NBS Source
I'm a manufacturer

"heat recovery systems"

1,747 results found

Sort by:

Showing 181-216 of 1291

Sponsored
Aviva Stadium

Aviva Stadium

Forbo Flooring Systems

Ireland's newest major sporting venue, the inspiring Aviva Stadium, required a fittingly impressive entrance and exit zone aesthetic for its opening year. Accommodating up to 50,000 seated spectators meant issues of safety were key to the specification process, and the entrance flooring system chosen had to be the highest level functionally as well as aesthetically. Fortunately, Forbo Flooring system's extensive portfolio of entrance matting systems offered the ideal products for the job. Robust, smartly attractive and with moisture absorbing qualities for anti-slip safety, Nuway Tuftiguard was used for entrance areas
Sponsored
Westfield Broadway, Bradford

Westfield Broadway, Bradford

Berry Systems

Berry Systems carried out works for Westfield for The Broadway shopping centre in Bradford, West Yorkshire. Our spring steel posts and a selection of our industrial items were utilised to provide effective barrier protection. The Broadway is a shopping and leisure complex located in Bradford, West Yorkshire that is home to both high street and luxury brand outlets. Built in 2015 by the Westfield Corporation, it houses over 1,000 car parking spaces for customers to visit the complex with ease. Because of this, sufficient car park protection was required to create a safe parking facility. Berry Systems delivered an effective vehicle restraint system solution to ensure the site was compliant and met legislation. For this project a spring post system was utilised as it has a single anchor fixing and a small footprint so it doesn’t encroach into the parking bay. This was of great benefit to the client as we were still able to deliver superior protection, without affecting the amount of car park spaces required. We also paired the spring post system with handrail and mesh to increase the level of protection for pedestrians. Additional items, such as our height restrictors and wheel guides, were installed from our industrial range to help reduce speed and prevent unwanted access to site.
Sponsored
The Petersham Hotel

The Petersham Hotel

Schlüter-Systems Ltd

Situated in Richmond, Surrey and overlooking the River Thames, the Petersham Hotel undertook a refurbishment of the Tower suite to ensure an unforgettable visit alongside the equally picturesque views. Tile and stone protection experts Schlüter-Systems were on hand to provide a level entry system solution for the bathroom of this stunning area of the hotel.
Sponsored
Buckley View, Rochdale

Buckley View, Rochdale

K Systems Insulated Facades

The refurbishment scheme at Buckley View in Smallbridge was completed in March 2022 and is one of a series of demonstrator projects that Rochdale Boroughwide Housing are completing.These projects are part of an ongoing approach to improve the energy efficiency of homes and reduce carbon emissions, helping to identify the best ways to meet Greater Manchester’s 2038 target to be carbon neutral.The scheme has seen 23 bungalows in Buckley View receive investment to help improve the energy efficiency of the homes and reduce carbon emissions using a whole-house, fabric first approach.The work carried out included replacing cavity wall and roof insulation, installing External Wall Insulation (EWI), upgrading ventilation and installing new windows and doors.We worked in close partnership with our approved installer Profac and provided a suitable EWI solution for the project and complementary finish. A brick slip finish was utilised, which was supplied in three colours to totally refresh the facades.The bungalows in Buckley View were totally transformed and will enjoy increased energy efficiency, improved thermal comfort, reduced fuel consumption for residents and, as a result, lower carbon emissions.Our ServiceK Systems prides itself on having an inspiring and effective solution for every style, and this project is just one example of how it provides the flexibility to fulfil any specific design criteria.We tailored the specification process for the project based on the set and very specific requirements of Rochdale Boroughwide Housing and its properties, and every single request / objective of the client was not only met but exceeded in the refurbishment.The design and delivery of the refurbishment not only received 100% satisfaction ratings from all parties involved, but has also gained external recognition for its excellence and already been shortlisted for three prestigious industry awards:Large Scale Project of the Year at the North West Energy Efficiency AwardsSustainability Project of the Year at the Aico HomeLink Community Awards 2022Best Retrofit Initiative at the Northern Housing AwardsOverall, an outstanding and successful refurbishment by our team that has given Buckley View in the North West a new lease of life.Ryan Robson at Rochdale Boroughwide Housing, said:“We are delighted and incredibly proud to have worked on the refurb project at Buckley View which has been recognised with three award nominations so far. These nominations are a testament to the great partnership approach by all involved parties, the highest levels of construction quality showcased throughout, and the exceptional performance outcomes of the entire project, for the housing residents, housing provider and for the wider area.”Technical Project DetailsThe external façade and sheathing boards on the existing, poorly insulated timber frame structures were removed. The sheathing boards were replaced with A1 rated carrier boards and the K Systems M, Mineral Wool Insulation System was specified.This system not only generates exceptional thermal performance and provides high levels of fire resistance (A2-s1, d0), but also boasts exceptional environmental qualities – by choosing it, we not only demonstrate our innate understanding of best-suited solutions but our dedication to sustainable working.The bespoke system specified for Buckley View was designed using 110mm non-combustible mineral wool insulation to meet the desired u-value of 0.20W/m2K, improved from 0.43W/m2K. This meant homes were more energy efficient, warmer, and less expensive to heat – a major bonus given the current cost of living crisis.For the finish, we specified a unique finish of VBriQ+ clay brick slips. This cost-effective, lightweight traditional clay brick slip system replicates traditional brick construction on low-rise buildings like the Buckley View bungalows.Our unique and innovative VBriQ+ clay brick slip finish was specified due to its robust, durable characteristics and wide range of colours. The brick slips were supplied in three colours, which totally transformed the facades aesthetically and with their low maintenance and element resistance qualities, will ensure the homes avoid cracking and maintain their appearance over time.At K Systems we are confident that we have the inspiring solution for every style, and this project is just one example of how we provide the flexibility to fulfil any specific design criteria.We tailored the specification process for the project based on the requirements of Rochdale Boroughwide Housing and their properties. Bespoke technical detailing included use of pistol brick slips around window reveals with a soldier course detail specified above window heads to create a contrasting aesthetic feature to the main walls. A band of silicone thincoat render was added as a design feature around the doors– yet again showcasing K Systems’ unrivalled attention to detail.
Sponsored
Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff Ltd

Marioff provided an efficient and environmentally sustainable fire protection solution.The unique structural requirements and responsibility of protecting more than 2,000 staff members, plus the public, called for a reliable and trustworthy partner in fire protection.The Brent Civic Centre, a council and community space in London, chose Marioff HI-FOG® water mist fire suppression to safeguard their sustainable building. The Centre serves as the headquarters of Brent Council, a London Borough local authority. It is situated in the Wembley Park area of Brent and opened in 2013 and was designed to be the greenest public building in the UK.The Centre needed an efficient and environmentally sustainable fire protection solution for the one-of-a-kind nine-story building. The structure features a five-story atrium, which doubles as an events venue, and a drum-shaped area that hosts a wide range of government functions, community events, and services.Brent Civic Centre chose Marioff HI-FOG as a sustainable solution. The fire suppression system put in place, validated by real fire tests, discharges fine water mist particles to efficiently cool radiant heat. This is accomplished while using significantly less water than a traditional sprinkler system — in keeping with the Centre’s sustainability focus. HI-FOG provides peace of mind to administration while safeguarding lives and ensuring continuity for the critical city hub.
Sponsored
Leaseplan

Leaseplan

Forbo Flooring Systems

Forbo Flooring Systems' unique and comprehensive product portfolio has brought to life a striking new refurbishment project at Leaseplan UK, Berkshire, where a wide range of Forbo's textile and resilient products have been specified as part of an exciting modular flooring solution. Flooring contractor: Crisp Designed Ltd
Sponsored
Neoworks

Neoworks

Forbo Flooring Systems

The vibrant colours of Forbo Flooring System's Marmoleum Modular portfolio led the interior designers HLW, to specify the floor covering to distinguish different working areas within London- based company, Neoworks. By creating an array of bright colours in an elaborate zigzag design, HLW has managed to produce a sophisticated but lively office interior.
Sponsored
Home / Blog / Noise Reduction within Flue and Chimney Systems

Home / Blog / Noise Reduction within Flue and Chimney Systems

Schiedel Chimney Systems

The first thoughts about safety at work are always about physical injury prevention as well as inhaling fumes, hazardous substances, etc. However, Occupational Noise, which is the amount of acoustic energy received by an employee of a company, can cause permanent damage if it is continuous.In the UK, The Control of Noise at Work Regulations 2005, came into effect for all industries from April 2008, which is quite late when you consider that the harm hearing loss can cause. Harm such as Tinnitus, which is the perception of noise in the ear or head, caused by a problem with the inner ear.The sustaining of high noise levels can also mask warning signals, prevent concentration and vital communication.Most authorities around the world have agreed that noise becomes dangerous when it’s higher than 85 decibels during a typical 8-hour work shift. However, noises under 85 decibels can also cause issues with the general public who are in and around the working environment.An example below shows the different examples of noise levels in decibels – the definition of noise is sound that is unpleasant or causes disturbance.ReductionIf a noise can’t be reduced by engineering the equipment, then acoustic quieting is required. This is the process of dampening vibrations from machinery and systems such as flue systems.With the increasing demand for noise attenuation, the demand for noise reduction from flues and chimneys in marine and industrial situations mean that many companies have developed their own silencer programmes. These tend to be combined with flue systems to have a product range which is reducing sound at the design stage
Sponsored
London’s Coolest Hotel Warms Up With Dimplex Opti-myst® Technology

London’s Coolest Hotel Warms Up With Dimplex Opti-myst® Technology

Glen Dimplex Heating and Ventilation

With state-of-the art facilities and interior design features throughout, it is little wonder that AccorHotels UK wanted to create a warm, welcoming and unforgettable first impression as guests entered their £90 million hotel. Whilst researching options, Joey’s team came across Dimplex’s Opti-myst® effect, which uses unique, state-of-the-art, patented technology to create the world’s most realistic electric flame effect – a highly convincing illusion of ‘flames’ and ‘smoke’.
Sponsored
Bespoke Shower Cubicle System for JP Morgan - Canary Wharf

Bespoke Shower Cubicle System for JP Morgan - Canary Wharf

Concept Cubicle Systems

JP Morgan is one of the largest investment firms that reside at Canary Wharf. They had a requirement for premium commercial shower cubicles for their staff. Glass and chrome was to a play a key features into the shower design, and we created a bespoke cubicle system to meet their requirements. Read the full case study on our website.
Sponsored
JACKOBOARD® A sustainable backerboard system for tiling

JACKOBOARD® A sustainable backerboard system for tiling

BEWI UK (JACKOBOARD®)

Manufactured with an extruded polystyrene foam core and a special coating on both sides, Jackoboard construction boards from Jackon by Bewi can be used as part of a system approach for tiling.With a range of shower trays and drain kits, Jackon says Jackoboard can help create a perfect wetroom or bathroom environment.Jackoboard construction systems provide the flexibility to meet modern requirements in bathroom design. “What was once considered a mere washroom has now been elevated to a private wellness oasis,” Jackon says. “In recent years, the demands placed on bathroom finishes have changed dramatically to allow refurbished bathrooms to shine like new with flexible and high-quality renovations.”The current British Standard for tiling, BS 5385-1:2018, requires the wider use of more appropriate materials for construction, and for receiving tiles in water sensitive and wet areas. This has reportedly increased the demand for the Jackoboard range in new build applications as well as in renovation works.The products are manufactured sustainably and, being superb insulators, they can be used in the design of energy-efficient homes, the company says. The protection of the environment is key to parent company Jackon by Bewi. The company says that plastics, when used as long-term construction materials can greatly reduce the need for heating energy and can therefore make a positive contribution to tackling the climate crisis. In fact, Jackon has been running a campaign in recent years to supply beehives made from the company’s polystyrene bead to the Bee Centre in Chorley. Like Jackoboard, the company says, these beehives will last a lifetime and provide better insulation than the alternatives, enabling the Bee Centre to continue its outreach work in support of honeybees and beekeeping.The surfaces of the Jackoboard system are said to provide an extremely strong bond for the tile adhesive and can be used on virtually any substrate. The boards are waterproof, thermally insulating, very lightweight and strong.The range can form the basis for a tiled finish, but it can also provide a substrate for wallpaper, paint or plaster. “So the possibilities for personal expression are virtually unlimited, allowing every bathroom to benefit from its own individual style,” Jackon says.Due to their core made of extruded polystyrene foam (XPS), Jackoboard construction boards and the wider product range are all lightweight and waterproof – a key benefit for bathroom new build and renovation.Jackoboard also makes installation “simple and easy”. The construction boards, bath panels and angle elements can be trimmed to the desired dimensions with standard tools, while their insulation values reportedly enable them to maximise the benefits of underfloor heating.The range is available in sizes and board thicknesses from 4-80mm to suit all building requirements. A suite of ancillary items are also available, from installation and sealing kits through to washers, fixing dowels and BoardFIX.J-Drain Linear and J-Drain Wall are recent additions to the family of wetroom products from Jackoboard. These products provide what the company calls a high-tech design solution to enable the creation of a totally minimalist walk-in shower.Both products are designed be used in combination with Jackoboard Sloping Boards for the floor and Plano Boards for the walls, to provide everything needed for a “highly fashionable and innovative walk-in shower solution”.“From a design point of view, these products are completely on-trend, given that the minimalist look for walk-in showers is very popular at the moment,” Jackon says. “Achieving this with a highly effective drain solution, which also showcases the tiling to maximum effect, is a key selling point for these new products, used together with Jackoboard backerboards.”
Sponsored
AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

Automatic Systems UK & Ireland

Automatic Systems was asked by Aspex UK Limited to work with them on a project they had won at the head office of Riverside Group.Riverside is a group of complementary businesses driven by a clear social purpose, with a charitable housing association at its core.Established over 90 years ago, they have grown to become a major provider of affordable housing, care and support services in England and Scotland, with almost 56,000 homes in management. Operating at scale and across 160 local authorities, their vision is to transform the lives of the 90,000+ people they house and revitalise the neighbourhoods in which they live.RiversideGroup approached Aspex as a result of Covid to help secure and control the access of their head quarter building.SOLUTIONWith the help of Automatic Systems Aspex came up with a solution that fulfilled their criteria. This included the installation of the newly launched Firstlane and AccessLane.WORK TIMEFRAMEHaving worked with Aspex on a number of previous projects Automatic Systems were the preferred supplier when the contract was won in December 2020. Works took a week to complete as allocated in February this year.FUTURE WORKAutomatic Systems looks forward to working with Aspex on future projects.
Sponsored
Potter Building, Slough

Potter Building, Slough

Berry Systems

Berry Systems completed works on behalf of our client, Bowmer & Kirkland, to deliver effective bespoke edge protection. We also installed rubber column protection and specialised bridge walkway pedestrian barrier to meet their specification requirements.The Porter Building houses 110, 625 square feet of office space for companies to utilise. It is conveniently situated in Slough with excellent transport links to key areas in London and the surrounding cities. The building itself has 100 car parking spaces and 100 bicycle parking spaces for employees and visitors to use. We were tasked with installing edge protection and vehicle restraint systems in the building to ensure both vehicle and pedestrian safety.The system installed was a perforated aluminium edge protection combined with buffer baseplates and mullion attached. This was designed in house by our design team to combine the two products delivering a compliant system meeting BS EN 1991-1-1 standards. Our team also designed the specialised bridge walkway pedestrian barrier to increase pedestrian safety on site. This particular project demonstrates our ability to design VRS solutions bespoke and being able to accommodate additional client requirements. In all of our projects, we work with our client to ensure that safety is the ultimate priority and the necessary industry standards are met.
Sponsored
Historic London hotel specifies complete package from Schlüter-Systems

Historic London hotel specifies complete package from Schlüter-Systems

Schlüter-Systems Ltd

Schlüter-Systems have become part of a historic refurbishment which will see the grand Chancery Court Hotel, London, a 1914 Edwardian heritage property, revamped with elegant and contemporary bathroom suites.
Sponsored
Beechview Drive

Beechview Drive

Licata Building Systems Ltd

Beechview Drive is a development by MD Constructions Ltd consisting of 8 brand new, luxury detached family houses set in a secure gated development. Each comprising 5 bedrooms, 3 bathrooms, stunning kitchen diners and integral double garages. Licata Building Systems supplied full silicone render systems and clay brick slips systems for the facades of the houses. The combination of the two finishes created a modern style to the development. Full Licata waterproofing systems were used in the bathrooms of the properties and were also finished of with high quality premium Italian porcelain tiles supplied by Licata.
Sponsored
Medical Park St. Hubertus

Medical Park St. Hubertus

Amtico International

The Medical Park St. Hubertus is a rehabilitation clinic, which specialises in orthopaedics and sports medicine. With a portfolio of high profile athletes it was important the chosen floor at Medical Park St Hubertus created a relaxing ambiance and allowed for it’s athletes to make a full recovery during their stay.
Sponsored
Grain Storage and Handling Industrial Doors - Gerico France

Grain Storage and Handling Industrial Doors - Gerico France

Hart Door Systems Ltd

Gerico France designs, manufactures and installs bulk solid storage and handling equipment. It offers bucket elevators, conveyors, pipes, silos, warehouses, milling machines, feed producing equipment, heat treatment devices, and accessories.Project/doors: 21 Speedor Storm High Speed DoorsThe challenge Gerico France delivered a turn-key flour mill project in Mombasa, Kenya for a Grain milling company at their state of the art milling plant. They required a solution to stop dust going out of the building instead of being aspirated by the installed system when emptying grain trucks into the wheat grain intake pit.The solutionHart installed three Speedor Storm doors from 4m wide x 5m high to 7m high. The Speedor Storm is the next generation of large external door which has improved wind resistance on both sides of the door and is suitable for larger openings, greater than 6m. This door does not require separate wind bars as the curtain contains wind bracing every 1m and is held securely into the guide channels with rollers at either side. The success Hart Doors sent an experienced engineer to Mombasa to supervise and assist in the installation and commissioning of the doors along with the training of staff to install future orders. 18 more Speedor Storms were ordered for a specialised dry bulk discharge and handling terminal for grain imports, located in Shimanzi, Mombasa.
Sponsored
Wick Tower

Wick Tower

Licata Building Systems Ltd

Wick Tower is an iconic building for the locals which lay derelict for 20 years. Licata Building Systems was part of the process to bring Wick Tower back to life. Our silicone render system was used to create an aesthetic façade finish. The render system used maintains it’s clean fresh look for many years to come due to its self cleaning properties and will protect the structure from moisture.
Sponsored
Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems

Working with Epwin Window Systems on any project can be like a breath of fresh air. Putting it simply, our experience & expertise in commercial projects counts. We’ll save you time & money, we’ll always work for the best overall outcome. We know that you’re the construction experts. Our job isn’t to tell you what to do. It’s to help you do what you do best, more economically & more efficiently. Simplifying the task of installation, reduce site damage & cut down on survey times while delivering the right windows & doors for all your projects. Call us.
Sponsored
Altro walls system helps open up a stimulating new sensory world for children

Altro walls system helps open up a stimulating new sensory world for children

Altro

Hydrotherapy has always been on the agenda at Vranch House, but this vital treatment has recently been given a new lease of life with a completely refurbished state-of-the-art indoor heated swimming pool, including Altro Whiterock hygienic wall sheet. “The walling choices were integral to this vision. Altro was a key partner on the project because they were sympathetic to the broader picture and what we wanted to achieve for the children. Their level of experience and understanding helped us to find a solution that delivered across the board; on quality, safety, aesthetics and durability.
Sponsored
Aggreko, Dumbarton

Aggreko, Dumbarton

Berry Systems

Berry Systems supplied and installed Internal and external vehicle safety barriers at new Aggreko, Dumbarton plant to protect; doorways, walkways, columns, site and equipment.Aggreko PLC, the world leader in the field of power and temperature control rental, has become the first company in the UK to have Berry Systems’ new Stopbollards installed at its new 170,000 sq ft Dumbarton facility.The many, internal and external vehicle doorways at the brand new Dumbarton site were identified very quickly as needing special protection. Glasgow architects Bradford Robertson considered a number of options before concluding with main contractors, Morgan Sindall, that our SlowStop bollards would prove a cost effective solution. During a collision, the kinetic energy of the impact is progressively absorbed as the post tilts, compressing an elastomeric sleeve within the base. The post is able to tilt from its vertical position to an angle of 20 before it locks within the base. After the impact the post will return back to its vertical position, ready to perform once again. A total of 104 SlowStop bollards were installed at Dumbarton, along with a variety of other products from our range.https://berrysystems.co.uk/wp-content/uploads/2024/03/Berry-Case-Study-Aggreko-Dumbarton.pdf
Sponsored
Private House, Leeds

Private House, Leeds

Senior Architectural Systems Ltd

Senior’s Ali FOLD sliding folding doors have been installed at a private home in Leeds, West Yorkshire, to enhance the renovation of the kitchen and living space.The homeowners chose to install Ali FOLD doors because of their attractive sleek appearance with slim sightlines which let in maximum daylight.With a vast choice of colours available via Senior’s in-house powder coating facility, the owners were also able to choose a colour which complemented their internal décor, adding to the overall colour scheme.The new Ali FOLD doors have transformed the living space, bathing the interior with light and providing uninterrupted views of the garden that can be enjoyed both day and night.The homeowners have been particularly impressed with how easy the doors are to open and by the flexibility of being able to open one or multiple door leaves depending on the desired level of access.Ali FOLD’s exceptional thermal performance has also delighted the couple, helping to retain heat and giving the renovated room a homely cosy feel. With a life expectancy in excess of 40 years, Senior’s Ali FOLD aluminium doors have been designed to be easy to fabricate, install and maintain and are available as a folding sliding bi-fold style as well as both single and double doors.
Sponsored
Starbucks, Llanelli

Starbucks, Llanelli

Senior Architectural Systems Ltd

A selection of our high-performance aluminium fenestration solutions has been used for this new café and drive-thru at a popular shopping destination in Wales.The new Starbucks at Parc Pemberton Retail Park has been designed by G1 Architects and built by Trojan Construction, with the aluminium fenestration package skilfully delivered by specialist contractor Sherwood Aluminium Systems.The project features both our cost-effective SCW aluminium curtain walling and our robust SFG shop front glazing system, which are both ideally suited for use in the retail sector as they combine slim sightlines with a robust and durable construction. Our curtain wall system has been used to create a bright and airy interior in the café, and the SFG system has been integrated with our SD aluminium doors to provide safe access at the entrance and exit. Our SD aluminium commercial doors have also been used on the drive-thru building, with the powder-coated aluminium frames perfectly complementing the use of timber cladding and grey façade design.The new Starbucks outlet has benefited from both Trojan Construction and Sherwood Aluminium Systems’ extensive experience undertaking similar schemes for the retailer across the UK, with Sherwood Aluminium Systems named as a preferred supplier for Starbucks.
Sponsored
London Heathrow Airport

London Heathrow Airport

Berry Systems

Berry Systems supplied and installed perimeter and ramp barriers for new multi-storey car park incorporating very thin  concrete decks.A revised design for the new Heathrow Terminal 2 multi-storey car park called for a floor depth of just 150mm comprising a 60mm deep slab with 90mm structural topping. However, and there’s always a however, a traditional rigid safety barrier post needs fixing with 4 bolts each to a depth of 170mm. Obviously these couldn’t be used,so contractors Laing O’Rourke turned to barrier specialists Berry Systems to provide a solution and appropriate perimeter barriers for the 6 decks and the spiral entrance and exit ramps.Over many years Berry Systems have developed a range of flexible spring steel barriers that ‘give’ on impact. This not only reduces damage to both the barrier and an impacting vehicle but crucially reduces the pull out loading on the anchorage by 50% or more. This in turn allows post fixing to be achieved by using only a single bolt embedded to a depth of merely 110mm - a depth achievable into the new slabs.The specification was completed with Berry Beam safety rails to provide a more attractive appearance than the well known “Armco” style. Post extensions provided mountings for a pedestrian handrail at 1100mm high with integral anti-climb mesh where needed.The thin slabs were developed by Bison Manufacturing and are the thinnest precast concrete planks produced to date in the UK. They led to many benefits which considerably reduced the construction programme. It also allowed 6 floors in the usual height of 5, increasing capacity to 1340 spaces. But perimeter protection would have proved problematical without the expertise of Berry Systems.
Sponsored
A facelift for the skyscraper foyer - Automatic Systems - International

A facelift for the skyscraper foyer - Automatic Systems - International

Automatic Systems UK & Ireland

The Skyper building complex in Frankfurt am Main boasts a very special architecture. The three-part complex – consisting of the 153.8-metre Skyper high-rise with 39 floors, the neoclassical Skyper Villa from 1915 and the Skyper Carrée – offers a total of 53,900 m2 of office space for numerous companies and banks. When the existing single access entry systems were dismantled in the summer of 2020 as part of renovation work on the foyer, the owner opted for a new, modern solution that would blend in perfectly with the architecture of the skyscraper. Every day, large numbers of people go the foyer to get to their workplace. Numerous visitors also pass through this area. This called for a solution combining functionality, safety and an appealing design.
Sponsored
Cala Homes

Cala Homes

Eagle Automation Systems Ltd

Eagle have completed another successful installation for Cala Homes at Sandy Lane Cobham. The installation consisted of 2 sets of electric gates and intercom system to the houses. Compliance with latest directives is essential so these gates were force tested and issued with a declaration of conformity. Eagle support all installations and are able to offer a 24hour emergency call out to offer peace of mind in the unlikely event something should go wrong. In the event of power failure all systems can be manually overridden. All systems are supported with CAD drawings and cabling requirements for intercoms and access control
Sponsored
Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

Iko Ireland

Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.
Sponsored
Remedial Basement Waterproofing

Remedial Basement Waterproofing

Delta Membrane Systems Ltd

When it comes to residential, commercial or any structure below ground, waterproofing is a critical component within the construction process for protecting and preserving a building. A poorly designed or installed waterproofing solution can fail leading to significant implications on the structure itself.Delta Registered Installers, Abtech (UK) Ltd were called upon to give assistance on a particularly technically complicated project where approaches to waterproofing design and installation had been incorporated, however the system had failed. For a great remedial waterproofing outcome, seek assistance from an experienced waterproofing company to inspect your site and carry out the remedial work.The property when built had a Type C, cavity drain membrane systems incorporated (not a Delta System), however there was no basement drainage incorporated into the design to manage water ingress.In principle a Type C, drainage system is a water management system. The Type C system is used to control water ingress once it has penetrated the structure.  Moisture or running water travel behind the Type C membrane within a controlled drainage system. A Type C System isn’t classified as a barrier but provides protection by means of water management. For a Type System to be successful a suitable drainage system is required to collect and discharge water ingress to a suitable and safe evacuation point (either by natural forces or a mechanical pump system).When correctly installed, groundwater drainage channels effectively relieve hydrostatic water pressure in the below ground structure. They are installed below flooring membranes at the floor/wall junction.
Sponsored
Britain's biggest domestic basement?

Britain's biggest domestic basement?

Triton Systems

Combining all three types of waterproofing system (Types A, B and C) supplied by Triton Systems, at the time of construction this project was believed to be the UK’s largest domestic basement. The three storey habitable space below ground was retrofitted under the existing property, and extends beneath the new build adjacent luxury apartment blocks.
Sponsored
Aston University

Aston University

Excelsior Panelling Systems Ltd

The Project Aston University Student Union at the heart of the University’s campus has seen a £6.5m investment.  The new, two-story building, home to over 100 student clubs and societies, acts as the social hub for the 13000+ students at the university & replaces the old 1960’s Building. The Universities brief was to incorporate the local area into the project using images of Birmingham City Skyline. The Challenge Offer a full height cubicle system, suitable for the environment and to a specification befittng the digital imagery. Digitally render images onto Laminate and apply to the façade of the full height system. Manage the precise fabrication process through the factory. The Solution  Excelsior’s Flush 30 Cubicle System encompasses a rebated aluminium frame to the doors and pilasters. The aluminium edge detail provides a robust trim and looks innovative within this modern building, an unrivalled system within the washroom market.The images, supplied by the client were digitally rendered onto laminate by Formica Younique and applied to the façade of a full height Flush system.Max McLoughlin, CEO of the Student Union comments: ‘We want the building to make students feel proud to be at Aston University. From a design perspective, we wanted the students to feel fully immersed in life on campus & we are very happy with the result’.
Sponsored
A Grant trio of technologies keep new build home in Perranporth up to temperature

A Grant trio of technologies keep new build home in Perranporth up to temperature

Grant Engineering (UK) Ltd

Tom Smith Plumbing and Heating Services, G1 Installers who specialise in renewable, eco-friendly technologies, completed the installation of a hattrick of Grant products in a new build property in Perranporth, Cornwall. An Aerona³ heat pump, Wave cylinder and Uflex underfloor heating system are working together to fulfil the heating requirements of this new family home.
Sponsored
Commercial | Dublin Landings, Basement

Commercial | Dublin Landings, Basement

Venesta Washroom Systems Ltd

Raising the bar of commercial space in the city centre, the new 77,000 sq. ft. of prestigious office space required a premium washroom shower cubicle solution.Unity Full Height shower cubicles were specified in the basement shower area of Dublin Landings. With minimal floor and ceiling clearances and flush fronts, Unity Full Height ensures maximum privacy for end users.A sturdy, waterproof and easy to maintain material was required for the 19 new shower cubicles, so Solid Grade Laminate (SGL) was specified. Also impact, scratch and heat resistant, SGL is an ideal choice for busy washroom facilities such as these at Dublin Landings. To complement the modern décor of the room, our popular light grey laminate ‘Cloud’ was selected for the full height shower cubicles, creating a bright, fresh and calm environment.Unity’s stainless steel and satin anodised aluminium hardware is durable and corrosion resistant, ideal for commercial shower areas. Some of the cubicles' rise and fall butt hinges were set to fall open, allowing office staff to easily identify vacant shower cubicles.Read the full case study for more details.
Sponsored
United Utilities

United Utilities

CLD Physical Security Systems

United Utilities Group PLC (UU) is the largest listed water company in the United Kingdom. Covering 5 counties it is responsible for providing water service to nearly 7,000,000 customers.Between 2010 and 2015 it spent almost £3.6billion on upgrading its services and infrastructure to meet the ever-increasing demand for reliability and standards.The BriefTo meet the then current threat levels all fencing and gate systems had to provide the following.Anti-Climb Fencing SystemsLPS 1175 SR2 rated Fence and Gate SystemsA Minimum guaranteed delay against attackSwing and Sliding gates rated to LPS 1175 SR2 to meet the demanding nature of the sites
Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Bradford Royal Infirmary

Bradford Royal Infirmary

Stone Cladding Systems

Architect: Broadway MalyanContractor: BAM ConstructionStone: YorkstoneThe £28M new Broadway Malyan designed Bradford Royal Infirmary Children’s Ward has now been officially opened by HRH The Princess Royal.The new wing, part of Bradford Teaching Hospitals NHS Foundation Trust, was recognised with the top honour at the Local Authority Building Control awards for West Yorkshire at Wakefield Unity Works. The Children’s ward is clad in Aztec Rainscreen with a façade of our local Yorkstone.Aztec was chosen because of its similarity to other local buildings and for its speed of installation. Bam, having used the system before were confident of Stone Cladding Systems ability to deliver a quality system on time. 
Sponsored
Aluminium Sliding Door System - MasterPatio

Aluminium Sliding Door System - MasterPatio

Reynaers Aluminium

Introducing the next generation of sliding systems. MasterPatio is a high insulation and high performance lift-slide system with minimalistic look and clean design, down to the details. The system combines top thermal performance with slim sightlines and a maximum element height of 3.7 m.

Showing 181-216 of 1291

Feedback