OVERVIEW
Fresh Wharf is a multi-phase brownfield project which transforms the wharf on the river Roding. The project includes a demolition of the old industrial estate and construction of 911 one and two bedroom apartments in a range of tenures, flexible commercial spaces, generous landscaping, a new riverside walk and new infrastructure, along with parking concealed below podium gardens. Buildings ranging from 3 to 14 storeys are surrounded by cafes, shops, and restaurants, it is 15 minutes from Barking station, with access to the underground, overground and rail connections into central London.
Cellecta’s YELOfon HD10+ was specified by Frank Reynolds Architects due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.
Countryside Properties UK was awarded this 40,000m² contract for this development in Barking.
YELOfon® HD10+ - Under Screed Acoustic Resilient Layer
Aris House, Lymington Road
Admirals Quay, Southampton
Alexandra House, Portsmouth
Arras Way, Folkestone
Arras Way, Folkestone
Bermondsey Spa, Southwark
Berwick Green, Bristol
Bream Street, Bow