NBS Source
I'm a manufacturer

"flooring"

9,591 results found

Sort by:

Showing 1945-1961 of 1961

Sponsored
Residential Refurbishment Oval, London. (Resilient 250 | 2.5mm Acoustic Underlay)

Residential Refurbishment Oval, London. (Resilient 250 | 2.5mm Acoustic Underlay)

Interfloor Ltd

Resilient 250 was installed beneath engineered wood flooring in the kitchen, landing and living room, covering approximately 75m². These spaces were located above bedrooms, and it was therefore essential to minimize sound transmission into areas where people would be sleeping. As Resilient 250 is a high performing acoustic underlay, this provided excellent impact performance in excess of UK sound insulation regulations. Benefits of Resilient 250 • Extremely fitter friendly • Clean, quick and cost effective installation • Less subfloor preparation required – an important factor given the client required minimal disruption • Provides lasting stability and comfort over time Made of durable sponge rubber, it is engineered to provide long lasting performance without deterioration. Resilient 250 provides sound improvement of 19 dB ΔLw, creating a quieter, more comfortable environment for the whole household. Resilient 250 is also an exceptionally ‘fitter friendly’ product, supplied in 10m² rolls for easy handling and distribution on site
Sponsored
Type G200 - Commercial Offices Manchester

Type G200 - Commercial Offices Manchester

London Wall Design Ltd

With views overlooking central Manchester from several floors up, the designers for this workspace have utilised glazed partitions throughout to maximise the transfer of light and make the most of the stunning backdrop offered by the city skyline.London Wall was approached to provide a glass moving wall system that could seamlessly integrate in to the overall design of the space by matching the proposed glass partitions, while offering space flexibility.Our Type G200 system was the perfect choice, with a crittal effect indention to the static panels on show elsewhere within the space. The glazed panels can quickly and easily be stacked, allowing staff the choice between a single, large open plan space or two smaller spaces.When the panels are in use, the two spaces both remain easily accessible thanks to a lockable pass door. Type G200’s impressive acoustic performance ensures that sound transfer between the two spaces is kept to a minimum, therefore reducing noise distraction and increasing privacy.
Sponsored
Type G200 - Commercial Offices Manchester

Type G200 - Commercial Offices Manchester

Movawall Systems Ltd

With views overlooking central Manchester from several floors up, the designers for this workspace have utilised glazed partitions throughout to maximise the transfer of light and make the most of the stunning backdrop offered by the city skyline.London Wall was approached to provide a glass moving wall system that could seamlessly integrate in to the overall design of the space by matching the proposed glass partitions, while offering space flexibility.Our Type G200 system was the perfect choice, with a crittal effect indention to the static panels on show elsewhere within the space. The glazed panels can quickly and easily be stacked, allowing staff the choice between a single, large open plan space or two smaller spaces.When the panels are in use, the two spaces both remain easily accessible thanks to a lockable pass door. Type G200’s impressive acoustic performance ensures that sound transfer between the two spaces is kept to a minimum, therefore reducing noise distraction and increasing privacy.
Sponsored
Charisma Rose - Georgian New Build

Charisma Rose - Georgian New Build

Roseview Windows

Based in Lincoln this multiple dwelling new build project required sash windows to fit its architecture. The homes were built using local stone which meant standard white windows wouldn’t match its high-end appearance. The developers also needed windows that came with high performing benefits such as thermal efficiency, security, all while remaining maintenance-free. Using our in-house spray shop, Charisma Rose was specified in a solid cream option that complimented the stonework beautifully. The trickle vents were also colour matched to seamlessly blend in with the windows and keep the luxury charm of the buildings. A traditional astragal bar grid was picked to match Georgian architecture as well as run through horns and a 2/3 unequal split for the ground floor. This project ran smoothly providing more than 50 sash windows over seven dwellings. All windows were manufactured and delivered on time and snag-free, meaning there was no impact on the developers schedules.
Sponsored
Fresh Wharf, Barking

Fresh Wharf, Barking

Cellecta Ltd

Fresh Wharf is a multi-phase brownfield project which transforms the wharf on the river Roding. The project includes a demolition of the old industrial estate and construction of 911 one and two bedroom apartments in a range of tenures, flexible commercial spaces, generous landscaping, a new riverside walk and new infrastructure, along with parking concealed below podium gardens. Buildings ranging from 3 to 14 storeys are surrounded by cafes, shops, and restaurants, it is 15 minutes from Barking station, with access to the underground, overground and rail connections into central London. Cellecta’s YELOfon HD10+ was specified by Frank Reynolds Architects due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Countryside Properties UK was awarded this 40,000m² contract for this development in Barking.
Sponsored
Westminster Methodist Church

Westminster Methodist Church

CAT (Carpet Accessory Trims) Limited

CAT stair nosings have been installed into one of the Worlds first purpose-built meeting facilities based in Westminster, London.​AN69 was the main section to fit the rounded step edge, then aluminium extension piece ANEXT creating a wider tread connected to an ANRE25 ramp edge at the back covering the safety vinyl flooring. Finally, the robust Aluminium ATI49.5 aluminium inserts were inserted into the tread of the AN69 to conceal the screw head fixings and give an all-aluminium finish.​Opening in 1912, the Great Hall has an impressively long history for hosting various events, the first meeting of the United Nations in 1946, debates, concerts and shelter for Londoners during the second world war.​Situated in the venues undercroft, Wesley’s Cafe is a hot spot for visitors and especially popular with tourists, the cafe covers over 300m2 and also is adjacent to further event space. Due to the entrance into the cafe is via a staircase, the constant high footfall called for a stair nosing made up from a combination of our Aluminium products.
Sponsored
Canonbie Road, Forest Hill

Canonbie Road, Forest Hill

Cellecta Ltd

Canonbie Road was home to a former hostel, which was demolished to construct a three-storey building comprising six council homes for families requiring temporary accommodation. Led by Lewisham Council as part of their programme to deliver new affordable council homes across the borough, the development includes dual-aspect family units of two and three beds in two wings that step with the sloping site. Each flat has generous private amenity space, access to a shared tree-lined garden and twelve cycle spaces.Cellecta’s YELOfon HD10+ was specified by Avanti Architects due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Building Associates Limited were supplied 450m² of Cellecta products for this development in Forest Hill.
Sponsored
The Tytherington, Macclesfield

The Tytherington, Macclesfield

Cellecta Ltd

The Tytherington is a 4-star hotel and club situated nearby to Manchester airport. The hotel saw the refurbishment of its club and the development of 65 bedrooms, with a bar and tennis court, guests can use the spa, wellness centre, fitness centre, sauna, hot tub, and garden. The new investment sees refurbishment of club facilities including members bars, changing rooms, function rooms, and reception areas. With over 300 onsite car parking spaces, Capesthorne Hall is 7.3 miles from The Tytherington while Fletcher Moss Botanical Gardens is 13 miles away.Cellecta’s ScreedBoard 28 was specified by HPW Architecture Ltd due to it being suitable for all floor types and is frequently viewed as the solution of choice for new build and refurbishment developments. With its interlocking edges for installation convenience, high density, and unique resilient layer it provides unrivalled acoustic performance.J M Scully was awarded this 2,000m² contract to construct this development and refurbishment in Macclesfield.
Sponsored
Bermondsey Spa, Southwark

Bermondsey Spa, Southwark

Cellecta Ltd

Bermondsey Spa is a transformation of a neglected corner of south London into one with well designed homes, streets, spaces, and places for the local community. Located in Southwark, close to Tower Bridge and Bermondsey Underground station. 2,000 new homes, 40% of which are affordable housing, have been created. 16 GP surgeries in two new health centres, a NHS dental practice, pharmacy, youth, and play facilities, 2.5 hectares of re-landscaped open space, bicycle parks, council offices and a One Stop Shop, shops, including a food retail store, and offices for the Southwark Primary Care Trust have been constructed.Cellecta’s YELOfon HD10+ was specified by Levitt Bernstein for this development for its acclaimed resilient layer which isolates floating screed from the structural concrete floor. YELOfon HD10+ has superior impact sound deadening properties, is light weight and is easy to handle and install.Hyde Group was awarded this 25,000m² contract to construct this development in one of the most vibrant places to live in London.
Sponsored
Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Orbis OS211 Glass Balustrades for Blackpool Victoria Hospital

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS200 Vertical Bar Infill Side FixThe main NHS hospital for Blackpool and the Fylde Coast, Blackpool Victoria Hospital has undergone a £16.4 million upgrade to create a new main entrance and a multi-storey car park.The new entrance includes a pharmacy, retail units, café, main reception, waiting area and office accommodation. Featuring extensive curtain walling, the new main entrance has been designed to maximise natural light and provide a feeling of openness. The use of glass for the balustrades helped to enhance this design style throughout the main feature areas and voids, using Delta Balustrades’ Orbis system.Delta Balustrades also supplied the balustrades and handrails for the main and rear staircases in the new multi-storey car park. Delta Balustrades calculated the loadings for all areas of the hospital installation and specified multiple fixing details for the atrium to accommodate variations in floor levels and construction.
Sponsored
The Sail, West Kirby - Alumasc Skyline Fascia, Soffit & Coping

The Sail, West Kirby - Alumasc Skyline Fascia, Soffit & Coping

Alumasc Water Management Solutions

Located on the picturesque waterfront of West Kirby, Wirral, The Sail is home to eight luxury apartments on South Parade overlooking the River Dee estuary to Wales. The building itself has a striking geometric form with a unique glass façade, reminiscent of art deco coastal properties from the 1930s.The apartments occupy four storeys over one thousand square metres and are flooded with an abundance of natural light thanks to the floor to ceiling windows, which also emphasise a strong connection to the outdoors. Alumasc Water Management Solutions were asked to assist and supply a number of bespoke products including aluminium fascia, modular soffit and coping systems from Skyline.  “Skyline was specified for its quality and ability to provide bespoke designs and solutions,” says Ivan Colvil, Senior Skyline Technical Sales Manager. “Numerous profiles were needed due to the building’s unique shape, which presented a challenge. It took a great deal of technical support and working with the architect to fulfil the brief.
Sponsored
University of Brighton, Bioscience Building

University of Brighton, Bioscience Building

Ash & Lacy

The 8,500m2 Biosciences building is clad in silver anodised ACM panels generally 1.3m high and up to 6.4m long that work together to wrap around the complex elevations. Each individual panel purpose-made and pre-curved at Ash & Lacy’s West Bromwich site, to fit around and match the windows on the building. The protruding raked capping details were also manufactured in the same material, in order to provide a fully cohesive design. Original concept architects, Llewelyn Davies Yeang, specified 3,500m2 Ash & Lacy Facade for the extensive new build, to give the building an innovative and hi-tech finish, reflecting the standards of the department itself.The design of the seven-storey building responds to the constraints of a steeply sloping site divided by a service road creating staggered floor levels, interesting external spaces and a flowing façade. The science block also features a sedum green roof fitted with solar panels for the heating of domestic water contributing to the very good BREEAM rating it has secured.
Sponsored
Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Dura Composites Ltd

Bespoke Access Structure | Case StudyThis two-level access structure with staircases, cladding, edge protection handrailing and anti-slip grating flooring was designed by Dura Composites in conjunction with our client ENGIE Fabricom UK, who provide engineering and construction services to sectors including renewables, oil and gas, power, chemical and energy from waste.With the ability to supply both composite timber cladding for the containers and all the required GRP elements for the project, Orsted chose to work with Dura Composites. Although steel had previously been considered, the rising cost of steel versus GRP and its tendency to corrode in coastal environments made composite materials a far more durable and cost-effective option.The resulting access structure is safe, looks attractive and is non-conductive and non-corrosive. With a long design life and 25 year warranty, the GRP components are part of the latest d² range from Dura Composites which offer safer, stronger, faster and proven properties.
Sponsored
Basement and External waterproofing

Basement and External waterproofing

Delta Membrane Systems Ltd

The scope of this ambitious project was to restore and transform an abandoned Neo-Gothic Cemetery Keeper’s Lodge with adjoining public facility into a luxurious mansion in just 12 months.  Works included demolishing the adjoining public facility to enable the construction of a new basement.The proposed new build construction would be a luxury ground floor extension which would run the footprint of the redundant public facility to offer a 4,000 square foot subterrain space with key features such as 13-meter swimming pool, 2 additional bedrooms, a tv games room and office space.Simon Gill Architect designed the ambitious project and was appointed as Project Manager.Delta Registered Installers 5 Star Basements were employed to undertake both dig out and installation of the structural waterproofing with Delta’s Technical Waterproofing Consultant, Paul Callaghan representing Delta. This approach at the design stage, allowed Paul to attend design team meetings and to ensure all criteria’s of BS8102:2009 were met.As aired on Grand Designs on 6th January 2021.
Sponsored
Stoke-on-Trent City Council, Retail Unit

Stoke-on-Trent City Council, Retail Unit

Recticel Insulation

A Stoke-on-Trent City Council unit required refurbishment due to its poorly insulated roof and subsequent thermal issues. The 2.000ft2 apex roof and adjoining service areas were refurbished to improve thermal performance with a total of 98, 50mm and 100mm thickness Eurothane® GP boards applied to the building.Spencer Crossley, the store owner explained:"The Eurothane® GP panels have done a fantastic job. They’ve made a huge impact on thermal conditions inside the shop. It means I can keep the store open later. The insulation within the refurbished roof has made for a more enjoyable shopping experience for customers and better working conditions. I’m extremely happy with this fantastic product."About Eurothane® GP:Eurothane® GP is a high performance PIR insulation board that is light weight, easy to cut, handle and install. Whether it’s a pitched roof, framed wall or floor, Eurothane® GP is the ideal solution amongst contractors and installers
Sponsored
Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, England

Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, England

Lödige Industries

Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, EnglandLödige Industries installs two reliable goods lifts to increase production efficiency in the warehouseHolland and Barrett’s pick, pack and dispatch warehouse in Burton upon Trent has multiple levels. Previously goods were transferred between levels with forklift trucks and pallet gates. However, the a huge spike in orders made the forklift trucks and pallet gates inefficient and impractical. In addition, the number of forklifts operating in a congested area were a cause for concern. To meet the growing demand, Lödige Industries installed two SHERPA goods lifts with multi-level and multi-directional stops, including one for a future mezzanine level yet to be installed, thus future proofing the solution. As a result, H&B has been able to support the increase in its online processes business growth by enabling a higher throughput in its warehouseby operating in an efficient warehouse. The health and wellness market leader benefits from the advantages of quick, safe and reliable SHERPA goods lifts to stock and distribute their goods when required.SHERPA goods lifts maximise storage space in the warehouseThe rising demand for Holland and Barrett’s products meant that the company needed to store and move more goods in the existing facility. The existing lifting processes via forklifts were no longer expandable. By installing twin SHERPA goods only lifts with free standing shafts, all three floors of the warehouse can now be accessed safely and efficiently. As the SHERPA can be installed into any building without any alterations such as pits, there was limited impact during construction.A potential third mezzanine level has already been taken into account and the highest level served has a lifting height of 9.05m. The lifts now enable fast transportation between all floors and open up the possibility of further storage space. Cabin size has been tailored to Holland & Barrett’s goods to ensure the most efficient transportation processes.Integrating with Holland and Barrett’s work routines to ensure uninterrupted processesThe warehouse is a fast-paced and hard-pressed working hive of activity. Avoiding any negative impact on throughput, delivery times and processes was therefore imperative. Lödige Industries team worked closely integrated with Holland and Barrett’s operations team and partners to adjust installation work to daily warehouse routines; the experienced team of engineers were able to adjust their installation to their production times. Therefore, the installation could productivelywas accomplished without impacting warehouse performance go ahead. Fast installation and delivery ensured continuous production and early gains for the customer. Despite the challenges of COVID-19 and its impact on supply chains, Lödige Industries completed the installation ahead of schedule.Enabling construction in an existing facility- a temporary scaffold meets special customer requirementsThe existing warehouse posed a few challenges in the installation of the new lifts. Many lifts require a temporary lifting beam during installation, to facilitate multiple lifting points. However, like many modern warehouses, the facility in Burton upon Trend did not have a lifting beam. As this was required for both lifts, Lödige Industries developed a concept for an extended load bearing beam, that was created and installed by one of Holland & Barrett’s partners in this project.SolutionIntegrating with Holland and Barrett’s daily routines ensured continuous production to address the rising demands and orders.The SHERPA goods lifts are transporting goods over four floors. This allows the customer to maximise its warehouse space and move their goods quicker and more efficiently.To facilitate multiple lifting points and transport unstable loads, Lödige Industries provided a temporary scaffold platform.
Sponsored
Darwin Centre, Natural History Museum

Darwin Centre, Natural History Museum

dormakaba UK & Ireland Ltd

Accessible for every visitorThe landmark £78 million Darwin Centre is the most significant development at the Natural History Museum since it moved to South Kensington in 1881. With over four and a half million visitors passing through its doors every year, choosing the right door products was crucial if this popular tourist attraction was going to stand the test of time.dormakaba’s contribution to the projectdormakaba TS 92, TS 93, and ITS 96 cam-action door closers were specified due to their low opening forces in accordance with BS8300 and their aesthetical design, which is in keeping with the overall style of the Darwin Centre. The TS 92 and TS 93 cam-action closers have been installed with the electro-magnetic hold-open feature and have been designed to remain open, closing automatically if the fire alarm is triggered. Offering the illusion of an invisible closer, the ITS 96 is a concealed cam-action closer hidden within the door leaf and frame, complementing the overall modern and sleek design of the new centre.As part of the brief, a wall of glass was to surround the technology and displays within the Darwin Centre, only accessible by staff through glass doors. Due to the small diameter between the wall and the glass door, specialists in glass interior products, Harbrine, overcame this by using dormakaba’s EA pinch free patch fitting which allowed safe access with a clear view of the museum display.dormakaba BTS 75V and BTS 80 floor springs also feature at the redevelopment. These floor springs feature a hydraulically controlled closing cycle, adjustable closing speed and mechanical backcheck.Also installed is dormakaba’s ED 200 – an automatic swing door operator that offers an optimum solution for safety in high traffic areas. During an emergency, fire doors and exit doors must continue to open for people to exit, but close firmly to prevent the fire or smoke spreading. The ED 200 is particularly appropriate for internal fire door applications and has been successfully third party fire tested to EN 1634-1 on timber doors. Its unique package of safety, security and interfacing features means that when a fire alarm is actuated, or when the power is cut, the closer will revert from automatic to manual operation with a hydraulically dampened spring close action.

Showing 1945-1961 of 1961

Feedback