NBS Source
I'm a manufacturer

Temple Back Fire Station

OVERVIEW

The size and poorly insulated design of the Avon Fire & Rescue Service's existing building makes it uneconomically expensive to maintain and run. To address this, the building is being demolished in stages with a new fire station being built on a much smaller footprint. The energy performance of the building envelope was a key consideration. A target U-value of 0.23 W/m²·K was set for the walls of the building. To help achieve this Kingspan Kooltherm K15 Rainscreen Board was specified. This has allowed the Service to not only save lives, but also energy and money.

Products featured in this case study

View all products (47)
Kingspan Kooltherm K15 Rainscreen Board - Insulation for Cladding Systems

Kingspan Kooltherm K15 Rainscreen Board - Insulation for Cladding Systems

More inspiration from Kingspan Insulation

View inspiration
Kingspan Insulation rises to the challenge of water tower renovation

Kingspan Insulation rises to the challenge of water tower renovation

Kingspan TEK travels through time at Seaton Jurassic

Kingspan TEK travels through time at Seaton Jurassic

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Kingspan insulates beachfront Grand Design

Kingspan insulates beachfront Grand Design