NBS Source
I'm a manufacturer

Cala Homes

OVERVIEW

Eagle have completed another successful installation for Cala Homes at Sandy Lane Cobham. The installation consisted of 2 sets of electric gates and intercom system to the houses. Compliance with latest directives is essential so these gates were force tested and issued with a declaration of conformity. Eagle support all installations and are able to offer a 24hour emergency call out to offer peace of mind in the unlikely event something should go wrong. In the event of power failure all systems can be manually overridden. All systems are supported with CAD drawings and cabling requirements for intercoms and access control

No featured products in this case study

Contact Eagle Automation Systems Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Eagle Automation Systems Ltd

View all case studies (4)
British Transport Police

British Transport Police

PAS68 Bi-Folding Airlock

PAS68 Bi-Folding Airlock

Thames Water

Thames Water