NBS Source
I'm a manufacturer

"hot water and oil filled radiators and fittings"

5,970 results found

Sort by:

Showing 325-360 of 1128

Sponsored
Heat pump cuts carbon footprint for Willow Cottage

Heat pump cuts carbon footprint for Willow Cottage

Daikin Ltd

After moving from busy Stockport in readiness for retirement, accountant Susan and husband Philip, a Manchester University academic, replaced the oil-based heating system at Willow Cottage with a Daikin Altherma high temperature heat pump. 
Sponsored
Give your wooden sun beds a makeover with Textrol

Give your wooden sun beds a makeover with Textrol

Owatrol UK Ltd

Even if your sun beds have spent the majority of the British summertime inside, it’s still vital to give them a good clean before applying any kind of finish.Net-Trol, is a fast-acting and powerful wood cleaner, neutraliser and colour restorer, that will effortlessly remove any surface or ground-in dirt on your untreated sun beds, leaving the wood looking vibrant and bright. Designed to remove all traces of weathering that have been caused by UV rays, pollution and mildew, Net-Trol’s main purpose is to prepare your sun beds for their finish.One of the great things about Net-Trol is that it is non-aggressive, so it’s harmless to your plants. We think is an essential element of any product that is going to be used in the garden. Plus, it’s biodegradable and doesn’t contain bleach or solvents.Even better, it works in as little as 15 minutes and using it should mean that you won’t need to undertake any time-consuming, backbreaking sanding. You can just sit back and relax while it works its magic.Applying Net-TrolBefore starting, you will need to wet your sun beds with fresh, clean water.Then, simply apply Net-Trol with a synthetic brush or roller and scrub your sun beds with a stiff synthetic brush.Leave it to work for 10-20 minutes. If you notice that the surface starts to dry, you’ll need to dampen it with a mist of water.If your sun beds were particularly dirty, you may need to repeat the procedure.You’ll now need to let your sun beds dry for at least 48 hours before applying any kind of finish.One of the great things about Net-Trol is that you can clean your tools with soap and water. There is no need for any white spirits!Finishing with TextrolTextrol, our penetrating oil finish developed for weathered wood, is available in 7 different colours, so you can give your sun beds a finish to suit your garden.This product has been developed so that it penetrates and protects wood from within, so it won’t form a film that could crack, peel or flake. Additionally, Textrol has in-built UV protection and will also protect your sun beds from moisture damage.As well as keeping your furniture safe from the British weather, Textrol will also enhance the natural beauty of the wood.One of Textrol’s main selling points is that it can be applied ‘wet-on-wet’, so you won’t have to wait for coats to dry during application.The maintenance is also extremely easy, with local touch-ups and no backbreaking sanding necessary.When you first apply Textrol to your sun beds, it will give them a rich, matt colour. This should gradually lighten over time to give you your finished look.Applying TextrolTextrol is applied in ‘wet-on-wet’ coats. Apply your first coat of Textrol then leave it for 15-30 minutes. This will allow time for it to penetrate into the wood but not to dry.Then, apply another coat of Textrol and leave it for another 15-30 minutes.You should repeat this process until the wood of your sun beds will not accept anymore oil. Then, wipe off any excess oil that hasn’t penetrated into the wood. This is important to ensure that you avoid shiny spots.It’s vital that you don’t allow Textrol to become touch dry between coats.That’s it – you’re done!Can I follow the same process if my sun beds are treated?If your sun beds have been treated in the past, you will need to use Aquanett or Dilunett before applying Net-Trol, in order to remove any previously applied treatments.Aquanett is our solvent-free wood oil remover, which will help to prepare your sun beds for their new coating. Aquanett is suitable for environmentally sensitive areas and as it has a gel-like consistency so it won’t run everywhere.After using Aquanett, it’s important to treat your sun beds with Net-Trol while they are still wet. This is because you need to neutralise the wood.If your sun beds have been painted, you should use Dilunett, our solvent-free paint remover, to prepare your sun beds for their makeover. Dilunett has also been developed with a gel-like consistency. This makes it ideal for use on the legs of your sun beds and underneath, as it won’t run onto the floor.Again, after applying and removing Dilunett, you should immediately treat your sun beds with Net-Trol, while they are still wet. This is to neutralise the wood.
Sponsored
Chalet Karlov

Chalet Karlov

Rubio Monocoat UK

Project Type: Chalet KarlovYear: 2020Location: Czech RepublicContractor and Architects: Fandament Architects s.r.o./ Furniture Manufacturer: Lugi s.r.o.Wood Species: Oak VeneerProducts: Rubio Monocoat Oil Plus 2C
Sponsored
Junckers Regal Sports Floor

Junckers Regal Sports Floor

New Era Floor Systems Ltd

Nike has transformed The Regal basketball court at the Black Prince Community Hub in South London, using Junckers Beech SylvaSport floor pre-finished with black oil over a New Era fully sprung sub-floor system.
Sponsored
Primary school in Cornwall makes the swap to HVO biofuel

Primary school in Cornwall makes the swap to HVO biofuel

Grant Engineering (UK) Ltd

Gwinear Primary School in Cornwall has upgraded its heating system and switched to renewables by installing a Grant Vortex oil boiler which is using HVO biofuel, becoming the first school in the UK to use this fossil free liquid fuel.
Sponsored
Home Gas Fire Conversion

Home Gas Fire Conversion

Kompozit'All UK

application area: domestic heatinguse type: gas fireplace project scope: restore fireplaces, rebuild chimney, line chimney ductadded value: 25-year guarantee on liner, quick and clean install, non-destructiveBackgroundThe camera survey revealed cracks in the chimney flue of a large victorian house in Muswell Hill. To protect against carbon monoxide leaks, the chimneys had to be lined before the gas fireplaces could be fitted. A flexible and uninflated FuranFlex tube was placed inside the chimney duct. Each FuranFlex liner is produced to fit the dimensions of the duct. Hot steam is used to inflate and harden the liner, fixing it in position.Statement of workThe installation took one day per chimney. The jointless and air-tight liner provides good draught and a clean and safe operation for the fireplaces. When FuranFlex liners are inflated they take up the shape of the chimney, providing maximum lined diameter and natural draught.
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Trap2 Traprenovatie

Trap2 Traprenovatie

Rubio Monocoat UK

Project Type: InteriorYear: 2019Location: Bachte-Maria-Leerne, BelgiumContractor: Trap2 Traprenovatie, Bakermat, F.C. LamaWood Species: OakProducts:Rubio Monocoat Pre Colour EasyRubio Monocoat Oil Plus 2C
Sponsored
West End Gate

West End Gate

VIEGA LTD

A high-quality installation of pipework for heating and drinking water, absolutely free of contaminants, quick to install and guaranteed to perform over the long term. These were the priorities for the developer of the prestigious West End Gate development in London, leading to the specification of the Profipress system from Viega throughout.The development is a collection of apartments, stunning penthouses, commercial units, and leisure facilities situated in the prestigious neighbourhood of Marylebone and Little Venice. Berkeley St Edwards were taking no risks with water hygiene, looking for a piping system which would guarantee clean water to the different heights of the towers. Given the prestige of the development, the system had to be faultless, future proof and guaranteed to last. Specifying a high-quality solutionKevin Guiry, Senior MEP Manager for Berkeley St Edwards, explained the rationale for specifying the Profipress solution. “Quality was our top priority, both in terms of the water system and the products used. With all the heating and chilled distribution pipework running in a closed system, we needed a solution to guarantee clean and safe water without contamination. The copper Profipress system delivers this alongside real on-site benefits.” Berkeley St Edwards has made a considered effort to move to press connections over soldering methods for pipework. Particularly in domestic projects, the benefit of cold press means contaminants from soldering are reduced and so systems produce a quicker turnaround for test results from flushing. On top of the speed advantages of cold press, the additional benefit of risk reduction through removal of hot works helps increase safety for those installing on site.“Viega was specified in the first phase block, and it was fantastic. As such, we approved the spec for the next phase as per the previous block. The contractor who received the contract used their same core operatives which resulted in a consistent, clean installation.” Kevin summarised.Working with Viega qualityCraig Yardy, Fit-Out Manager at Vital Energi, oversaw the installation of the system and mirrored the sentiment from Kevin. “Three to four years ago we mainly used soldering, but we’ve shifted to press connections systems. With soldering, you get flux and contaminants in the pipe, so you must flush the system. With press, it’s a far cleaner system.”On working with the Viega Profipress system Craig commented: “we had used the copper system on previous projects which were good installations, and it has been the same on-site here. Generally, the high-level fitting has been easy, the challenge has been where pipework in the walls runs into mixers. This means tight spaces for the installer to work the pipes and makes it difficult to press the joints. Viega press tools come with an angled jaw giving us the flexibility to get into those hard-to-reach places.”Providing ongoing support and training One of the benefits of choosing the Viega specification is the on-site training offered for the installation teams. This will ensure that the systems are installed correctly and effectively, using the recommended tools and techniques. Not only does this process maximise speed of installation, it also allows Viega to issue its full warranty.“The support from Viega started with demonstration days at the very beginning of the project. Throughout the first block installation they visited multiple times to check on the installation, offering support and guidance” Kevin noted. “We plan to continue using Viega for the remaining phases of the development. The Viega quality and future guarantees are what made the initial investment worth it in the long run. I’m a big believer in quality and with this system we’re getting the best quality fittings for this premium development. We didn’t want to risk any further maintenance or damage and the Viega Profipress system achieves this.”Due to be completed in 2025, the first four tower blocks have been completed. Ranging from 10 to 30 storeys in height, the development offers unparalleled views of the surrounding area, commanding high-quality finishes to the apartments inside and out.
Sponsored
Myatts Field North, Lambeth

Myatts Field North, Lambeth

Cellecta Ltd

Myatts Field North is a major regeneration project in the London borough of Lambeth, the development consists of 808 new homes, and 172 refurbished properties with 10 per cent fully accessible to wheelchairs. New streets, green spaces, play areas, landscaped park with two seven-a-side football pitches, multi-use games area and a play area, community centre, local store, commercial units, and an energy plant which provides reliable and efficient heating and hot water were also installed.Cellecta’s ScreedBoard 28 was specified by PRP Architects due to its ultimate single layer acoustic overlay treatment. It is frequently reviewed as the solution of choice for new build and refurbishment developments. Its high density and unique resilient layer provides an unrivalled acoustic performance.Regenter Ltd was awarded this 50,000m² contract to construct this regeneration in South London.
Sponsored
Stunning Decking Transformation with D1 Pro

Stunning Decking Transformation with D1 Pro

Owatrol UK Ltd

This client had an untreated deck that had degraded due to UV exposure and needed it restored and finished. this was achieved by using Net-trol Wood Cleaner & Colour Restorer followed by D1 Pro Saturating Oil.Cleaning and preparing an IPE Deck for FinishingBefore using Net-Trol you need to ensure that your surface is cleared of debris – a good sweep should suffice.The surface then needs to be made wet and Net-Trol should then be scrubbed into the surface. We recommend using a stiff brush, then leave it to stand for approximately 20 minutes.Then it should be rinsed whilst scrubbing ,again with a stiff brush. Try to use the highest pressure water source you can (a pressure washer is ideal but a hose will suffice).Your surface then needs to be left for at least 48 hours to dry completely before applying your finish.Why use Owatrol’s D1 Pro?In this case, the client has chosen to finish their IPE deck with Owatrol’s D1 Pro, a product from our Professional Range which is a saturating wood oil for hardwoods giving a long-lasting natural finish and advanced UV protection.This product is well-suited for use in heavy-traffic areas such as decking and areas exposed to harsh weather. This is because it has a long-lasting finish that will protect in the years to come with minimal maintenance.It’s also perfect for dense, oily or greasy woods which are difficult to impregnate with saturating products. D1 Pro delivers excellent wood penetration and can protect even these more difficult woods from within.As such it was perfect for this project as it is made from IPE Decking which is an extremely hard wood decking (approximately 3 times harder than oak!).Many high street products would not have been able to provide adequate saturation in a wood as hard as this and therefore would not provide the long-lasting protection offered by D1 Pro.Finishing a deck with D1 ProOwatrol’s D1 Pro is a saturating wood oil protection. This means that its place is inside the wood not on top of it.To apply a saturating oil you need to apply ‘wet on wet’ coats. This means that the surface cannot be allowed to dry in between coats. If this was to happen then the D1 Pro that had been absorbed so far would start working and prevent any further moisture from penetrating the wood!This sounds a little scary but it really isn’t.The key is to work on small sections at a time (an area which can be completed in around 15 minutes). You need to apply the first coat and allow it to be absorbed for around 15-20 minutes but do not allow it to become surface dry.You then continue to apply coats until no more oil can be absorbed and the wood is saturated. At this point be sure to brush away any excess D1 Pro sitting on the surface to prevent shiny patches.Be sure to work along the length of your decking boards and always work an entire board at once. Never stop mid-board to prevent uneven coverage.Once this is completed you will have a deck protected for the long-haul with minimal maintenance required.Regular washing with Net-Trol is optional but will help to maintain the look of your deck. The look of the deck will gradually lighten over time; when it returns to a grey colour it is time for a maintenance coat. You apply it in exactly the same way but usually only 1-2 coats is necessary.You can also apply a maintenance coat in just a small localised area if that’s all that is necessary. No sanding or stripping required!The finished resultsAs you can see the results are stunning! The client can be safe in the knowledge that their deck is protected for years to come from damage caused by UV rays and moisture.On top of this, they know that they will need to do minimal maintenance. If the deck begins to look worn in high traffic areas, they’re able to carry out touch-ups easily.
Sponsored
Singapore Cruise Ship Install

Singapore Cruise Ship Install

Evergreens UK Group

Our unique fixing system allows the artificial surface to be permanently attached to the painted ship deck, but allows for easy removal when the ship comes back for a re-fit in the future. In contrast to conventional fixing systems, this method removes the need of messy water blasting to remove the adhesive from the deck.
Sponsored
Singapore Cruise Ship Install

Singapore Cruise Ship Install

Evergreens UK Group

Our unique fixing system allows the artificial surface to be permanently attached to the painted ship deck, but allows for easy removal when the ship comes back for a re-fit in the future. In contrast to conventional fixing systems, this method removes the need of messy water blasting to remove the adhesive from the deck.
Sponsored
Singapore Cruise Ship Install

Singapore Cruise Ship Install

Evergreens UK Group

Our unique fixing system allows the artificial surface to be permanently attached to the painted ship deck, but allows for easy removal when the ship comes back for a re-fit in the future. In contrast to conventional fixing systems, this method removes the need of messy water blasting to remove the adhesive from the deck.
Sponsored
100 Greengate / Anaconda Cut, Salford (2019)

100 Greengate / Anaconda Cut, Salford (2019)

Artform Urban Furniture Limited

Anaconda Cut, also known as 100 Greengate, is a 44 storey apartment building. Situated next to the River Irwell, it is the tallest building in the City of Salford and one of the tallest in Greater Manchester.It is home to 349 elegant rental apartments, including luxury penthouses. Artform were asked to provide external seating, tables & planters for 2 roof terraces. Our popular range of out-sider products were considered due to the lightweight nature for manoeuvring, material durability and a wide range of colour options.A key factor in the design discussion was the end client's concerns regarding the use of timber products for a variety of reasons, including maintenance resulting in alternative materials being sourced. One of the key benefits of the Loop range of products is that they don't need to be permanently fixed down and can also be filled with either sand or in this instance water, adding ballast weight, taking a product with an initial weight of 37kg to in excess of 250kg.
Sponsored
A contemporary approach to working from home

A contemporary approach to working from home

ACO Technologies plc

To create a garden studio with spaces filled  with natural light and using materials in a contemporary design. 
Sponsored
EuroPipe at Manchester Airport - Case Study

EuroPipe at Manchester Airport - Case Study

BLÜCHER UK Ltd

BLÜCHER recently supplied our BLÜCHER EuroPipe system to the new Terminal 2 car park at Manchester Airport. The new multi-story car park has space for 3,800 vehicles and is part of the £1 billion transformation programme at the airport. The installation was overseen by G Beverley & Son on behalf of the M&E Contractor, Crown House. Our stainless steel drainage systems are the ideal choice due to our lightweight push-fit pipes and fittings are easy to handle and install, and provide rapid discharge of rainwater and waste water.
Sponsored
Our Contribution to Cwmglas Primary School Retrofit Project

Our Contribution to Cwmglas Primary School Retrofit Project

Towelrads

In February of 2022, Towelrads embarked on a collaborative venture, joining a 36-month ongoing initiative aimed at retrofitting Cwmglas Primary School. To ensure minimal disruption to the school’s daily operations, this project has been thoughtfully divided into several stages.Stage 1The initial phase, designated as Stage 1, focused on the top floor of the school premises. Specifically, attention was directed towards the music education and nurture rooms situated on this level. A noticeable difference in temperature existed within these spaces, making them colder than other areas throughout the school. These rooms sported aging standing convector heaters, rendering them ineffective. Furthermore, the characteristics of the building’s construction, the room dimensions, and the heat load posed challenges that rendered conventional low surface temperature radiators insufficient.In response, the decision was made to utilise the Towelrad TZT convector heater equipped with an integrated fan. This selection proved suitable for the low-temperature wet heating system, offering an elevated heating capacity. Notably, the rounded edges of the TZT convector heater not only enhanced its aesthetic appeal but also elevated the safety of the products, rendering it an ideal choice for a school.The thermostat-controlled fan speed of the TZT convector heater ensured continuous and responsive temperature management within the room, promoting optimal thermal comfort.Although the solution was successfully implemented within the designated rooms, the challenge persisted in the corridors. Enter our Vertical and Horizontal LST Ultra Radiators, serving as the perfect antidote to this issue. Our Ultra LST radiators deliver impressive heat output while maintaining a low surface area. Moreover, their covers, measuring a substantial 2mm in thickness (above industry standards), guaranteed safety across the entirety of the top floor.The Future: Stage 2With the successful completion of Stage 1, marked by the seamless integration of our products into the design framework, we have been entrusted with an extension of our role into Stage 2. This forthcoming phase encompasses the lower floor of the school, encompassing the dining hall, corridors, and classrooms. This work will be carried out over the summer months so that come the start of the school term the students can tackle the winter months in a comfortable learning environment.
Sponsored
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

ABG

Quarry Bank MIll is an old cotton mill. Now operated by the National Trust it attracts large numbers of visitors daily to its attrections. The overflow car park quickly turns to mud currently being fit for purpose fields. A permeable surface was required however to allow for a permeable surface large tanks would be needed to store rain water infiltration. ABG Sudspave was chosen to provide a permeable surface and allow water to infiltrate. Sudspave can be quickly and easily installed and cut to size on site. Sudspave can be finished with either gravel or grass for a natural finish.
Sponsored
Durlum Rhombus and Polylam at Breitling White City

Durlum Rhombus and Polylam at Breitling White City

LSA Projects Ltd

Architect: Breitling UK LtdInstaller:  Barnwood ConstructionProduct:  Durlum Polylam and RhombusA mixture of Durlum Rhombus expanded metal ceiling panels and Durlum Polylam acoustic metal baffles were supplied to Breitling UK Ltd for their Westfield White City store.Rhombus panels we’re produced to fit around feature elements of the shop’s ceiling space including structural beams and the curved storefront, in total 7 special sizes we’re designed by LSA alongside 3 types of standard rectangular panel.All pieces were powder coated with RAL 9004 (Black) for an industrial feel. 27 Polylam baffles with L6 perforations and filled with acoustic mineral wool were installed below the Rhombus panels above the till desk and signature black and gold ‘B’ wall.
Sponsored
SPIG-LITEadvanced coastal windbreak

SPIG-LITEadvanced coastal windbreak

Pure Vista Ltd

A stunning installation of the SPIG-LITEadvanced in Cornwall.If you own a home by the Cornish sea you don’t want to miss out on any of the view. This home, high above the water boasts enormous panoramic sea views. Cornwall is known for its quick changing weather, and high winds could be a downside to this location. However, there is an easy solution! A frameless glass balustrade. SPIG-LITEadvanced can support glass up to 1100mm high. Creating an elegant and stylish windbreak to protect furniture and people on the balcony. Without a channel being used, more of the view can be enjoyed. For this installation, the spigots are placed below eye-level when you’re on the balcony but can be seen from other angles around the property. The SPIG-LITEadvanced is easier to install and transport to and from any site. The lightweight and compact product can fit into smaller vans to fit through those country winding lanes. For our installers, there are many advantages to this product; the easy installation, adjustment, product weight and outstanding test results. SPIG-LITEadvanced can be spaced 500mm apart, enabling just 2 spigots per 1000mm piece of glass. Free water drainage is also a big benefit to this product, rain and water can flow beneath the glass, reducing the chance of water ingress and making this product perfect to use around swimming pools or other wet areas. If you’re interested in reading about the SPIG-LITEadvanced head over to the product page. 
Sponsored
City View Apartments and Retail

City View Apartments and Retail

Sherwin-Williams General Industrial

Crystal Window & Door Systems fabricated over 2,100 windows and doors for the project. All of the windows and the storefront of the structure were coated in Powdura® 5000 coatings from Sherwin-Williams General Industrial Coatings,in the colors Bronze and Cloud. The fluoropolymer resins and solar reflective pigments in this powder coating defend against UV radiation, enhance thermal stability and deliver a hard, durable finish to combat wear and tear. As a result, the materials will require less maintenance, because the durability of these coatings will serve to protect the integrity of the structure’s design well into the future.
Sponsored
Ironmonger Row Baths

Ironmonger Row Baths

Sauna360 Ltd

The original Ironmonger Row Baths site was built in the 1930s with swimming pool and traditional style bathing house of hot rooms and cold plunge in the basement. These facilities were completely upgraded in 2012 with saunas and steam rooms added.  In January 2022, the basement spa was destroyed by a fire. A complete restoration of the area was required of the builder’s work, fabric and services and Sauna360 UK was honoured to be commissioned to design and install all wellness areas. In January 2024 the "bathing house" re-opened to a wonderful reception.There has been a transformation of the area and a feeling of space, tranquillity and relaxation. Huge full height tiles adorn the walls throughout. Longitudinal floor tiles subtly take the eye to the glass fronted Salt sauna at one end and the backlit image and relax zone the other.  On arriving from the changing area the guest has a choice of contemporary facilities of saunas, aroma steam rooms, feature showers and ice to the left or traditional hot rooms, cold plunge and massage slabs to the right with large relaxation areas in the centre.  In the contemporary zone there are two large saunas: The Juniper Sauna This sauna  is operated at 75-85C with automatic infusion for a medium humidity. To the front a Juniper wall provides a beautiful detail with its own natural spicy aroma.  Behind the benches, and hidden within the wall, are Infra red panels. These allow the room to be operated in separate sessions at a lower temperature 40-45C with the benefits of IR bathing.The Salt Sauna The Salt Sauna is hot (85-95C) and dry like a traditional Finnish sauna and provides the ideal environment for the large salt wall. The impressive sauna has the height for a third bench in the hottest zone. The glass front allows the backlit salt wall and attractive finishes to be viewed from outside and the feeling of space appreciated from within. The Aroma Steam Room This opulent room has copious amounts of steam infused with seasonally changing essence. The stunning, large format, dark marble tiles are paired with subtle underbench lighting to create a relaxing ambience. Inclined backrests are used for ultimate comfort.Salt Inhalation Steam Room Contrasting beautifully with Aroma Steam Room, this thermal experience infuses the area with a mint or lemon essence to complement the automated salt spray within the steam environment for enhanced inhalation benefits.Completing the area are two Feature showers with warm and cool programs using essence plus a Cool room with ice feature and icy mint spray.Infrared Benching In the central area there is a long Recliner bench in ergonomic ceramics with gentle Infra red heating plus an expansive relaxation zone.Hot Rooms In the traditional zone there are the Hot Rooms. A series of interlinked rooms in large ceramics with increasing temperature as you get further in for the ultimate thermal experience.Drench Bucket & Plunge Pool Outside the hot rooms one will find a drench bucket cleansing shower and a large Plunge pool. The plunge pool now includes a unique heat recovery system which uses the heat removed from the plunge pool water to provide heat to the existing learner pool.Massage Slabs & Footrests The traditional zone also has twin heated Massage slabs for wet massage treatments by the spa therapists. The area is completed by additional heated benching with heated foot rests, below the backlit feature wall.
Sponsored
SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

ABG

When Brexit terms were finally decided in 2020, the end to the freedom and movement of EU goods was agreed to begin from the 1st January 2021. HMRC therefore required an Inland Border Facility to be urgently mobilised to perform the new series of checks required on HGVs crossing the UK Border at the Port of Dover and the Channel Tunnel. This site acts as a location for checking movements of goods inbound (Defra and HMRC) and outbound (HMRC only).Each location is to include parking areas for HGVs and other vehicles, with security measures and facilities to enable the checking of vehicles and goods entering and exiting the sites. There are also temporary office buildings, staff and driver welfare amenities.The design of the facility onto 48ha of former agricultural land was developed with a view to maintaining the landscape and biodiversity of the surrounding area and to screen views of the site from the local villages.Excavated materials were sustainably reused as part of this process in order to create bunds, whilst surface water drainage of the site is directed to local wildlife ponds and wetlands via 30,000 square metres of aggregate filled Truckcell cellular paving.The site is trafficked by up to 950 HGVs at any one time and provides a free-draining, sustainable and durable SuDS surface to withstand the traffic levels without damage or abrasion.Throughout the project, ABG’s in house technical team provided design guidance and site installation support for the customer. Truckcell is a heavy duty cellular paving system manufactured from 100% recycled and recyclable plastic, capable of sustaining frequent HGV loads up to GVW 60 and 10 tonne wheels loads. It can be filled with angular gravel (as was the case on this project) or topsoil and grass seeded, according to the application.
Sponsored
Villa Kivi

Villa Kivi

Rubio Monocoat UK

Project Type: Interior & ExteriorYear: 2019Location: FinlandContractor: Vertti Kivi / Honkatalot / Chips and BricksProductsRubio Monocoat Pre Colour Easy - Intense Black, Nordic White and Mint WhiteRubio Monocoat Oil Plus 2C - Black, Cotton White and Super White
Sponsored
Porsche Design Tower, Florida SentryGlas® – part of the Trosifol Structural product portfolio – balances form, fit and function at the Porsche Design Tower.

Porsche Design Tower, Florida SentryGlas® – part of the Trosifol Structural product portfolio – balances form, fit and function at the Porsche Design Tower.

Kuraray – Trosifol® - SentryGlas®

Described by Dezer Developments and the Porsche Design Group as ‘engineered luxury’, the $560 million Porsche Design Tower is a 57 storey ultra-luxury structure occupying 2.2 acres (8,900 m2) of beachfront land on Collins Avenue in Sunny Isles Beach, Florida. The tower – the first of its kind anywhere – comes equipped with a speedy 600 ft (183 m) per minute elevator for the residence owner’s cars – allowing owners to park their vehicles right next to their apartments, no matter what floor, in their own sky garage
Sponsored
Coq Du Nord/The Roost development, Guernsey, UK

Coq Du Nord/The Roost development, Guernsey, UK

Warmup plc

Warmup inscreed cables were installed throughout this brand new development of 12 exclusive 3 and 4 bedroom family homes.Warmup’s underfloor heating was installed under the hallway’s beautiful oak, rustic brushed and UV oiled bevelled flooring and the underfloor heated wooden flooring continues into the lounge areas.
Sponsored
Cutting costs and carbon whilst keeping cool in the capital

Cutting costs and carbon whilst keeping cool in the capital

Kensa Group

Networked heat pumps in a new build development at the York Way EstateGround source heat pumps from Kensa are cutting costs and carbon at a development of 91 high-quality social rent new homes at the City of London Corporation’s York Way Estate in the London Borough of Islington. The environmentally-friendly newbuild scheme is supporting the City Corporation’s Climate Action Strategy.Key Facts91 new homes in 4 blocks, all for social rentRanging in size from studio apartments to four-bedroom homesFour-star Home Quality Mark in line with LETI design guidance - https://www.leti.uk/cedgAnnual heat demand 215,563 kWhMixture of 63 x 3kW and 28 x 6kW Kensa Shoebox heat pumpsProviding heating, hot water and passive cooling31 x boreholes with an average depth of 145m184.83g NOx saved per year
Sponsored
La Roche Limestone Staircase Project

La Roche Limestone Staircase Project

Stoneworld Oxfordshire Ltd

This stunning bespoke stone staircase, created from La Roche limestone, forms part of a large project that Stoneworld have collaborated on: After digitally templating the bare concrete structure onsite, individual step treads and step risers have been cut on the water jet cutter in our masonry factory. These have then been expertly fitted by the contractor.
Sponsored
Udo Walz hair salon

Udo Walz hair salon

Amtico International

In hairdressing, besides a professional service, a pleasant atmosphere is essential for customers and employees to be happy. Top German stylist Udo Walz’s new Berlin salon, radiates a modern, unmistakable look full of charm and sophistication. 350sqm were covered with Chateau Oak from the premium Signature collection in XL size planks. Bigger, bolder details sit proud amongst the rich, smoky tones of Chateau Oak, exuding strength and sophistication. Signature also has a 1mm thick wear layer, which makes it extremely wear-resistant and therefore perfect for high-traffic areas.
Sponsored
James Ensorhuis

James Ensorhuis

Rubio Monocoat UK

Project Type: Interior - James EnsorhuisYear: 2020Location: Oostende, BelgiumContractor: Vandekerckhove nv, Stad Oostende, De Pauw Luc van Parket de Pauw en Kerkhofs Peer Wood Species: Larch andOakProducts: Oil Plus 2C in Mist 5%, Smoke 5% and Pure.
Sponsored
Food Chain and Salsa Mexican Grill

Food Chain and Salsa Mexican Grill

Rubio Monocoat UK

It was critical to specify the correct colours for Food Chain and Salsa Mexican Grill, to ensure the brand identity was standardized throughout, with no variance. Both the Rubio Monocoat Oil Plus 2C, and Hybrid Wood Protector range was applied to counters, wall cladding, bulkheads, table tops, counter fronts, chairs, benches and door frames.
Sponsored
Premier Inn, Birmingham

Premier Inn, Birmingham

Geberit Sales Ltd

Geberit’s Sovent fitting, used for the first time on an English building. A revolutionary system, the Geberit Sovent negates the need for two stack drainage, streamlining systems for tall-buildings of this nature. In addition to Sovent, Geberit Silent-db20, a waste water pipe with built in sound insulation, was installed to ensure peace and quiet for the hotel’s guests, Geberit Mapress press-fit pipe system provides general plumbing and Geberit HDPE; a long-lasting pipe with low environmental impact; delivers above-ground drainage. Plumbing systems were specified and installed by Sharpe Mechanical Services.
Sponsored
Minories

Minories

Specwall SP

Location: Aldgate, LondonX Construct chose Specwall for its Minories development in Aldgate, London as a replacement for the plasterboard/blockwork system it had previously planned to use. The project was not water tight and, consequently, was subject to water ingress during works. This required a new solution which Specwall was able to provide due to it being an inert, cementitious product which can be installed either dry or wet.Additionally, the ground floor of the Minories development was an unusually busy area during construction and could not fit any extensive scaffolding works. Specwall’s single-visit construction method utilising mobile access suited these conditions and made it the perfect choice.
Sponsored
St Margarets Head Railway Tunnel

St Margarets Head Railway Tunnel

Cordek Ltd

The now disused St Margaret’s Head Tunnel was a structure originally formed as part of the Dunfermline to North Queensferry railway line, providing a link to the ferry service until the opening of the Forth Bridge in 1890 and remaining in limited use for freight until 1954. The vaulted roof and brick lined tunnel is located 15 metres below the A900 trunk road and the B981, adjacent to the northern approach to the Forth Road Bridge. Cordek were asked to supply a structural fill solution, encapsulated within a protective membrane to fill the entire cavity of the tunnel.
Sponsored
Imperial War Museum

Imperial War Museum

Anderson, GEC Ltd

GEC Anderson stainless steel worktops were recently specified by Architects, Dannatt Johnson within the new Learning Spaces and Tea Points within the historic and acclaimed museum. Working for kitchen and bathroom specialists, Brandt Kitchens, GEC Anderson supplied and installed a total of four areas, all within the remit of main contractor, Buxton Building.  Bespoke stainless steel worktops were deployed in two Tea Point and two Learning Spaces. GEC Anderson were able to meet the special detailing requirements prescribed for the various units. 5.0mm SolidTop worktops were specified for the Tea Points that included double sinks and provision for Zip hot water taps and drip trays. In the Learning Spaces, made to measure sink tops with lipped edges and integral back upstands were located in ‘hide away’ areas, behind sliding door sections of the rooms. Managing Director of GEC Anderson comments “This was a really nice project to have been involved with and, actually, is a great showcase of some of the many options that we are able to offer. For instance, in the Learning Space on Level 2, special sized sink bowls were required to fit within the bespoke [narrow] space available, whilst at the same time having space for our lipped edge detail (3) at the front and sides of the worktop perimeter, as well as our upstand edge (10) at the back.  Meanwhile, in the Tea Points, we had the exiting new 5.0mm SolidTops (solid stainless steel, as opposed to the normal, folded, edges). The result of using this detail is always striking with its slim simplicity of form.”

Showing 325-360 of 1128

Feedback