts recording upwards of 500 false alarms.The worrying results reveal that both in the past year and historically, several patients have sustained ‘injuries during evacuation’, highlighting the damaging effects of an unnecessary evacuation.With appointments cancelled, operations delayed, and a fall in emergency department attendances during the period, we might have expected to see the number of false fire alarms fall significantly during the pandemic.At a time where it is vital to avoid the crowded corridors and large gatherings at assembly points that follow an evacuation, it has become even more pertinent to eradicate the causes of false alarms ensuring a socially distanced environment for vulnerable patients.Of the 19,566 false alarms 5,742 resulted in a callout, firefighters respond to all alarms as if they are real. This exposes the public and fire crews to unnecessary risk in their emergency response to unwanted fire signals, directing them away from real emergencies – threatening to place added pressure on the NHS.Across the 216 NHS trusts listed within the data, a total of 1,175 genuine fires were recorded.False alarms cost businesses and Fire and Rescue Service authorities an estimated £1 billion a year in the UK. In order to recoup this cost, the London Fire Brigade became the first fire service in the country to recover costs from hospitals with a poor false alarm record.A false alarm is a fire alarm signal caused by means other than a genuine fire, which has activated a fire detection and alarm system, these can include: equipment false alarm, environmental influences, accidental damage, and inappropriate human action, including the malicious activation of a manual call point.As recommended in BS 5839-1:2017 manual call points can be fitted with a protective cover to prevent false fire alarms. The British Standard Institute recommends in section 20.2b that: “All MCPs should be fitted with a protective cover, which is moved to gain access to the frangible element.“It is now recommended that a protective cover is fitted to a Type A manual call point to help prevent false alarms.”This is supported by fire safety guidance set out by the Department of Health which outlines the importance of “initiating measures to reduce false alarms and unwanted fire signals,” such as “the provision of lift flaps, or lift flaps combined with a local alarm device [which] are sufficient to control the possibility of undesirable actuation by patients.”Safety Technology International manufacture a range of protective covers, from integral covers to outdoor and sounder models; there are variations to suit all applications. These covers are specifically designed to prevent false alarms whether accidental or malicious.The Call Point Stopper is a protective cover ideal for areas with a risk of accidental activation, such as hospitals and healthcare facilities. The polycarbonate cover does not restrict the legitimate operation of vulnerable call points and helps distinguish a fire call point from a green electronic door release – often located nearby, this is a common cause of false alarms.Fire crews recently attended a false fire alarm at the Royal Blackburn Hospital after a discharged patient broke five break glass call points. If there is a history of malicious activations whereby patients or visitors intentionally activate the fire alarms, causing unwanted evacuations and disrupting important healthcare, the Euro Stopper offers a solution.The Euro Stopper provides a tamper-proof cover featuring the same sturdy UV-stabilised polycarbonate housing as the Call Point Stopper with the useful addition of an optional integral sounder and glow-in-the-dark frame. The 96 dB sounder emits a piercing alarm when the cover is lifted drawing immediate attention to the area, acting as a pre-alarm in a real emergency.If further robust protection is still required the Universal Stopper provides IP56 protection from the elements, with a tough outer dome or low profile cover strong enough to withstand the severest of knocks from hospital beds, trollies, or wheelchairs. An optional sounder and break seal acts as an additional deterrent against malicious activation.Conforming up to IP66, the Enviro Stopper offers the same protection against both accidental and malicious activation whilst guarding against ingress in harsh environments, such as wet rooms or wash down areas.
Sponsored
Local Crescent Case Study

Local Crescent Case Study

PFC Corofil Fire Stop Products

For a major new residential development in the Salford area of Greater Manchester, PFC Corofil has provided a proven range of fire-stopping insulation systems as part of the façade system and to maintain fire compartmentation of the buildings.
Sponsored
Bodmin Community Fire Station

Bodmin Community Fire Station

Gerflor Flooring UK Limited

When Bodmin Community Fire Station in Cornwall needed a hardwearing, hygienic, and safe flooring solution for their fitness room and gym, they turned to international flooring specialists Gerflor. Its’ Taraflex® sports flooring was supplied and would deliver to the highest standards required by the site users. In acknowledgement of the brave and hard work of Cornwall Fire Service crews, Gerflor donated 60m2 of this world-renowned sports flooring in the colour ‘Red’.
Sponsored
Wooden High Performance Casement Windows, French doors and Entrance doors, Woking, Surrey

Wooden High Performance Casement Windows, French doors and Entrance doors, Woking, Surrey

Lomax + Wood Limited

Dual finish wooden windows and doors were used in the renovation of this delightful 1900’s Arts and Crafts style property. The family chose from the Lomax + Wood made-to-order range of timber flush casements and doors. 42 Double glazed fully weather-stripped flush casement windows, French doors and entrance doors. Dual colour factory finished paint colour. White internally and Squirrel grey externally. Engineered timber for stability and durability. Espagnolette locking for security. Faceted bay windows. Polished chrome ironmongery.
Sponsored
INTERIORS UK - BI-FOLDING DOORS

INTERIORS UK - BI-FOLDING DOORS

Next Doors Ltd

In response to the aspirations of our up-and-coming fast-food customer, seeking to extend the dining experience into the inviting embrace of summer months, we embarked on a project to seamlessly integrate a patio terrace with their new restaurant. Positioned at the front of the establishment, this terrace would not only enhance the dining experience but also provide patrons with a warm and enticing view of the dining facility.To bring this vision to life, we proposed a sophisticated bi-folding system designed to offer an expansive opening, effectively blurring the boundaries between indoor and outdoor spaces. This innovative solution provided a seamless transition, allowing guests to seamlessly move between the restaurant’s interior and the charming patio terrace. Moreover, the bi-folding system was equipped with an easy-to-use lockable folding door mechanism, ensuring both security and convenience for staff. To further personalise the space and align with the customer’s corporate identity, custom graphics were incorporated, adding a unique touch that resonated with the brand’s ethos and aesthetic.
Sponsored
Mailbox Birmingham using Apton's Glazed Partitions, acoustic doors and sliding glass doors.

Mailbox Birmingham using Apton's Glazed Partitions, acoustic doors and sliding glass doors.

Apton Partitioning

The Mailbox is situated within the city centre of Birmingham, England. To represent the unique history of the building, office spaces at Mailbox are built in a light and minimalistic style, complemented by our Quartz single glazed frameless system, Stile Aluminium single glazed door and our QuartzGlide 2 sliding door.
Sponsored
What The Real Cost Of Fire Protection Means In Buildings

What The Real Cost Of Fire Protection Means In Buildings

Trade Access Panels

When you design a building that will be used by lots of people, like a tower block, you need to make sure that the building has the correct level of fire prevention and fire protection equipment. In instances where this isn’t the case, tragedies like the Grenfell Fire can happen. The importance of passive and active fire protection methods are vital for the safety of the intended occupants, but how can you ensure they’re going to be safe?
Sponsored
Fire Rated Roof Hatch - Killeen, Texas

Fire Rated Roof Hatch - Killeen, Texas

Surespan

Surespan designed and manufactured several fire-rated roof hatches for the Killeen ISD East/West Ward Elementary School, in Killeen Texas.  The Project:Huckabee is the architect behind the East/West Ward Elementary School, tasked with replacing two 60-year-old campuses, by combining them into one new holistic learning environment. The planning behind the architecture focuses on efficiency, function and ease of wayfinding. From simple to navigate corridors, modernised classrooms and glazing to illuminate the interior with natural light. East/West Ward Elementary School blends district design standards with innovative thinking to achieve spacial efficiency and maintain equitability.Product:Surespan designed and manufactured five 35.5-inch x 35.5-inch Fire Rated Roof Hatch with an integral guard hand railing attached. These hatches are thermally broken and have been designed and tested with 4-hour fire resistance for integrity to EN 1634-1:2014.  Features:These hatches are using environmentally friendly materials such as non-combustible minerals and fireboard cladding to achieve a top-performing thermal efficiency. All the hatches were finished in a light grey polyester powder-coated finish for an aesthetically pleasing solution. The coating is set to last many years, just like the durable masonry veneer that is featured in the building, helping to maintain the space for years to come. 
Sponsored
Tours Duo, Paris - Pyroguard Protect

Tours Duo, Paris - Pyroguard Protect

Pyroguard UK Ltd

The ChallengeInstalled within the reception hall and circulation areas of the two towers, Pyroguard Protect, which was chosen by fire protection specialists, Pyrometal, has helped architect Ateliers Jean Nouvel achieve his ambitious vision, without compromising on safety.Following the successful testing, Pyroguard Protect was installed throughout DUO-1 and DUO-2.In the reception hall, Pyroguard Protect EI120 was fitted inside PYROTEK steel profiles to form full height glass partitions and in the circulation areas on each floor, around 690 square metres of E30 was used inside double-leaf doors with EI60 glass partitions.The same was also used in the corridor doors as a means of compartmentation, which connects various areas to the stairs and lift landings.The SolutionTours Duo rises on a former industrial site on the edge of the River Seine in the Paris Rive Gauche district and at 180 m, DUO-1 is set to be the third tallest building in the capital.The pair of towers, DUO-1 and DUO-2, which lean to form an impressive asymmetrical ‘V’, will house offices, retail spaces, restaurants, a hotel and a top floor panoramic bar.In the design of the mixed-use scheme, Ateliers Jean Nouvel was tasked to create high performing, aesthetically striking buildings and as such, decided to take a bioclimatic approach to reduce energy use and make the most of the outdoor weather conditions.Giving the best protection for people and property, Pyroguard Protect provides integrity and heat insulation for 30 to 180 minutes (EI classification).The solution also provides 1B1 impact classification without the need for additional counterpanes, high performing acoustic properties and peace of mind throughout the lifespan of the product due to its UV stability.

Showing 145-180 of 920

Feedback